PlanningRegister.ie
Planning report · Dun Laoghaire-Rathdown County Council · 500 m around the house · the last 12 months · 31 Oct 2026, 03:13

Knocknacree Park, Dalkey, Dalkey Commons

53.27331, -6.10364

Homes here mostly date from the 1960s. 3 planning files on this house, the latest from 2025. Home extensions nearby almost always get approved (93%). 22 homes approved 439 m away haven't started.

See on the mapWatch this area

How planning works, with this area's numbers

steps can overlap · medians for home extensions within 1.5 km, 10 years
  1. 1ApplySite notice up, plans online
  2. 2Comments5 weeks, €20. Comment to keep your right to appeal
  3. 3Decision8 weeks by law. Here 52 days
  4. 4Appeal window4 weeks after the decision
  5. 5AppealHere about 6 months
  6. 6PermissionLasts 5 years
  7. 7StartStart notice to the council. Here about 6 months after
  8. 8Sign-offCompletion cert, or the owner opts out
Question 1

What's the planning story of this house?

Figure 1

When it was built, and the rules since

Most homes here were built 1961–70, around when planning permission began (1964). 3 planning files on this house, the latest from 2026.

Timeline from 1955: planning permission needed from October 1964, building regulations from June 1992, building records online from March 2014, sign-off opt-out from September 2015. Most homes here were built 1961–1970. 3 planning files on this house.1960197019801990200020102020Oct 1964permission neededJun 1992building regulationsMar 2014building records onlineSep 2015owners may opt out of sign-offThis houseAll of Knocknacree ParkBuilt: most homes in this small area date from 1961–1970 (census estimate)most built2026: D25A/1004/WEB · extension, refused2024: D24A/0678/WEB · demolition, refused2022: D22A/0576 · demolition, refused2022: 3 files on Knocknacree Park2023: 3 files on Knocknacree Park2024: 1 file on Knocknacree Park2025: 1 file on Knocknacree Park2026: 2 files on Knocknacree Park10 files

Each line is a rule that applies to work done after it.

MeasuredEstimatecouncil register via NPAD · build years: CSO Census 2022, small area

  1. 2026
    D25A/1004/WEB · extension · refused 2026
    approvedstarted?signed off?
  2. 2024
    D24A/0678/WEB · demolition · refused 2024
    approvedstarted?signed off?
  3. 2022
    D22A/0576 · demolition · refused 2022
    approvedstarted?signed off?
On this site
R2
Zoning · Existing residential
No
Protected or listed · on the council's list
No
Vacant land tax · lived-in homes don't pay it
1 in 5
Radon (EPA) · homes with high radon
Zoning, protection, tax and flood: the detail
ZoningR2 · Existing residential
What it says

Objective A: A To provide residential development and improve residential amenity while protecting the existing residential amenities

An established residential area. The objective is to protect existing residential amenity as well as to provide housing — which is the objective a neighbour's objection to an overbearing extension is usually argued under.

county development plan 2022 2028 · 1 Apr 2022 – 1 Apr 2028

ZoningR2 · Existing residential
What it says

Objective A: A To provide residential development and improve residential amenity while protecting the existing residential amenities

An established residential area. The objective is to protect existing residential amenity as well as to provide housing — which is the objective a neighbour's objection to an overbearing extension is usually argued under.

d n laoghaire rathdown county development plan 2022 2028 variation no 1 · 21 Apr 2022 – 20 Apr 2028

Protected building1 within 100 m Ardbrugh House
Radon1 in 5 homes have high radon (EPA)

Not on this site: heritage inventory, monument zone, conservation area, EU nature site, EU bird site, natural heritage area, tree order, landslide risk, derelict list.

Vacant land taxNo lived-in homes don't pay it
Flood riskNone mapped within 500 m
Within 500 mCountFor example
Conservation areas4Ardbrugh Villas, Ardburgh Road, Dalkey, Co. Dublin; Dalkey Village
Natural heritage areas1Dalkey Coastal Zone And Killiney Hill
Radon grid squares8
Protected buildings47Tram Yard; Church of the Assumption
Monuments6Castle - unclassified; Ritual site - holy well
How we work this out
'On this site' means the record's own map outline touches the registered parcel (or a 12 m circle round the point where there is no parcel). Only the council's own list confirms a protected building; ask the council if in doubt. The council's map for the vacant land tax shows this spot inside an area of existing homes. Homes people live in, and their gardens, don't pay the tax. The OPW flood map's licence lets us show a yes/no only. Land on the vacant land tax map nearby: 2 on the draft 2027 map; 2 on the final 2026 map.
Sources: Development plan zoning (councils), EPA radon map, Records of Protected Structures, Residential Zoned Land Tax maps, Constraint layers (bundle), Architectural Conservation Areas, Natural Heritage Areas (NPWS), Sites and Monuments Record · fetched 25 Oct 2026, 23:43
SourceLicenceFetchedLink
Development plan zoning (councils)CC BY 4.025 Oct 2026, 23:06open
EPA radon mapCC BY 4.027 Sept 2026, 19:36open
Records of Protected StructuresCC BY 4.027 Sept 2026, 19:36open
Residential Zoned Land Tax mapsCC BY 4.025 Oct 2026, 23:43open
Constraint layers (bundle)CC BY 4.0, CC BY-NC-ND 4.027 Sept 2026, 19:37open
Architectural Conservation AreasCC BY 4.027 Sept 2026, 19:36open
Natural Heritage Areas (NPWS)CC BY 4.027 Sept 2026, 19:27open
Sites and Monuments RecordCC BY 4.027 Sept 2026, 19:29open
How we work this out
Applications whose site outline (or map point) falls on this property. 'No sign building has started' means we found no notice to the council's building control office; small jobs don't always file one, so ask. A missing completion certificate is not proof of a problem: an owner can opt out of official sign-off for a house or extension built for themselves.
Sources: Building Control Management System (commencement notices), National Planning Application Database · fetched 31 Oct 2026, 02:56
SourceLicenceFetchedLink
Building Control Management System (commencement notices)CC BY 4.031 Oct 2026, 02:56open
National Planning Application DatabaseCC BY 4.031 Oct 2026, 02:03open
Question 2

Could you extend?

Nothing on this site restricts it: not protected, not in a conservation area.

Figure 2

What happened to applications like yours

Extensions are almost always approved here: 88–100% by type. A new house in a garden is harder: 61% approved, and 1 in 4 is asked for more information.

Single-storey rear55 decided · more info asked 11%
96% · council 96%
Two-storey rear36 decided · more info asked 19%
97% · council 92%
Two-storey side13 decided · more info asked 31%
100% · council 95%
Single-storey side11 decided · more info asked 0%
100% · council 96%
Attic or dormer87 decided · more info asked 6%
91% · council 94%
First-floor34 decided · more info asked 12%
88% · council 90%
Garage conversion18 decided · more info asked 6%
100% · council 99%
Porch or front19 decided · more info asked 5%
100% · council 98%
New house in a garden or site44 decided · more info asked 25%
61% · council 63%
Approved nearbyDún Laoghaire-Rathdown overall

Decided applications within 1.5 km, received in the last 10 years. The kind of work is read from each description.

CalculatedOur classificationcouncil register via NPAD · 317 nearby, 3,892 council-wide

Figure 3

Knocknacree Park, file by file since 2022

2 of 3 decided extensions on the road were approved. New houses in side gardens or on sites: 0 of 2.

10 planning files on Knocknacree Park since 2022, by kind and decision.20222023202420252026Extensions, atticsNo. 26 · 2023 · rear · withdrawn or invalid · D23A/0661No. 26 · 2023 · garage conversion · approved · D23A/0672No. 20 · 2023 · side · approved · D23B/0243No. 33 · 2025 · other extension · refused · D25A/1004/WEBPorches, roofs, otherNo. 23 · 2022 · other work · approved · D22A/0612No. 27 · 2022 · other work · approved · D22A/0769No. 30 · 2026 · other work · approved · D26A/0095/WEBNo. 11 · 2026 · other work · approved · D26A/0526/WEBNew house in a side gardenNo. 33 · 2022 · new house · refused · D22A/057633No. 33 · 2024 · new house · refused · D24A/0678/WEB33
ApprovedRefusedWithdrawn or invalid

10 files with "Knocknacree Park" in the address within 600 m, other roads of the same name left out. Hover a dot for the house number and reference.

MeasuredOur classificationcouncil register via NPAD · 2022–2026

Extensions and refusals right beside you 6 within 250 m · 1 refused within 100 m

Extensions and refusals near you 6 extensions within 250 m · the last 12 months

3 approved1 refused2 no decision or withdrawn
KindAppliedApprovedRefused
Other421
Dormer or attic11—
Single-storey rear10—

Refused within 100 m 1 in the last 12 months

  • D25A/1004/WEB · extension · refused 24 Feb 2026 · 3 m appeal refused
    Reasons raised: demolition and the justification for replacement; residential amenity and privacy; design, character and external finishes
    inspector's report
How we work this out
Home extensions are read from the application's description (extension, attic or dormer, porch, garage conversion, garden room), so a few may be missed or mislabelled. The kind is the first that fits: a dormer with a rear extension counts as a dormer. Refusal reasons come from An Coimisiún Pleanála's inspector reports, so they exist only where the refusal was appealed (Dún Laoghaire-Rathdown so far). The council's own reasons are on its planning file.
Sources: National Planning Application Database, An Coimisiún Pleanála cases (ArcGIS feed) · fetched 31 Oct 2026, 02:03
SourceLicenceFetchedLink
National Planning Application DatabaseCC BY 4.031 Oct 2026, 02:03open
An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.030 Oct 2026, 23:01open
Sources: An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices), National Planning Application Database · fetched 31 Oct 2026, 02:56
SourceLicenceFetchedLink
An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.030 Oct 2026, 23:01open
Building Control Management System (commencement notices)CC BY 4.031 Oct 2026, 02:56open
National Planning Application DatabaseCC BY 4.031 Oct 2026, 02:03open
Question 3

How long, and what if someone objects?

Figure 4

A home extension's journey here

A decision takes 52 days. 1 in 10 is asked for more information, which adds about 66 days. Building starts about 6 months after permission.

Comments open: 5 weeks · €20; Council decision: 52 days; If more info asked (1 in 10): 120 days; Appeal window: 4 weeks; If appealed: +177 days; Building starts: 184 days after permission0 mo3 mo6 mo9 mo12 mo15 moComments openComments close 5 weeks after the application is lodged5 weeks · €20Council decisionDecision: median 52 days, middle half 49–54 (n=325)52 daysIf more info asked (1 in 10)With further information: median 120 days (n=38)120 daysAppeal windowAnyone who commented can appeal within 4 weeks of the decision4 weeksIf appealedAt An Coimisiún Pleanála: median 177 days (n=109, all appeals within 1.5 km)+177 daysBuilding startsStart notice: median 184 days after permission (n=167)184 days after permissionSigned off475 days after the start, for the few who file. 65% of owners opt out of sign-off

Bars are medians; whiskers show the middle half. Medians of separate steps don't add up exactly.

Calculated363 decided home extensions, 172 start notices, 109 decided appeals · within 1.5 km, 10 years · NPAD, BCMS, An Coimisiún Pleanála

Figure 5

What appeals changed

19 of 49 appealed refusals became permissions. 5 of 62 appealed approvals were reversed.

Refusals appealed49 decided
19 became permissions
Approvals appealed62 decided
5 reversed
Ended approvedEnded refusedWithdrawn, invalid or other

Every appeal decided within 1.5 km in 10 years, any kind of development.

CalculatedAn Coimisiún Pleanála cases linked to the council file

Appeals nearby 9 in the last 12 months

None of 6 changed the council's decision

  • 502139 Pending · 5, Sorrento Road, Dalkey, Dublin, A96F6W4 (ACA) · 322 m
  • 501311 Granted · The Coach House, Cunningham Road, Dalkey, Co. Dublin, A96A9TV · 169 m
  • 501312 Granted · Arranmore, Cunningham Road, Dalkey, Co. Dublin, A96E440 · 145 m
  • 501762 Withdrawn · The Flags, Dalkey Avenue, Dalkey, Co. Dublin, A96DX94 · 281 m
  • 500481 Granted · 1, Knock Na Cree Road, Dalkey, Dublin, A96VN59 · 379 m report
  • 501044 Refused · Coolkeel, 33 Knocknacree Park, Dalkey, Dublin, A96V250 · 2 m report
  • 501593 Pending · Altamont, Knocknacree Road, Dalkey, Co. Dublin, A96YP60 · 36 m
  • 500438 Granted · 2, Coliemore Road, Dalkey, Dublin, A96F227 · 466 m report
  • 500418 Granted · Miroka Bungalow, 106 Coliemore Road, Dalkey, Co. Dublin, A96DN40 · 408 m report
Sources: An Coimisiún Pleanála cases (ArcGIS feed), Courts Service legal diary (judicial reviews), National Planning Application Database · fetched 31 Oct 2026, 02:03
SourceLicenceFetchedLink
An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.030 Oct 2026, 23:01open
Courts Service legal diary (judicial reviews)© the publisher30 Oct 2026, 23:12open
National Planning Application DatabaseCC BY 4.031 Oct 2026, 02:03open
Question 4

What's changing around you?

Street map around Knocknacree Park, Dalkey, Dalkey Commons with 15 numbered planning items
⌖ the houseOpen for commentsWindow closingDerelict buildingApproved, not startedAppealEmpty land zoned for homesApprovedNo decision yet
  1. 1Casa Blanca, Ardeevin Road D26A/0792/WEBNo decision yet · 161 m
  2. 2Inishowen, Knocknacree Road D26A/0793/WEBNo decision yet · 175 m
  3. 3The Flags, Dalkey Avenue D26A/0728/WEBNo decision yet · 281 m
  4. 43, Rockfort Avenue D26A/0798/WEBNo decision yet · 420 m
  5. 5Marrakesh, Knocknacree Road D26A/0610/WEBApproved · 210 m
  6. 6DERELICT, TORCA ROAD DS: 1604Derelict building · 261 m
  7. 7Former Dalkey Lodge Nursing Home D26A/0055/WEBApproved, no sign building has started · 439 m
  8. 8Coolkeel, 33 Knocknacree Park 501044Appeal: refused · 2 m
  9. 9Altamont, Knocknacree Road 501593Appeal: no decision yet · 36 m
  10. 10Arranmore, Cunningham Road 501312Appeal: approved · 145 m
  11. 11The Coach House, Cunningham Road 501311Appeal: approved · 169 m
  12. 120.3 ha zoned for homesEmpty land zoned for homes · 492 m
  13. 13Chiasso, 30 D26A/0095/WEBApproved · 26 m
  14. 1411, Knocknacree Park D26A/0526/WEBApproved · 75 m
  15. 15Rowan Lodge, Ardeevin Road D26B/0487/WEBNo decision yet · 117 m
Figure 6

What happens to applications within 500 m

Permission isn't building. Of 158 permissions since 2016, 71 show a start notice and 4 have a completion certificate. Most owners opt out of sign-off.

224 applications lodged within 500 m. Council: 160 approved, 25 refused. After appeals: 158 approved. Of those: 4 signed off, 41 built with the owner's opt-out, 26 started, 86 with no start notice found, 1 ran out.LODGEDCOUNCIL DECISIONAFTER APPEALSWHAT HAPPENED NEXT160: lodged → approved25: lodged → refused30: lodged → withdrawn or invalid9: lodged → undecided154: approved → approved21: refused → refused30: withdrawn or invalid → withdrawn9: undecided → undecided2 approved by the council, undecided after an appeal1 approved by the council, refused after an appeal3 approved by the council, withdrawn or invalid after an appeal4 refused by the council, approved after an appeal86: approved → no start notice found41: approved → built, owner opted out26: approved → started, not signed off4: approved → signed off1: approved → ran out224 lodged224 lodged160 approved160 approved25 refused25 refused30 withdrawn or invalid30 withdrawn or invalid9 undecided9 undecided158 approved158 approved22 refused22 refused33 withdrawn33 withdrawn11 undecided11 undecided86 no start notice found86 no start notice found41 built, owner opted out41 built, owner opted out26 started, not signed off26 started, not signed off4 signed off4 signed off1 ran out1 ran out

Purple bands are refusals turned into permissions on appeal. "No start notice found" includes small jobs that never needed one and notices we couldn't match.

Measured224 applications in 10 years · NPAD, An Coimisiún Pleanála, BCMS start notices and completion certificates

Figure 7

The next 30 days

7 deadlines within 500 m; the first closes 2 Nov 2026.

7 deadlines in the next 30 days: 2026-11-02 D26A/0728/WEB: application received — construction of a 40sqm single-storey garden room to the north-eastern boundary; 2026-11-04 ACP 501312: Grant permission; 2026-11-04 D26A/0610/WEB: GRANT PERMISSION — The renovation and extension of the existing two storey detached dwelling inclu; 2026-11-04 ACP 501311: Grant permission; 2026-11-23 D26A/0792/WEB: application received — Permission is sought for the demolition of the existing flat roofs over the ground-floor front and side structures, the ; 2026-11-25 D26A/0793/WEB: application received — 1. Construction of a single storey extension to the rear at lower ground floor level, with a terrace above, including a ; 2026-11-27 D26A/0798/WEB: application received — The development will consist of to the main house roof; the replacement of non-original fibre cement tiles with slate, otoday5 Nov10 Nov15 Nov20 Nov25 Nov30 NovD26A/0728/WEB: application received — construction of a 40sqm single-storey garden room to the north-eastern boundary · 281 m away · 2026-11-02ACP 501312: Grant permission · 145 m away · 2026-11-04D26A/0610/WEB: GRANT PERMISSION — The renovation and extension of the existing two storey detached dwelling inclu · 210 m away · 2026-11-04ACP 501311: Grant permission · 169 m away · 2026-11-04D26A/0792/WEB: application received — Permission is sought for the demolition of the existing flat roofs over the ground-floor front and side structures, the · 161 m away · 2026-11-23D26A/0793/WEB: application received — 1. Construction of a single storey extension to the rear at lower ground floor level, with a terrace above, including a · 175 m away · 2026-11-25D26A/0798/WEB: application received — The development will consist of to the main house roof; the replacement of non-original fibre cement tiles with slate, o · 420 m away · 2026-11-27
Comments closeTime to appeal endsHigh Court window ends
  • Comments close 2 Nov 20262 days left
    3D26A/0728/WEB · application received — construction of a 40sqm single-storey garden room to the north-eastern boundary
    €20 to the council · 281 m away
  • Time to ask the High Court for a review ends 4 Nov 20264 days left
    Grant permission
    145 m away
  • Time to appeal ends 4 Nov 20264 days left
    5D26A/0610/WEB · GRANT PERMISSION — The renovation and extension of the existing two storey detached dwelling inclu
    €220 to An Coimisiún Pleanála (€110 observer) · 210 m away
  • Time to ask the High Court for a review ends 4 Nov 20264 days left
    Grant permission
    169 m away
  • Comments close 23 Nov 202623 days left
    1D26A/0792/WEB · application received — Permission is sought for the demolition of the existing flat roofs over the ground-floor front…
    €20 to the council · 161 m away
  • Comments close 25 Nov 202625 days left
    2D26A/0793/WEB · application received — 1. Construction of a single storey extension to the rear at lower ground floor level, with a…
    €20 to the council · 175 m away
  • Comments close 27 Nov 202627 days left
    4D26A/0798/WEB · application received — The development will consist of to the main house roof; the replacement of non-original fibre…
    €20 to the council · 420 m away

Measuredcouncil registers and An Coimisiún Pleanála · deadlines worked out from the dates on file

Figure 8

Approved, stalled or planned, not built yet

22 homes 439 m away were approved Aug 2026 with no start notice yet; the permission runs to Aug 2031.

Former Dalkey Lodge… · 22 homes: 22 homes approved Aug 2026, not started202420252026202720282029203020312032Former Dalkey Lodge… · 22 homes439 m · D26A/0055/WEB22 homes approved Aug 2026, not started22 homes approved Aug 2026, not startedtoday

Each row is a dated fact from a public register: no score and no forecast.

Measuredcouncil registers, BCMS, derelict sites registers, development plan layers (CC BY 4.0)

Sites that could change 3 within 500 m

Derelict building 1

  • 6DERELICT, TORCA ROAD · listed as derelict · 261 m

Approved, not started 1

Empty land zoned for homes 1

  • 120.3 ha zoned for homes · no homes built on it yet · 492 m
Sources: An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices), Derelict sites registers, Council meetings (ModernGov), National Planning Application Database, Residential Zoned Land Tax maps · fetched 31 Oct 2026, 02:56
SourceLicenceFetchedLink
An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.030 Oct 2026, 23:01open
Building Control Management System (commencement notices)CC BY 4.031 Oct 2026, 02:56open
Derelict sites registersCC BY 4.026 Oct 2026, 23:09open
Council meetings (ModernGov)Public31 Oct 2026, 02:21open
National Planning Application DatabaseCC BY 4.031 Oct 2026, 02:03open
Residential Zoned Land Tax mapsCC BY 4.025 Oct 2026, 23:43open
Figure 9

Applications within 500 m, by year

Between 31 and 39 a year; busiest 2025. 86% of decisions were approvals.

2021: 49, 2022: 31, 2023: 31, 2024: 37, 2025: 39, 2026: 37010203040502021: 38 approved2021: 9 refused2021: 2 withdrawn or invalid49’21*2022: 23 approved2022: 7 refused2022: 1 withdrawn or invalid31’222023: 25 approved2023: 4 refused2023: 2 withdrawn or invalid31’232024: 25 approved2024: 2 refused2024: 10 withdrawn or invalid37’242025: 28 approved2025: 2 refused2025: 9 withdrawn or invalid39’252026: 21 approved2026: 1 refused2026: 6 withdrawn or invalid2026: 9 undecided37’26*
ApprovedRefusedWithdrawn or invalidUndecided

2021 and 2026 are part years (*). Exemption requests and time extensions are left out.

Measuredcouncil register via NPAD

Open for comments €20 to comment

Every application within 500 m 45 in the last 12 months

See every application on the map

How we work this out
Descriptions are shortened by the national planning database (to 80 characters in Dún Laoghaire-Rathdown, 70 in Fingal), and it does not publish applicants' names.
Sources: National Planning Application Database, An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices) · fetched 31 Oct 2026, 02:56
SourceLicenceFetchedLink
National Planning Application DatabaseCC BY 4.031 Oct 2026, 02:03open
An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.030 Oct 2026, 23:01open
Building Control Management System (commencement notices)CC BY 4.031 Oct 2026, 02:56open
Building work nearby 14 in the last 12 months
1 not signed off13 no sign-off needed
  • 1 Craiglands, Dublin, A96 F792 · 2 Nov 2026 · 1 homes · short notice no sign-off needed · D26B/0327/WEB · 229 m
  • Sorrento Road, Dalkey, Dublin · 1 Oct 2026 · short notice no sign-off needed · D25B/0723/WEB · 354 m
  • Sorrento Road, Dalkey, Dublin, A96 W6WA · 7 Sept 2026 · 1 homes · short notice no sign-off needed · D25B/0465/WEB · 419 m
  • Saint Germans, Vico Road, Dalkey, Co. Dublin, Dalkey, Dublin · 29 Jul 2026 · 1 homes · start notice, opted out no sign-off needed · D21A/0931 · 497 m
  • 3 Saint Patrick's Road, Dalkey, Dublin · 24 Jul 2026 · 6 homes · 7-day notice not signed off · D25A/0326/WEB · 491 m
  • 2 Dalkey Grove, Dalkey, Dún Laoghaire-Rathdown, A96 WE54 · 18 May 2026 · 1 homes · start notice, opted out no sign-off needed · D25B/0384/WEB · 444 m
  • 6 Knock-Na-Cree Grove, Dalkey, Dún Laoghaire-Rathdown · 11 May 2026 · 1 homes · start notice, opted out no sign-off needed · D24A/0005 · 270 m
  • 3 Saint Patrick's Road, Dalkey, Dún Laoghaire-Rathdown, A96 VW50 · 16 Apr 2026 · short notice no sign-off needed · D25A/0326/WEB · 491 m
  • 4 Tubbermore Avenue, Dalkey, Dún Laoghaire-Rathdown, A96 N738 · 5 Mar 2026 · 1 homes · short notice no sign-off needed · D25A/0770 · 378 m
  • 9 Cunningham Road, Dublin, South Dublin, A96 AD77 · 18 Feb 2026 · 1 homes · start notice, opted out no sign-off needed · D25A/0447/WEB · 224 m
  • Rockfort Avenue, Dublin, Dún Laoghaire-Rathdown, A96 YW35 · 11 Dec 2025 · 1 homes · short notice no sign-off needed · D25A/0676/WEB · 471 m
  • Ardeevin Road, Dalkey, Dún Laoghaire-Rathdown, A96 HR62 · 17 Nov 2025 · 1 homes · start notice, opted out no sign-off needed · ABP-321331-24 · 121 m
  • 90 Sorrento Road, Dalkey, Dún Laoghaire-Rathdown, A96 FT53 · 3 Nov 2025 · start notice, opted out no sign-off needed · D25A/0300/WEB · 331 m
  • 5 Sorrento Road, Dalkey, Dún Laoghaire-Rathdown, A96 F6W4 · 31 Oct 2025 · 1 homes · start notice, opted out no sign-off needed · D25A/0169/WEB · 332 m
How we work this out
Each row is a notice the builder sent to the council's building control office before work started. One notice can cover many homes. 'Signed off as finished' means a completion certificate is on file; work done under an opt-out or a short notice doesn't need one.
Source: Building Control Management System (commencement notices) · fetched 31 Oct 2026, 02:56
SourceLicenceFetchedLink
Building Control Management System (commencement notices)CC BY 4.031 Oct 2026, 02:56open
Homes coming 22 not started
  • Corrig Road, Dalkey · Completed · 2 homes · 415 m
How we work this out
Schemes of 10 or more homes approved since 2021, from the council and An Coimisiún Pleanála registers. 'Building started' means the builder told the council's building control office that work was starting (a commencement notice).
Sources: An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices), National Planning Application Database, Social housing construction status report · fetched 31 Oct 2026, 02:56
SourceLicenceFetchedLink
An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.030 Oct 2026, 23:01open
Building Control Management System (commencement notices)CC BY 4.031 Oct 2026, 02:56open
National Planning Application DatabaseCC BY 4.031 Oct 2026, 02:03open
Social housing construction status reportCC BY-SA 4.023 Oct 2026, 23:02open
Named places nearby: estate, schemes, crèches, schools

Named places estate, developments, inspections

Developments within 1.0 km

SchemeHomesProgressDistance
Former Dalkey Lodge Nursing Home22— (2026-Q2)404 m
Lands at3636 built (2025-Q4)542 m
The Barn, Atmospheric Road2222 not started (2026-Q2)693 m
'Yonder'2424 not started (2025-Q2)932 m

Crèches and schools inspected

NameLatest inspectionDistance
Dalkey Community Pre School Playgroup Limited · Crèche6 Dec 2024 · report · Tusla Early Years Inspectorate604 m
Bayview Montessori Ltd · Crèche4 Apr 2025 · report · Tusla Early Years Inspectorate679 m
Smart Cookies Montessori · Crèche13 Jan 2026 · report · Tusla Early Years Inspectorate925 m
How we work this out
Organisations only: a person named on an application is never listed. Inspection dates and links are the publisher's; read their report for the findings.
Sources: Dublin housing delivery pipeline, National Planning Application Database, Department of Education school list, Tusla early years register · fetched 31 Oct 2026, 02:03
SourceLicenceFetchedLink
Dublin housing delivery pipelineCC BY 4.026 Oct 2026, 23:00open
National Planning Application DatabaseCC BY 4.031 Oct 2026, 02:03open
Department of Education school listCC BY 4.027 Oct 2026, 23:04open
Tusla early years registerPublic register28 Oct 2026, 23:19open
How busy is this area Busier than most of Dún Laoghaire-Rathdown County Council.
Homes approved
Here44
Council middle46
Homes started
Here145
Council middle80
How we work this out
Homes approved counts schemes of 10 or more homes (one-off houses are not included). Homes started counts every home in a notice that building work was starting. The council figure is the middle value across the council's built-up squares of the same area (3.1 km², about a 1 km circle), so half of them saw more and half fewer.
Sources: An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices), National Planning Application Database · fetched 31 Oct 2026, 02:56
SourceLicenceFetchedLink
An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.030 Oct 2026, 23:01open
Building Control Management System (commencement notices)CC BY 4.031 Oct 2026, 02:56open
National Planning Application DatabaseCC BY 4.031 Oct 2026, 02:03open
Question 5

What's the area like?

Figure 10

This street block against the council

59% of homes built before 1971 (council 38%). 91% owner-occupied (council 68%).

Homes built before 1971
59% · council 38%
Homes built since 2001
19% · council 25%
Owner-occupied
91% · council 68%
Rented
8% · council 29%
Children under 15
14% · council 18%
Aged 65 and over
29% · council 17%
Households with 2+ cars
61% · council 39%
Work mainly from home
29% · council 19%
This small area (355 people)Dún Laoghaire-Rathdown

MeasuredCSO Census 2022, Small Area Population Statistics (CC BY 4.0) · small area 267060006

Train
284 m
Dalkey · DART · busiest stop within 500 m: 12 an hour at peak
Radon
1 in 5
homes here likely high (EPA). Test it
Nearest school
567 m
Harold Boys NS, 106 pupils
Homes sold nearby
85
in 3 years, 44 new (Property Price Register)
Schools, stops and the council

Schools

  • Harold Boys NS · primary · 106 pupils · 567 m
  • Loreto Abbey Secondary School · postprimary · 757 pupils · 737 m
  • Loreto National School · primary · 314 pupils · 796 m
  • S N Gleann na gCaorach Iníon Léinín · primary · 211 pupils · 917 m
  • Dalkey NS (2) · primary · 101 pupils · 921 m

Stops 12

  • Dalkey · DART · 12/hour at peak · 284 m
  • Dalkey Village · 111, 59, 702, 7D, 7E, 7n · 1/hour at peak · 606 m
  • Hyde Road · 111, 59, 702 · 3/hour at peak · 633 m
  • Church Road · 111, 59, 7D · 2/hour at peak · 781 m

Schools growing or shrinking planning in 3 years · pupils last year

  • Harold Boys NS · 566 m-6.2% pupils (106)
  • Loreto Abbey Secondary School · 737 m+2% pupils (757) · 4 classrooms 2026, section 5: exempt
  • Loreto National School · 796 m+1.6% pupils (314)
  • S N Gleann na gCaorach Iníon Léinín · 917 m-1.9% pupils (211)
  • Dalkey NS (2) · 921 m0% pupils (101) · 4 classrooms 2026, section 5: exempt

Council meetings 16 items

Public land

  • Dun Laoghaire Rathdown County Council · 45.67 ha · 167 m
  • Dún Laoghaire-Rathdown County Council · 0.48 ha · 275 m
  • Dún Laoghaire-Rathdown County Council · 0.19 ha · 483 m
Sources: Public transport stops and routes (NTA GTFS), Department of Education school list, National Planning Application Database, Council consultation portals, Council meetings (ModernGov), Land Development Agency public land register, cso_saps_2022, National Transport Authority, Fingal County Council and Dún Laoghaire-Rathdown County Council development plan layers (CC BY 4.0), dartplus.ie project extents over NTA GTFS rail shapes (CC BY 4.0), EPA strategic noise maps, Fingal County Council · fetched 31 Oct 2026, 02:21
SourceLicenceFetchedLink
Public transport stops and routes (NTA GTFS)CC BY 4.025 Oct 2026, 23:02open
Department of Education school listCC BY 4.027 Oct 2026, 23:04open
National Planning Application DatabaseCC BY 4.031 Oct 2026, 02:03open
Council consultation portalsPublic31 Oct 2026, 01:06open
Council meetings (ModernGov)Public31 Oct 2026, 02:21open
Land Development Agency public land registerCC BY 4.011 Sept 2026, 16:43open
cso_saps_2022CC BY 4.0—open
National Transport AuthorityCC BY 4.0——
Fingal County Council and Dún Laoghaire-Rathdown County Council development plan layers (CC BY 4.0)CC BY 4.0——
dartplus.ie project extents over NTA GTFS rail shapes (CC BY 4.0)CC BY 4.0——
EPA strategic noise mapsCC BY 4.0——
Fingal County CouncilCC BY 4.0——
Question 6

What to ask, and who

  1. Extension (D25A/1004/WEB) refused 2026: built anyway?
    Ask for: The seller's answer and your surveyor's check.
    Seller · solicitor
  2. Demolition (D24A/0678/WEB) refused 2024: built anyway?
    Ask for: The seller's answer and your surveyor's check.
    Seller · solicitor
  3. Demolition (D22A/0576) refused 2022: built anyway?
    Ask for: The seller's answer and your surveyor's check.
    Seller · solicitor
  4. High radon area (1 in 5 homes): has it been tested?
    Ask for: Radon test results.
    Seller
  5. An extension 3 m away was refused in 2026: could yours be?
    Ask for: The refusal reasons on the council's file for D25A/1004/WEB.
    Council
  6. Any work done without planning permission?
    Ask for: An opinion of compliance for the whole house.
    Seller · solicitor
Reference

Where this is, the terms, the sources

Townland
Dalkey
Electoral division
Dalkey Hill
Electoral area
Dún Laoghaire
Council
Dun Laoghaire-Rathdown County Council
Everything we found, as a list 8 lines
  • 3 applications on this site; latest D25A/1004/WEB, refused 2026.
  • Zoned R2 (existing residential); not protected; no vacant land tax; high radon area.
  • 3 sites nearby could change: 1 derelict, 1 approved scheme, 1 empty zoned plot.
  • 4 applications open for comments nearby; nearest closes 23 Nov 2026.
  • 1 application refused within 100 m since 2025; latest an extension (2026), for demolition and the justification for replacement, appeal refused too.
  • 22 homes approved nearby, not started; largest 22 at Former Dalkey Lodge Nursing Home.
  • Dalkey (train DART) 284 m away: 12 an hour at morning peak.
  • Here (2022 census): 91% owner-occupied (council 68%); 11% of homes empty (council 6%); most built 1961–1970; 46% drive to work (council 43%); population down 5% since 2016.
What the terms mean 9 terms
  • Vacant land tax (Residential Zoned Land Tax (RZLT)): A yearly tax of 3% of the land's value on land that is zoned for homes and serviced but left unbuilt.
  • Building started (Commencement notice (BCMS)): The builder must tell the council's building control office 14 to 28 days before work starts.
  • Signed off as finished (Certificate of Compliance on Completion): A certificate filed when a building is finished, confirming it meets the building regulations.
  • Approved (Grant of permission): The council said yes, usually with conditions.
  • Listed by the council as derelict (Derelict Sites Register): Councils keep a public list of land and buildings in a ruinous or dangerous state.
  • Protected building (Protected structure (Record of Protected Structures)): A building the council has listed for its heritage value.
  • Comment on an application (Observation / submission): Anyone can comment on a planning application within five weeks of it being lodged, for a €20 fee.
  • Appeal (Appeal to An Coimisiún Pleanála): The applicant, or anyone who commented in time, can appeal the council's decision within four weeks.
  • What the land is zoned for (Zoning objective): The council's development plan sets what each area is for: homes, shops, open space and so on.
Sources and licences 32
SourcePublisherLicenceFetched
EPA strategic noise maps—CC BY 4.0—
Fingal County Council—CC BY 4.0—
Fingal County Council and Dún Laoghaire-Rathdown County Council development plan layers (CC BY 4.0)—CC BY 4.0—
National Transport Authority—CC BY 4.0—
services-eu1.arcgis.comAn Coimisiún PleanálaCC BY 4.030 Oct 2026
data.nbco.gov.ieNational Building Control Office (BCMS)CC BY 4.031 Oct 2026
data.gov.ieVarious (see each layer)CC BY 4.0, CC BY-NC-ND 4.027 Sept 2026
services.arcgis.comLocal authorities (ACAs)CC BY 4.027 Sept 2026
services-eu1.arcgis.comNational Parks and Wildlife ServiceCC BY 4.027 Sept 2026
gis.epa.ieEnvironmental Protection AgencyCC BY 4.027 Sept 2026
services.arcgis.comLocal authorities (Record of Protected Structures)CC BY 4.027 Sept 2026
services-eu1.arcgis.comNational Monuments Service (SMR)CC BY 4.027 Sept 2026
dlrcoco.citizenspace.comLocal authorities (consultation portals)Public31 Oct 2026
www2.courts.ie—© the publisher30 Oct 2026
cso.ie—CC BY 4.0—
dartplus.ie project extents over NTA GTFS rail shapes (CC BY 4.0)—CC BY 4.0—
services-eu1.arcgis.comLocal authorities (derelict sites registers)CC BY 4.026 Oct 2026
services.arcgis.comDublin local authorities (housing delivery pipeline)CC BY 4.026 Oct 2026
esbnetworks.ie—© the publisher · flag only11 Sept 2026
transportforireland.ieNational Transport AuthorityCC BY 4.025 Oct 2026
lda.ieLand Development AgencyCC BY 4.011 Sept 2026
meetings.fingal.ieLocal authorities (council meetings)Public31 Oct 2026
services.arcgis.comDepartment of Housing (National Planning Application Database)CC BY 4.031 Oct 2026
services-eu1.arcgis.comTailte ÉireannCC BY 4.011 Sept 2026
services-eu1.arcgis.comCSO, Tailte Éireann, OpenStreetMap contributorsCC BY 4.04 Oct 2026
propertypriceregister.ieProperty Services Regulatory Authority (PPR)© PSRA, PSI licence31 Oct 2026
data.gov.ieLocal authorities (Record of Protected Structures)CC BY 4.0—
services.arcgis.comLocal authorities (RZLT maps)CC BY 4.025 Oct 2026
gov.ieDepartment of EducationCC BY 4.027 Oct 2026
gov.ieDepartment of HousingCC BY-SA 4.023 Oct 2026
tusla.ieTusla (Early Years Inspectorate)Public register28 Oct 2026
services.arcgis.comLocal authorities via the Department of Housing (GZT / MyPlan)CC BY 4.025 Oct 2026
Measured
counted from a public register
Calculated
a rate or median we worked out from those counts
Our classification
we sorted it by reading each description
Estimate
inferred from another source (census, map data)
Rule summary
the law, simplified: check before relying on it
How we work this out
Generated 31 Oct 2026, 03:13 from the Planning Register store; nothing was fetched live. Not a legal search: the council's planning file is the record. Deadlines come from published dates under the Planning and Development Act 2000: confirm with the council before relying on them. Street map © OpenStreetMap contributors; building outlines © Overture Maps Foundation. The text version carries every figure with its source, for an AI assistant.