PlanningRegister.ie
Observation pack · Tipperary County Council

Lisbrien , Nenagh , Tipperary

permission for development on lands in the townland of Lisbrien, Co. Tipperary (the Proposed Development) which comprises a renewable energy development as defined by the European Union (Planning and Development) (Renewable Energy) Regulations 2025. The application seeks a 10-year permission with an operational lifetime of 40 years. The Proposed Development, subject of this application, will consist of: The development and operation of a solar photovoltaic (PV) farm with a total site area of 6.9 hectares. The application comprises the following – i. Construction and operation of 22,500 sqm. of solar PV arrays on ground-mounted metal frames, with a maximum overall height of 4.7 metres. ii. Internal underground trenching, electrical cabling and ducting between the solar PV arrays and electrical invertor units. iii. 4 no. electrical invertor units. iv. Use and upgrading of 1 no. existing field access point for construction and operational access to the site.1 no. temporary laydown area. v. 2 no. control cabins. vi. 33kV connector cable network, joint bays and associated works. vii. Internal access track, drainage works, security fencing, CCTV, and all associated ancillary site development works. viii. The decommissioning of the solar farm and reinstatement of the site at the end of its operational life. This development is covered by the provisions of the Renewable Energy Directive III (Directive (EU) 2023/2413) and it is important to note that the planning application may be subject to section 34D of the Planning and Development Act 2000, as amended. When a notice issues in accordance with section 34D(b), the provisions of article 26A of the Planning and Development Regulations 2001 to 2026 shall apply.

Observations close 20 Oct 2026 24 days left
5 weeks from receipt (received 15 Sept 2026) · s.34 Planning and Development Act 2000 · art. 29 Regulations 2001 · fee €20 · council decision due 9 Nov 2026

The application

Reference
2660902 · full record
Authority
Tipperary County Council
Type
PERMISSION
Status
PRE_VALIDATION
Applicant
not published by the national dataset — see the council register
Units
0
Floor area
—
Site area
8.32 ha
Received
15 Sept 2026
We first saw it
22 Sept 2026, 16:10
Decision due
9 Nov 2026
Decision
N/a

The national dataset truncates descriptions (80 characters for DLR, 70 for Fingal) and omits the applicant. The full description and the drawings are on the council register linked in step 1.

How to submit an observation

  1. Read the file on the council register.Drawings, planning statement and site notices are at http://www.eplanning.ie/TipperaryCC/AppFileRefDetails/2660902/0.
  2. Write your observation.Quote 2660902 at the top, give your name and the address the authority should reply to, and confine it to planning matters — zoning objective, height, overlooking, traffic, drainage, heritage. What you say here is what you can later appeal on.
  3. Pay the €20 fee.Every submission needs it; without it the observation is invalid and is returned. Tipperary County Council takes it online with the submission or at the counter.
  4. Submit before 20 Oct 2026.Online through the register above, or in writing to the Planning Department, Tipperary County Council. The test is the date the authority receives it, not the date you post it.
  5. Keep the acknowledgement.The council's receipt is your proof of a valid observation — see below.

Statutory basis. Section 34(1) of the Planning and Development Act 2000 (as amended) requires a planning authority to consider any submission or observation made to it in accordance with the Regulations. Article 29 of the Planning and Development Regulations 2001 (as amended) sets the window: a submission or observation must be received by the authority within five weeks beginning on the date of receipt of the application, and must be accompanied by the prescribed fee of €20. A submission received after the window, or without the fee, is invalid and the authority must return it.

After you submit: keep the acknowledgement. Under the 2024 Act it secures your right to appeal — only the applicant and a person who made a valid observation may bring the council's decision to An Coimisiún Pleanála, within four weeks of the decision. Making a valid observation is also what buys a right of appeal: under s.37(1) of the 2000 Act, only the applicant and a person who made a valid submission or observation to the planning authority may appeal the decision to An Coimisiún Pleanála (within four weeks of the decision). Missing the five-week window closes both doors.

What the site is zoned

No current zoning polygon covers this site in the store.

Designations on or near the site

Nothing designated within 100 m of the site.

Nearby precedents within 500 m, last 5 years

Decisions

ReferenceDecisionDecidedUnitsDistanceDescription
2660606Conditional6 Aug 20260145 mchange of house design to that granted under planning ref: 2260722 including: a) Internal modifications and upgrades to the existing dwelling house (Protected Structure S243) and creation of openings to the new extension b) Single storey and part two-storey rear extension to the existing dwelling house c) Removal of existing derelict out-house and formation of new domestic garage d) Wastewater treatment system and all associated site works
25206Refused26 Nov 202500 m19600111 a solar PV panel array consisting of up to 22,500m2 of solar panels on ground mounted steel frames, 2 no. electricity control cabins, 4 no. inverter units, underground cable ducts, hard standing area, boundary security fence, site entrance, access track, landscaping, CCTV and all associated site works
2360435Conditional10 Aug 2023172 mthe construction of a dwelling house, garage, waste water treatment system & entrance along with all ancillary site works
2260722Conditional16 Feb 20230145 ma) Two new rooflights one in each gable roof hip; b) Single storey extension to the rear : Kitchen, dining, living area, WC, utility, en-suite & service store; c) Patio area to the rear and side; d) Removal of derelict outhouse & formation of a new side parking area; e) Wastewater Treatment system; f) Internal modifications to create 2 No. en-suite shower rooms at first floor and ground floor openings to the rear extension
2260238Conditional27 Oct 2022172 ma dwelling house, garage, waste water treatment system and entrance along with all ancillary site works
22504Conditional20 Sept 20220261 man extension to existing dairy cow cubicle housing containing new cubicles, easy feed passages, new underground slatted tanks, calving pen and a new steel framed shed to cover new and existing cubicles and passages
21571Conditional12 Oct 202103 mproposed new car park, new site entrance, relocation/alterations to existing agricultural entrance, proposed new all-weather area and including all associated site works

Appeals

No appeals within 500 m in the last 5 years.

What has happened on this file

  • 15 Sept 2026 New application · observations close 20 Oct 2026
  • 15 Sept 2026 Decision