Planning report · Cork County Council · 2000 m around the house · the last 12 months · 12 Oct 2026, 14:19

Quartertown Road, Mallow

52.13093, -8.65622

Homes here mostly date from the 1960s. Home extensions nearby almost always get approved (99%). 102 homes approved 1.3 km away haven't started.

See on the mapWatch this area
Applications, appeals and commencement notices for this county. Consultations, zoning and RZLT maps: Dublin, Kildare, Meath and Wicklow only for now.

How planning works, with this area's numbers

steps can overlap · medians for home extensions within 1.5 km, 10 years
  1. 1ApplySite notice up, plans online
  2. 2Comments5 weeks, €20. Comment to keep your right to appeal
  3. 3Decision8 weeks by law. Here 59 days
  4. 4Appeal window4 weeks after the decision
  5. 5AppealAt An Coimisiún Pleanála
  6. 6PermissionLasts 5 years
  7. 7StartStart notice to the council. Here about 3 months after
  8. 8Sign-offCompletion cert, or the owner opts out
Question 1

What's the planning story of this house?

Figure 1

When it was built, and the rules since

Most homes here were built 1961–70, around when planning permission began (1964).

Timeline from 1955: planning permission needed from October 1964, building regulations from June 1992, building records online from March 2014, sign-off opt-out from September 2015. Most homes here were built 1961–1970.1960197019801990200020102020Oct 1964permission neededJun 1992building regulationsMar 2014building records onlineSep 2015owners may opt out of sign-offThis houseAll of BallydahinBuilt: most homes in this small area date from 1961–1970 (census estimate)most built2007: 2 files on Ballydahin2008: 2 files on Ballydahin2009: 1 file on Ballydahin2012: 1 file on Ballydahin2013: 1 file on Ballydahin2014: 1 file on Ballydahin2015: 5 files on Ballydahin2016: 4 files on Ballydahin2017: 3 files on Ballydahin2018: 5 files on Ballydahin2019: 3 files on Ballydahin2020: 3 files on Ballydahin2021: 6 files on Ballydahin2022: 1 file on Ballydahin2023: 1 file on Ballydahin2024: 2 files on Ballydahin2025: 1 file on Ballydahin2026: 1 file on Ballydahin43 files

Each line is a rule that applies to work done after it.

MeasuredEstimatecouncil register via NPAD · build years: CSO Census 2022, small area

On this site
R2
Zoning · Existing residential
No
Vacant land tax · not on the map
B
Flood zone (development plan) · Zone B: moderate risk
Zoning, protection, tax and flood: the detail
ZoningR2 · Existing residential
What it says

Existing Residential/Mixed Residential and Other Uses: The scale of new residential and mixed residential developments within the Existing Residential/Mixed Residential and Other Uses within the settlement network should normally respect the pattern and grain of existing urban development in the surrounding

An established residential area. The objective is to protect existing residential amenity as well as to provide housing — which is the objective a neighbour's objection to an overbearing extension is usually argued under.

cork county development plan 2022 · 6 Jun 2022 – 5 Jun 2028

Heritage inventory2 within 100 m Blackrock Viaduct; house

Not on this site: protected building, monument zone, conservation area, EU nature site, EU bird site, natural heritage area, tree order, landslide risk, derelict list.

Licensed industrial sites within 1.0 km: Micam Limited (450 m); Magh nAla Limited (Quartertown) (665 m); Road Binders Limited (731 m)

Vacant land taxNo not on the map
Flood riskNone mapped within 2.0 km
Within 2.0 kmCountFor example
Heritage inventory buildings143house
Monuments84Burial ground; Ritual site - holy well
How we work this out
'On this site' means the record's own map outline touches the registered parcel (or a 12 m circle round the point where there is no parcel). Only the council's own list confirms a protected building; ask the council if in doubt. The OPW flood map's licence lets us show a yes/no only. Land on the vacant land tax map nearby: 8 on the draft 2027 map; 8 on the final 2026 map.
Sources: zoning, constraints.niah, epa_leap, rzlt, constraints, constraints.smr · fetched 11 Oct 2026, 23:18
SourceLicenceFetchedLink
zoningCC-BY-4.011 Oct 2026, 23:18open
constraints.niahCC-BY-4.027 Sept 2026, 19:35open
epa_leapCC-BY-4.05 Oct 2026, 23:09open
rzltCC-BY-4.012 Oct 2026, 00:14open
constraintsmixed — CC-BY-4.0 except OPW flood (CC-BY-NC-ND-4.0, publishable=false)27 Sept 2026, 19:37open
constraints.smrCC-BY-4.027 Sept 2026, 19:29open
How we work this out
Applications whose site outline (or map point) falls on this property. 'No sign building has started' means we found no notice to the council's building control office; small jobs don't always file one, so ask. A missing completion certificate is not proof of a problem: an owner can opt out of official sign-off for a house or extension built for themselves.
Sources: bcms, npad · fetched 12 Oct 2026, 00:09
SourceLicenceFetchedLink
bcmsCC-BY-4.012 Oct 2026, 00:09open
npadCC-BY-4.012 Oct 2026, 01:44open
Question 2

Could you extend?

Nothing on this site restricts it: not protected, not in a conservation area.

Figure 2

What happened to applications like yours

Extensions are almost always approved here: 100% by type. A new house in a garden is harder: 87% approved.

Single-storey rear24 decided · more info asked 0%
100% · council 99%
New house in a garden or site30 decided · more info asked 0%
87% · council 86%
Approved nearbyCork overall

Decided applications within 1.5 km, received in the last 10 years. The kind of work is read from each description.

CalculatedOur classificationcouncil register via NPAD · 54 nearby, 8,941 council-wide

Figure 3

Ballydahin, file by file since 2007

15 of 15 decided extensions on the road were approved.

43 planning files on Ballydahin since 2007, by kind and decision.2007200920112013201520172019202120232025Extensions, atticsNo. 57 · 2007 · other extension · undecided · 07/55030No number · 2008 · attic conversion / dormer · approved · 08/55087No number · 2009 · other extension · undecided · 09/55021No. 11 · 2014 · rear · approved · 14/6268No number · 2015 · single-storey rear · undecided · 15/4579No. 1 · 2015 · single-storey rear · approved · 15/4674No. 30 · 2016 · attic conversion / dormer · approved · 16/4507No. 20 · 2016 · single-storey rear · approved · 16/5696No. 2 · 2017 · single-storey rear · approved · 17/4206No. 11 · 2018 · other extension · undecided · 18/4796No. 11 · 2018 · other extension · approved · 18/5441No. 10 · 2019 · rear · approved · 19/5309No. 18 · 2020 · attic conversion / dormer · approved · 20/5782No number · 2020 · other extension · approved · 20/6790No. 8 · 2021 · rear · approved · 21/4287No. 55 · 2021 · side · undecided · 21/5900No. 55 · 2021 · other extension · approved · 21/6210No. 16 · 2023 · other extension · approved · 23/4516No. 25 · 2024 · single-storey rear · approved · 24/4795No. 18 · 2025 · attic conversion / dormer · undecided · 25/6738No. 42 · 2026 · porch / front · approved · 26/1306Porches, roofs, otherNo number · 2007 · other work · undecided · 07/55073No number · 2008 · other work · approved · 08/55019No number · 2012 · other work · refused · 12/55007No number · 2013 · other work · approved · 13/55010No. 16 · 2015 · other work · approved · 15/4096No. 51 · 2015 · other work · approved · 15/4360No number · 2015 · other work · approved · 15/6061No. 2 · 2016 · other work · approved · 16/5560No number · 2016 · other work · approved · 16/7121No number · 2017 · other work · undecided · 17/6023No number · 2017 · other work · approved · 17/6267No. 1 · 2018 · other work · undecided · 18/6318No number · 2018 · other work · approved · 18/6540No. 1 · 2018 · other work · approved · 18/6814No number · 2019 · other work · approved · 19/5078No number · 2019 · other work · approved · 19/5454No. 2 · 2020 · other work · approved · 20/5697No number · 2021 · other work · undecided · 21/5741No number · 2021 · other work · approved · 21/6442No number · 2021 · other work · approved · 21/7468No. 53 · 2022 · other work · approved · 22/5202No. 25 · 2024 · other work · approved · 24/5590New house in a side garden
ApprovedRefusedWithdrawn or invalid

43 files with "Ballydahin" in the address within 600 m, other roads of the same name left out. Hover a dot for the house number and reference.

MeasuredOur classificationcouncil register via NPAD · 2007–2026

Extensions and refusals right beside you 0 within 250 m · 0 refused within 100 m

Extensions and refusals near you 0 extensions within 250 m · the last 12 months

No home extensions within 250 m in the last 12 months.

Refused within 100 m 0 in the last 12 months

Nothing refused this close in the last 12 months.

    How we work this out
    Home extensions are read from the application's description (extension, attic or dormer, porch, garage conversion, garden room), so a few may be missed or mislabelled. The kind is the first that fits: a dormer with a rear extension counts as a dormer. Refusal reasons come from An Coimisiún Pleanála's inspector reports, so they exist only where the refusal was appealed (Dún Laoghaire-Rathdown so far). The council's own reasons are on its planning file.
    Sources: npad, acp · fetched 12 Oct 2026, 01:44
    SourceLicenceFetchedLink
    npadCC-BY-4.012 Oct 2026, 01:44open
    acpCC-BY-4.09 Oct 2026, 23:03open
    Sources: acp, bcms, npad · fetched 9 Oct 2026, 23:03
    SourceLicenceFetchedLink
    acpCC-BY-4.09 Oct 2026, 23:03open
    bcmsCC-BY-4.012 Oct 2026, 00:09open
    npadCC-BY-4.012 Oct 2026, 01:44open
    Question 3

    How long, and what if someone objects?

    Figure 4

    A home extension's journey here

    A decision takes 59 days. Building starts about 3 months after permission.

    Comments open: 5 weeks · €20; Council decision: 59 days; Appeal window: 4 weeks; Building starts: 78 days after permission0 mo3 mo6 mo9 mo12 mo15 moComments openComments close 5 weeks after the application is lodged5 weeks · €20Council decisionDecision: median 59 days, middle half 53–106 (n=81)59 daysAppeal windowAnyone who commented can appeal within 4 weeks of the decision4 weeksBuilding startsStart notice: median 78 days after permission (n=8)78 days after permissionSigned off38% of owners opt out of sign-off

    Bars are medians; whiskers show the middle half. Medians of separate steps don't add up exactly.

    Calculated81 decided home extensions, 8 start notices · within 1.5 km, 10 years · NPAD, BCMS, An Coimisiún Pleanála

    Appeals nearby 2 in the last 12 months
    • 500923 Granted with conditions · Kingsfort Gardens Castlepark, Castlelands St. Joseph's Road, Mallow… · 1.9 km
    • 323904 Granted with conditions · Annabella, Mallow, Co.Cork, · 1.0 km
    Sources: acp, courts, npad · fetched 9 Oct 2026, 23:03
    SourceLicenceFetchedLink
    acpCC-BY-4.09 Oct 2026, 23:03open
    courtsall-rights-reserved12 Oct 2026, 01:27open
    npadCC-BY-4.012 Oct 2026, 01:44open
    Question 4

    What's changing around you?

    Street map around Quartertown Road, Mallow with 15 numbered planning items
    ⌖ the houseOpen for commentsApproved, not startedBuilding site that stoppedEmpty land zoned for homesApprovedNo decision yet
    1. 1Lyonara Cold Stores, Gooldshill 26/2377No decision yet · 1.4 km
    2. 2Annabella (townland), Mallow 26/2537No decision yet · 1.5 km
    3. 3Emmet Street Mallow Co.Cork 22/4501Approved, no sign building has started · 852 m
    4. 4Annabella Mallow Co.Cork 25/5124Approved, no sign building has started · 1.3 km
    5. 5Annabella, Mallow 15/6970Building site that stopped · 1.3 km
    6. 6The Old Course Spaglen Mallow Co. Cork 25/5765Approved, no sign building has started · 1.9 km
    7. 70.8 ha zoned for homesEmpty land zoned for homes · 909 m
    8. 84.0 ha zoned for homesEmpty land zoned for homes · 1.1 km
    9. 91.0 ha zoned for homesEmpty land zoned for homes · 1.2 km
    10. 103.1 ha zoned for homesEmpty land zoned for homes · 1.3 km
    11. 118.3 ha zoned for homesEmpty land zoned for homes · 1.3 km
    12. 12West End And Park Road, Annabella 26/0299Approved · 515 m
    13. 1318 Dromore Drive, Ballydahin 25/6738No decision yet · 543 m
    14. 14Quartertown Lower, Mallow 26/1781No decision yet · 590 m
    15. 1542, Dromore Drive 26/1306Approved with conditions · 595 m
    Figure 5

    What happens to applications within 500 m

    Permission isn't building. Of 24 permissions since 2016, 2 show a start notice and 1 has a completion certificate.

    30 applications lodged within 500 m. Council: 24 approved, 0 refused. After appeals: 24 approved. Of those: 1 signed off, 1 built with the owner's opt-out, 0 started, 22 with no start notice found, 0 ran out.LODGEDCOUNCIL DECISIONAFTER APPEALSWHAT HAPPENED NEXT24: lodged → approved6: lodged → undecided24: approved → approved6: undecided → undecided22: approved → no start notice found1: approved → built, owner opted out1: approved → signed off30 lodged30 lodged24 approved24 approved6 undecided6 undecided24 approved24 approved6 undecided6 undecided22 no start notice found22 no start notice found1 built, owner opted out1 built, owner opted out1 signed off1 signed off

    Purple bands are refusals turned into permissions on appeal. "No start notice found" includes small jobs that never needed one and notices we couldn't match.

    Measured30 applications in 10 years · NPAD, An Coimisiún Pleanála, BCMS start notices and completion certificates

    Figure 6

    The next 30 days

    2 deadlines within 2.0 km; the first closes 16 Oct 2026.

    2 deadlines in the next 30 days: 2026-10-16 26/2377: application received — 1/ Construct 1 No. cold store extension (Cold Store 07) located to the front of the existing building. 2/ Construct 1 No; 2026-11-04 26/2537: application received — The construction of 2 no. semi-detached houses and all associated ancillary development works including access, parking,today17 Oct22 Oct27 Oct1 Nov6 Nov11 Nov26/2377: application received — 1/ Construct 1 No. cold store extension (Cold Store 07) located to the front of the existing building. 2/ Construct 1 No · 1.4 km away · 2026-10-1626/2537: application received — The construction of 2 no. semi-detached houses and all associated ancillary development works including access, parking, · 1.5 km away · 2026-11-04
    Comments close
    • Comments close 16 Oct 20264 days left
      126/2377 · application received — 1/ Construct 1 No. cold store extension (Cold Store 07) located to the front of the existing…
      €20 to the council · 1.4 km away
    • Comments close 4 Nov 202623 days left
      226/2537 · application received — The construction of 2 no. semi-detached houses and all associated ancillary development works…
      €20 to the council · 1.5 km away

    Measuredcouncil registers and An Coimisiún Pleanála · deadlines worked out from the dates on file

    Figure 7

    Approved, stalled or planned, not built yet

    102 homes 1.3 km away were approved Nov 2025 with no start notice yet; the permission runs to Nov 2030. 1 building site nearby stopped before sign-off.

    Annabella Mallow Co.Cork · 102 homes: 102 homes approved Nov 2025, not started; Annabella, Mallow · 85 homes: 85 homes, started Jan 2022, never signed off; The Old Course Spaglen… · 28 homes: 28 homes approved Jan 2026, not started; Emmet Street Mallow… · 22 homes: 22 homes approved Dec 2022, not started2022202320242025202620272028202920302031Annabella Mallow Co.Cork · 102 homes1.3 km · 25/5124102 homes approved Nov 2025, not started102 homes approved Nov 2025, not startedAnnabella, Mallow · 85 homes1.3 km · 15/697085 homes, started Jan 2022, never signed off85 homes, started Jan 2022, never signed offThe Old Course Spaglen… · 28 homes1.9 km · 25/576528 homes approved Jan 2026, not started28 homes approved Jan 2026, not startedEmmet Street Mallow… · 22 homes852 m · 22/450122 homes approved Dec 2022, not started22 homes approved Dec 2022, not startedtoday

    Each row is a dated fact from a public register: no score and no forecast.

    Measuredcouncil registers, BCMS, derelict sites registers, development plan layers (CC BY 4.0)

    Sites that could change 11 within 2.0 km

    Building site that stopped 1

    Approved, not started 3

    Empty land zoned for homes 7

    • 70.8 ha zoned for homes · no homes built on it yet · 909 m
    • 84.0 ha zoned for homes · no homes built on it yet · 1.1 km
    • 91.0 ha zoned for homes · no homes built on it yet · 1.2 km
    • 103.1 ha zoned for homes · no homes built on it yet · 1.3 km
    • 118.3 ha zoned for homes · no homes built on it yet · 1.3 km
    • 5.6 ha zoned for homes · no homes built on it yet · 1.8 km
    • 5.7 ha zoned for homes · no homes built on it yet · 1.9 km

    Not covered here: council land to be sold, empty land zoned for homes (Dublin only).

    Sources: acp, bcms, derelict, npad · fetched 9 Oct 2026, 23:03
    SourceLicenceFetchedLink
    acpCC-BY-4.09 Oct 2026, 23:03open
    bcmsCC-BY-4.012 Oct 2026, 00:09open
    derelictCC-BY-4.05 Oct 2026, 09:35open
    npadCC-BY-4.012 Oct 2026, 01:44open
    Figure 8

    Applications within 500 m, by year

    Between 2 and 7 a year; busiest 2021. 100% of decisions were approvals.

    2017: 2, 2018: 6, 2019: 3, 2020: 6, 2021: 7, 2022: 2, 2023: 2, 2024: 205102017: 1 approved2017: 1 undecided2’17*2018: 4 approved2018: 2 undecided6’182019: 3 approved3’192020: 5 approved2020: 1 undecided6’202021: 5 approved2021: 2 undecided7’212022: 2 approved2’222023: 2 approved2’232024: 2 approved2’24
    ApprovedRefusedWithdrawn or invalidUndecided

    2017 and 2026 are part years (*). Exemption requests and time extensions are left out.

    Measuredcouncil register via NPAD

    Open for comments €20 to comment

    Every application within 2.0 km 54 in the last 12 months

    See every application on the map

    How we work this out
    Descriptions are shortened by the national planning database (to 80 characters in Dún Laoghaire-Rathdown, 70 in Fingal), and it does not publish applicants' names.
    Sources: npad, acp, bcms · fetched 12 Oct 2026, 01:44
    SourceLicenceFetchedLink
    npadCC-BY-4.012 Oct 2026, 01:44open
    acpCC-BY-4.09 Oct 2026, 23:03open
    bcmsCC-BY-4.012 Oct 2026, 00:09open
    Building work nearby 28 in the last 12 months
    2 signed off as finished13 not signed off13 no sign-off needed
    • Ballyrusheen, Castlecor, Mallow, Cork · 14 Oct 2026 · 1 homes · start notice, opted out no sign-off needed · 26/1000 · 909 m
    • 2 The Links, Mallow, Cork · 31 Aug 2026 · start notice signed off · 1.7 km
    • 50 Bóthar Chorcaí, Mallow, Cork, P51 X62N · 20 Aug 2026 · 1 homes · start notice, opted out no sign-off needed · 26/0867 · 719 m
    • Rear of No. 8 Kilmorna, Ballydahin,, Mallow, Cork · 7 Aug 2026 · 2 homes · start notice not signed off · 22/06765 · 751 m
    • QUARTERTOWN INDUSTRIAL ESTATE, Mallow, Lower Quartertown, Cork, P51XC7K · 13 Jul 2026 · 7-day notice not signed off · 256210 · 974 m
    • Spaglen, Mallow, Cork, P51 HNP6 · 13 Jul 2026 · start notice not signed off · 224372 · 1.6 km
    • 16-19 The Drive View, Old Course,, Mallow, Cork · 10 Jul 2026 · 4 homes · 7-day notice not signed off · 22/4676 · 1.9 km
    • 12-15 The Drive View, Old Course,, Mallow, Cork · 10 Jul 2026 · 4 homes · 7-day notice not signed off · 22/4676 · 1.8 km
    • 8-11 The Drive View, Old Course,, Mallow, Cork · 10 Jul 2026 · 4 homes · 7-day notice not signed off · 22/4676 · 1.8 km
    • Rear of No. 6 Kilmorna, Ballydahin,, Mallow, Cork · 26 Jun 2026 · 1 homes · start notice, opted out no sign-off needed · 22/06757 · 757 m
    • Bridewell Lane, Mallow, Cork, P51 NNK3 & P51 N7YH · 22 Jun 2026 · start notice not signed off · 1.2 km
    • Annabella, Mallow, Cork, P51 XXX · 29 May 2026 · 1 homes · start notice, opted out no sign-off needed · 24/05644 · 2.0 km
    • 26 Bank Place, Mallow, Cork, P51 W8WN · 15 May 2026 · 2 homes · start notice not signed off · 996 m
    • Shanakill, Rathcool, Mallow, Cork · 14 May 2026 · 1 homes · start notice, opted out no sign-off needed · 25/6786 · 909 m
    • 1 The Alders, Mallow, Cork · 11 May 2026 · 2 homes · start notice, opted out no sign-off needed · 255017 · 1.3 km
    • THE WILDGOOSE, QUARTERTOWN UPPER, Mallow, Cork, P51 P294 · 17 Apr 2026 · 9 homes · 7-day notice not signed off · 1.9 km
    • LACKANALOOHA, Mallow, Cork · 31 Mar 2026 · 2 homes · start notice, opted out no sign-off needed · 255017 · 1.3 km
    • Shanagh, Shanballymore, Mallow, Cork · 2 Mar 2026 · 1 homes · start notice, opted out no sign-off needed · 24/4945 · 909 m
    • 4 Maple Drive, Mallow, Cork, P51 K6DC · 9 Feb 2026 · 1 homes · start notice, opted out no sign-off needed · 246101 · 1.8 km
    • Unit 1 Park Road, Mallow, Cork, P51 CV99 · 9 Feb 2026 · short notice no sign-off needed · 558 m
    • Rathcool, Mallow, Cork · 23 Jan 2026 · 1 homes · start notice, opted out no sign-off needed · 24/5380 · 909 m
    • First and Second Floors, 120 Thomas Davis Street, Mallow, Cork, P51 AK84 · 30 Dec 2025 · 4 homes · start notice not signed off · 1.1 km
    • Rose Hill Annabella, Mallow, Cork · 25 Dec 2025 · 2 homes · start notice not signed off · ABP-312640-22 · 1.5 km
    • Park Road, Mallow, Co Cork., Mallow, Cork, P51 CV99 · 21 Nov 2025 · 7-day notice signed off · 24/5483 · 596 m
    • 31 Beecher Street, Mallow, Cork, no eircode · 18 Nov 2025 · 2 homes · start notice not signed off · 25/4087 · 1.2 km
    • 1 an 2 Landscape Terrace,, Mallow, Cork, P51 T383 · 10 Nov 2025 · start notice not signed off · 245694 · 1.2 km
    • 31b Beecher Street, Mallow, Cork, no eircode · 24 Oct 2025 · 1 homes · start notice, opted out no sign-off needed · 25/4087 · 1.3 km
    • 31a Beecher Street, Mallow, Cork, NONE · 17 Oct 2025 · 1 homes · start notice, opted out no sign-off needed · 25/4087 · 1.2 km
    How we work this out
    Each row is a notice the builder sent to the council's building control office before work started. One notice can cover many homes. 'Signed off as finished' means a completion certificate is on file; work done under an opt-out or a short notice doesn't need one.
    Source: bcms · fetched 12 Oct 2026, 00:09
    SourceLicenceFetchedLink
    bcmsCC-BY-4.012 Oct 2026, 00:09open
    Homes coming 152 not started
    How we work this out
    Schemes of 10 or more homes approved since 2019, from the council and An Coimisiún Pleanála registers. 'Building started' means the builder told the council's building control office that work was starting (a commencement notice).
    Sources: acp, bcms, npad, social_housing · fetched 9 Oct 2026, 23:03
    SourceLicenceFetchedLink
    acpCC-BY-4.09 Oct 2026, 23:03open
    bcmsCC-BY-4.012 Oct 2026, 00:09open
    npadCC-BY-4.012 Oct 2026, 01:44open
    social_housingCC-BY-SA-4.09 Oct 2026, 23:01open
    Named places nearby: estate, schemes, crèches, schools

    Named places estate, developments, inspections

    Crèches and schools inspected

    NameLatest inspectionDistance
    Serendipity Montessori & Childcare Facility · Crèche9 Sept 2024 · report · Tusla Early Years Inspectorate789 m
    How we work this out
    Organisations only: a person named on an application is never listed. Inspection dates and links are the publisher's; read their report for the findings.
    Sources: schools, tusla_ey · fetched 27 Sept 2026, 23:32
    SourceLicenceFetchedLink
    schoolsCC-BY-4.027 Sept 2026, 23:32open
    tusla_eypublic (Tusla statutory register; acknowledgement required, no open licence stated)5 Oct 2026, 23:33open
    How busy is this area Busier than most of Cork County Council.
    Homes approved
    Here52
    Council middle0
    Homes started
    Here15
    Council middle1
    How we work this out
    Homes approved counts schemes of 10 or more homes (one-off houses are not included). Homes started counts every home in a notice that building work was starting. The council figure is the middle value across the council's built-up squares of the same area (3.1 km², about a 1 km circle), so half of them saw more and half fewer.
    Sources: acp, bcms, npad · fetched 9 Oct 2026, 23:03
    SourceLicenceFetchedLink
    acpCC-BY-4.09 Oct 2026, 23:03open
    bcmsCC-BY-4.012 Oct 2026, 00:09open
    npadCC-BY-4.012 Oct 2026, 01:44open
    Question 5

    What's the area like?

    Figure 9

    This street block against the council

    43% of homes built before 1971 (council 28%). 81% owner-occupied (council 73%).

    Homes built before 1971
    43% · council 28%
    Homes built since 2001
    3% · council 36%
    Owner-occupied
    81% · council 73%
    Rented
    14% · council 22%
    Children under 15
    13% · council 21%
    Aged 65 and over
    26% · council 16%
    Households with 2+ cars
    40% · council 52%
    Work mainly from home
    9% · council 12%
    This small area (258 people)Cork

    MeasuredCSO Census 2022, Small Area Population Statistics (CC BY 4.0) · small area 047246001

    Road noise
    60–64 dB
    day–night average (EPA 2022)
    Nearest school
    701 m
    Scoil Ghobnatan, 470 pupils
    Schools, stops and the council

    Schools

    • Scoil Ghobnatan · primary · 470 pupils · 701 m
    • Gael Scoil Thomais Daibhis · primary · 412 pupils · 1.1 km
    • Davis College · postprimary · 1033 pupils · 1.2 km
    • Patrician Academy · postprimary · 568 pupils · 1.2 km
    • S N Naomh Padraig Boys Senior School · primary · 212 pupils · 1.4 km
    • St Mary's Secondary School · postprimary · 749 pupils · 1.5 km
    • Convent Girls Senior National School · primary · 246 pupils · 1.6 km
    • S N Iosagain · primary · 133 pupils · 1.7 km

    Stops 5

      Schools growing or shrinking planning in 3 years · pupils last year

      • Scoil Ghobnatan · 700 m-5.4% pupils (470)
      Sources: gtfs, schools, npad, consult, moderngov, lda_lands, cso_saps_2022, National Transport Authority, Fingal County Council and Dún Laoghaire-Rathdown County Council development plan layers (CC BY 4.0), dartplus.ie project extents over NTA GTFS rail shapes (CC BY 4.0), EPA strategic noise maps, Fingal County Council · fetched 11 Oct 2026, 23:43
      SourceLicenceFetchedLink
      gtfsCC-BY-4.011 Oct 2026, 23:43open
      schoolsCC-BY-4.027 Sept 2026, 23:32open
      npadCC-BY-4.012 Oct 2026, 01:44open
      consultpublic12 Oct 2026, 01:26open
      moderngovpublic12 Oct 2026, 01:27open
      lda_landsCC-BY-4.011 Sept 2026, 16:43open
      cso_saps_2022CC BY 4.0—open
      National Transport AuthorityCC BY 4.0——
      Fingal County Council and Dún Laoghaire-Rathdown County Council development plan layers (CC BY 4.0)CC BY 4.0——
      dartplus.ie project extents over NTA GTFS rail shapes (CC BY 4.0)CC BY 4.0——
      EPA strategic noise mapsCC BY 4.0——
      Fingal County CouncilCC BY 4.0——
      Question 6

      What to ask, and who

      1. Inside Flood Zone B on the council's development plan map: can you insure it?
        Ask for: A home insurance quote before you bid, and any flood risk assessment in the site's planning file.
        Insurer
      2. Application 1.4 km away open for comments until 16 Oct 2026: comment?
        Ask for: The plans on the council's website (€20 to comment).
        Council
      3. Any work done without planning permission?
        Ask for: An opinion of compliance for the whole house.
        Seller · solicitor
      Reference

      Where this is, the terms, the sources

      Townland
      Ballydahin
      Electoral division
      Mallow South Urban
      Electoral area
      Mallow
      Council
      Cork County Council
      Everything we found, as a list 8 lines
      • Zoned R2 (existing residential); no vacant land tax.
      • Inside Flood Zone B on the Cork County Development Plan 2022-2028 flood map.
      • 11 sites nearby could change: 1 stalled build, 3 approved schemes, 7 empty zoned plots.
      • 2 applications open for comments nearby; nearest closes 16 Oct 2026.
      • 152 homes approved nearby, not started; largest 102 at Annabella Mallow Co.Cork.
      • No scheduled public transport within 800 m.
      • Noise from road traffic mapped at 60–64 dB (day-evening-night average, EPA 2022).
      • Here (2022 census): 81% owner-occupied (council 73%); 6% of homes empty (council 13%); most built 1961–1970; 76% drive to work (council 66%); population up 5% since 2016.
      What the terms mean 8 terms
      • Vacant land tax (Residential Zoned Land Tax (RZLT)): A yearly tax of 3% of the land's value on land that is zoned for homes and serviced but left unbuilt.
      • Building started (Commencement notice (BCMS)): The builder must tell the council's building control office 14 to 28 days before work starts.
      • Signed off as finished (Certificate of Compliance on Completion): A certificate filed when a building is finished, confirming it meets the building regulations.
      • Approved (Grant of permission): The council said yes, usually with conditions.
      • Comment on an application (Observation / submission): Anyone can comment on a planning application within five weeks of it being lodged, for a €20 fee.
      • Appeal (Appeal to An Coimisiún Pleanála): The applicant, or anyone who commented in time, can appeal the council's decision within four weeks.
      • What the land is zoned for (Zoning objective): The council's development plan sets what each area is for: homes, shops, open space and so on.
      • Building site that stopped (Commenced, no completion certificate): A housing build that told the council it was starting at least three years ago, passed its own planned finish date, and has never been signed off as finished.
      Sources and licences 28
      SourcePublisherLicenceFetched
      EPA strategic noise maps—CC BY 4.0—
      Fingal County Council—CC BY 4.0—
      Fingal County Council and Dún Laoghaire-Rathdown County Council development plan layers (CC BY 4.0)—CC BY 4.0—
      National Transport Authority—CC BY 4.0—
      services-eu1.arcgis.comAn Coimisiún PleanálaCC-BY-4.09 Oct 2026
      data.nbco.gov.ieNational Building Control Office (BCMS)CC-BY-4.011 Oct 2026
      data.gov.ieVarious (see each layer)mixed — CC-BY-4.0 except OPW flood (CC…27 Sept 2026
      services-eu1.arcgis.comNational Inventory of Architectural HeritageCC-BY-4.027 Sept 2026
      services-eu1.arcgis.comNational Monuments Service (SMR)CC-BY-4.027 Sept 2026
      dlrcoco.citizenspace.com | https:Local authorities (consultation portals)public12 Oct 2026
      www2.courts.ie—all-rights-reserved12 Oct 2026
      cso.ie—CC BY 4.0—
      dartplus.ie project extents over NTA GTFS rail shapes (CC BY 4.0)—CC BY 4.0—
      services-eu1.arcgis.comLocal authorities (derelict sites registers)CC-BY-4.05 Oct 2026
      data.epa.ieEnvironmental Protection Agency (LEAP licence register)CC-BY-4.05 Oct 2026
      services-eu1.arcgis.com—CC-BY-4.0—
      transportforireland.ieNational Transport AuthorityCC-BY-4.011 Oct 2026
      lda.ieLand Development AgencyCC-BY-4.011 Sept 2026
      meetings.fingal.ieLocal authorities (council meetings)public12 Oct 2026
      services.arcgis.comDepartment of Housing (National Planning Application Database)CC-BY-4.012 Oct 2026
      services-eu1.arcgis.comTailte ÉireannCC-BY-4.011 Sept 2026
      services-eu1.arcgis.comCSO, Tailte Éireann, OpenStreetMap contributorsCC-BY-4.04 Oct 2026
      propertypriceregister.ieProperty Services Regulatory Authority (PPR)PSI — PSRA re-use terms (psr.ie/re-use…12 Oct 2026
      services.arcgis.comLocal authorities (RZLT maps)CC-BY-4.011 Oct 2026
      gov.ieDepartment of EducationCC-BY-4.027 Sept 2026
      gov.ieDepartment of HousingCC-BY-SA-4.09 Oct 2026
      tusla.ieTusla (Early Years Inspectorate)public (Tusla statutory register; ackn…5 Oct 2026
      services.arcgis.comLocal authorities via the Department of Housing (GZT / MyPlan)CC-BY-4.011 Oct 2026
      Measured
      counted from a public register
      Calculated
      a rate or median we worked out from those counts
      Our classification
      we sorted it by reading each description
      Estimate
      inferred from another source (census, map data)
      Rule summary
      the law, simplified: check before relying on it
      How we work this out
      Generated 12 Oct 2026, 14:19 from the Planning Register store; nothing was fetched live. Not a legal search: the council's planning file is the record. Deadlines come from published dates under the Planning and Development Act 2000: confirm with the council before relying on them. Street map © OpenStreetMap contributors; building outlines © Overture Maps Foundation. The text version carries every figure with its source, for an AI assistant.