Loughloher , Cahir , Co. Tipperary
dwelling, garage, effluent treatment system, entrance and all associated site works
The application
- Reference
- 2660928 · full record
- Authority
- Tipperary County Council
- Type
- PERMISSION
- Status
- NEW APPLICATION
- Applicant
- not published by the national dataset — see the council register
- Units
- 1
- Floor area
- 298 m²
- Site area
- 5,676 m²
- Received
- 22 Sept 2026
- We first saw it
- 29 Sept 2026, 23:03
- Decision due
- 16 Nov 2026
- Decision
- N/a
The national dataset truncates descriptions (80 characters for DLR, 70 for Fingal) and omits the applicant. The full description and the drawings are on the council register linked in step 1.
How to submit an observation
- Read the file on the council register.Drawings, planning statement and site notices are at http://www.eplanning.ie/TipperaryCC/AppFileRefDetails/2660928/0.
- Write your observation.Quote
2660928at the top, give your name and the address the authority should reply to, and confine it to planning matters — zoning objective, height, overlooking, traffic, drainage, heritage. What you say here is what you can later appeal on. - Pay the €20 fee.Every submission needs it; without it the observation is invalid and is returned. Tipperary County Council takes it online with the submission or at the counter.
- Submit before 27 Oct 2026.Online through the register above, or in writing to the Planning Department, Tipperary County Council. The test is the date the authority receives it, not the date you post it.
- Keep the acknowledgement.The council's receipt is your proof of a valid observation — see below.
Statutory basis. Section 34(1) of the Planning and Development Act 2000 (as amended) requires a planning authority to consider any submission or observation made to it in accordance with the Regulations. Article 29 of the Planning and Development Regulations 2001 (as amended) sets the window: a submission or observation must be received by the authority within five weeks beginning on the date of receipt of the application, and must be accompanied by the prescribed fee of €20. A submission received after the window, or without the fee, is invalid and the authority must return it.
What the site is zoned
No current zoning polygon covers this site in the store.
Designations on or near the site
Nothing designated within 100 m of the site.
Nearby precedents within 500 m, last 5 years
Decisions
| Reference | Decision | Decided | Units | Distance | Description |
|---|---|---|---|---|---|
| 2560832 | Conditional | 20 Oct 2025 | 2 | 156 m | to demolish existing dwelling and construct new dwelling, garage, Effluent Treatment System, modification of existing entrance and all associated site works |
| 24195 | Conditional | 22 Oct 2024 | 1 | 297 m | a single storey dwelling and detached domestic garage as constructed |
| 2277 | Refused | 24 Mar 2022 | 2 | 156 m | demolish existing dwelling and construct a new replacement dwelling, garage, effluent treatment system and relocation of existing entrance along with all associated site works |
| 2253 | Conditional | 3 Mar 2022 | 0 | 490 m | alterations to the previously granted solar farm (Tipperary County Council Reg Ref 16600465 as amended by Tipperary County Council Reg Ref P19600119). Permission was originally granted for a solar photovoltaic installation comprising up to 32,000 m2 of solar panels on ground mounted frames, 4 no. inverters in 2 blocks, 1 no. kV substation, fencing, access track, CCTV and all associated ancillary development works and services. Permission was subsequently granted for the addition of 3 no. battery storage containers and extension to the operational period of the solar farm from 25 years to 30 years under Tipperary County Council Reg Ref. 19600119 and An Bord Pleanala Ref. ABP-305222-19. Permission is now sought for the following: increase the area of solar panels from up to 32,000 m2 to up to 37,641 m2, increase in height to the permitted solar panels from 2.72m to 2.82m and Permission to increase the operational period of the solar farm from 30 years to 35 years |
Appeals
No appeals within 500 m in the last 5 years.
What has happened on this file
- 22 Sept 2026 New application · observations close 27 Oct 2026
- 22 Sept 2026 Decision
Generated from the Planning Register store; nothing was fetched live for this page. Source: national planning dataset, fetched 29 Sept 2026, 23:03. Not legal advice — confirm the deadline with Tipperary County Council before relying on it.