Planning report · Galway City Council · 500 m around the house · the last 12 months · 24 Oct 2026, 04:57

67 Dalysfort Road

53.26326, -9.08034

Homes here mostly date from the 1950s. 2 planning files on this house, the latest from 2022. Home extensions nearby almost always get approved (94%). 25 homes approved 473 m away haven't started.

See on the mapWatch this area

Not held yet for Galway City Council: council consultations.

How planning works, with this area's numbers

steps can overlap · medians for home extensions within 1.5 km, 10 years
  1. 1ApplySite notice up, plans online
  2. 2Comments5 weeks, €20. Comment to keep your right to appeal
  3. 3Decision8 weeks by law. Here 53 days
  4. 4Appeal window4 weeks after the decision
  5. 5AppealAt An Coimisiún Pleanála
  6. 6PermissionLasts 5 years
  7. 7StartStart notice to the council. Here about 7 months after
  8. 8Sign-offCompletion cert, or the owner opts out
Question 1

What's the planning story of this house?

Figure 1

When it was built, and the rules since

Most homes here were built 1946–60, before planning permission was needed. 2 planning files on this house, the latest from 2023.

Timeline from 1942: planning permission needed from October 1964, building regulations from June 1992, building records online from March 2014, sign-off opt-out from September 2015. Most homes here were built 1946–1960. 2 planning files on this house.19501960197019801990200020102020Oct 1964permission neededJun 1992building regulationsMar 2014building records onlineSep 2015owners may opt out of sign-offThis houseBuilt: most homes in this small area date from 1946–1960 (census estimate)most built2023: 22311 · work already done, approved2022: 21380 · work already done, approved

Each line is a rule that applies to work done after it.

MeasuredEstimatecouncil register via NPAD · build years: CSO Census 2022, small area

  1. 2023
    22311 · work already done · approved 2023 · work already done
    approvedstartedsigned off?
  2. 2022
    21380 · work already done · approved 2022 · work already done
    approvedstartedsigned off?
  • 1 Jul 2021 · notice that building work was starting · owner opted out of official sign-off: no completion certificate expected
  • 8 Mar 2021 · notice that building work was starting · signed off as finished may 2024
On this site
R3
Zoning · Rural cluster
No
Protected or listed · on the council's list
Yes
Vacant land tax · 3% of land value a year
Zoning, protection, tax and flood: the detail
ZoningR3 · Rural cluster
What it says

Residential: To provide residential development and for associated support development, which will ensure the protection of existing residential amenity and will contribute to sustainable residential neighbourhoods

A small rural settlement where only modest infill serving local need is envisaged.

galway city development plan 2023 2029 · 4 Jan 2023 – 4 Jan 2029

ZoningR3 · Rural cluster
What it says

Residential: To provide residential development and for associated support development, which will ensure the protection of existing residential amenity and will contribute to sustainable residential neighbourhoods

A small rural settlement where only modest infill serving local need is envisaged.

galway city development plan 2023 2029 variations 1 2 3 · 4 Jan 2023 – 4 Jan 2029

Monument zone1 within 100 m House - 18th/19th century, Cappanaveagh

Not on this site: protected building, heritage inventory, conservation area, EU nature site, EU bird site, natural heritage area, tree order, landslide risk, derelict list.

Vacant land taxYes 3% of the land's value a year
Flood riskNone mapped within 500 m
Within 500 mCountFor example
Heritage inventory buildings3Salthill Park; Catholic Church of Christ the King
Monuments7Ringfort - unclassified; House - 18th/19th century
How we work this out
'On this site' means the record's own map outline touches the registered parcel (or a 12 m circle round the point where there is no parcel). Only the council's own list confirms a protected building; ask the council if in doubt. This land is on the council's final map for the vacant land tax. Unless it is a home someone lives in (or its garden), the owner pays 3% of the land's value a year until homes are built or the zoning changes. The OPW flood map's licence lets us show a yes/no only. Land on the vacant land tax map nearby: 43 on the draft 2027 map; 43 on the final 2026 map.
Sources: Development plan zoning (councils), Sites and Monuments Record, Residential Zoned Land Tax maps, Constraint layers (bundle), National Inventory of Architectural Heritage · fetched 19 Oct 2026, 00:29
SourceLicenceFetchedLink
Development plan zoning (councils)CC BY 4.018 Oct 2026, 23:24open
Sites and Monuments RecordCC BY 4.027 Sept 2026, 19:29open
Residential Zoned Land Tax mapsCC BY 4.019 Oct 2026, 00:29open
Constraint layers (bundle)CC BY 4.0, CC BY-NC-ND 4.027 Sept 2026, 19:37open
National Inventory of Architectural HeritageCC BY 4.027 Sept 2026, 19:35open
How we work this out
Applications whose site outline (or map point) falls on this property. 'No sign building has started' means we found no notice to the council's building control office; small jobs don't always file one, so ask. A missing completion certificate is not proof of a problem: an owner can opt out of official sign-off for a house or extension built for themselves.
Sources: Building Control Management System (commencement notices), National Planning Application Database · fetched 24 Oct 2026, 02:34
SourceLicenceFetchedLink
Building Control Management System (commencement notices)CC BY 4.024 Oct 2026, 02:34open
National Planning Application DatabaseCC BY 4.024 Oct 2026, 02:29open
Question 2

Could you extend?

Nothing on this site restricts it: not protected, not in a conservation area.

Figure 2

What happened to applications like yours

Extensions are almost always approved here: 85–100% by type. A new house in a garden is harder: 80% approved, and 1 in 3 is asked for more information.

Single-storey rear46 decided · more info asked 13%
98% · council 94%
Two-storey rear30 decided · more info asked 37%
97% · council 92%
Two-storey side10 decided · more info asked 20%
100% · council 96%
Attic or dormer27 decided · more info asked 22%
85% · council 88%
First-floor14 decided · more info asked 7%
93% · council 96%
Garage conversion13 decided · more info asked 31%
100% · council 97%
Porch or front22 decided · more info asked 9%
91% · council 89%
New house in a garden or site49 decided · more info asked 37%
80% · council 84%
Approved nearbyGalway overall

Decided applications within 1.5 km, received in the last 10 years. The kind of work is read from each description.

CalculatedOur classificationcouncil register via NPAD · 211 nearby, 607 council-wide

Extensions and refusals right beside you 2 within 250 m · 1 refused within 100 m

Extensions and refusals near you 2 extensions within 250 m · the last 12 months

2 approved
KindAppliedApprovedRefused
Dormer or attic11—
Side11—

On Dalysfort Road: 22 extensions in 10 years, 86% of all applications approved; most common rear.

Refused within 100 m 1 in the last 12 months

  • 2660086 · work already done · refused 5 May 2026 · 78 m
How we work this out
Home extensions are read from the application's description (extension, attic or dormer, porch, garage conversion, garden room), so a few may be missed or mislabelled. The kind is the first that fits: a dormer with a rear extension counts as a dormer. Refusal reasons come from An Coimisiún Pleanála's inspector reports, so they exist only where the refusal was appealed (Dún Laoghaire-Rathdown so far). The council's own reasons are on its planning file.
Sources: National Planning Application Database, An Coimisiún Pleanála cases (ArcGIS feed) · fetched 24 Oct 2026, 02:29
SourceLicenceFetchedLink
National Planning Application DatabaseCC BY 4.024 Oct 2026, 02:29open
An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.023 Oct 2026, 23:08open
Sources: An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices), National Planning Application Database · fetched 24 Oct 2026, 02:34
SourceLicenceFetchedLink
An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.023 Oct 2026, 23:08open
Building Control Management System (commencement notices)CC BY 4.024 Oct 2026, 02:34open
National Planning Application DatabaseCC BY 4.024 Oct 2026, 02:29open
Question 3

How long, and what if someone objects?

Figure 3

A home extension's journey here

A decision takes 53 days. 1 in 5 is asked for more information, which adds about 91 days. Building starts about 7 months after permission.

Comments open: 5 weeks · €20; Council decision: 53 days; If more info asked (1 in 5): 141 days; Appeal window: 4 weeks; Building starts: 218 days after permission0 mo3 mo6 mo9 mo12 mo15 moComments openComments close 5 weeks after the application is lodged5 weeks · €20Council decisionDecision: median 53 days, middle half 48–55 (n=187)53 daysIf more info asked (1 in 5)With further information: median 141 days (n=44)141 daysAppeal windowAnyone who commented can appeal within 4 weeks of the decision4 weeksBuilding startsStart notice: median 218 days after permission (n=98)218 days after permissionSigned off65% of owners opt out of sign-off

Bars are medians; whiskers show the middle half. Medians of separate steps don't add up exactly.

Calculated231 decided home extensions, 98 start notices · within 1.5 km, 10 years · NPAD, BCMS, An Coimisiún Pleanála

Figure 4

What appeals changed

6 of 15 appealed refusals became permissions. 1 of 25 appealed approvals were reversed.

Refusals appealed15 decided
6 became permissions
Approvals appealed25 decided
1 reversed
Ended approvedEnded refusedWithdrawn, invalid or other

Every appeal decided within 1.5 km in 10 years, any kind of development.

CalculatedAn Coimisiún Pleanála cases linked to the council file

Appeals nearby 4 in the last 12 months
  • 501446 Refused · 46 Dalysfort Road , Towland of Cappanaveagh , Salthill · 78 m
  • 501955 Pending · No 20 Lenaboy Park , Salthill , Galway · 310 m
  • 501737 Open · Quincentennial Drive , Salthill , Galway City. · 476 m
  • 501557 Open · 206 Upper Salthill Road , Salthill , Galway · 395 m
Sources: An Coimisiún Pleanála cases (ArcGIS feed), Courts Service legal diary (judicial reviews), National Planning Application Database · fetched 24 Oct 2026, 02:29
SourceLicenceFetchedLink
An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.023 Oct 2026, 23:08open
Courts Service legal diary (judicial reviews)© the publisher23 Oct 2026, 23:01open
National Planning Application DatabaseCC BY 4.024 Oct 2026, 02:29open
Question 4

What's changing around you?

Street map around 67 Dalysfort Road with 15 numbered planning items
⌖ the houseApproved, not startedRefusedEmpty land zoned for homesBuilding startedNo decision yetApproved
  1. 1Rockbarton Court 21307Approved, no sign building has started · 473 m
  2. 246 Dalysfort Road, Towland of Cappanaveagh 2660086Refused · 78 m
  3. 35.3 ha zoned for homesEmpty land zoned for homes · 25 m
  4. 41.2 ha zoned for homesEmpty land zoned for homes · 50 m
  5. 510 Rockbarton Road, Galway 25/60151Building started · 129 m
  6. 610 Rockbarton Road, Galway 25/60151Building started · 136 m
  7. 71.6 ha zoned for homesEmpty land zoned for homes · 139 m
  8. 80.4 ha zoned for homesEmpty land zoned for homes · 139 m
  9. 95.6 ha zoned for homesEmpty land zoned for homes · 145 m
  10. 101.7 ha zoned for homesEmpty land zoned for homes · 171 m
  11. 1119 Doctor Mannix Road, Galway 2560391Building started · 187 m
  12. 1219 Árd na Mara, Bóthar na Trá 2660152No decision yet · 103 m
  13. 1319 Doctor Mannix Road, Salthill 2560391Approved with conditions · 174 m
  14. 143 D'alton Drive, Salthill 2660078Approved with conditions · 214 m
  15. 153 PARK AVENUE, SALTHILL 2560377Approved with conditions · 237 m
Figure 5

What happens to applications within 500 m

Permission isn't building. Of 137 permissions since 2016, 55 show a start notice and 4 have a completion certificate. Most owners opt out of sign-off.

152 applications lodged within 500 m. Council: 136 approved, 16 refused. After appeals: 137 approved. Of those: 4 signed off, 36 built with the owner's opt-out, 15 started, 70 with no start notice found, 12 ran out.LODGEDCOUNCIL DECISIONAFTER APPEALSWHAT HAPPENED NEXT136: lodged → approved16: lodged → refused136: approved → approved15: refused → refused1 refused by the council, approved after an appeal70: approved → no start notice found36: approved → built, owner opted out15: approved → started, not signed off4: approved → signed off12: approved → ran out152 lodged152 lodged136 approved136 approved16 refused16 refused137 approved137 approved15 refused15 refused70 no start notice found70 no start notice found36 built, owner opted out36 built, owner opted out15 started, not signed off15 started, not signed off4 signed off4 signed off12 ran out12 ran out

Purple bands are refusals turned into permissions on appeal. "No start notice found" includes small jobs that never needed one and notices we couldn't match.

Measured152 applications in 10 years · NPAD, An Coimisiún Pleanála, BCMS start notices and completion certificates

Figure 6

The next 30 days

1 deadline within 500 m; the first closes 13 Nov 2026.

1 deadlines in the next 30 days: 2026-11-13 ACP 501446: Refuse permissiontoday29 Oct3 Nov8 Nov13 Nov18 Nov23 NovACP 501446: Refuse permission · 78 m away · 2026-11-13
High Court window ends
  • Time to ask the High Court for a review ends 13 Nov 202620 days left
    Refuse permission
    78 m away

Measuredcouncil registers and An Coimisiún Pleanála · deadlines worked out from the dates on file

Figure 7

Approved, stalled or planned, not built yet

25 homes 473 m away were approved May 2022 with no start notice yet; the permission runs to Nov 2028.

Rockbarton Court · 25 homes: 25 homes approved May 2022, not started20222023202420252026202720282029Rockbarton Court · 25 homes473 m · 2130725 homes approved May 2022, not started25 homes approved May 2022, not startedtoday

Each row is a dated fact from a public register: no score and no forecast.

Measuredcouncil registers, BCMS, derelict sites registers, development plan layers (CC BY 4.0)

Sites that could change 11 within 500 m

Approved, not started 1

Empty land zoned for homes 10

  • 35.3 ha zoned for homes · no homes built on it yet · 25 m
  • 41.2 ha zoned for homes · no homes built on it yet · 50 m
  • 71.6 ha zoned for homes · no homes built on it yet · 139 m
  • 80.4 ha zoned for homes · no homes built on it yet · 139 m
  • 95.6 ha zoned for homes · no homes built on it yet · 145 m
  • 101.7 ha zoned for homes · no homes built on it yet · 171 m
  • 1.7 ha zoned for homes · no homes built on it yet · 176 m
  • 1.3 ha zoned for homes · no homes built on it yet · 188 m
  • 1.8 ha zoned for homes · no homes built on it yet · 208 m
  • 2.1 ha zoned for homes · no homes built on it yet · 0 m

Not covered here: council land to be sold (Dublin only).

Sources: An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices), Derelict sites registers, National Planning Application Database, Residential Zoned Land Tax maps · fetched 24 Oct 2026, 02:34
SourceLicenceFetchedLink
An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.023 Oct 2026, 23:08open
Building Control Management System (commencement notices)CC BY 4.024 Oct 2026, 02:34open
Derelict sites registersCC BY 4.019 Oct 2026, 23:17open
National Planning Application DatabaseCC BY 4.024 Oct 2026, 02:29open
Residential Zoned Land Tax mapsCC BY 4.019 Oct 2026, 00:29open
Figure 8

Applications within 500 m, by year

Between 18 and 35 a year; busiest 2023. 89% of decisions were approvals.

2021: 34, 2022: 18, 2023: 35, 2024: 24, 2025: 28, 2026: 130102030402021: 32 approved2021: 2 refused34’21*2022: 16 approved2022: 2 refused18’222023: 32 approved2023: 3 refused35’232024: 21 approved2024: 3 refused24’242025: 24 approved2025: 4 refused28’252026: 11 approved2026: 2 refused13’26*
ApprovedRefusedWithdrawn or invalidUndecided

2021 and 2026 are part years (*). Exemption requests and time extensions are left out.

Measuredcouncil register via NPAD

Every application within 500 m 26 in the last 12 months

See every application on the map

How we work this out
Descriptions are shortened by the national planning database (to 80 characters in Dún Laoghaire-Rathdown, 70 in Fingal), and it does not publish applicants' names.
Sources: National Planning Application Database, An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices) · fetched 24 Oct 2026, 02:34
SourceLicenceFetchedLink
National Planning Application DatabaseCC BY 4.024 Oct 2026, 02:29open
An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.023 Oct 2026, 23:08open
Building Control Management System (commencement notices)CC BY 4.024 Oct 2026, 02:34open
Building work nearby 16 in the last 12 months
7 not signed off9 no sign-off needed
  • 6 Rockbarton Green, Galway, H91 N93C · 21 Oct 2026 · 1 homes · start notice, opted out no sign-off needed · 26/60114 · 290 m
  • 610 Rockbarton Road, Galway · 22 Sept 2026 · 2 homes · start notice not signed off · 25/60151 · 136 m
  • 510 Rockbarton Road, Galway · 22 Sept 2026 · 2 homes · start notice not signed off · 25/60151 · 129 m
  • 36 Glenard Crescent, Galway, H91 ER2V · 27 Aug 2026 · 1 homes · start notice, opted out no sign-off needed · 2560304 · 393 m
  • 4 Glenard Avenue, Galway, H91 P90H · 24 Aug 2026 · 1 homes · start notice, opted out no sign-off needed · PP2660115 · 420 m
  • 1119 Doctor Mannix Road, Galway, H91 W9HE · 20 Jul 2026 · 1 homes · short notice no sign-off needed · 2560391 · 187 m
  • Rockbarton North, Galway, H91 KH94 · 16 Jul 2026 · 7-day notice not signed off · 25/60056 · 393 m
  • 2 Dalysfort Road, Galway · 5 Jun 2026 · 1 homes · start notice not signed off · 2660022 · 473 m
  • 28 Dalysfort Road, Salthill, Galway, H91 W08Y · 1 Jun 2026 · short notice no sign-off needed · 25/60343 · 263 m
  • 28 Dalysfort Road, Salthill, Galway, H91 W08Y · 19 May 2026 · 1 homes · start notice not signed off · 23/151 · 261 m
  • 3 Beach Avenue, Galway, H91 DD8C · 17 Apr 2026 · 1 homes · start notice, opted out no sign-off needed · 24/60356 · 478 m
  • 6 Doctor Mannix Road, Galway, H91 P8KH · 23 Mar 2026 · 1 homes · start notice, opted out no sign-off needed · 446 m
  • 5 Glenard Road, Galway, H91 Y83C · 2 Feb 2026 · 1 homes · start notice, opted out no sign-off needed · 2560047 · 340 m
  • 150 Bóthar Na Trá Uachtarach, Galway · 29 Dec 2025 · start notice not signed off · 2460218 · 482 m
  • 8 Rockbarton Green, Galway, H91 YN1F · 4 Nov 2025 · 1 homes · short notice no sign-off needed · 278 m
  • 147 Upper Salthill, Galway, H91 FT6K · 25 Oct 2025 · start notice not signed off · 23/114 · 456 m
How we work this out
Each row is a notice the builder sent to the council's building control office before work started. One notice can cover many homes. 'Signed off as finished' means a completion certificate is on file; work done under an opt-out or a short notice doesn't need one.
Source: Building Control Management System (commencement notices) · fetched 24 Oct 2026, 02:34
SourceLicenceFetchedLink
Building Control Management System (commencement notices)CC BY 4.024 Oct 2026, 02:34open
Homes coming 25 not started
How we work this out
Schemes of 10 or more homes approved since 2021, from the council and An Coimisiún Pleanála registers. 'Building started' means the builder told the council's building control office that work was starting (a commencement notice).
Sources: An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices), National Planning Application Database, Social housing construction status report · fetched 24 Oct 2026, 02:34
SourceLicenceFetchedLink
An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.023 Oct 2026, 23:08open
Building Control Management System (commencement notices)CC BY 4.024 Oct 2026, 02:34open
National Planning Application DatabaseCC BY 4.024 Oct 2026, 02:29open
Social housing construction status reportCC BY-SA 4.023 Oct 2026, 23:02open
Named places nearby: estate, schemes, crèches, schools

Named places estate, developments, inspections

Estate: Dalysfort Road · 38 applications in 10 years · 86% approved · most common: rear

Crèches and schools inspected

NameLatest inspectionDistance
Bright Minds Preschool · Crèche19 Feb 2025 · report · Tusla Early Years Inspectorate255 m
Rosebuds Pre- School · Crèche2 Dec 2025 · report · Tusla Early Years Inspectorate622 m
Smarties Montessori · Crèche12 May 2025 · report · Tusla Early Years Inspectorate709 m
Amberley Montessori Preschool · Crèche6 Sept 2024 · report · Tusla Early Years Inspectorate850 m
How we work this out
Organisations only: a person named on an application is never listed. Inspection dates and links are the publisher's; read their report for the findings.
Sources: Housing estates, Department of Education school list, Tusla early years register · fetched 21 Oct 2026, 23:37
SourceLicenceFetchedLink
Housing estatesODbL 1.0, CC BY-SA 4.0, CC BY 4.027 Sept 2026, 20:18open
Department of Education school listCC BY 4.027 Sept 2026, 23:32open
Tusla early years registerPublic register21 Oct 2026, 23:37open
How busy is this area Busier than most of Galway City Council.
Homes approved
Here189
Council middle5
Homes started
Here70
Council middle36
How we work this out
Homes approved counts schemes of 10 or more homes (one-off houses are not included). Homes started counts every home in a notice that building work was starting. The council figure is the middle value across the council's built-up squares of the same area (3.1 km², about a 1 km circle), so half of them saw more and half fewer.
Sources: An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices), National Planning Application Database · fetched 24 Oct 2026, 02:34
SourceLicenceFetchedLink
An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.023 Oct 2026, 23:08open
Building Control Management System (commencement notices)CC BY 4.024 Oct 2026, 02:34open
National Planning Application DatabaseCC BY 4.024 Oct 2026, 02:29open
Question 5

What's the area like?

Figure 9

This street block against the council

77% of homes built before 1971 (council 17%). 71% owner-occupied (council 46%).

Homes built before 1971
77% · council 17%
Homes built since 2001
11% · council 31%
Owner-occupied
71% · council 46%
Rented
25% · council 47%
Children under 15
9% · council 15%
Aged 65 and over
24% · council 13%
Households with 2+ cars
30% · council 29%
Work mainly from home
17% · council 11%
This small area (266 people)Galway

MeasuredCSO Census 2022, Small Area Population Statistics (CC BY 4.0) · small area 068017003

Bus
108 m
Forster Park · 401 · busiest stop within 500 m: 4 an hour at peak
Nearest school
78 m
Scoil Ide, 244 pupils
Schools, stops and the council

Schools

  • Scoil Ide · primary · 244 pupils · 78 m
  • Scoil Naomh Einde · primary · 119 pupils · 255 m
  • Jesus & Mary Secondary School · postprimary · 658 pupils · 618 m
  • Scoil Náisiúnta Róis · primary · 297 pupils · 622 m
  • Dominican College · postprimary · 564 pupils · 634 m
  • Coláiste Einde · postprimary · 808 pupils · 679 m

Stops 36

  • Forster Park · 401 · 3/hour at peak · 108 m
  • Dalysfort Road · 401 · 3/hour at peak · 173 m
  • Pearse Stadium · 401 · 3/hour at peak · 224 m
  • Salthill Pk · 401 · 3/hour at peak · 368 m
  • Salthill Upr · 401, 410, 424 · 4/hour at peak · 433 m
  • Salthill Upr · 401, 410 · 3/hour at peak · 450 m
  • Salthill GAA · 401 · 3/hour at peak · 459 m
  • Lenaboy Pk · 401, 410 · 3/hour at peak · 499 m

Schools growing or shrinking planning in 3 years · pupils last year

  • Scoil Ide · 78 m-10.3% pupils (244)
  • Scoil Naomh Einde · 255 m+1.7% pupils (119)
  • Jesus & Mary Secondary School · 618 m-1.2% pupils (658)
  • Scoil Náisiúnta Róis · 622 m-5.7% pupils (297)
  • Dominican College · 634 m-6.2% pupils (564) · a pitch or play area 2025, approved with conditions
  • Coláiste Einde · 679 m+0.2% pupils (808) · an extension 2025, approved with conditions
Sources: Public transport stops and routes (NTA GTFS), Department of Education school list, National Planning Application Database, Council consultation portals, Council meetings (ModernGov), Land Development Agency public land register, cso_saps_2022, National Transport Authority, Fingal County Council and Dún Laoghaire-Rathdown County Council development plan layers (CC BY 4.0), dartplus.ie project extents over NTA GTFS rail shapes (CC BY 4.0), EPA strategic noise maps, Fingal County Council · fetched 24 Oct 2026, 02:46
SourceLicenceFetchedLink
Public transport stops and routes (NTA GTFS)CC BY 4.018 Oct 2026, 23:44open
Department of Education school listCC BY 4.027 Sept 2026, 23:32open
National Planning Application DatabaseCC BY 4.024 Oct 2026, 02:29open
Council consultation portalsPublic24 Oct 2026, 01:49open
Council meetings (ModernGov)Public24 Oct 2026, 02:46open
Land Development Agency public land registerCC BY 4.011 Sept 2026, 16:43open
cso_saps_2022CC BY 4.0—open
National Transport AuthorityCC BY 4.0——
Fingal County Council and Dún Laoghaire-Rathdown County Council development plan layers (CC BY 4.0)CC BY 4.0——
dartplus.ie project extents over NTA GTFS rail shapes (CC BY 4.0)CC BY 4.0——
EPA strategic noise mapsCC BY 4.0——
Fingal County CouncilCC BY 4.0——
Question 6

What to ask, and who

  1. Work already done (22311): work kept with permission. Done as approved?
    Ask for: The retention grant and an opinion of compliance.
    Seller · solicitor
  2. Work already done (21380): work kept with permission. Done as approved?
    Ask for: The retention grant and an opinion of compliance.
    Seller · solicitor
  3. On the vacant land tax map: is the 3% tax being paid?
    Ask for: Your solicitor's check of liability or exemption.
    Solicitor
  4. Any work done without planning permission?
    Ask for: An opinion of compliance for the whole house.
    Seller · solicitor
Reference

Where this is, the terms, the sources

Electoral division
Rockbarton
Electoral area
Galway City West
Council
Galway City Council
Everything we found, as a list 8 lines
  • 2 applications on this site; latest 22311, approved 2023, work already done.
  • Zoned R3 (rural cluster); not protected; on the vacant land tax map.
  • 11 sites nearby could change: 1 approved scheme, 10 empty zoned plots.
  • 1 application refused within 100 m since 2025; latest for work already done (2026).
  • 25 homes approved nearby, not started; largest 25 at Rockbarton Court.
  • Salthill Upr (bus 401, 410) 433 m away: 4 an hour at morning peak; 25 from all stops within 500 m.
  • Here (2022 census): 71% owner-occupied (council 46%); 13% of homes empty (council 10%); most built 1946–1960; 49% drive to work (council 47%); population down 12% since 2016.
  • 2 home extensions within 250 m since 2025. On Dalysfort Road: 22 in 10 years, 86% approved.
What the terms mean 7 terms
  • Vacant land tax (Residential Zoned Land Tax (RZLT)): A yearly tax of 3% of the land's value on land that is zoned for homes and serviced but left unbuilt.
  • Building started (Commencement notice (BCMS)): The builder must tell the council's building control office 14 to 28 days before work starts.
  • Signed off as finished (Certificate of Compliance on Completion): A certificate filed when a building is finished, confirming it meets the building regulations.
  • Approved (Grant of permission): The council said yes, usually with conditions.
  • Appeal (Appeal to An Coimisiún Pleanála): The applicant, or anyone who commented in time, can appeal the council's decision within four weeks.
  • Permission for work already done (Retention permission): An application to keep something that was built without permission.
  • What the land is zoned for (Zoning objective): The council's development plan sets what each area is for: homes, shops, open space and so on.
Sources and licences 27
SourcePublisherLicenceFetched
EPA strategic noise maps—CC BY 4.0—
Fingal County Council—CC BY 4.0—
Fingal County Council and Dún Laoghaire-Rathdown County Council development plan layers (CC BY 4.0)—CC BY 4.0—
National Transport Authority—CC BY 4.0—
services-eu1.arcgis.comAn Coimisiún PleanálaCC BY 4.023 Oct 2026
data.nbco.gov.ieNational Building Control Office (BCMS)CC BY 4.024 Oct 2026
data.gov.ieVarious (see each layer)CC BY 4.0, CC BY-NC-ND 4.027 Sept 2026
services-eu1.arcgis.comNational Inventory of Architectural HeritageCC BY 4.027 Sept 2026
services-eu1.arcgis.comNational Monuments Service (SMR)CC BY 4.027 Sept 2026
dlrcoco.citizenspace.comLocal authorities (consultation portals)Public24 Oct 2026
www2.courts.ie—© the publisher23 Oct 2026
cso.ie—CC BY 4.0—
dartplus.ie project extents over NTA GTFS rail shapes (CC BY 4.0)—CC BY 4.0—
services-eu1.arcgis.comLocal authorities (derelict sites registers)CC BY 4.019 Oct 2026
overpass-api.deOpenStreetMap contributors, NHDS, Kildare County CouncilODbL 1.0, CC BY-SA 4.0, CC BY 4.027 Sept 2026
transportforireland.ieNational Transport AuthorityCC BY 4.018 Oct 2026
lda.ieLand Development AgencyCC BY 4.011 Sept 2026
meetings.fingal.ieLocal authorities (council meetings)Public24 Oct 2026
services.arcgis.comDepartment of Housing (National Planning Application Database)CC BY 4.024 Oct 2026
services-eu1.arcgis.comTailte ÉireannCC BY 4.011 Sept 2026
services-eu1.arcgis.comCSO, Tailte Éireann, OpenStreetMap contributorsCC BY 4.04 Oct 2026
propertypriceregister.ieProperty Services Regulatory Authority (PPR)© PSRA, PSI licence24 Oct 2026
services.arcgis.comLocal authorities (RZLT maps)CC BY 4.018 Oct 2026
gov.ieDepartment of EducationCC BY 4.027 Sept 2026
gov.ieDepartment of HousingCC BY-SA 4.023 Oct 2026
tusla.ieTusla (Early Years Inspectorate)Public register21 Oct 2026
services.arcgis.comLocal authorities via the Department of Housing (GZT / MyPlan)CC BY 4.018 Oct 2026
Measured
counted from a public register
Calculated
a rate or median we worked out from those counts
Our classification
we sorted it by reading each description
Estimate
inferred from another source (census, map data)
Rule summary
the law, simplified: check before relying on it
How we work this out
Generated 24 Oct 2026, 04:57 from the Planning Register store; nothing was fetched live. Not a legal search: the council's planning file is the record. Deadlines come from published dates under the Planning and Development Act 2000: confirm with the council before relying on them. Street map © OpenStreetMap contributors; building outlines © Overture Maps Foundation. The text version carries every figure with its source, for an AI assistant.