PlanningRegister.ie
Planning report · Dun Laoghaire-Rathdown County Council · 500 m around the house · the last 12 months · 1 Nov 2026, 00:05

Springhill Park

53.27140, -6.11768

Homes here mostly date from the 1950s. Home extensions nearby almost always get approved (94%). 2 applications nearby open for comments.

See on the mapWatch this area

How planning works, with this area's numbers

steps can overlap · medians for home extensions within 1.5 km, 10 years
  1. 1ApplySite notice up, plans online
  2. 2Comments5 weeks, €20. Comment to keep your right to appeal
  3. 3Decision8 weeks by law. Here 51 days
  4. 4Appeal window4 weeks after the decision
  5. 5AppealHere about 6 months
  6. 6PermissionLasts 5 years
  7. 7StartStart notice to the council. Here about 6 months after
  8. 8Sign-offCompletion cert, or the owner opts out
Question 1

What's the planning story of this house?

Figure 1

When it was built, and the rules since

Most homes here were built 1946–60, before planning permission was needed.

Timeline from 1942: planning permission needed from October 1964, building regulations from June 1992, building records online from March 2014, sign-off opt-out from September 2015. Most homes here were built 1946–1960.19501960197019801990200020102020Oct 1964permission neededJun 1992building regulationsMar 2014building records onlineSep 2015owners may opt out of sign-offThis houseAll of Springhill ParkBuilt: most homes in this small area date from 1946–1960 (census estimate)most built2021: 1 file on Springhill Park2022: 3 files on Springhill Park2025: 3 files on Springhill Park7 files

Each line is a rule that applies to work done after it.

MeasuredEstimatecouncil register via NPAD · build years: CSO Census 2022, small area

On this site
R2
Zoning · Existing residential
No
Protected or listed · on the council's list
No
Vacant land tax · lived-in homes don't pay it
1 in 10
Radon (EPA) · homes with high radon
Zoning, protection, tax and flood: the detail
ZoningR2 · Existing residential
What it says

Objective A: A To provide residential development and improve residential amenity while protecting the existing residential amenities

An established residential area. The objective is to protect existing residential amenity as well as to provide housing — which is the objective a neighbour's objection to an overbearing extension is usually argued under.

county development plan 2022 2028 · 1 Apr 2022 – 1 Apr 2028

ZoningR2 · Existing residential
What it says

Objective A: A To provide residential development and improve residential amenity while protecting the existing residential amenities

An established residential area. The objective is to protect existing residential amenity as well as to provide housing — which is the objective a neighbour's objection to an overbearing extension is usually argued under.

d n laoghaire rathdown county development plan 2022 2028 variation no 1 · 21 Apr 2022 – 20 Apr 2028

Radon1 in 10 homes have high radon (EPA)

Not on this site: protected building, heritage inventory, monument zone, conservation area, EU nature site, EU bird site, natural heritage area, tree order, landslide risk, derelict list.

Vacant land taxNo lived-in homes don't pay it
Flood riskNone mapped within 500 m
Within 500 mCountFor example
Natural heritage areas1Dalkey Coastal Zone And Killiney Hill
Radon grid squares4
Protected buildings5Proby; Fairlawn House
How we work this out
'On this site' means the record's own map outline touches the registered parcel (or a 12 m circle round the point where there is no parcel). Only the council's own list confirms a protected building; ask the council if in doubt. The council's map for the vacant land tax shows this spot inside an area of existing homes. Homes people live in, and their gardens, don't pay the tax. The OPW flood map's licence lets us show a yes/no only.
Sources: Development plan zoning (councils), EPA radon map, Residential Zoned Land Tax maps, Constraint layers (bundle), Natural Heritage Areas (NPWS), Records of Protected Structures · fetched 25 Oct 2026, 23:43
SourceLicenceFetchedLink
Development plan zoning (councils)CC BY 4.025 Oct 2026, 23:06open
EPA radon mapCC BY 4.027 Sept 2026, 19:36open
Residential Zoned Land Tax mapsCC BY 4.025 Oct 2026, 23:43open
Constraint layers (bundle)CC BY 4.0, CC BY-NC-ND 4.027 Sept 2026, 19:37open
Natural Heritage Areas (NPWS)CC BY 4.027 Sept 2026, 19:27open
Records of Protected StructuresCC BY 4.027 Sept 2026, 19:36open
How we work this out
Applications whose site outline (or map point) falls on this property. 'No sign building has started' means we found no notice to the council's building control office; small jobs don't always file one, so ask. A missing completion certificate is not proof of a problem: an owner can opt out of official sign-off for a house or extension built for themselves.
Sources: Building Control Management System (commencement notices), National Planning Application Database · fetched 31 Oct 2026, 23:00
SourceLicenceFetchedLink
Building Control Management System (commencement notices)CC BY 4.031 Oct 2026, 02:56open
National Planning Application DatabaseCC BY 4.031 Oct 2026, 23:00open
Question 2

Could you extend?

Nothing on this site restricts it: not protected, not in a conservation area.

Figure 2

What happened to applications like yours

Extensions are almost always approved here: 88–100% by type. A new house in a garden is harder: 68% approved, and 1 in 4 is asked for more information.

Single-storey rear79 decided · more info asked 10%
97% · council 96%
Two-storey rear47 decided · more info asked 19%
96% · council 92%
Two-storey side23 decided · more info asked 22%
100% · council 95%
Single-storey side13 decided · more info asked 8%
100% · council 96%
Attic or dormer151 decided · more info asked 7%
93% · council 94%
First-floor43 decided · more info asked 9%
88% · council 90%
Garage conversion23 decided · more info asked 4%
100% · council 99%
Porch or front22 decided · more info asked 5%
100% · council 98%
New house in a garden or site53 decided · more info asked 23%
68% · council 63%
Approved nearbyDún Laoghaire-Rathdown overall

Decided applications within 1.5 km, received in the last 10 years. The kind of work is read from each description.

CalculatedOur classificationcouncil register via NPAD · 454 nearby, 3,892 council-wide

Figure 3

Springhill Park, file by file since 2021

6 of 6 decided extensions on the road were approved.

7 planning files on Springhill Park since 2021, by kind and decision.202120222023202420252026Extensions, atticsNo. 64 · 2021 · porch / front · approved · D21B/0541No. 59 · 2022 · two-storey rear · approved · D22B/0387No. 24 · 2022 · single-storey rear · approved · D22B/0533No. 18 · 2025 · garage conversion · approved · D25A/0217/WEBNo. 31 · 2025 · two-storey side · approved · D25B/0149/WEBNo. 25 · 2025 · two-storey side · approved · D25B/0264/WEBPorches, roofs, otherNo. 70 · 2022 · other work · approved · D22A/0295New house in a side garden
ApprovedRefusedWithdrawn or invalid

7 files with "Springhill Park" in the address within 600 m, other roads of the same name left out. Hover a dot for the house number and reference.

MeasuredOur classificationcouncil register via NPAD · 2021–2026

Extensions and refusals right beside you 3 within 250 m · 0 refused within 100 m

Extensions and refusals near you 3 extensions within 250 m · the last 12 months

1 approved1 refused1 no decision or withdrawn
KindAppliedApprovedRefused
Porch10—
Side101
Two-storey side11—

On Springhill Park: 11 extensions in 10 years, 100% of all applications approved; most common garage conversion.

Refused within 100 m 0 in the last 12 months

Nothing refused this close in the last 12 months.

    How we work this out
    Home extensions are read from the application's description (extension, attic or dormer, porch, garage conversion, garden room), so a few may be missed or mislabelled. The kind is the first that fits: a dormer with a rear extension counts as a dormer. Refusal reasons come from An Coimisiún Pleanála's inspector reports, so they exist only where the refusal was appealed (Dún Laoghaire-Rathdown so far). The council's own reasons are on its planning file.
    Sources: National Planning Application Database, An Coimisiún Pleanála cases (ArcGIS feed) · fetched 31 Oct 2026, 23:00
    SourceLicenceFetchedLink
    National Planning Application DatabaseCC BY 4.031 Oct 2026, 23:00open
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.030 Oct 2026, 23:01open
    Sources: An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices), National Planning Application Database · fetched 31 Oct 2026, 23:00
    SourceLicenceFetchedLink
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.030 Oct 2026, 23:01open
    Building Control Management System (commencement notices)CC BY 4.031 Oct 2026, 02:56open
    National Planning Application DatabaseCC BY 4.031 Oct 2026, 23:00open
    Question 3

    How long, and what if someone objects?

    Figure 4

    A home extension's journey here

    A decision takes 51 days. 1 in 9 is asked for more information, which adds about 63 days. Building starts about 6 months after permission.

    Comments open: 5 weeks · €20; Council decision: 51 days; If more info asked (1 in 9): 113 days; Appeal window: 4 weeks; If appealed: +168 days; Building starts: 168 days after permission0 mo3 mo6 mo9 mo12 mo15 moComments openComments close 5 weeks after the application is lodged5 weeks · €20Council decisionDecision: median 51 days, middle half 49–54 (n=458)51 daysIf more info asked (1 in 9)With further information: median 113 days (n=55)113 daysAppeal windowAnyone who commented can appeal within 4 weeks of the decision4 weeksIf appealedAt An Coimisiún Pleanála: median 168 days (n=132, all appeals within 1.5 km)+168 daysBuilding startsStart notice: median 168 days after permission (n=240)168 days after permissionSigned off461 days after the start, for the few who file. 63% of owners opt out of sign-off

    Bars are medians; whiskers show the middle half. Medians of separate steps don't add up exactly.

    Calculated513 decided home extensions, 247 start notices, 132 decided appeals · within 1.5 km, 10 years · NPAD, BCMS, An Coimisiún Pleanála

    Figure 5

    What appeals changed

    21 of 54 appealed refusals became permissions. 6 of 82 appealed approvals were reversed.

    Refusals appealed54 decided
    21 became permissions
    Approvals appealed82 decided
    6 reversed
    Ended approvedEnded refusedWithdrawn, invalid or other

    Every appeal decided within 1.5 km in 10 years, any kind of development.

    CalculatedAn Coimisiún Pleanála cases linked to the council file

    Appeals nearby 3 in the last 12 months

    None of 1 changed the council's decision

    • 502240 Pending · 32a, Ballinclea Heights, Killiney, Co. Dublin, A96N22E · 443 m
    • 501745 Open · Shamrock Lodge, Barnhill Avenue, Dalkey, Co. Dublin, A96D892 · 488 m
    • 501043 Refused · Kilfenora, 3 Killiney Road, Dalkey, Dublin, A96KN80 · 226 m report
    Sources: An Coimisiún Pleanála cases (ArcGIS feed), Courts Service legal diary (judicial reviews), National Planning Application Database · fetched 31 Oct 2026, 23:12
    SourceLicenceFetchedLink
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.030 Oct 2026, 23:01open
    Courts Service legal diary (judicial reviews)© the publisher31 Oct 2026, 23:12open
    National Planning Application DatabaseCC BY 4.031 Oct 2026, 23:00open
    Question 4

    What's changing around you?

    Street map around Springhill Park with 15 numbered planning items
    ⌖ the houseOpen for commentsNo decision yetOtherApprovedRefused
    1. 1The Ridings, Killiney Road D26B/0530/WEBNo decision yet · 161 m
    2. 2Istria, Dalkey Avenue D26B/0539/WEBNo decision yet · 222 m
    3. 34, Saval Park Crescent C3A/0004/26No decision yet · 51 m
    4. 42 Fortlawns, Killiney Road REF10726Section 5: awaiting decision · 102 m
    5. 5Morningside, Saval Park Road D25A/0916/WEBApproved · 168 m
    6. 6Kilfenora, 3 Killiney Road D26B/0002/WEBRefused · 226 m
    7. 7Kilkerry, Killiney Road D26B/0120Approved · 227 m
    8. 8Roscorrig, 43 Killiney Road D26A/0514Refused · 234 m
    9. 9Nought, Ballinclea Heights D25A/0965/WEBApproved · 248 m
    10. 10139A Ballinclea Heights, Ballinclea REF8526Section 5: exempt · 253 m
    11. 11Mornington, Saval Park Road REF6826Section 5: exempt · 260 m
    12. 12Fitzpatrick Castle Hotel, Killiney Hill Road D26A/0698/WEBNo decision yet · 283 m
    13. 1342, Mapas Road D25B/0704/WEBApproved · 347 m
    14. 14121, Ballinclea Heights D26B/0156/WEBApproved · 348 m
    15. 1516, Avondale Crescent D26A/0710No decision yet · 373 m
    Figure 6

    What happens to applications within 500 m

    Permission isn't building. Of 114 permissions since 2016, 62 show a start notice and 4 have a completion certificate.

    156 applications lodged within 500 m. Council: 116 approved, 10 refused. After appeals: 114 approved. Of those: 4 signed off, 31 built with the owner's opt-out, 27 started, 51 with no start notice found, 1 ran out.LODGEDCOUNCIL DECISIONAFTER APPEALSWHAT HAPPENED NEXT116: lodged → approved10: lodged → refused22: lodged → withdrawn or invalid8: lodged → undecided112: approved → approved8: refused → refused22: withdrawn or invalid → withdrawn8: undecided → undecided1 approved by the council, undecided after an appeal3 approved by the council, withdrawn or invalid after an appeal2 refused by the council, approved after an appeal51: approved → no start notice found31: approved → built, owner opted out27: approved → started, not signed off4: approved → signed off1: approved → ran out156 lodged156 lodged116 approved116 approved10 refused10 refused22 withdrawn or invalid22 withdrawn or invalid8 undecided8 undecided114 approved114 approved8 refused8 refused25 withdrawn25 withdrawn9 undecided9 undecided51 no start notice found51 no start notice found31 built, owner opted out31 built, owner opted out27 started, not signed off27 started, not signed off4 signed off4 signed off1 ran out1 ran out

    Purple bands are refusals turned into permissions on appeal. "No start notice found" includes small jobs that never needed one and notices we couldn't match.

    Measured156 applications in 10 years · NPAD, An Coimisiún Pleanála, BCMS start notices and completion certificates

    Figure 7

    The next 30 days

    2 deadlines within 500 m; the first closes 11 Nov 2026.

    2 deadlines in the next 30 days: 2026-11-11 D26B/0530/WEB: application received — Development consisting of new entrance porch and bay window to front elevation.; 2026-11-16 D26B/0539/WEB: application received — We, Kevin Sweeney and Sinead Hassett, intend to apply for retention permissiontoday6 Nov11 Nov16 Nov21 Nov26 Nov1 DecD26B/0530/WEB: application received — Development consisting of new entrance porch and bay window to front elevation. · 161 m away · 2026-11-11D26B/0539/WEB: application received — We, Kevin Sweeney and Sinead Hassett, intend to apply for retention permission · 222 m away · 2026-11-16
    Comments close
    • Comments close 11 Nov 202610 days left
      1D26B/0530/WEB · application received — Development consisting of new entrance porch and bay window to front elevation.
      €20 to the council · 161 m away
    • Comments close 16 Nov 202615 days left
      2D26B/0539/WEB · application received — We, Kevin Sweeney and Sinead Hassett, intend to apply for retention permission
      €20 to the council · 222 m away

    Measuredcouncil registers and An Coimisiún Pleanála · deadlines worked out from the dates on file

    Figure 8

    Applications within 500 m, by year

    Between 17 and 40 a year; busiest 2025. 92% of decisions were approvals.

    2021: 22, 2022: 27, 2023: 17, 2024: 28, 2025: 40, 2026: 220102030402021: 20 approved2021: 2 refused22’21*2022: 24 approved2022: 2 refused2022: 1 withdrawn or invalid27’222023: 16 approved2023: 1 refused17’232024: 20 approved2024: 8 withdrawn or invalid28’242025: 28 approved2025: 1 refused2025: 11 withdrawn or invalid40’252026: 8 approved2026: 4 refused2026: 2 withdrawn or invalid2026: 8 undecided22’26*
    ApprovedRefusedWithdrawn or invalidUndecided

    2021 and 2026 are part years (*). Exemption requests and time extensions are left out.

    Measuredcouncil register via NPAD

    Open for comments €20 to comment

    Every application within 500 m 36 in the last 12 months

    See every application on the map

    How we work this out
    Descriptions are shortened by the national planning database (to 80 characters in Dún Laoghaire-Rathdown, 70 in Fingal), and it does not publish applicants' names.
    Sources: National Planning Application Database, An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices) · fetched 31 Oct 2026, 23:00
    SourceLicenceFetchedLink
    National Planning Application DatabaseCC BY 4.031 Oct 2026, 23:00open
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.030 Oct 2026, 23:01open
    Building Control Management System (commencement notices)CC BY 4.031 Oct 2026, 02:56open
    Building work nearby 15 in the last 12 months
    5 not signed off10 no sign-off needed
    • 169 Ballinclea Heights, Killiney, Dublin, A96 X2H4 · 28 Sept 2026 · 1 homes · short notice no sign-off needed · D22A/0293 · 271 m
    • 50 Killiney Road, Dublin, A96 CD60 · 21 Sept 2026 · 1 homes · start notice, opted out no sign-off needed · D25A/0140/WEB · 259 m
    • 121 Ballinclea Heights, Killiney, Dublin, A96 T1K0 · 20 Aug 2026 · 1 homes · start notice, opted out no sign-off needed · D26B/0156/WEB · 362 m
    • 1 Ballinclea Heights, Killiney, Dublin · 10 Aug 2026 · 1 homes · start notice not signed off · D25A/0348/WEB · 247 m
    • St Joseph of Cluny, Killiney, Dublin, A96 DK13 · 17 Jul 2026 · 7-day notice not signed off · D25A/0694/WEB · 402 m
    • Saval Park Road, Dublin, Dún Laoghaire-Rathdown, A96D293 · 30 Apr 2026 · start notice not signed off · D25A/0702/WEB · 300 m
    • 3 Anglesey Park, Killiney, Dún Laoghaire-Rathdown, A96 HK84 · 7 Apr 2026 · 1 homes · start notice, opted out no sign-off needed · D25A/0377/WEB · 192 m
    • 35 Barnhill Avenue, Dublin, Dún Laoghaire-Rathdown, A96 YW52 · 24 Mar 2026 · 1 homes · start notice, opted out no sign-off needed · D25A/0051/WEB · 470 m
    • Morningside, Saval Park Road, Dalkey, Dún Laoghaire-Rathdown, A96 K597 · 23 Mar 2026 · 1 homes · start notice not signed off · D25A/0916/WEB · 178 m
    • 41 Mapas Road, Dalkey, Dún Laoghaire-Rathdown, A96 Y368 · 16 Feb 2026 · 1 homes · short notice no sign-off needed · 357 m
    • Killiney Hill Road, Killiney, Dún Laoghaire-Rathdown, A96H728 · 22 Jan 2026 · 1 homes · start notice not signed off · D25A/0593/WEB D24A0858/WEB · 496 m
    • 18 Springhill Park, Dalkey, Dún Laoghaire-Rathdown, A96 PP46 · 20 Jan 2026 · 1 homes · start notice, opted out no sign-off needed · D25A/0217/WEB · 353 m
    • 43 Dalkey Park, Dalkey, Dún Laoghaire-Rathdown, A96 WF38 · 17 Jan 2026 · short notice no sign-off needed · D25B/0349/WEB · 455 m
    • 4 Saval Park Road, Dublin, Dún Laoghaire-Rathdown, A96 D622 · 16 Jan 2026 · 1 homes · short notice no sign-off needed · D21B/0050 · 467 m
    • 31 Mapas Road, Dalkey, Dún Laoghaire-Rathdown, A96 EW27 · 12 Nov 2025 · 1 homes · short notice no sign-off needed · 341 m
    How we work this out
    Each row is a notice the builder sent to the council's building control office before work started. One notice can cover many homes. 'Signed off as finished' means a completion certificate is on file; work done under an opt-out or a short notice doesn't need one.
    Source: Building Control Management System (commencement notices) · fetched 31 Oct 2026, 02:56
    SourceLicenceFetchedLink
    Building Control Management System (commencement notices)CC BY 4.031 Oct 2026, 02:56open
    0
    Named places nearby: estate, schemes, crèches, schools

    Named places estate, developments, inspections

    Estate: Springhill Park · 13 applications in 10 years · 100% approved · most common: garage conversion

    Developments within 1.0 km

    SchemeHomesProgressDistance
    Former Dalkey Lodge Nursing Home22— (2026-Q2)489 m
    Lands at3636 built (2025-Q4)669 m
    The Barn, Atmospheric Road2222 not started (2026-Q2)822 m

    Crèches and schools inspected

    NameLatest inspectionDistance
    Bayview Montessori Ltd · Crèche4 Apr 2025 · report · Tusla Early Years Inspectorate521 m
    The Apres School Club Ltd · Crèche26 Mar 2026 · report · Tusla Early Years Inspectorate522 m
    Blue Stars Early Years Services · Crèche6 Mar 2024 · report · Tusla Early Years Inspectorate622 m
    Sharavogue School · Crèche13 May 2026 · report · Tusla Early Years Inspectorate836 m
    Rathdown Pre- School Service · Crèche8 Oct 2024 · report · Tusla Early Years Inspectorate987 m
    How we work this out
    Organisations only: a person named on an application is never listed. Inspection dates and links are the publisher's; read their report for the findings.
    Sources: Dublin housing delivery pipeline, Housing estates, National Planning Application Database, Department of Education school list, Tusla early years register · fetched 31 Oct 2026, 23:00
    SourceLicenceFetchedLink
    Dublin housing delivery pipelineCC BY 4.026 Oct 2026, 23:00open
    Housing estatesODbL 1.0, CC BY-SA 4.0, CC BY 4.027 Oct 2026, 23:03open
    National Planning Application DatabaseCC BY 4.031 Oct 2026, 23:00open
    Department of Education school listCC BY 4.027 Oct 2026, 23:04open
    Tusla early years registerPublic register28 Oct 2026, 23:19open
    How busy is this area Busier than most of Dún Laoghaire-Rathdown County Council.
    Homes approved
    Here44
    Council middle44
    Homes started
    Here151
    Council middle93
    How we work this out
    Homes approved counts schemes of 10 or more homes (one-off houses are not included). Homes started counts every home in a notice that building work was starting. The council figure is the middle value across the council's built-up squares of the same area (3.1 km², about a 1 km circle), so half of them saw more and half fewer.
    Sources: An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices), National Planning Application Database · fetched 31 Oct 2026, 23:00
    SourceLicenceFetchedLink
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.030 Oct 2026, 23:01open
    Building Control Management System (commencement notices)CC BY 4.031 Oct 2026, 02:56open
    National Planning Application DatabaseCC BY 4.031 Oct 2026, 23:00open
    Question 5

    What's the area like?

    Figure 9

    This street block against the council

    66% of homes built before 1971 (council 38%). 93% owner-occupied (council 68%).

    Homes built before 1971
    66% · council 38%
    Homes built since 2001
    22% · council 25%
    Owner-occupied
    93% · council 68%
    Rented
    5% · council 29%
    Children under 15
    20% · council 18%
    Aged 65 and over
    21% · council 17%
    Households with 2+ cars
    57% · council 39%
    Work mainly from home
    28% · council 19%
    This small area (463 people)Dún Laoghaire-Rathdown

    MeasuredCSO Census 2022, Small Area Population Statistics (CC BY 4.0) · small area 267061003

    Bus
    112 m
    Killiney Road · 59 · busiest stop within 500 m: 1 an hour at peak
    Radon
    1 in 10
    homes here likely high (EPA). Test it
    Nearest school
    253 m
    S N Gleann na gCaorach Iníon Léinín, 211 pupils
    Homes sold nearby
    42
    in 3 years (Property Price Register)
    Schools, stops and the council

    Schools

    • S N Gleann na gCaorach Iníon Léinín · primary · 211 pupils · 253 m
    • St Joseph Of Cluny Secondary School · postprimary · 270 pupils · 402 m
    • Rathdown School · postprimary · 364 pupils · 987 m

    Stops 22

    • Killiney Road · 59 · 1/hour at peak · 112 m
    • Killiney Grove · 59 · 1/hour at peak · 124 m
    • Killiney Road · 59 · 1/hour at peak · 219 m
    • Wyvern Estate · 59 · 1/hour at peak · 240 m
    • Ballinaclea Road · 59 · 1/hour at peak · 262 m
    • Ballinaclea Road · 59 · 1/hour at peak · 280 m
    • Killiney Hill Park · 59 · 1/hour at peak · 417 m
    • Killiney Hill Park · 59 · 1/hour at peak · 450 m

    Schools growing or shrinking planning in 3 years · pupils last year

    • S N Gleann na gCaorach Iníon Léinín · 253 m-1.9% pupils (211)
    • St Joseph Of Cluny Secondary School · 402 m+5.5% pupils (270)
    • Rathdown School · 987 m+4.3% pupils (364) · an extension 2026, approved

    Council meetings 16 items

    Public land

    • Dún Laoghaire-Rathdown County Council · 0.31 ha · 94 m
    • Electricity Supply Board · 0.1 ha · 280 m
    • Dun Laoghaire Rathdown County Council · 45.67 ha · 362 m
    Sources: Public transport stops and routes (NTA GTFS), Department of Education school list, National Planning Application Database, Council consultation portals, Council meetings (ModernGov), Land Development Agency public land register, cso_saps_2022, National Transport Authority, Fingal County Council and Dún Laoghaire-Rathdown County Council development plan layers (CC BY 4.0), dartplus.ie project extents over NTA GTFS rail shapes (CC BY 4.0), EPA strategic noise maps, Fingal County Council · fetched 31 Oct 2026, 23:00
    SourceLicenceFetchedLink
    Public transport stops and routes (NTA GTFS)CC BY 4.025 Oct 2026, 23:02open
    Department of Education school listCC BY 4.027 Oct 2026, 23:04open
    National Planning Application DatabaseCC BY 4.031 Oct 2026, 23:00open
    Council consultation portalsPublic31 Oct 2026, 01:06open
    Council meetings (ModernGov)Public31 Oct 2026, 02:21open
    Land Development Agency public land registerCC BY 4.011 Sept 2026, 16:43open
    cso_saps_2022CC BY 4.0—open
    National Transport AuthorityCC BY 4.0——
    Fingal County Council and Dún Laoghaire-Rathdown County Council development plan layers (CC BY 4.0)CC BY 4.0——
    dartplus.ie project extents over NTA GTFS rail shapes (CC BY 4.0)CC BY 4.0——
    EPA strategic noise mapsCC BY 4.0——
    Fingal County CouncilCC BY 4.0——
    Question 6

    What to ask, and who

    1. High radon area (1 in 10 homes): has it been tested?
      Ask for: Radon test results.
      Seller
    2. Application 161 m away open for comments until 11 Nov 2026: comment?
      Ask for: The plans on the council's website (€20 to comment).
      Council
    3. Any work done without planning permission?
      Ask for: An opinion of compliance for the whole house.
      Seller · solicitor
    Reference

    Where this is, the terms, the sources

    Townland
    Bullock
    Electoral division
    Dalkey Upper
    Electoral area
    Dún Laoghaire
    Council
    Dun Laoghaire-Rathdown County Council
    Everything we found, as a list 8 lines
    • Zoned R2 (existing residential); not protected; no vacant land tax; high radon area.
    • Nothing nearby looks set to change.
    • 2 applications open for comments nearby; nearest closes 11 Nov 2026.
    • Killiney Road (bus 59) 112 m away: 1 an hour at morning peak; 9 from all stops within 500 m.
    • Here (2022 census): 93% owner-occupied (council 68%); 6% of homes empty (council 6%); most built 1946–1960; 42% drive to work (council 43%); population up 1% since 2016.
    • 3 home extensions within 250 m since 2025. 1 side extension refused. On Springhill Park: 11 in 10 years, 100% approved.
    • Around here the council decides in a median 50 days (about 7 weeks); 1 in 8 is asked for more information.
    • Homes started within 1 km: 49 in the last year, 71 three years before.
    What the terms mean 7 terms
    • Vacant land tax (Residential Zoned Land Tax (RZLT)): A yearly tax of 3% of the land's value on land that is zoned for homes and serviced but left unbuilt.
    • Building started (Commencement notice (BCMS)): The builder must tell the council's building control office 14 to 28 days before work starts.
    • Signed off as finished (Certificate of Compliance on Completion): A certificate filed when a building is finished, confirming it meets the building regulations.
    • Approved (Grant of permission): The council said yes, usually with conditions.
    • Comment on an application (Observation / submission): Anyone can comment on a planning application within five weeks of it being lodged, for a €20 fee.
    • Appeal (Appeal to An Coimisiún Pleanála): The applicant, or anyone who commented in time, can appeal the council's decision within four weeks.
    • What the land is zoned for (Zoning objective): The council's development plan sets what each area is for: homes, shops, open space and so on.
    Sources and licences 30
    SourcePublisherLicenceFetched
    EPA strategic noise maps—CC BY 4.0—
    Fingal County Council—CC BY 4.0—
    Fingal County Council and Dún Laoghaire-Rathdown County Council development plan layers (CC BY 4.0)—CC BY 4.0—
    National Transport Authority—CC BY 4.0—
    services-eu1.arcgis.comAn Coimisiún PleanálaCC BY 4.030 Oct 2026
    data.nbco.gov.ieNational Building Control Office (BCMS)CC BY 4.031 Oct 2026
    data.gov.ieVarious (see each layer)CC BY 4.0, CC BY-NC-ND 4.027 Sept 2026
    services-eu1.arcgis.comNational Parks and Wildlife ServiceCC BY 4.027 Sept 2026
    gis.epa.ieEnvironmental Protection AgencyCC BY 4.027 Sept 2026
    services.arcgis.comLocal authorities (Record of Protected Structures)CC BY 4.027 Sept 2026
    dlrcoco.citizenspace.comLocal authorities (consultation portals)Public31 Oct 2026
    www2.courts.ie—© the publisher31 Oct 2026
    cso.ie—CC BY 4.0—
    dartplus.ie project extents over NTA GTFS rail shapes (CC BY 4.0)—CC BY 4.0—
    services-eu1.arcgis.comLocal authorities (derelict sites registers)CC BY 4.026 Oct 2026
    services.arcgis.comDublin local authorities (housing delivery pipeline)CC BY 4.026 Oct 2026
    esbnetworks.ie—© the publisher · flag only11 Sept 2026
    overpass-api.deOpenStreetMap contributors, NHDS, Kildare County CouncilODbL 1.0, CC BY-SA 4.0, CC BY 4.027 Oct 2026
    transportforireland.ieNational Transport AuthorityCC BY 4.025 Oct 2026
    lda.ieLand Development AgencyCC BY 4.011 Sept 2026
    meetings.fingal.ieLocal authorities (council meetings)Public31 Oct 2026
    services.arcgis.comDepartment of Housing (National Planning Application Database)CC BY 4.031 Oct 2026
    services-eu1.arcgis.comTailte ÉireannCC BY 4.011 Sept 2026
    services-eu1.arcgis.comCSO, Tailte Éireann, OpenStreetMap contributorsCC BY 4.04 Oct 2026
    propertypriceregister.ieProperty Services Regulatory Authority (PPR)© PSRA, PSI licence31 Oct 2026
    services.arcgis.comLocal authorities (RZLT maps)CC BY 4.025 Oct 2026
    gov.ieDepartment of EducationCC BY 4.027 Oct 2026
    gov.ieDepartment of HousingCC BY-SA 4.023 Oct 2026
    tusla.ieTusla (Early Years Inspectorate)Public register28 Oct 2026
    services.arcgis.comLocal authorities via the Department of Housing (GZT / MyPlan)CC BY 4.025 Oct 2026
    Measured
    counted from a public register
    Calculated
    a rate or median we worked out from those counts
    Our classification
    we sorted it by reading each description
    Estimate
    inferred from another source (census, map data)
    Rule summary
    the law, simplified: check before relying on it
    How we work this out
    Generated 1 Nov 2026, 00:05 from the Planning Register store; nothing was fetched live. Not a legal search: the council's planning file is the record. Deadlines come from published dates under the Planning and Development Act 2000: confirm with the council before relying on them. Street map © OpenStreetMap contributors; building outlines © Overture Maps Foundation. The text version carries every figure with its source, for an AI assistant.