Coolagh , Ballynaclogh , Co. Tipperary
a) renovation/alterations to existing single storey detached derelict dwelling, b) new single storey and 1.5 storey dormer extensions to rear north/northwest elevations of existing dwelling, c) new single storey garage to rear of existing dwelling, d) proposed new treatment system, percolation area to replace existing, e) all associated site works/adjustments to existing entrance and ancillary services
The application
- Reference
- 2660849 · full record
- Authority
- Tipperary County Council
- Type
- PERMISSION
- Status
- NEW APPLICATION
- Applicant
- not published by the national dataset — see the council register
- Units
- 0
- Floor area
- —
- Site area
- 4,819 m²
- Received
- 31 Aug 2026
- We first saw it
- 18 Sept 2026, 15:44
- Decision due
- 25 Oct 2026
- Decision
- N/a
The national dataset truncates descriptions (80 characters for DLR, 70 for Fingal) and omits the applicant. The full description and the drawings are on the council register linked in step 1.
How to submit an observation
- Read the file on the council register.Drawings, planning statement and site notices are at http://www.eplanning.ie/TipperaryCC/AppFileRefDetails/2660849/0.
- Write your observation.Quote
2660849at the top, give your name and the address the authority should reply to, and confine it to planning matters — zoning objective, height, overlooking, traffic, drainage, heritage. What you say here is what you can later appeal on. - Pay the €20 fee.Every submission needs it; without it the observation is invalid and is returned. Tipperary County Council takes it online with the submission or at the counter.
- Submit before 5 Oct 2026.Online through the register above, or in writing to the Planning Department, Tipperary County Council. The test is the date the authority receives it, not the date you post it.
- Keep the acknowledgement.The council's receipt is your proof of a valid observation — see below.
Statutory basis. Section 34(1) of the Planning and Development Act 2000 (as amended) requires a planning authority to consider any submission or observation made to it in accordance with the Regulations. Article 29 of the Planning and Development Regulations 2001 (as amended) sets the window: a submission or observation must be received by the authority within five weeks beginning on the date of receipt of the application, and must be accompanied by the prescribed fee of €20. A submission received after the window, or without the fee, is invalid and the authority must return it.
What the site is zoned
No current zoning polygon covers this site in the store.
Designations on or near the site
Nothing designated within 100 m of the site.
Nearby precedents within 500 m, last 5 years
Decisions
| Reference | Decision | Decided | Units | Distance | Description |
|---|---|---|---|---|---|
| 2689 | Conditional | 17 Aug 2026 | 0 | 127 m | the construction of a link between existing house and garage and to convert garage to living space |
| 2460074 | Conditional | 20 Aug 2024 | 0 | 301 m | a 10-year planning permission to construct and complete a solar PV Energy Development with a total site area of c. 88.5 hectares comprising of solar PV ground mounted on support structures, inverter substations, 38kV substation, watercourse crossings, temporary construction compounds, internal access tracks (new, upgrading existing and existing), security fencing, electrical cabling and ducting, CCTV and other ancillary infrastructure. The development also comprises a protected structure ‘S694 – Stone piers and cast iron gates with carriage stone’. This structure is at the entrance to the former Debsborough House and no works are required to the structure. Realignment of 35m of wall, re-location of a telegraph pole and vegetation trimming are required to achieve the northern visibility splay. The solar farm would be operational for 40 years |
Appeals
No appeals within 500 m in the last 5 years.
What has happened on this file
- 31 Aug 2026 New application · observations close 5 Oct 2026
- 31 Aug 2026 Decision