PlanningRegister.ie
Planning report · Cork County Council · 500 m around the house · the last 12 months · 27 Oct 2026, 16:57

Fair Street

52.14031, -8.64191

Homes here mostly date from the 1960s. Home extensions nearby almost always get approved (100%).

See on the mapWatch this area

Not held yet for Cork County Council: council consultations.

How planning works, with this area's numbers

steps can overlap · medians for home extensions within 1.5 km, 10 years
  1. 1ApplySite notice up, plans online
  2. 2Comments5 weeks, €20. Comment to keep your right to appeal
  3. 3Decision8 weeks by law. Here 55 days
  4. 4Appeal window4 weeks after the decision
  5. 5AppealAt An Coimisiún Pleanála
  6. 6PermissionLasts 5 years
  7. 7StartStart notice to the council. Here about 4 months after
  8. 8Sign-offCompletion cert, or the owner opts out
Question 1

What's the planning story of this house?

Figure 1

When it was built, and the rules since

Most homes here were built 1961–70, around when planning permission began (1964).

Timeline from 1955: planning permission needed from October 1964, building regulations from June 1992, building records online from March 2014, sign-off opt-out from September 2015. Most homes here were built 1961–1970.1960197019801990200020102020Oct 1964permission neededJun 1992building regulationsMar 2014building records onlineSep 2015owners may opt out of sign-offThis houseAll of MallowBuilt: most homes in this small area date from 1961–1970 (census estimate)most built2021: 20 files on Mallow2022: 17 files on Mallow2023: 18 files on Mallow2024: 15 files on Mallow2025: 15 files on Mallow2026: 6 files on Mallow91 files

Each line is a rule that applies to work done after it.

MeasuredEstimatecouncil register via NPAD · build years: CSO Census 2022, small area

On this site
R2
Zoning · Existing residential
No
Vacant land tax · not on the map
No
Flood zone (development plan) · not in Zone A or B
Zoning, protection, tax and flood: the detail
ZoningR2 · Existing residential
What it says

Existing Residential/Mixed Residential and Other Uses: The scale of new residential and mixed residential developments within the Existing Residential/Mixed Residential and Other Uses within the settlement network should normally respect the pattern and grain of existing urban development in the surrounding

An established residential area. The objective is to protect existing residential amenity as well as to provide housing — which is the objective a neighbour's objection to an overbearing extension is usually argued under.

cork county development plan 2022 · 6 Jun 2022 – 5 Jun 2028

Monument zone1 within 100 m Standing stone, Mallow (Fermoy By.)

Not on this site: protected building, heritage inventory, conservation area, EU nature site, EU bird site, natural heritage area, tree order, landslide risk, derelict list.

Licensed industrial sites within 1.0 km: Dairygold Co-Operative Society Limited (Mallow) (657 m)

Vacant land taxNo not on the map
Flood riskNone mapped within 500 m
Within 500 mCountFor example
Heritage inventory buildings50house
Monuments12Castle - unclassified; Kiln - lime
How we work this out
'On this site' means the record's own map outline touches the registered parcel (or a 12 m circle round the point where there is no parcel). Only the council's own list confirms a protected building; ask the council if in doubt. The OPW flood map's licence lets us show a yes/no only. Land on the vacant land tax map nearby: 3 on the draft 2027 map; 3 on the final 2026 map.
Sources: Development plan zoning (councils), Sites and Monuments Record, EPA licensed facilities (LEAP), Residential Zoned Land Tax maps, Constraint layers (bundle), National Inventory of Architectural Heritage · fetched 26 Oct 2026, 23:21
SourceLicenceFetchedLink
Development plan zoning (councils)CC BY 4.025 Oct 2026, 23:06open
Sites and Monuments RecordCC BY 4.027 Sept 2026, 19:29open
EPA licensed facilities (LEAP)CC BY 4.026 Oct 2026, 23:21open
Residential Zoned Land Tax mapsCC BY 4.025 Oct 2026, 23:43open
Constraint layers (bundle)CC BY 4.0, CC BY-NC-ND 4.027 Sept 2026, 19:37open
National Inventory of Architectural HeritageCC BY 4.027 Sept 2026, 19:35open
How we work this out
Applications whose site outline (or map point) falls on this property. 'No sign building has started' means we found no notice to the council's building control office; small jobs don't always file one, so ask. A missing completion certificate is not proof of a problem: an owner can opt out of official sign-off for a house or extension built for themselves.
Sources: Building Control Management System (commencement notices), National Planning Application Database · fetched 27 Oct 2026, 02:09
SourceLicenceFetchedLink
Building Control Management System (commencement notices)CC BY 4.027 Oct 2026, 02:09open
National Planning Application DatabaseCC BY 4.027 Oct 2026, 01:33open
Question 2

Could you extend?

Nothing on this site restricts it: not protected, not in a conservation area.

Figure 2

What happened to applications like yours

Extensions are almost always approved here: 100% by type. A new house in a garden is harder: 91% approved.

Single-storey rear11 decided · more info asked 0%
100% · council 100%
New house in a garden or site11 decided · more info asked 0%
91% · council 87%
Approved nearbyCork overall

Decided applications within 1.5 km, received in the last 10 years. The kind of work is read from each description.

CalculatedOur classificationcouncil register via NPAD · 22 nearby, 5,035 council-wide

Figure 3

Mallow, file by file since 2021

14 of 14 decided extensions on the road were approved. New houses in side gardens or on sites: 3 of 4.

91 planning files on Mallow since 2021, by kind and decision.202120222023202420252026Extensions, atticsNo number · 2021 · single-storey side · approved · 21/4869No. 6 · 2021 · single-storey rear · approved · 21/5876No. 143 · 2021 · rear · undecided · 21/5938No. 143 · 2021 · rear · undecided · 21/6217No. 13 · 2021 · single-storey rear · approved · 21/6317No number · 2021 · side · approved · 21/6586No number · 2022 · other extension · approved · 22/4372No. 143 · 2022 · rear · undecided · 22/5695No. 143 · 2022 · rear · undecided · 22/5918No. 143 · 2022 · rear · approved · 22/6166No. 2 · 2023 · two-storey rear · approved · 23/5322No. 51 · 2023 · single-storey rear · approved · 23/5695No. 9 · 2024 · two-storey rear · approved · 24/4333No. 11 · 2024 · two-storey rear · approved · 24/4551No number · 2024 · other extension · undecided · 24/4583No number · 2024 · other extension · approved · 24/4713No number · 2024 · single-storey side · approved · 24/6286No. 14 · 2025 · side · approved · 25/4507No number · 2025 · single-storey side · undecided · 25/4616No. 14 · 2026 · attic conversion / dormer · approved · 26/0525No number · 2026 · first-floor · undecided · 26/1333No number · 2026 · first-floor · undecided · 26/1624Porches, roofs, otherNo. 21 · 2021 · other work · approved · 21/4524No number · 2021 · other work · undecided · 21/4598No number · 2021 · other work · undecided · 21/4851No number · 2021 · other work · approved · 21/5090No number · 2021 · other work · refused · 21/5687No number · 2021 · other work · approved · 21/5714No. 67 · 2021 · other work · approved · 21/6061No. 17 · 2021 · other work · approved · 21/6413No number · 2021 · other work · approved · 21/6703No. 7 · 2021 · other work · approved · 21/6805No number · 2021 · other work · undecided · 21/7174No number · 2021 · other work · undecided · 21/7190No number · 2022 · other work · approved · 22/4158No number · 2022 · other work · undecided · 22/4352No number · 2022 · other work · approved · 22/4501No. 77 · 2022 · other work · undecided · 22/4525No number · 2022 · other work · approved · 22/4676No. 6 · 2022 · other work · approved · 22/4782No. 77 · 2022 · other work · approved · 22/4806No number · 2022 · other work · approved · 22/4911No. 16 · 2022 · other work · approved · 22/5603No. 13 · 2022 · other work · undecided · 22/6012No number · 2022 · other work · undecided · 22/6445No number · 2022 · other work · approved · 22/6814No. 30 · 2023 · other work · undecided · 23/4009No number · 2023 · other work · approved · 23/4200No. 5 · 2023 · other work · approved · 23/4349No. 20 · 2023 · other work · approved · 23/4378No. 144B · 2023 · other work · approved · 23/4586No. 18 · 2023 · other work · approved · 23/4772No. 30 · 2023 · other work · approved · 23/5002No. 116 · 2023 · other work · undecided · 23/5266No. 49 · 2023 · other work · approved · 23/5359No. 7 · 2023 · other work · refused · 23/5390No. 4 · 2023 · other work · undecided · 23/5613No. 116 · 2023 · other work · undecided · 23/5666No. 116 · 2023 · other work · approved · 23/5828No. 1 · 2023 · other work · approved · 23/6175No number · 2024 · other work · approved · 24/4147No. 150 · 2024 · other work · refused · 24/4294No. 2 · 2024 · other work · approved · 24/5694No number · 2024 · other work · undecided · 24/5767No. 108 · 2024 · other work · undecided · 24/5875No. 108 · 2024 · other work · undecided · 24/6096No number · 2024 · other work · undecided · 24/6194No. 108 · 2024 · other work · refused · 24/6244No number · 2024 · other work · approved · 24/6457No number · 2024 · other work · undecided · 24/6493No number · 2025 · other work · undecided · 25/4026No number · 2025 · other work · approved · 25/4200No. 51 · 2025 · other work · approved · 25/4336No. 26 · 2025 · other work · approved · 25/5006No. 8 · 2025 · other work · approved · 25/5293No number · 2025 · other work · approved · 25/5765No. 1 · 2025 · other work · approved · 25/6152No. 135 · 2025 · other work · undecided · 25/6339No. 4 · 2025 · other work · undecided · 25/6498No. 1A · 2025 · other work · approved · 25/6582No. 135 · 2025 · other work · approved · 25/6584No number · 2026 · other work · undecided · 26/0437No number · 2026 · other work · undecided · 26/1172No. 7 · 2026 · other work · approved · 26/1250New house in a side gardenNo. 6 · 2021 · new house · undecided · 21/67726No. 6 · 2021 · new house · undecided · 21/7046No number · 2022 · new house · approved · 22/4464No. 6 · 2023 · new house · approved · 23/44956No. 4 · 2023 · new house · approved · 23/5846No. 34 · 2025 · new house · undecided · 25/623234No. 34 · 2025 · new house · refused · 25/6545
ApprovedRefusedWithdrawn or invalid

91 files with "Mallow" in the address within 600 m, other roads of the same name left out. Hover a dot for the house number and reference.

MeasuredOur classificationcouncil register via NPAD · 2021–2026

Extensions and refusals right beside you 2 within 250 m · 0 refused within 100 m

Extensions and refusals near you 2 extensions within 250 m · the last 12 months

2 no decision or withdrawn
KindAppliedApprovedRefused
Other20—

Refused within 100 m 0 in the last 12 months

Nothing refused this close in the last 12 months.

    How we work this out
    Home extensions are read from the application's description (extension, attic or dormer, porch, garage conversion, garden room), so a few may be missed or mislabelled. The kind is the first that fits: a dormer with a rear extension counts as a dormer. Refusal reasons come from An Coimisiún Pleanála's inspector reports, so they exist only where the refusal was appealed (Dún Laoghaire-Rathdown so far). The council's own reasons are on its planning file.
    Sources: National Planning Application Database, An Coimisiún Pleanála cases (ArcGIS feed) · fetched 27 Oct 2026, 01:33
    SourceLicenceFetchedLink
    National Planning Application DatabaseCC BY 4.027 Oct 2026, 01:33open
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.023 Oct 2026, 23:08open
    Sources: An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices), National Planning Application Database · fetched 27 Oct 2026, 02:09
    SourceLicenceFetchedLink
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.023 Oct 2026, 23:08open
    Building Control Management System (commencement notices)CC BY 4.027 Oct 2026, 02:09open
    National Planning Application DatabaseCC BY 4.027 Oct 2026, 01:33open
    Question 3

    How long, and what if someone objects?

    Figure 4

    A home extension's journey here

    A decision takes 55 days. Building starts about 4 months after permission.

    Comments open: 5 weeks · €20; Council decision: 55 days; Appeal window: 4 weeks; Building starts: 119 days after permission0 mo3 mo6 mo9 mo12 mo15 moComments openComments close 5 weeks after the application is lodged5 weeks · €20Council decisionDecision: median 55 days, middle half 52–102 (n=47)55 daysAppeal windowAnyone who commented can appeal within 4 weeks of the decision4 weeksBuilding startsStart notice: median 119 days after permission (n=11)119 days after permissionSigned off400 days after the start, for the few who file. 27% of owners opt out of sign-off

    Bars are medians; whiskers show the middle half. Medians of separate steps don't add up exactly.

    Calculated47 decided home extensions, 11 start notices · within 1.5 km, 10 years · NPAD, BCMS, An Coimisiún Pleanála

    Question 4

    What's changing around you?

    Street map around Fair Street with 10 numbered planning items
    ⌖ the houseEmpty land zoned for homesNo decision yetApprovedRefused
    1. 11.0 ha zoned for homesEmpty land zoned for homes · 222 m
    2. 25.7 ha zoned for homesEmpty land zoned for homes · 484 m
    3. 3St. Mary's Secondary School, Mallow 26/1624No decision yet · 63 m
    4. 4Unit 4, The Towers 25/6498No decision yet · 207 m
    5. 5Fair Street, Mallow 26/1172No decision yet · 211 m
    6. 6No. 1A, Rosecourt 25/6582Approved with conditions · 380 m
    7. 734 Bank Place, Mallow 25/6545Refused · 391 m
    8. 8134/135, Thomas Davis Street 25/6584Approved with conditions · 416 m
    9. 9No. 7 Saint Anthony's Park, Mallow 26/1250Approved with conditions · 453 m
    10. 10No.14 Deal Yard Lane, Mallow 26/0525Approved with conditions · 465 m
    Figure 5

    What happens to applications within 500 m

    Permission isn't building. Of 37 permissions since 2016, 4 show a start notice and 0 have a completion certificate.

    71 applications lodged within 500 m. Council: 37 approved, 3 refused. After appeals: 37 approved. Of those: 0 signed off, 0 built with the owner's opt-out, 4 started, 33 with no start notice found, 0 ran out.LODGEDCOUNCIL DECISIONAFTER APPEALSWHAT HAPPENED NEXT37: lodged → approved3: lodged → refused31: lodged → undecided37: approved → approved3: refused → refused31: undecided → undecided33: approved → no start notice found4: approved → started, not signed off71 lodged71 lodged37 approved37 approved3 refused3 refused31 undecided31 undecided37 approved37 approved3 refused3 refused31 undecided31 undecided33 no start notice found33 no start notice found4 started, not signed off4 started, not signed off

    Purple bands are refusals turned into permissions on appeal. "No start notice found" includes small jobs that never needed one and notices we couldn't match.

    Measured71 applications in 10 years · NPAD, An Coimisiún Pleanála, BCMS start notices and completion certificates

    Figure 6

    The next 30 days

    Nothing closes within 500 m in the next 30 days.

      Measuredcouncil registers and An Coimisiún Pleanála · deadlines worked out from the dates on file

      Sites that could change 2 within 500 m

      Empty land zoned for homes 2

      • 11.0 ha zoned for homes · no homes built on it yet · 222 m
      • 25.7 ha zoned for homes · no homes built on it yet · 484 m

      Not covered here: council land to be sold (Dublin only).

      Sources: An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices), Derelict sites registers, National Planning Application Database, Residential Zoned Land Tax maps · fetched 27 Oct 2026, 02:09
      SourceLicenceFetchedLink
      An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.023 Oct 2026, 23:08open
      Building Control Management System (commencement notices)CC BY 4.027 Oct 2026, 02:09open
      Derelict sites registersCC BY 4.026 Oct 2026, 23:09open
      National Planning Application DatabaseCC BY 4.027 Oct 2026, 01:33open
      Residential Zoned Land Tax mapsCC BY 4.025 Oct 2026, 23:43open
      Figure 7

      Applications within 500 m, by year

      Between 12 and 13 a year; busiest 2023. 93% of decisions were approvals.

      2021: 15, 2022: 12, 2023: 13, 2024: 13, 2025: 12, 2026: 6051015202021: 7 approved2021: 8 undecided15’21*2022: 7 approved2022: 5 undecided12’222023: 9 approved2023: 4 undecided13’232024: 6 approved2024: 2 refused2024: 5 undecided13’242025: 6 approved2025: 1 refused2025: 5 undecided12’252026: 2 approved2026: 4 undecided6’26*
      ApprovedRefusedWithdrawn or invalidUndecided

      2021 and 2026 are part years (*). Exemption requests and time extensions are left out.

      Measuredcouncil register via NPAD

      Every application within 500 m 11 in the last 12 months

      See every application on the map

      How we work this out
      Descriptions are shortened by the national planning database (to 80 characters in Dún Laoghaire-Rathdown, 70 in Fingal), and it does not publish applicants' names.
      Sources: National Planning Application Database, An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices) · fetched 27 Oct 2026, 02:09
      SourceLicenceFetchedLink
      National Planning Application DatabaseCC BY 4.027 Oct 2026, 01:33open
      An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.023 Oct 2026, 23:08open
      Building Control Management System (commencement notices)CC BY 4.027 Oct 2026, 02:09open
      Building work nearby 4 in the last 12 months
      4 not signed off
      • Spaglen, Mallow, Cork, P51 HNP6 · 13 Jul 2026 · start notice not signed off · 224372 · 350 m
      • 26 Bank Place, Mallow, Cork, P51 W8WN · 15 May 2026 · 2 homes · start notice not signed off · 436 m
      • First and Second Floors, 120 Thomas Davis Street, Mallow, Cork, P51 AK84 · 30 Dec 2025 · 4 homes · start notice not signed off · 437 m
      • 1 an 2 Landscape Terrace,, Mallow, Cork, P51 T383 · 10 Nov 2025 · start notice not signed off · 245694 · 297 m
      How we work this out
      Each row is a notice the builder sent to the council's building control office before work started. One notice can cover many homes. 'Signed off as finished' means a completion certificate is on file; work done under an opt-out or a short notice doesn't need one.
      Source: Building Control Management System (commencement notices) · fetched 27 Oct 2026, 02:09
      SourceLicenceFetchedLink
      Building Control Management System (commencement notices)CC BY 4.027 Oct 2026, 02:09open
      0
      Named places nearby: estate, schemes, crèches, schools

      Named places estate, developments, inspections

      Crèches and schools inspected

      NameLatest inspectionDistance
      Le Cheile Family Resource Centre (Mallow) Ltd · Crèche9 Apr 2026 · report · Tusla Early Years Inspectorate159 m
      Teach na nOige · Crèche22 Jan 2026 · report · Tusla Early Years Inspectorate791 m
      Serendipity Montessori & Childcare Facility · Crèche9 Sept 2024 · report · Tusla Early Years Inspectorate799 m
      How we work this out
      Organisations only: a person named on an application is never listed. Inspection dates and links are the publisher's; read their report for the findings.
      Sources: Department of Education school list, Tusla early years register · fetched 21 Oct 2026, 23:37
      SourceLicenceFetchedLink
      Department of Education school listCC BY 4.027 Sept 2026, 23:32open
      Tusla early years registerPublic register21 Oct 2026, 23:37open
      How busy is this area Busier than most of Cork County Council.
      Homes approved
      Here176
      Council middle0
      Homes started
      Here389
      Council middle1
      How we work this out
      Homes approved counts schemes of 10 or more homes (one-off houses are not included). Homes started counts every home in a notice that building work was starting. The council figure is the middle value across the council's built-up squares of the same area (3.1 km², about a 1 km circle), so half of them saw more and half fewer.
      Sources: An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices), National Planning Application Database · fetched 27 Oct 2026, 02:09
      SourceLicenceFetchedLink
      An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.023 Oct 2026, 23:08open
      Building Control Management System (commencement notices)CC BY 4.027 Oct 2026, 02:09open
      National Planning Application DatabaseCC BY 4.027 Oct 2026, 01:33open
      Question 5

      What's the area like?

      Figure 8

      This street block against the council

      49% of homes built before 1971 (council 28%). 72% owner-occupied (council 73%).

      Homes built before 1971
      49% · council 28%
      Homes built since 2001
      23% · council 36%
      Owner-occupied
      72% · council 73%
      Rented
      23% · council 22%
      Children under 15
      10% · council 21%
      Aged 65 and over
      49% · council 16%
      Households with 2+ cars
      26% · council 52%
      Work mainly from home
      9% · council 12%
      This small area (411 people)Cork

      MeasuredCSO Census 2022, Small Area Population Statistics (CC BY 4.0) · small area 047324020

      Bus
      571 m
      Mallow · 243, 51, 519
      Nearest school
      124 m
      St Mary's Secondary School, 749 pupils
      Schools, stops and the council

      Schools

      • St Mary's Secondary School · postprimary · 749 pupils · 124 m
      • S N Naomh Padraig Boys Senior School · primary · 212 pupils · 149 m
      • Patrician Academy · postprimary · 568 pupils · 218 m
      • Convent Girls Senior National School · primary · 246 pupils · 326 m
      • S N Iosagain · primary · 133 pupils · 374 m
      • Mallow Community National School · primary · 202 pupils · 785 m

      Stops 4

      • Mallow · 243, 51, 519, 522, 523, 530 · 5/hour at peak · 571 m

      Schools growing or shrinking planning in 3 years · pupils last year

      • St Mary's Secondary School · 124 m-1.2% pupils (749) · temporary classrooms 2026, no decision yet
      • S N Naomh Padraig Boys Senior School · 149 m+1.4% pupils (212)
      • Patrician Academy · 218 m-0.4% pupils (568)
      • Convent Girls Senior National School · 325 m-1.2% pupils (246)
      • S N Iosagain · 374 m-7% pupils (133)
      • Mallow Community National School · 785 m-1% pupils (202)
      Sources: Public transport stops and routes (NTA GTFS), Department of Education school list, National Planning Application Database, Council consultation portals, Council meetings (ModernGov), Land Development Agency public land register, cso_saps_2022, National Transport Authority, Fingal County Council and Dún Laoghaire-Rathdown County Council development plan layers (CC BY 4.0), dartplus.ie project extents over NTA GTFS rail shapes (CC BY 4.0), EPA strategic noise maps, Fingal County Council · fetched 27 Oct 2026, 01:57
      SourceLicenceFetchedLink
      Public transport stops and routes (NTA GTFS)CC BY 4.025 Oct 2026, 23:02open
      Department of Education school listCC BY 4.027 Sept 2026, 23:32open
      National Planning Application DatabaseCC BY 4.027 Oct 2026, 01:33open
      Council consultation portalsPublic27 Oct 2026, 00:57open
      Council meetings (ModernGov)Public27 Oct 2026, 01:57open
      Land Development Agency public land registerCC BY 4.011 Sept 2026, 16:43open
      cso_saps_2022CC BY 4.0—open
      National Transport AuthorityCC BY 4.0——
      Fingal County Council and Dún Laoghaire-Rathdown County Council development plan layers (CC BY 4.0)CC BY 4.0——
      dartplus.ie project extents over NTA GTFS rail shapes (CC BY 4.0)CC BY 4.0——
      EPA strategic noise mapsCC BY 4.0——
      Fingal County CouncilCC BY 4.0——
      Question 6

      What to ask, and who

      1. Any work done without planning permission?
        Ask for: An opinion of compliance for the whole house.
        Seller · solicitor
      Reference

      Where this is, the terms, the sources

      Townland
      Mallow
      Electoral division
      Mallow North Urban
      Electoral area
      Mallow
      Council
      Cork County Council
      Everything we found, as a list 8 lines
      • Zoned R2 (existing residential); no vacant land tax.
      • 2 sites nearby could change: 2 empty zoned plots.
      • No morning-peak service within 500 m; nearest is Mallow, 571 m away (5 an hour).
      • Here (2022 census): 72% owner-occupied (council 73%); 9% of homes empty (council 13%); most built 1961–1970; 62% drive to work (council 66%); population up 7% since 2016.
      • 2 home extensions within 250 m since 2026.
      • The council decides in a median 66 days (about 9 weeks).
      • Homes started within 1 km: 19 in the last year, 20 three years before.
      • 11 applications nearby in the last 12 months; 80% approved (council 92%).
      What the terms mean 5 terms
      • Vacant land tax (Residential Zoned Land Tax (RZLT)): A yearly tax of 3% of the land's value on land that is zoned for homes and serviced but left unbuilt.
      • Building started (Commencement notice (BCMS)): The builder must tell the council's building control office 14 to 28 days before work starts.
      • Signed off as finished (Certificate of Compliance on Completion): A certificate filed when a building is finished, confirming it meets the building regulations.
      • Approved (Grant of permission): The council said yes, usually with conditions.
      • What the land is zoned for (Zoning objective): The council's development plan sets what each area is for: homes, shops, open space and so on.
      Sources and licences 27
      SourcePublisherLicenceFetched
      EPA strategic noise maps—CC BY 4.0—
      Fingal County Council—CC BY 4.0—
      Fingal County Council and Dún Laoghaire-Rathdown County Council development plan layers (CC BY 4.0)—CC BY 4.0—
      National Transport Authority—CC BY 4.0—
      services-eu1.arcgis.comAn Coimisiún PleanálaCC BY 4.023 Oct 2026
      data.nbco.gov.ieNational Building Control Office (BCMS)CC BY 4.027 Oct 2026
      data.gov.ieVarious (see each layer)CC BY 4.0, CC BY-NC-ND 4.027 Sept 2026
      services-eu1.arcgis.comNational Inventory of Architectural HeritageCC BY 4.027 Sept 2026
      services-eu1.arcgis.comNational Monuments Service (SMR)CC BY 4.027 Sept 2026
      dlrcoco.citizenspace.comLocal authorities (consultation portals)Public27 Oct 2026
      www2.courts.ie—© the publisher26 Oct 2026
      cso.ie—CC BY 4.0—
      dartplus.ie project extents over NTA GTFS rail shapes (CC BY 4.0)—CC BY 4.0—
      services-eu1.arcgis.comLocal authorities (derelict sites registers)CC BY 4.026 Oct 2026
      data.epa.ieEnvironmental Protection Agency (LEAP licence register)CC BY 4.026 Oct 2026
      transportforireland.ieNational Transport AuthorityCC BY 4.025 Oct 2026
      lda.ieLand Development AgencyCC BY 4.011 Sept 2026
      meetings.fingal.ieLocal authorities (council meetings)Public27 Oct 2026
      services.arcgis.comDepartment of Housing (National Planning Application Database)CC BY 4.027 Oct 2026
      services-eu1.arcgis.comTailte ÉireannCC BY 4.011 Sept 2026
      services-eu1.arcgis.comCSO, Tailte Éireann, OpenStreetMap contributorsCC BY 4.04 Oct 2026
      propertypriceregister.ieProperty Services Regulatory Authority (PPR)© PSRA, PSI licence27 Oct 2026
      services.arcgis.comLocal authorities (RZLT maps)CC BY 4.025 Oct 2026
      gov.ieDepartment of EducationCC BY 4.027 Sept 2026
      gov.ieDepartment of HousingCC BY-SA 4.023 Oct 2026
      tusla.ieTusla (Early Years Inspectorate)Public register21 Oct 2026
      services.arcgis.comLocal authorities via the Department of Housing (GZT / MyPlan)CC BY 4.025 Oct 2026
      Measured
      counted from a public register
      Calculated
      a rate or median we worked out from those counts
      Our classification
      we sorted it by reading each description
      Estimate
      inferred from another source (census, map data)
      Rule summary
      the law, simplified: check before relying on it
      How we work this out
      Generated 27 Oct 2026, 16:57 from the Planning Register store; nothing was fetched live. Not a legal search: the council's planning file is the record. Deadlines come from published dates under the Planning and Development Act 2000: confirm with the council before relying on them. Street map © OpenStreetMap contributors; building outlines © Overture Maps Foundation. The text version carries every figure with its source, for an AI assistant.