Planning report · Wicklow County Council · 2000 m around the house · the last 12 months · 24 Oct 2026, 10:42

Sidmonton Court

53.19661, -6.09805

Homes here mostly date from 1919–1945. Home extensions nearby almost always get approved (93%). 341 homes approved 1.4 km away haven't started.

See on the mapWatch this area

How planning works, with this area's numbers

steps can overlap · medians for home extensions within 1.5 km, 10 years
  1. 1ApplySite notice up, plans online
  2. 2Comments5 weeks, €20. Comment to keep your right to appeal
  3. 3Decision8 weeks by law. Here 49 days
  4. 4Appeal window4 weeks after the decision
  5. 5AppealAt An Coimisiún Pleanála
  6. 6PermissionLasts 5 years
  7. 7StartStart notice to the council. Here about 6 months after
  8. 8Sign-offCompletion cert, or the owner opts out
Question 1

What's the planning story of this house?

Figure 1

When it was built, and the rules since

Most homes here were built 1919–45, before planning permission was needed.

Timeline from 1915: planning permission needed from October 1964, building regulations from June 1992, building records online from March 2014, sign-off opt-out from September 2015. Most homes here were built 1919–1945.19201930194019501960197019801990200020102020Oct 1964permission neededJun 1992building regulationsMar 2014building records onlineSep 2015owners may opt out of sign-offThis houseAll of Sidmonton CourtBuilt: most homes in this small area date from 1919–1945 (census estimate)most built2022: 1 file on Sidmonton Court2024: 2 files on Sidmonton Court3 files

Each line is a rule that applies to work done after it.

MeasuredEstimatecouncil register via NPAD · build years: CSO Census 2022, small area

On this site
R2
Zoning · Existing residential
No
Protected or listed · on the council's list
No
Vacant land tax · not on the map
1 in 20
Radon (EPA) · homes with high radon
B
Flood zone (development plan) · Zone B: moderate risk
Zoning, protection, tax and flood: the detail
ZoningR2 · Existing residential
What it says

Existing Residential: To protect, provide and improve residential amenities of existing residential areas.

An established residential area. The objective is to protect existing residential amenity as well as to provide housing — which is the objective a neighbour's objection to an overbearing extension is usually argued under.

bray municipal district local area plan 2018 · 10 Jun 2018 – 23 Oct 2028

Radon1 in 20 homes have high radon (EPA)

Not on this site: protected building, heritage inventory, monument zone, conservation area, EU nature site, EU bird site, natural heritage area, tree order, landslide risk, derelict list.

Vacant land taxNo not on the map
Flood riskWithin 100 m OPW map area within 100 m · floodinfo.ie
Within 2.0 kmCountFor example
Licensed industrial sites5A. O. Smith Electric Motors (Ireland) Limited; Bray Chemicals Ltd.
Landslide risk areas3Bray2003; Bray 1840
Natural heritage areas1Bray Head
Heritage inventory buildings304Altona House; Neptune House
Radon grid squares10
EU nature sites1Bray Head SAC
Monuments54Church; Graveyard
How we work this out
'On this site' means the record's own map outline touches the registered parcel (or a 12 m circle round the point where there is no parcel). Only the council's own list confirms a protected building; ask the council if in doubt. The OPW flood map's licence lets us show a yes/no only. Land on the vacant land tax map nearby: 19 on the draft 2027 map; 19 on the final 2026 map.
Sources: Development plan zoning (councils), EPA radon map, Residential Zoned Land Tax maps, Constraint layers (bundle), EPA licensed sites, OPW flood maps (CFRAM), OPW flood maps (NIFM), GSI landslide susceptibility, Natural Heritage Areas (NPWS), National Inventory of Architectural Heritage, Special Areas of Conservation (NPWS), Sites and Monuments Record · fetched 19 Oct 2026, 00:29
SourceLicenceFetchedLink
Development plan zoning (councils)CC BY 4.018 Oct 2026, 23:24open
EPA radon mapCC BY 4.027 Sept 2026, 19:36open
Residential Zoned Land Tax mapsCC BY 4.019 Oct 2026, 00:29open
Constraint layers (bundle)CC BY 4.0, CC BY-NC-ND 4.027 Sept 2026, 19:37open
EPA licensed sitesCC BY 4.027 Sept 2026, 19:36open
OPW flood maps (CFRAM)CC BY-NC-ND 4.0 · shown as a yes/no only11 Sept 2026, 19:11open
OPW flood maps (NIFM)CC BY-NC-ND 4.0 · shown as a yes/no only11 Sept 2026, 19:11open
GSI landslide susceptibilityPublic27 Sept 2026, 19:36open
Natural Heritage Areas (NPWS)CC BY 4.027 Sept 2026, 19:27open
National Inventory of Architectural HeritageCC BY 4.027 Sept 2026, 19:35open
Special Areas of Conservation (NPWS)CC BY 4.027 Sept 2026, 19:27open
Sites and Monuments RecordCC BY 4.027 Sept 2026, 19:29open
How we work this out
Applications whose site outline (or map point) falls on this property. 'No sign building has started' means we found no notice to the council's building control office; small jobs don't always file one, so ask. A missing completion certificate is not proof of a problem: an owner can opt out of official sign-off for a house or extension built for themselves.
Sources: Building Control Management System (commencement notices), National Planning Application Database · fetched 24 Oct 2026, 02:34
SourceLicenceFetchedLink
Building Control Management System (commencement notices)CC BY 4.024 Oct 2026, 02:34open
National Planning Application DatabaseCC BY 4.024 Oct 2026, 02:29open
Question 2

Could you extend?

Nothing on this site restricts it: not protected, not in a conservation area.

Figure 2

What happened to applications like yours

Extensions are almost always approved here: 91–100% by type. A new house in a garden is harder: 57% approved, and 1 in 3 is asked for more information.

Single-storey rear38 decided · more info asked 21%
97% · council 95%
Two-storey rear15 decided · more info asked 7%
93% · council 90%
Single-storey side12 decided · more info asked 8%
100% · council 99%
Attic or dormer49 decided · more info asked 35%
94% · council 92%
First-floor24 decided · more info asked 29%
96% · council 92%
Garage conversion11 decided · more info asked 9%
100% · council 88%
Porch or front11 decided · more info asked 36%
91% · council 93%
New house in a garden or site21 decided · more info asked 38%
57% · council 82%
Approved nearbyWicklow overall

Decided applications within 1.5 km, received in the last 10 years. The kind of work is read from each description.

CalculatedOur classificationcouncil register via NPAD · 181 nearby, 2,192 council-wide

Figure 3

Sidmonton Court, file by file since 2022

1 of 1 decided extensions on the road were approved. New houses in side gardens or on sites: 1 of 2.

3 planning files on Sidmonton Court since 2022, by kind and decision.20222023202420252026Extensions, atticsNo. 1 · 2024 · garage conversion · approved · 2460199Porches, roofs, otherNew house in a side gardenNo number · 2022 · new house · refused · 22595No number · 2024 · new house · approved · 2460301
ApprovedRefusedWithdrawn or invalid

3 files with "Sidmonton Court" in the address within 600 m, other roads of the same name left out. Hover a dot for the house number and reference.

MeasuredOur classificationcouncil register via NPAD · 2022–2026

Extensions and refusals right beside you 9 within 250 m · 1 refused within 100 m

Extensions and refusals near you 9 extensions within 250 m · the last 12 months

6 of 7 approved (86%) · most common: dormer or attic

6 approved1 refused2 no decision or withdrawn
KindAppliedApprovedRefused
Dormer or attic531
Rear21—
First-floor11—
Single-storey rear11—

Refused within 100 m 1 in the last 12 months

  • 2560904 · dormer or attic conversion · refused 4 Mar 2026 · 35 m
How we work this out
Home extensions are read from the application's description (extension, attic or dormer, porch, garage conversion, garden room), so a few may be missed or mislabelled. The kind is the first that fits: a dormer with a rear extension counts as a dormer. Refusal reasons come from An Coimisiún Pleanála's inspector reports, so they exist only where the refusal was appealed (Dún Laoghaire-Rathdown so far). The council's own reasons are on its planning file.
Sources: National Planning Application Database, An Coimisiún Pleanála cases (ArcGIS feed) · fetched 24 Oct 2026, 02:29
SourceLicenceFetchedLink
National Planning Application DatabaseCC BY 4.024 Oct 2026, 02:29open
An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.023 Oct 2026, 23:08open
Sources: An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices), National Planning Application Database · fetched 24 Oct 2026, 02:34
SourceLicenceFetchedLink
An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.023 Oct 2026, 23:08open
Building Control Management System (commencement notices)CC BY 4.024 Oct 2026, 02:34open
National Planning Application DatabaseCC BY 4.024 Oct 2026, 02:29open
Question 3

How long, and what if someone objects?

Figure 4

A home extension's journey here

A decision takes 49 days. 1 in 4 is asked for more information, which adds about 49 days. Building starts about 6 months after permission.

Comments open: 5 weeks · €20; Council decision: 49 days; If more info asked (1 in 4): 98 days; Appeal window: 4 weeks; Building starts: 188 days after permission0 mo3 mo6 mo9 mo12 mo15 mo18 moComments openComments close 5 weeks after the application is lodged5 weeks · €20Council decisionDecision: median 49 days, middle half 46–53 (n=143)49 daysIf more info asked (1 in 4)With further information: median 98 days (n=49)98 daysAppeal windowAnyone who commented can appeal within 4 weeks of the decision4 weeksBuilding startsStart notice: median 188 days after permission (n=67)188 days after permissionSigned off61% of owners opt out of sign-off

Bars are medians; whiskers show the middle half. Medians of separate steps don't add up exactly.

Calculated192 decided home extensions, 67 start notices · within 1.5 km, 10 years · NPAD, BCMS, An Coimisiún Pleanála

Figure 5

What appeals changed

12 of 24 appealed refusals became permissions. 3 of 28 appealed approvals were reversed.

Refusals appealed24 decided
12 became permissions
Approvals appealed28 decided
3 reversed
Ended approvedEnded refusedWithdrawn, invalid or other

Every appeal decided within 1.5 km in 10 years, any kind of development.

CalculatedAn Coimisiún Pleanála cases linked to the council file

Appeals nearby 15 in the last 12 months

None of 1 changed the council's decision

  • 501974 Pending · Site of c. 0.3 ha at Riverside Works , Bray , Co. Wicklow · 1.2 km
  • 501655 Open · Saint Kevin's Square , Bray , Co. Wicklow · 1.0 km
  • 501051 Granted · Mountrath , Meath Road , Bray · 35 m
  • 500809 Granted · Bray Waterfront, Strand Road, Bray, Co. Wicklow,, Site includes the… · 233 m
  • 323846 Other · 15A St. Kevins Square, Bray, Co. Wicklow · 1.1 km
  • 500829 Granted · Petite Maison, 61 Meath Road, Bray, Co. Wicklow · 67 m
  • 500684 Granted with conditions · Dunville, Upper Dargle Road, Bray, Co. Wicklow · 1.7 km
  • 324074 Granted with conditions · Site at the former Bray Golf Club Lands off the Dublin Road and… · 1.6 km report
  • 501380 Pending · 31 Seapoint Court , Bray , Co. Wickow · 1.3 km
  • 501360 Pending · A 0.4883 Ha site to the south of Boghall Road , Bray Co. Wicklow ,… · 1.3 km
  • 501293 Pending · Former Radius Communications site; Ballywaltrim Business Park ,… · 1.8 km
  • 500807 Invalid · Petite Maison, 61 Meath Road, Bray, Co. Wicklow · 67 m
  • 500768 Pending · A 0.4883 Ha site to the south of Boghall Road, The site is generally… · 1.3 km
  • 500393 Pending · Shemrune House , Killarney Road , Bray · 1.5 km
  • 500380 Invalid · Shemrune House , Killarney Road , Bray · 1.5 km
Sources: An Coimisiún Pleanála cases (ArcGIS feed), Courts Service legal diary (judicial reviews), National Planning Application Database · fetched 24 Oct 2026, 02:29
SourceLicenceFetchedLink
An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.023 Oct 2026, 23:08open
Courts Service legal diary (judicial reviews)© the publisher23 Oct 2026, 23:01open
National Planning Application DatabaseCC BY 4.024 Oct 2026, 02:29open
Question 4

What's changing around you?

Street map around Sidmonton Court with 15 numbered planning items
⌖ the houseOpen for commentsWindow closingApproved, not started
  1. 1Commercial Unit 1, Strand View Apartments 2660913No decision yet · 437 m
  2. 2Mizpah, Florence Road 2660887No decision yet · 837 m
  3. 3Fatima House, Quinsborough Road 2660857No decision yet · 988 m
  4. 4Rosemarie Galtrim Park, Bray 2660880No decision yet · 1.1 km
  5. 5The Court, Foggie Field 2660893No decision yet · 1.3 km
  6. 683 Wheatfield, Bray 2660847No decision yet · 1.3 km
  7. 7Gort na Mona, 2a Oldcourt Park 2660870No decision yet · 1.5 km
  8. 8Bray Motors, Corke abbey avenue D26A/0725/WEBNo decision yet · 2.0 km
  9. 92 Sydenham Villas, Putland Road Bray 2660762Approved with conditions · 124 m
  10. 10No. 2 Westbourne Terrace, Quinsborough Road 2660748Refused · 1.1 km
  11. 111 Quinsborough Road, Bray 2660757Approved with conditions · 1.1 km
  12. 12Bray Sailing Club, Harbour Road 2660726Approved with conditions · 1.2 km
  13. 13Southern Cross Road, Bray 2660088Approved with conditions · 1.6 km
  14. 14Site includes the existing surface car park accessible off S 2560512Approved, no sign building has started · 289 m
  15. 155 Albert Avenue 21470Approved, not started, approval runs out within a year · 770 m
Figure 6

What happens to applications within 500 m

Permission isn't building. Of 100 permissions since 2016, 39 show a start notice and 3 have a completion certificate. Most owners opt out of sign-off.

114 applications lodged within 500 m. Council: 96 approved, 18 refused. After appeals: 100 approved. Of those: 3 signed off, 24 built with the owner's opt-out, 12 started, 58 with no start notice found, 3 ran out.LODGEDCOUNCIL DECISIONAFTER APPEALSWHAT HAPPENED NEXT96: lodged → approved18: lodged → refused95: approved → approved13: refused → refused1 approved by the council, refused after an appeal5 refused by the council, approved after an appeal58: approved → no start notice found24: approved → built, owner opted out12: approved → started, not signed off3: approved → signed off3: approved → ran out114 lodged114 lodged96 approved96 approved18 refused18 refused100 approved100 approved14 refused14 refused58 no start notice found58 no start notice found24 built, owner opted out24 built, owner opted out12 started, not signed off12 started, not signed off3 signed off3 signed off3 ran out3 ran out

Purple bands are refusals turned into permissions on appeal. "No start notice found" includes small jobs that never needed one and notices we couldn't match.

Measured114 applications in 10 years · NPAD, An Coimisiún Pleanála, BCMS start notices and completion certificates

Figure 7

The next 30 days

14 deadlines within 2.0 km; the first closes 27 Oct 2026.

13 deadlines in the next 30 days: 2026-10-27 2660847: application received — alterations and extension to the existing two storey semi-detached house to include, a new two storey side extension, ; 2026-10-28 2660857: application received — planning application for permission for amendments to previously approved grant of planning permission (An Bord Pleanála; 2026-10-29 2660762: CONDITIONAL — a new vehicular entrance with hinged gates, along with all associated and ancillary site development works; 2026-10-29 2660748: REFUSED — (1) Removal of existing rear garden storage building along the east boundary; (2) Converting the existing first and seco; 2026-11-02 2660726: CONDITIONAL — installation of an external platform lift, extension of the external deck at first floor level by 12 sq.m., extension of; 2026-11-02 D26A/0725/WEB: application received — The development will consist of retention permission for an attic conversion wi; 2026-11-03 2660870: application received — (a) demolition of single storey sun room to rear, (b) construction of single storey extension to front, side and rear, (; 2026-11-05 2660880: application received — (1) The removal of the existing single-storey rear extension. (2) The construction of a new flat-roofed rear extension a; 2026-11-05 2660088: CONDITIONAL — • provision of new vehicular entrance off Southern Cross Road with associated internal access road. • construction of 2 ; 2026-11-06 2660887: application received — modifications to the front and side (east) elevations, including alterations to existing window openings, the constructi; 2026-11-10 2660757: CONDITIONAL — the change of use from retail to a residential use at first floor and part ground floor, the residential unit will compr; 2026-11-10 2660893: application received — (1) the retention of a laundry facility located within the existing porch at the entrance to the premises; (2) the reten; 2026-11-16 2660913: application received — material change of use of restaurant limited to an ice-cream/waffle parlour to restaurant, together with associated signtoday29 Oct3 Nov8 Nov13 Nov18 Nov23 Nov2660847: application received — alterations and extension to the existing two storey semi-detached house to include, a new two storey side extension, · 1.3 km away · 2026-10-272660857: application received — planning application for permission for amendments to previously approved grant of planning permission (An Bord Pleanála · 988 m away · 2026-10-282660762: CONDITIONAL — a new vehicular entrance with hinged gates, along with all associated and ancillary site development works · 124 m away · 2026-10-292660748: REFUSED — (1) Removal of existing rear garden storage building along the east boundary; (2) Converting the existing first and seco · 1.1 km away · 2026-10-292660726: CONDITIONAL — installation of an external platform lift, extension of the external deck at first floor level by 12 sq.m., extension of · 1.2 km away · 2026-11-02D26A/0725/WEB: application received — The development will consist of retention permission for an attic conversion wi · 2 km away · 2026-11-022660870: application received — (a) demolition of single storey sun room to rear, (b) construction of single storey extension to front, side and rear, ( · 1.5 km away · 2026-11-032660880: application received — (1) The removal of the existing single-storey rear extension. (2) The construction of a new flat-roofed rear extension a · 1.1 km away · 2026-11-052660088: CONDITIONAL — • provision of new vehicular entrance off Southern Cross Road with associated internal access road. • construction of 2 · 1.6 km away · 2026-11-052660887: application received — modifications to the front and side (east) elevations, including alterations to existing window openings, the constructi · 837 m away · 2026-11-062660757: CONDITIONAL — the change of use from retail to a residential use at first floor and part ground floor, the residential unit will compr · 1.1 km away · 2026-11-102660893: application received — (1) the retention of a laundry facility located within the existing porch at the entrance to the premises; (2) the reten · 1.3 km away · 2026-11-102660913: application received — material change of use of restaurant limited to an ice-cream/waffle parlour to restaurant, together with associated sign · 437 m away · 2026-11-16
Comments closeTime to appeal endsHigh Court window ends
  • Comments close 27 Oct 20263 days left
    62660847 · application received — alterations and extension to the existing two storey semi-detached house to include, a new two…
    €20 to the council · 1.3 km away
  • Comments close 28 Oct 20264 days left
    32660857 · application received — planning application for permission for amendments to previously approved grant of planning…
    €20 to the council · 988 m away
  • Time to appeal ends 29 Oct 20265 days left
    92660762 · CONDITIONAL — a new vehicular entrance with hinged gates, along with all associated and ancillary site development works
    €220 to An Coimisiún Pleanála (€110 observer) · 124 m away
  • Time to appeal ends 29 Oct 20265 days left
    102660748 · REFUSED — (1) Removal of existing rear garden storage building along the east boundary; (2) Converting the existing…
    €220 to An Coimisiún Pleanála (€110 observer) · 1.1 km away
  • Time to appeal ends 2 Nov 20269 days left
    122660726 · CONDITIONAL — installation of an external platform lift, extension of the external deck at first floor level by 12…
    €220 to An Coimisiún Pleanála (€110 observer) · 1.2 km away
  • Comments close 2 Nov 20269 days left
    8D26A/0725/WEB · application received — The development will consist of retention permission for an attic conversion wi
    €20 to the council · 2.0 km away
  • Comments close 3 Nov 202610 days left
    72660870 · application received — (a) demolition of single storey sun room to rear, (b) construction of single storey extension to…
    €20 to the council · 1.5 km away
  • Comments close 5 Nov 202612 days left
    42660880 · application received — (1) The removal of the existing single-storey rear extension. (2) The construction of a new…
    €20 to the council · 1.1 km away
  • Time to appeal ends 5 Nov 202612 days left
    132660088 · CONDITIONAL — • provision of new vehicular entrance off Southern Cross Road with associated internal access road. •…
    €220 to An Coimisiún Pleanála (€110 observer) · 1.6 km away
  • Comments close 6 Nov 202613 days left
    22660887 · application received — modifications to the front and side (east) elevations, including alterations to existing window…
    €20 to the council · 837 m away
  • Time to appeal ends 10 Nov 202617 days left
    112660757 · CONDITIONAL — the change of use from retail to a residential use at first floor and part ground floor, the residential…
    €220 to An Coimisiún Pleanála (€110 observer) · 1.1 km away
  • Comments close 10 Nov 202617 days left
    52660893 · application received — (1) the retention of a laundry facility located within the existing porch at the entrance to the…
    €20 to the council · 1.3 km away
  • Comments close 16 Nov 202623 days left
    12660913 · application received — material change of use of restaurant limited to an ice-cream/waffle parlour to restaurant,…
    €20 to the council · 437 m away
  • Time to ask the High Court for a review ends 25 Nov 202632 days left
    Grant permission
    1.3 km away

Measuredcouncil registers and An Coimisiún Pleanála · deadlines worked out from the dates on file

Figure 8

Approved, stalled or planned, not built yet

341 homes 1.4 km away were approved Sept 2025 with no start notice yet; the permission runs to Sept 2031. DART+ Coastal South is planned 165 m away.

Former Bray Golf Course… · 341 homes: 341 homes approved Sep 2025, not started; Vevay Road and Boghall… · 178 homes: 178 homes approved Mar 2024, not started; Former Bray Golf Club… · 159 homes: 159 homes approved May 2026, not started; Bray Golf Club Lands · 125 homes: 125 homes approved, not started; runs out Dec 2026; DART+ Coastal South, DART+…: proposed (stage 1: Bray-Greystones 2 to 3 trains per hour); DART+ Coastal South, Bray…: proposed (stage 1: Bray-Greystones 2 to 3 trains per hour)202120222023202420252026202720282029203020312032Former Bray Golf Course… · 341 homes1.4 km · 2560207341 homes approved Sep 2025, not started341 homes approved Sep 2025, not startedVevay Road and Boghall… · 178 homes1.0 km · 2446178 homes approved Mar 2024, not started178 homes approved Mar 2024, not startedFormer Bray Golf Club… · 159 homes1.7 km · LRD25A/0644/WEB159 homes approved May 2026, not started159 homes approved May 2026, not startedBray Golf Club Lands · 125 homes1.5 km · SH202103125 homes approved, not started; runs out Dec 2026125 homes approved, not started; runs out Dec 2026DART+ Coastal South, DART+…165 m · plannedproposed (stage 1: Bray-Greystones 2 to 3 trains per hour)DART+ Coastal South, Bray…803 m · plannedproposed (stage 1: Bray-Greystones 2 to 3 trains per hour)today

Each row is a dated fact from a public register: no score and no forecast.

Measuredcouncil registers, BCMS, derelict sites registers, development plan layers (CC BY 4.0)

Sites that could change 19 within 2.0 km

Approved, not started, approval running out 2

Approved, not started 7

Empty land zoned for homes 10

  • 0.2 ha zoned for homes · no homes built on it yet · 266 m
  • 1.7 ha zoned for homes · no homes built on it yet · 370 m
  • 2.0 ha zoned for homes · no homes built on it yet · 711 m
  • 0.1 ha zoned for homes · no homes built on it yet · 976 m
  • 1.1 ha zoned for homes · no homes built on it yet · 1.1 km
  • 0.3 ha zoned for homes · no homes built on it yet · 1.2 km
  • 4.4 ha zoned for homes · no homes built on it yet · 1.3 km
  • 1.5 ha zoned for homes · no homes built on it yet · 1.4 km
  • 1.9 ha zoned for homes · no homes built on it yet · 1.6 km
  • 0.5 ha zoned for homes · no homes built on it yet · 1.7 km

Not covered here: council land to be sold (Dublin only).

Sources: An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices), Derelict sites registers, National Planning Application Database, Residential Zoned Land Tax maps · fetched 24 Oct 2026, 02:34
SourceLicenceFetchedLink
An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.023 Oct 2026, 23:08open
Building Control Management System (commencement notices)CC BY 4.024 Oct 2026, 02:34open
Derelict sites registersCC BY 4.019 Oct 2026, 23:17open
National Planning Application DatabaseCC BY 4.024 Oct 2026, 02:29open
Residential Zoned Land Tax mapsCC BY 4.019 Oct 2026, 00:29open
Figure 9

Applications within 500 m, by year

Between 17 and 22 a year; busiest 2024. 84% of decisions were approvals.

2021: 24, 2022: 17, 2023: 18, 2024: 22, 2025: 20, 2026: 1301020302021: 22 approved2021: 2 refused24’21*2022: 13 approved2022: 4 refused17’222023: 14 approved2023: 4 refused18’232024: 18 approved2024: 4 refused22’242025: 16 approved2025: 4 refused20’252026: 13 approved13’26*
ApprovedRefusedWithdrawn or invalidUndecided

2021 and 2026 are part years (*). Exemption requests and time extensions are left out.

Measuredcouncil register via NPAD

Open for comments €20 to comment

Every application within 2.0 km 169 in the last 12 months

See every application on the map

How we work this out
Descriptions are shortened by the national planning database (to 80 characters in Dún Laoghaire-Rathdown, 70 in Fingal), and it does not publish applicants' names.
Sources: National Planning Application Database, An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices) · fetched 24 Oct 2026, 02:34
SourceLicenceFetchedLink
National Planning Application DatabaseCC BY 4.024 Oct 2026, 02:29open
An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.023 Oct 2026, 23:08open
Building Control Management System (commencement notices)CC BY 4.024 Oct 2026, 02:34open
Building work nearby 50 in the last 12 months
2 signed off as finished14 not signed off34 no sign-off needed
  • Realt Na Mara, 1 Fontenoy Terrace, Strand Road,, Bray, Wicklow, A98N9K1 · 23 Oct 2026 · 1 homes · short notice no sign-off needed · 26/60064 · 353 m
  • Galtrim Park, Bray, Wicklow · 21 Oct 2026 · 5 homes · start notice not signed off · 1.1 km
  • 4 Raheen Lawn, Bray, Wicklow, A98 A7N8 · 20 Oct 2026 · 1 homes · start notice, opted out no sign-off needed · 211485 · 352 m
  • Vevay Road, Bray, Wicklow · 15 Oct 2026 · 53 homes · start notice not signed off · 25184 · 778 m
  • Shoreside, Sea Gardens, Bray, Wicklow, A98 F3C2 · 15 Oct 2026 · start notice not signed off · 1.5 km
  • 4 Quinsborough Road, Bray, Wicklow, A98 XH63 · 12 Oct 2026 · 1 homes · 7-day notice not signed off · 2660195 · 1.1 km
  • King Edward Lawn, Bray, Wicklow · 21 Sept 2026 · short notice no sign-off needed · 25/60563 · 1.2 km
  • Glenlucan House, Glenlucan Court, Bray, Wicklow · 2 Sept 2026 · 6 homes · 7-day notice not signed off · 25/60302 · 1.4 km
  • Boghall Road, Bray, Wicklow · 24 Aug 2026 · 9 homes · start notice not signed off · 23/338 - ABP317752-23 · 1.2 km
  • Castle Street, Bray, Wicklow, A98K290 · 13 Aug 2026 · 1 homes · start notice, opted out no sign-off needed · 2655 · 1.3 km
  • Putland Road, Bray, Wicklow, A98 CK73 · 5 Aug 2026 · 172 homes · 7-day notice not signed off · 26/60118 · 204 m
  • Main Street Central, Bray, Wicklow, A98 H9X5 · 4 Aug 2026 · 7-day notice not signed off · 1.1 km
  • Strand Road, Bray, Wicklow, A98CA32 · 31 Jul 2026 · 1 homes · start notice, opted out no sign-off needed · 25/60828 · 490 m
  • Seapoint Court, Bray, Wicklow · 22 Jul 2026 · 1 homes · short notice no sign-off needed · 25/61056 · 1.2 km
  • 50 Ardmore Park, Bray, Wicklow, A98 XR80 · 15 Jul 2026 · 1 homes · short notice no sign-off needed · 2660259 · 1.5 km
  • 123 Hollybrook Park, Bray, Wicklow, A98 YV81 · 13 Jul 2026 · 1 homes · short notice no sign-off needed · 26/60120 · 1.9 km
  • 32 Beechwood Close, Bray, Wicklow, A98 DA39 · 7 Jul 2026 · 7-day notice not signed off · 25/61047 · 1.1 km
  • 1A Raverty Villas, Bray, Wicklow, A98 R970 · 6 Jul 2026 · 1 homes · short notice no sign-off needed · 25/60951 · 1.9 km
  • 160 Ardmore Park, Bray, Wicklow, A98 HF97 · 11 Jun 2026 · 1 homes · short notice no sign-off needed · 25/60432 · 1.7 km
  • King Edward Road, Bray, Wicklow, A98P271 · 10 Jun 2026 · 1 homes · start notice, opted out no sign-off needed · 2360390 · 1.4 km
  • Seapoint Road, Bray, Wicklow · 27 May 2026 · 1 homes · start notice not signed off · 26/60035 · 1.2 km
  • Sidmonton Road, Bray, Wicklow, A98 RD73 · 15 May 2026 · short notice no sign-off needed · 2560918 · 358 m
  • Block C - Sea Gardens, Bray, Wicklow, 0 · 11 May 2026 · start notice signed off · 25/60681 · 1.5 km
  • Upper Dargle Road, Bray, Wicklow, A98 D6P4 · 6 May 2026 · 1 homes · start notice, opted out no sign-off needed · 23/691 · 1.7 km
  • 2 Newcourt Avenue, Bray, Wicklow, A98 WN53 · 5 May 2026 · 1 homes · short notice no sign-off needed · 25/60389 · 404 m
  • Newcourt Avenue, Bray, Wicklow, A98K352 · 1 May 2026 · 1 homes · start notice, opted out no sign-off needed · 25/60561 · 377 m
  • Unit 2, Dargan Hall, Bray, Wicklow, A98 A0X8 · 24 Apr 2026 · start notice signed off · 2560641 · 845 m
  • 1 Wheatfield, Bray, Wicklow, A98 YW61 · 16 Apr 2026 · short notice no sign-off needed · 20/1111 · 1.4 km
  • 4 Old Brighton Terrace, Parnell Road, Bray, Wicklow, A98 E7Y5 · 13 Apr 2026 · 1 homes · short notice no sign-off needed · 221194 · 1.2 km
  • 69 Meath Road, Bray, Wicklow, A98RK06 · 6 Apr 2026 · 1 homes · start notice, opted out no sign-off needed · 2560265 · 163 m
  • 12 Cuala Road, Bray, Wicklow, A98 F8W2 · 3 Apr 2026 · 1 homes · short notice no sign-off needed · 2560458 · 281 m
  • Leenan, Putland Rd,, Bray, Wicklow, A98 FH59 · 23 Feb 2026 · 1 homes · start notice, opted out no sign-off needed · 2560122 / ABP32236725 · 249 m
  • Mill Lane, Bray, Wicklow · 11 Feb 2026 · 1 homes · 7-day notice not signed off · PL REF. 23238 & APPEAL REF. 2560433 · 1.2 km
  • Putland Road, Bray, Wicklow, A98Y4T8 · 4 Feb 2026 · 1 homes · short notice no sign-off needed · 22/74 · 529 m
  • 52 James Connolly Square, Bray, Wicklow, A98 DT93 · 3 Feb 2026 · 1 homes · short notice no sign-off needed · 25/60454 · 1.1 km
  • Takeda Ireland Ltd, Bray Business Park, Kilruddery, Wicklow, A98 CD36 · 3 Feb 2026 · short notice no sign-off needed · 25/60727 · 1.8 km
  • 50 Church Road, Bray, Wicklow, A98DW65 · 27 Jan 2026 · 1 homes · short notice no sign-off needed · 1.1 km
  • 4 Oldcourt Park, Bray, Wicklow, A98X9F9 · 23 Jan 2026 · 1 homes · short notice no sign-off needed · 25/60618 · 1.4 km
  • 33 Giltspur Wood, Bray, Wicklow, A98 XE37 · 21 Jan 2026 · short notice no sign-off needed · 2460410 · 1.3 km
  • Strand Road, Bray, Wicklow · 7 Jan 2026 · start notice not signed off · 22/232 · 728 m
  • 1 Churchlands, Bray, Wicklow, A98 VP92 · 24 Dec 2025 · 1 homes · start notice, opted out no sign-off needed · 943 m
  • 66F-66J Upper Dargle Road & Green Park Road, Bray, Wicklow, n/a · 21 Dec 2025 · 4 homes · 7-day notice not signed off · 1.7 km
  • 4 Saint Peters Road, Bray, Wicklow, A98 TN12 · 15 Dec 2025 · 1 homes · short notice no sign-off needed · 25/60093 · 1.9 km
  • Herbert Road, Bray, Wicklow, A98 V8X7 · 1 Dec 2025 · 1 homes · start notice, opted out no sign-off needed · 25/60298 · 1.3 km
  • Upper Dargle Road, Bray, Wicklow, A98 D796 · 1 Dec 2025 · 1 homes · start notice, opted out no sign-off needed · 22/875 · 1.8 km
  • 27 Dublin Road, Bray, Wicklow, A98 NP49 · 20 Nov 2025 · 3 homes · 7-day notice not signed off · 1.8 km
  • Church Road, Bray, Wicklow, a98 x726 · 18 Nov 2025 · 1 homes · short notice no sign-off needed · 24/60221 · 1.0 km
  • 2 Cuala Road, Bray, Wicklow, A98 T6C4 · 10 Nov 2025 · 1 homes · start notice, opted out no sign-off needed · 23398 · 342 m
  • Strand Road, Bray, Wicklow, A98 R8X9 · 31 Oct 2025 · 1 homes · start notice, opted out no sign-off needed · 25/60477 · 782 m
  • 30 Ledwidge Crescent, Bray, Wicklow, A98 WK00 · 27 Oct 2025 · 1 homes · start notice, opted out no sign-off needed · 2560128 · 1.7 km
How we work this out
Each row is a notice the builder sent to the council's building control office before work started. One notice can cover many homes. 'Signed off as finished' means a completion certificate is on file; work done under an opt-out or a short notice doesn't need one.
Source: Building Control Management System (commencement notices) · fetched 24 Oct 2026, 02:34
SourceLicenceFetchedLink
Building Control Management System (commencement notices)CC BY 4.024 Oct 2026, 02:34open
Homes coming 1,575 not started
How we work this out
Schemes of 10 or more homes approved since 2021, from the council and An Coimisiún Pleanála registers. 'Building started' means the builder told the council's building control office that work was starting (a commencement notice).
Sources: An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices), National Planning Application Database, Social housing construction status report · fetched 24 Oct 2026, 02:34
SourceLicenceFetchedLink
An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.023 Oct 2026, 23:08open
Building Control Management System (commencement notices)CC BY 4.024 Oct 2026, 02:34open
National Planning Application DatabaseCC BY 4.024 Oct 2026, 02:29open
Social housing construction status reportCC BY-SA 4.023 Oct 2026, 23:02open
Named places nearby: estate, schemes, crèches, schools

Named places estate, developments, inspections

Crèches and schools inspected

NameLatest inspectionDistance
Clare Elizabeth Creche · Crèche25 Feb 2025 · report · Tusla Early Years Inspectorate262 m
Cuala Montessori · Crèche28 Nov 2025 · report · Tusla Early Years Inspectorate266 m
Little Bunnies Montessori · Crèche24 Mar 2026 · report · Tusla Early Years Inspectorate837 m
Little Bunnies Montessori · Crèche8 Oct 2025 · report · Tusla Early Years Inspectorate841 m
How we work this out
Organisations only: a person named on an application is never listed. Inspection dates and links are the publisher's; read their report for the findings.
Sources: Department of Education school list, Tusla early years register · fetched 21 Oct 2026, 23:37
SourceLicenceFetchedLink
Department of Education school listCC BY 4.027 Sept 2026, 23:32open
Tusla early years registerPublic register21 Oct 2026, 23:37open
How busy is this area Busier than most of Wicklow County Council.
Homes approved
Here190
Council middle0
Homes started
Here308
Council middle1
How we work this out
Homes approved counts schemes of 10 or more homes (one-off houses are not included). Homes started counts every home in a notice that building work was starting. The council figure is the middle value across the council's built-up squares of the same area (3.1 km², about a 1 km circle), so half of them saw more and half fewer.
Sources: An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices), National Planning Application Database · fetched 24 Oct 2026, 02:34
SourceLicenceFetchedLink
An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.023 Oct 2026, 23:08open
Building Control Management System (commencement notices)CC BY 4.024 Oct 2026, 02:34open
National Planning Application DatabaseCC BY 4.024 Oct 2026, 02:29open
Question 5

What's the area like?

Figure 10

This street block against the council

48% of homes built before 1971 (council 26%). 89% owner-occupied (council 71%).

Homes built before 1971
48% · council 26%
Homes built since 2001
5% · council 32%
Owner-occupied
89% · council 71%
Rented
11% · council 24%
Children under 15
10% · council 21%
Aged 65 and over
44% · council 15%
Households with 2+ cars
39% · council 48%
Work mainly from home
14% · council 14%
This small area (360 people)Wicklow

MeasuredCSO Census 2022, Small Area Population Statistics (CC BY 4.0) · small area 257081019

Rail noise
45–49 dB
day–night average (EPA 2022)
Bus
93 m
Putland Road · L14 · busiest stop within 500 m: 2 an hour at peak
Planned
165 m
DART+ Coastal South, DART+ Coastal South: Bray (Daly) - Greystones
Radon
1 in 20
homes here likely high (EPA). Test it
Flood
Yes
OPW flood map area within 100 m
Nearest school
566 m
Loreto Secondary School, 747 pupils
Homes sold nearby
1124
in 3 years, 243 new (Property Price Register)
Schools, stops and the council

Schools

  • Loreto Secondary School · postprimary · 747 pupils · 566 m
  • Presentation College · postprimary · 667 pupils · 569 m
  • Scoil Chualann · primary · 185 pupils · 633 m
  • Cronan Naofa NS · primary · 388 pupils · 698 m
  • Gaelscoil Ui Cheadaigh · primary · 166 pupils · 813 m
  • Scoil Padraig Naofa · primary · 680 pupils · 825 m
  • St Andrews NS · primary · 204 pupils · 837 m
  • New Court School · primary · 100 pupils · 837 m

Stops 88

  • Putland Road · L14 · 2/hour at peak · 93 m
  • Sidmonton Road · L14 · 2/hour at peak · 100 m
  • Meath Road · L14 · 2/hour at peak · 126 m
  • Bray Promenade · L14 · 2/hour at peak · 297 m
  • Presentation Col · L14 · 2/hour at peak · 379 m
  • Victoria Avenue · L14 · 2/hour at peak · 405 m
  • Putland Road · L14 · 2/hour at peak · 495 m
  • Lauderdale Terrace · 185T, 45A, 45B, 84n, L1, L2 · 7/hour at peak · 629 m

Schools growing or shrinking planning in 3 years · pupils last year

  • Loreto Secondary School · 566 m+1.6% pupils (747) · temporary classrooms 2026, no decision yet
  • Presentation College · 569 m+2.8% pupils (667)
  • Scoil Chualann · 633 m-2.1% pupils (185)
  • Cronan Naofa NS · 698 m-1% pupils (388)
  • Gaelscoil Ui Cheadaigh · 813 m-11.7% pupils (166) · temporary classrooms 2026, no decision yet
  • Scoil Padraig Naofa · 825 m-4.9% pupils (680) · temporary classrooms 2026, no decision yet

Public land

  • Wicklow County Council · 0.2 ha · 426 m
  • Wicklow County Council · 2.48 ha · 428 m
  • Wicklow County Council · 0.74 ha · 434 m
  • Wicklow County Council · 2.84 ha · 439 m
  • Health Service Executive · 0.13 ha · 459 m
  • Wicklow County Council · 1.3 ha · 488 m
Sources: Public transport stops and routes (NTA GTFS), Department of Education school list, National Planning Application Database, Council consultation portals, Council meetings (ModernGov), Land Development Agency public land register, cso_saps_2022, National Transport Authority, Fingal County Council and Dún Laoghaire-Rathdown County Council development plan layers (CC BY 4.0), dartplus.ie project extents over NTA GTFS rail shapes (CC BY 4.0), EPA strategic noise maps, Fingal County Council · fetched 24 Oct 2026, 02:46
SourceLicenceFetchedLink
Public transport stops and routes (NTA GTFS)CC BY 4.018 Oct 2026, 23:44open
Department of Education school listCC BY 4.027 Sept 2026, 23:32open
National Planning Application DatabaseCC BY 4.024 Oct 2026, 02:29open
Council consultation portalsPublic24 Oct 2026, 01:49open
Council meetings (ModernGov)Public24 Oct 2026, 02:46open
Land Development Agency public land registerCC BY 4.011 Sept 2026, 16:43open
cso_saps_2022CC BY 4.0—open
National Transport AuthorityCC BY 4.0——
Fingal County Council and Dún Laoghaire-Rathdown County Council development plan layers (CC BY 4.0)CC BY 4.0——
dartplus.ie project extents over NTA GTFS rail shapes (CC BY 4.0)CC BY 4.0——
EPA strategic noise mapsCC BY 4.0——
Fingal County CouncilCC BY 4.0——
Question 6

What to ask, and who

  1. Inside Flood Zone B on the council's development plan map: can you insure it?
    Ask for: A home insurance quote before you bid, and any flood risk assessment in the site's planning file.
    Insurer
  2. Flood risk area within 100 m: can you insure it?
    Ask for: A flood-cover quote before sale agreed.
    Insurer
  3. A dormer or attic conversion 35 m away was refused in 2026: could yours be?
    Ask for: The refusal reasons on the council's file for 2560904.
    Council
  4. Application 437 m away open for comments until 16 Nov 2026: comment?
    Ask for: The plans on the council's website (€20 to comment).
    Council
  5. Decision 124 m away can be appealed until 29 Oct 2026: appeal?
    Ask for: The decision on the council's website (€220 to appeal).
    Council
  6. Any work done without planning permission?
    Ask for: An opinion of compliance for the whole house.
    Seller · solicitor
Reference

Where this is, the terms, the sources

Townland
Bray
Electoral division
Bray No. 2
Electoral area
Bray East
Council
Wicklow County Council
Everything we found, as a list 8 lines
  • Zoned R2 (existing residential); not protected; no vacant land tax; flood risk area within 100 m.
  • Inside Flood Zone B on the Wicklow County Development Plan 2022-2028 flood map.
  • 19 sites nearby could change: 9 approved schemes, 10 empty zoned plots.
  • 8 applications open for comments nearby; nearest closes 16 Nov 2026.
  • 1 application refused within 100 m since 2025; latest a dormer or attic conversion (2026).
  • 1,575 homes approved nearby, not started; largest 586 at Bray Golf Club Lands.
  • Putland Road (bus L14) 93 m away: 2 an hour at morning peak; 14 from all stops within 500 m. Planned: DART+ Coastal South 165 m away, proposed (stage 1: Bray-Greystones 2 to 3 trains per hour).
  • Noise from rail mapped at 45–49 dB (day-evening-night average, EPA 2022).
What the terms mean 8 terms
  • Vacant land tax (Residential Zoned Land Tax (RZLT)): A yearly tax of 3% of the land's value on land that is zoned for homes and serviced but left unbuilt.
  • Building started (Commencement notice (BCMS)): The builder must tell the council's building control office 14 to 28 days before work starts.
  • Signed off as finished (Certificate of Compliance on Completion): A certificate filed when a building is finished, confirming it meets the building regulations.
  • Approved (Grant of permission): The council said yes, usually with conditions.
  • Approval ran out without being built (Permission lapsed / expired): Most permissions last five years.
  • Comment on an application (Observation / submission): Anyone can comment on a planning application within five weeks of it being lodged, for a €20 fee.
  • Appeal (Appeal to An Coimisiún Pleanála): The applicant, or anyone who commented in time, can appeal the council's decision within four weeks.
  • What the land is zoned for (Zoning objective): The council's development plan sets what each area is for: homes, shops, open space and so on.
Sources and licences 37
SourcePublisherLicenceFetched
EPA strategic noise maps—CC BY 4.0—
Fingal County Council—CC BY 4.0—
Fingal County Council and Dún Laoghaire-Rathdown County Council development plan layers (CC BY 4.0)—CC BY 4.0—
National Transport Authority—CC BY 4.0—
services-eu1.arcgis.comAn Coimisiún PleanálaCC BY 4.023 Oct 2026
data.nbco.gov.ieNational Building Control Office (BCMS)CC BY 4.024 Oct 2026
data.gov.ieVarious (see each layer)CC BY 4.0, CC BY-NC-ND 4.027 Sept 2026
gis.epa.ieEnvironmental Protection AgencyCC BY 4.027 Sept 2026
s3.eu-west-1.amazonaws.comOffice of Public WorksCC BY-NC-ND 4.0 · flag only11 Sept 2026
s3.eu-west-1.amazonaws.comOffice of Public WorksCC BY-NC-ND 4.0 · flag only11 Sept 2026
gsi.geodata.gov.ieGeological Survey IrelandPublic27 Sept 2026
services-eu1.arcgis.comNational Parks and Wildlife ServiceCC BY 4.027 Sept 2026
services-eu1.arcgis.comNational Inventory of Architectural HeritageCC BY 4.027 Sept 2026
gis.epa.ieEnvironmental Protection AgencyCC BY 4.027 Sept 2026
services-eu1.arcgis.comNational Parks and Wildlife ServiceCC BY 4.027 Sept 2026
services-eu1.arcgis.comNational Monuments Service (SMR)CC BY 4.027 Sept 2026
dlrcoco.citizenspace.comLocal authorities (consultation portals)Public24 Oct 2026
www2.courts.ie—© the publisher23 Oct 2026
cso.ie—CC BY 4.0—
dartplus.ie project extents over NTA GTFS rail shapes (CC BY 4.0)—CC BY 4.0—
services-eu1.arcgis.comLocal authorities (derelict sites registers)CC BY 4.019 Oct 2026
esbnetworks.ie—© the publisher · flag only11 Sept 2026
services.arcgis.com—CC BY 4.0—
transportforireland.ieNational Transport AuthorityCC BY 4.018 Oct 2026
lda.ieLand Development AgencyCC BY 4.011 Sept 2026
meetings.fingal.ieLocal authorities (council meetings)Public24 Oct 2026
services.arcgis.comDepartment of Housing (National Planning Application Database)CC BY 4.024 Oct 2026
services-eu1.arcgis.comTailte ÉireannCC BY 4.011 Sept 2026
services-eu1.arcgis.comCSO, Tailte Éireann, OpenStreetMap contributorsCC BY 4.04 Oct 2026
propertypriceregister.ieProperty Services Regulatory Authority (PPR)© PSRA, PSI licence24 Oct 2026
services.arcgis.comLocal authorities (RZLT maps)CC BY 4.018 Oct 2026
gov.ieDepartment of EducationCC BY 4.027 Sept 2026
gov.ieDepartment of HousingCC BY-SA 4.023 Oct 2026
tusla.ieTusla (Early Years Inspectorate)Public register21 Oct 2026
water.ie—© the publisher · flag only—
water.ie—© the publisher · flag only—
services.arcgis.comLocal authorities via the Department of Housing (GZT / MyPlan)CC BY 4.018 Oct 2026
Measured
counted from a public register
Calculated
a rate or median we worked out from those counts
Our classification
we sorted it by reading each description
Estimate
inferred from another source (census, map data)
Rule summary
the law, simplified: check before relying on it
How we work this out
Generated 24 Oct 2026, 10:42 from the Planning Register store; nothing was fetched live. Not a legal search: the council's planning file is the record. Deadlines come from published dates under the Planning and Development Act 2000: confirm with the council before relying on them. Street map © OpenStreetMap contributors; building outlines © Overture Maps Foundation. The text version carries every figure with its source, for an AI assistant.