How planning works, with this area's numbers

steps can overlap · medians for home extensions within 1.5 km, 10 years
  1. 1ApplySite notice up, plans online
  2. 2Comments5 weeks, €20. Comment to keep your right to appeal
  3. 3Decision8 weeks by law. Here 52 days
  4. 4Appeal window4 weeks after the decision
  5. 5AppealHere about 6 months
  6. 6PermissionLasts 5 years
  7. 7StartStart notice to the council. Here about 4 months after
  8. 8Sign-offCompletion cert, or the owner opts out
Question 1

What's the planning story of this house?

Figure 1

When it was built, and the rules since

Most homes here were built 1981–90, after planning permission began and before building regulations (1992).

Timeline from 1955: planning permission needed from October 1964, building regulations from June 1992, building records online from March 2014, sign-off opt-out from September 2015. Most homes here were built 1981–1990.1960197019801990200020102020Oct 1964permission neededJun 1992building regulationsMar 2014building records onlineSep 2015owners may opt out of sign-offThis houseBuilt: most homes in this small area date from 1981–1990 (census estimate)most built

Each line is a rule that applies to work done after it.

MeasuredEstimatecouncil register via NPAD · build years: CSO Census 2022, small area

On this site
G1
Zoning · Open space with recreation
No
Protected or listed · on the council's list
No
Vacant land tax · not on the map
1 in 20
Radon (EPA) · homes with high radon
Zoning, protection, tax and flood: the detail
ZoningG1 · Open space with recreation
What it says

Objective F: F To preserve and provide for open space with ancillary active recreational amenities.

Open space with active recreational amenities — pitches, courts, play areas.

county development plan 2022 2028 · 1 Apr 2022 – 1 Apr 2028

ZoningG1 · Open space with recreation
What it says

Objective F: F To preserve and provide for open space with ancillary active recreational amenities.

Open space with active recreational amenities — pitches, courts, play areas.

d n laoghaire rathdown county development plan 2022 2028 variation no 1 · 21 Apr 2022 – 20 Apr 2028

Radon1 in 20 homes have high radon (EPA)

Not on this site: protected building, heritage inventory, monument zone, conservation area, EU nature site, EU bird site, natural heritage area, tree order, landslide risk, derelict list.

Licensed industrial sites within 1.0 km: Ballyogan Landfill Facility Ballyogan Recycling Park (831 m)

Vacant land taxNo not on the map
Flood riskNone mapped within 500 m
Within 500 mCountFor example
Conservation areas1Foxrock
Heritage inventory buildings1Leopardstown Race Course
Radon grid squares6
Protected buildings1Leopardstown Race Course
How we work this out
'On this site' means the record's own map outline touches the registered parcel (or a 12 m circle round the point where there is no parcel). Only the council's own list confirms a protected building; ask the council if in doubt. The OPW flood map's licence lets us show a yes/no only.
Sources: Development plan zoning (councils), EPA licensed sites, EPA radon map, Residential Zoned Land Tax maps, Constraint layers (bundle), Architectural Conservation Areas, National Inventory of Architectural Heritage, Records of Protected Structures · fetched 25 Oct 2026, 23:43
SourceLicenceFetchedLink
Development plan zoning (councils)CC BY 4.025 Oct 2026, 23:06open
EPA licensed sitesCC BY 4.027 Sept 2026, 19:36open
EPA radon mapCC BY 4.027 Sept 2026, 19:36open
Residential Zoned Land Tax mapsCC BY 4.025 Oct 2026, 23:43open
Constraint layers (bundle)CC BY 4.0, CC BY-NC-ND 4.027 Sept 2026, 19:37open
Architectural Conservation AreasCC BY 4.027 Sept 2026, 19:36open
National Inventory of Architectural HeritageCC BY 4.027 Sept 2026, 19:35open
Records of Protected StructuresCC BY 4.027 Sept 2026, 19:36open
How we work this out
Applications whose site outline (or map point) falls on this property. 'No sign building has started' means we found no notice to the council's building control office; small jobs don't always file one, so ask. A missing completion certificate is not proof of a problem: an owner can opt out of official sign-off for a house or extension built for themselves.
Sources: Building Control Management System (commencement notices), National Planning Application Database · fetched 31 Oct 2026, 05:04
SourceLicenceFetchedLink
Building Control Management System (commencement notices)CC BY 4.031 Oct 2026, 02:56open
National Planning Application DatabaseCC BY 4.031 Oct 2026, 05:04open
Question 2

Could you extend?

Nothing on this site restricts it: not protected, not in a conservation area.

Figure 2

What happened to applications like yours

Extensions are almost always approved here: 88–97% by type. A new house in a garden is harder: 40% approved, and 1 in 3 is asked for more information.

Single-storey rear39 decided · more info asked 13%
97% · council 96%
Attic or dormer74 decided · more info asked 12%
88% · council 94%
New house in a garden or site15 decided · more info asked 40%
40% · council 63%
Approved nearbyDún Laoghaire-Rathdown overall

Decided applications within 1.5 km, received in the last 10 years. The kind of work is read from each description.

CalculatedOur classificationcouncil register via NPAD · 128 nearby, 2,642 council-wide

Extensions and refusals right beside you 0 within 250 m · 0 refused within 100 m

Extensions and refusals near you 0 extensions within 250 m · the last 12 months

No home extensions within 250 m in the last 12 months.

Refused within 100 m 0 in the last 12 months

Nothing refused this close in the last 12 months.

    How we work this out
    Home extensions are read from the application's description (extension, attic or dormer, porch, garage conversion, garden room), so a few may be missed or mislabelled. The kind is the first that fits: a dormer with a rear extension counts as a dormer. Refusal reasons come from An Coimisiún Pleanála's inspector reports, so they exist only where the refusal was appealed (Dún Laoghaire-Rathdown so far). The council's own reasons are on its planning file.
    Sources: National Planning Application Database, An Coimisiún Pleanála cases (ArcGIS feed) · fetched 31 Oct 2026, 05:04
    SourceLicenceFetchedLink
    National Planning Application DatabaseCC BY 4.031 Oct 2026, 05:04open
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.030 Oct 2026, 23:01open
    Sources: An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices), National Planning Application Database · fetched 31 Oct 2026, 05:04
    SourceLicenceFetchedLink
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.030 Oct 2026, 23:01open
    Building Control Management System (commencement notices)CC BY 4.031 Oct 2026, 02:56open
    National Planning Application DatabaseCC BY 4.031 Oct 2026, 05:04open
    Question 3

    How long, and what if someone objects?

    Figure 3

    A home extension's journey here

    A decision takes 52 days. 1 in 6 is asked for more information, which adds about 90 days. Building starts about 4 months after permission.

    Comments open: 5 weeks · €20; Council decision: 52 days; If more info asked (1 in 6): 142 days; Appeal window: 4 weeks; If appealed: +183 days; Building starts: 120 days after permission0 mo3 mo6 mo9 mo12 mo15 mo18 moComments openComments close 5 weeks after the application is lodged5 weeks · €20Council decisionDecision: median 52 days, middle half 49–54 (n=156)52 daysIf more info asked (1 in 6)With further information: median 142 days (n=34)142 daysAppeal windowAnyone who commented can appeal within 4 weeks of the decision4 weeksIf appealedAt An Coimisiún Pleanála: median 183 days (n=54, all appeals within 1.5 km)+183 daysBuilding startsStart notice: median 120 days after permission (n=76)120 days after permissionSigned off64% of owners opt out of sign-off

    Bars are medians; whiskers show the middle half. Medians of separate steps don't add up exactly.

    Calculated190 decided home extensions, 76 start notices, 54 decided appeals · within 1.5 km, 10 years · NPAD, BCMS, An Coimisiún Pleanála

    Figure 4

    What appeals changed

    14 of 33 appealed refusals became permissions. 1 of 23 appealed approvals were reversed.

    Refusals appealed33 decided
    14 became permissions
    Approvals appealed23 decided
    1 reversed
    Ended approvedEnded refusedWithdrawn, invalid or other

    Every appeal decided within 1.5 km in 10 years, any kind of development.

    CalculatedAn Coimisiún Pleanála cases linked to the council file

    Appeals nearby 1 in the last 12 months
    • 502056 Pending · Foxrock Service Station, Brighton Road, Foxrock, Dublin 18, D18X2N0 · 471 m
    Sources: An Coimisiún Pleanála cases (ArcGIS feed), Courts Service legal diary (judicial reviews), National Planning Application Database · fetched 31 Oct 2026, 05:04
    SourceLicenceFetchedLink
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.030 Oct 2026, 23:01open
    Courts Service legal diary (judicial reviews)© the publisher30 Oct 2026, 23:12open
    National Planning Application DatabaseCC BY 4.031 Oct 2026, 05:04open
    Question 4

    What's changing around you?

    Street map around Drinaghmore Court, Ballyogan with 5 numbered planning items
    ⌖ the houseOpen for commentsOtherApprovedRefusedNo decision yet
    1. 1Lands at and between, Carrickmines 220kV Substation D26A/0763/WEBNo decision yet · 182 m
    2. 2Levmoss Park, Leopardstown REF17925Section 5: needs permission · 371 m
    3. 3G7 Management Co CLG, Levmoss Park D26A/0193/WEBApproved · 410 m
    4. 4Foxrock Service Station, Brighton Road D26A/0457/WEBRefused · 471 m
    5. 5National Mobility Hubs Pilot: Dún Laoghaire-Rathdown, 73 Locations Across the Council's Administrative Area PC/IC/01/26No decision yet · 471 m
    Figure 5

    What happens to applications within 500 m

    Permission isn't building. Of 18 permissions since 2016, 7 show a start notice and 2 have a completion certificate.

    26 applications lodged within 500 m. Council: 18 approved, 2 refused. After appeals: 18 approved. Of those: 2 signed off, 0 built with the owner's opt-out, 5 started, 10 with no start notice found, 1 ran out.LODGEDCOUNCIL DECISIONAFTER APPEALSWHAT HAPPENED NEXT18: lodged → approved2: lodged → refused4: lodged → withdrawn or invalid2: lodged → undecided18: approved → approved1: refused → refused4: withdrawn or invalid → withdrawn2: undecided → undecided1 refused by the council, undecided after an appeal10: approved → no start notice found5: approved → started, not signed off2: approved → signed off1: approved → ran out26 lodged26 lodged18 approved18 approved2 refused2 refused4 withdrawn or invalid4 withdrawn or invalid2 undecided2 undecided18 approved18 approved1 refused1 refused4 withdrawn4 withdrawn3 undecided3 undecided10 no start notice found10 no start notice found5 started, not signed off5 started, not signed off2 signed off2 signed off1 ran out1 ran out

    Purple bands are refusals turned into permissions on appeal. "No start notice found" includes small jobs that never needed one and notices we couldn't match.

    Measured26 applications in 10 years · NPAD, An Coimisiún Pleanála, BCMS start notices and completion certificates

    Figure 6

    The next 30 days

    1 deadline within 500 m; the first closes 16 Nov 2026.

    1 deadlines in the next 30 days: 2026-11-16 D26A/0763/WEB: application received — The development will consist of the provision of: a c. 7.03km underground cabletoday5 Nov10 Nov15 Nov20 Nov25 Nov30 NovD26A/0763/WEB: application received — The development will consist of the provision of: a c. 7.03km underground cable · 182 m away · 2026-11-16
    Comments close
    • Comments close 16 Nov 202616 days left
      1D26A/0763/WEB · application received — The development will consist of the provision of: a c. 7.03km underground cable
      €20 to the council · 182 m away

    Measuredcouncil registers and An Coimisiún Pleanála · deadlines worked out from the dates on file

    Figure 7

    Applications within 500 m, by year

    Between 2 and 7 a year; busiest 2022. 90% of decisions were approvals.

    2021: 4, 2022: 7, 2023: 2, 2024: 4, 2025: 4, 2026: 505102021: 3 approved2021: 1 withdrawn or invalid4’21*2022: 4 approved2022: 1 refused2022: 2 withdrawn or invalid7’222023: 2 approved2’232024: 4 approved4’242025: 4 approved4’252026: 1 approved2026: 1 refused2026: 1 withdrawn or invalid2026: 2 undecided5’26*
    ApprovedRefusedWithdrawn or invalidUndecided

    2021 and 2026 are part years (*). Exemption requests and time extensions are left out.

    Measuredcouncil register via NPAD

    Open for comments €20 to comment

    Every application within 500 m 6 in the last 12 months

    See every application on the map

    How we work this out
    Descriptions are shortened by the national planning database (to 80 characters in Dún Laoghaire-Rathdown, 70 in Fingal), and it does not publish applicants' names.
    Sources: National Planning Application Database, An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices) · fetched 31 Oct 2026, 05:04
    SourceLicenceFetchedLink
    National Planning Application DatabaseCC BY 4.031 Oct 2026, 05:04open
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.030 Oct 2026, 23:01open
    Building Control Management System (commencement notices)CC BY 4.031 Oct 2026, 02:56open
    Building work nearby 1 in the last 12 months
    1 no sign-off needed
    • Brighton Road, Foxrock, Dún Laoghaire-Rathdown, D18R8K1 · 11 Feb 2026 · short notice no sign-off needed · D25A/0622/WEB · 247 m
    How we work this out
    Each row is a notice the builder sent to the council's building control office before work started. One notice can cover many homes. 'Signed off as finished' means a completion certificate is on file; work done under an opt-out or a short notice doesn't need one.
    Source: Building Control Management System (commencement notices) · fetched 31 Oct 2026, 02:56
    SourceLicenceFetchedLink
    Building Control Management System (commencement notices)CC BY 4.031 Oct 2026, 02:56open
    Homes coming 0 not started
    • Kiln View, Clay Farm Place (formerly Way), Leopardstown, Co Dublin (Phase 1)* · Completed · 55 homes · 416 m
    • Lisieux Manor, Murphystown Road, Leopardstown, Dublin 18 (Phase 1)* · Completed · 133 homes · 416 m
    How we work this out
    Schemes of 10 or more homes approved since 2021, from the council and An Coimisiún Pleanála registers. 'Building started' means the builder told the council's building control office that work was starting (a commencement notice).
    Sources: An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices), National Planning Application Database, Social housing construction status report · fetched 31 Oct 2026, 05:04
    SourceLicenceFetchedLink
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.030 Oct 2026, 23:01open
    Building Control Management System (commencement notices)CC BY 4.031 Oct 2026, 02:56open
    National Planning Application DatabaseCC BY 4.031 Oct 2026, 05:04open
    Social housing construction status reportCC BY-SA 4.023 Oct 2026, 23:02open
    Named places nearby: estate, schemes, crèches, schools

    Named places estate, developments, inspections

    Developments within 1.0 km

    SchemeHomesProgressDistance
    Brighton Road Development577 built · 50 being built (2026-Q2)479 m
    Gortanore51— (2026-Q2)535 m
    Leopardstown Village Centre Site B5757 not started (2026-Q2)576 m
    Rockbrae, Westminster Road2626 being built (2026-Q2)584 m
    Rockall, The Birches2424 not started (2026-Q2)713 m
    Glencairn352352 built (2025-Q2)746 m
    Rockall2828 not started (2026-Q2)834 m
    133 and 152 Ballyogan Road4949 not started (2026-Q2)877 m

    Crèches and schools inspected

    NameLatest inspectionDistance
    Libby McGuire Montessori School · Crèche15 Sept 2025 · report · Tusla Early Years Inspectorate545 m
    Nord Anglia International School Dublin · Crèche9 Dec 2025 · report · Tusla Early Years Inspectorate582 m
    Ballyogan Community Development · Crèche15 Jun 2026 · report · Tusla Early Years Inspectorate612 m
    Links Childcare Foxrock · Crèche2 Sept 2025 · report · Tusla Early Years Inspectorate690 m
    Giraffe Childcare Central Park · Crèche25 Nov 2025 · report · Tusla Early Years Inspectorate721 m
    Giraffe Childcare Leopardstown · Crèche4 Mar 2026 · report · Tusla Early Years Inspectorate820 m
    Blue Stars Early Years Service · Crèche9 Dec 2025 · report · Tusla Early Years Inspectorate949 m
    How we work this out
    Organisations only: a person named on an application is never listed. Inspection dates and links are the publisher's; read their report for the findings.
    Sources: Dublin housing delivery pipeline, National Planning Application Database, Department of Education school list, Tusla early years register · fetched 31 Oct 2026, 05:04
    SourceLicenceFetchedLink
    Dublin housing delivery pipelineCC BY 4.026 Oct 2026, 23:00open
    National Planning Application DatabaseCC BY 4.031 Oct 2026, 05:04open
    Department of Education school listCC BY 4.027 Oct 2026, 23:04open
    Tusla early years registerPublic register28 Oct 2026, 23:19open
    How busy is this area About as busy as most of Dún Laoghaire-Rathdown County Council.
    Homes approved
    Here120
    Council middle46
    Homes started
    Here115
    Council middle82
    How we work this out
    Homes approved counts schemes of 10 or more homes (one-off houses are not included). Homes started counts every home in a notice that building work was starting. The council figure is the middle value across the council's built-up squares of the same area (3.1 km², about a 1 km circle), so half of them saw more and half fewer.
    Sources: An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices), National Planning Application Database · fetched 31 Oct 2026, 05:04
    SourceLicenceFetchedLink
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.030 Oct 2026, 23:01open
    Building Control Management System (commencement notices)CC BY 4.031 Oct 2026, 02:56open
    National Planning Application DatabaseCC BY 4.031 Oct 2026, 05:04open
    Question 5

    What's the area like?

    Figure 8

    This street block against the council

    6% of homes built before 1971 (council 38%). 78% owner-occupied (council 68%).

    Homes built before 1971
    6% · council 38%
    Homes built since 2001
    1% · council 25%
    Owner-occupied
    78% · council 68%
    Rented
    18% · council 29%
    Children under 15
    14% · council 18%
    Aged 65 and over
    34% · council 17%
    Households with 2+ cars
    39% · council 39%
    Work mainly from home
    14% · council 19%
    This small area (437 people)Dún Laoghaire-Rathdown

    MeasuredCSO Census 2022, Small Area Population Statistics (CC BY 4.0) · small area 267092055/01

    Road noise
    60–64 dB
    day–night average (EPA 2022)
    Bus
    573 m
    Ballyogan Avenue · L27
    Radon
    1 in 20
    homes here likely high (EPA). Test it
    Nearest school
    406 m
    Stepaside Educate Together Secondary School, 741 pupils
    Homes sold nearby
    10
    in 3 years (Property Price Register)
    Schools, stops and the council

    Schools

    • Stepaside Educate Together Secondary School · postprimary · 741 pupils · 406 m
    • Holy Trinity National School · primary · 586 pupils · 460 m
    • Gaelscoil Shliabh Rua · primary · 359 pupils · 907 m

    Stops 9

    • Ballyogan Avenue · L27 · 2/hour at peak · 573 m
    • Ballyogan Ave · L27 · 2/hour at peak · 580 m
    • Ballyogan Ct · L27 · 2/hour at peak · 777 m
    • Leopardstown SC · L27 · 2/hour at peak · 784 m
    • Ballyogan Court · L27 · 2/hour at peak · 791 m

    Schools growing or shrinking planning in 3 years · pupils last year

    • Stepaside Educate Together Secondary School · 406 m+12.4% pupils (741)
    • Holy Trinity National School · 460 m-1.7% pupils (586)
    • Gaelscoil Shliabh Rua · 907 m+3.2% pupils (359)

    Council meetings 3 items

    Public land

    • Horse Racing Ireland · 70.15 ha · 0 m
    • Dún Laoghaire-Rathdown County Council · 3.44 ha · 242 m
    • Horse Racing Ireland · 12.24 ha · 260 m
    • Horse Racing Ireland · 4.63 ha · 313 m
    • Dún Laoghaire-Rathdown County Council · 2.32 ha · 317 m
    • Horse Racing Ireland · 0.25 ha · 349 m
    Sources: Public transport stops and routes (NTA GTFS), Department of Education school list, National Planning Application Database, Council consultation portals, Council meetings (ModernGov), Land Development Agency public land register, cso_saps_2022, National Transport Authority, Fingal County Council and Dún Laoghaire-Rathdown County Council development plan layers (CC BY 4.0), dartplus.ie project extents over NTA GTFS rail shapes (CC BY 4.0), EPA strategic noise maps, Fingal County Council · fetched 31 Oct 2026, 05:04
    SourceLicenceFetchedLink
    Public transport stops and routes (NTA GTFS)CC BY 4.025 Oct 2026, 23:02open
    Department of Education school listCC BY 4.027 Oct 2026, 23:04open
    National Planning Application DatabaseCC BY 4.031 Oct 2026, 05:04open
    Council consultation portalsPublic31 Oct 2026, 01:06open
    Council meetings (ModernGov)Public31 Oct 2026, 02:21open
    Land Development Agency public land registerCC BY 4.011 Sept 2026, 16:43open
    cso_saps_2022CC BY 4.0—open
    National Transport AuthorityCC BY 4.0——
    Fingal County Council and Dún Laoghaire-Rathdown County Council development plan layers (CC BY 4.0)CC BY 4.0——
    dartplus.ie project extents over NTA GTFS rail shapes (CC BY 4.0)CC BY 4.0——
    EPA strategic noise mapsCC BY 4.0——
    Fingal County CouncilCC BY 4.0——
    Question 6

    What to ask, and who

    1. Zoned G1 (open space with recreation), not for homes: could you extend?
      Ask for: A solicitor's or planner's view.
      Solicitor · planner
    2. Application 182 m away open for comments until 16 Nov 2026: comment?
      Ask for: The plans on the council's website (€20 to comment).
      Council
    3. Any work done without planning permission?
      Ask for: An opinion of compliance for the whole house.
      Seller · solicitor
    Reference

    Where this is, the terms, the sources

    Townland
    Carmanhall and Leopardstown
    Electoral division
    Glencullen
    Electoral area
    Glencullen-Sandyford
    Council
    Dun Laoghaire-Rathdown County Council
    Everything we found, as a list 8 lines
    • Zoned G1 (open space with recreation); not protected; no vacant land tax.
    • Nothing nearby looks set to change.
    • 1 application open for comments nearby; nearest closes 16 Nov 2026.
    • No morning-peak service within 500 m; nearest is Ballyogan Avenue, 573 m away (2 an hour).
    • Noise from road traffic mapped at 60–64 dB (day-evening-night average, EPA 2022).
    • Here (2022 census): 78% owner-occupied (council 68%); 5% of homes empty (council 6%); most built 1981–1990; 47% drive to work (council 43%); population up 19% since 2016.
    • Around here the council decides in a median 53 days (about 8 weeks); 1 in 6 is asked for more information.
    • Homes started within 1 km: 19 in the last year, 6 three years before.
    What the terms mean 7 terms
    • Vacant land tax (Residential Zoned Land Tax (RZLT)): A yearly tax of 3% of the land's value on land that is zoned for homes and serviced but left unbuilt.
    • Building started (Commencement notice (BCMS)): The builder must tell the council's building control office 14 to 28 days before work starts.
    • Signed off as finished (Certificate of Compliance on Completion): A certificate filed when a building is finished, confirming it meets the building regulations.
    • Approved (Grant of permission): The council said yes, usually with conditions.
    • Comment on an application (Observation / submission): Anyone can comment on a planning application within five weeks of it being lodged, for a €20 fee.
    • Appeal (Appeal to An Coimisiún Pleanála): The applicant, or anyone who commented in time, can appeal the council's decision within four weeks.
    • What the land is zoned for (Zoning objective): The council's development plan sets what each area is for: homes, shops, open space and so on.
    Sources and licences 31
    SourcePublisherLicenceFetched
    EPA strategic noise maps—CC BY 4.0—
    Fingal County Council—CC BY 4.0—
    Fingal County Council and Dún Laoghaire-Rathdown County Council development plan layers (CC BY 4.0)—CC BY 4.0—
    National Transport Authority—CC BY 4.0—
    services-eu1.arcgis.comAn Coimisiún PleanálaCC BY 4.030 Oct 2026
    data.nbco.gov.ieNational Building Control Office (BCMS)CC BY 4.031 Oct 2026
    data.gov.ieVarious (see each layer)CC BY 4.0, CC BY-NC-ND 4.027 Sept 2026
    services.arcgis.comLocal authorities (ACAs)CC BY 4.027 Sept 2026
    gis.epa.ieEnvironmental Protection AgencyCC BY 4.027 Sept 2026
    services-eu1.arcgis.comNational Inventory of Architectural HeritageCC BY 4.027 Sept 2026
    gis.epa.ieEnvironmental Protection AgencyCC BY 4.027 Sept 2026
    services.arcgis.comLocal authorities (Record of Protected Structures)CC BY 4.027 Sept 2026
    dlrcoco.citizenspace.comLocal authorities (consultation portals)Public31 Oct 2026
    www2.courts.ie—© the publisher30 Oct 2026
    cso.ie—CC BY 4.0—
    dartplus.ie project extents over NTA GTFS rail shapes (CC BY 4.0)—CC BY 4.0—
    services-eu1.arcgis.comLocal authorities (derelict sites registers)CC BY 4.026 Oct 2026
    services.arcgis.comDublin local authorities (housing delivery pipeline)CC BY 4.026 Oct 2026
    esbnetworks.ie—© the publisher · flag only11 Sept 2026
    transportforireland.ieNational Transport AuthorityCC BY 4.025 Oct 2026
    lda.ieLand Development AgencyCC BY 4.011 Sept 2026
    meetings.fingal.ieLocal authorities (council meetings)Public31 Oct 2026
    services.arcgis.comDepartment of Housing (National Planning Application Database)CC BY 4.031 Oct 2026
    services-eu1.arcgis.comTailte ÉireannCC BY 4.011 Sept 2026
    services-eu1.arcgis.comCSO, Tailte Éireann, OpenStreetMap contributorsCC BY 4.04 Oct 2026
    propertypriceregister.ieProperty Services Regulatory Authority (PPR)© PSRA, PSI licence31 Oct 2026
    services.arcgis.comLocal authorities (RZLT maps)CC BY 4.025 Oct 2026
    gov.ieDepartment of EducationCC BY 4.027 Oct 2026
    gov.ieDepartment of HousingCC BY-SA 4.023 Oct 2026
    tusla.ieTusla (Early Years Inspectorate)Public register28 Oct 2026
    services.arcgis.comLocal authorities via the Department of Housing (GZT / MyPlan)CC BY 4.025 Oct 2026
    Measured
    counted from a public register
    Calculated
    a rate or median we worked out from those counts
    Our classification
    we sorted it by reading each description
    Estimate
    inferred from another source (census, map data)
    Rule summary
    the law, simplified: check before relying on it
    How we work this out
    Generated 31 Oct 2026, 21:04 from the Planning Register store; nothing was fetched live. Not a legal search: the council's planning file is the record. Deadlines come from published dates under the Planning and Development Act 2000: confirm with the council before relying on them. Street map © OpenStreetMap contributors; building outlines © Overture Maps Foundation. The text version carries every figure with its source, for an AI assistant.