How planning works, with this area's numbers

steps can overlap · medians for home extensions within 1.5 km, 10 years
  1. 1ApplySite notice up, plans online
  2. 2Comments5 weeks, €20. Comment to keep your right to appeal
  3. 3Decision8 weeks by law. Here 52 days
  4. 4Appeal window4 weeks after the decision
  5. 5AppealHere about 6 months
  6. 6PermissionLasts 5 years
  7. 7StartStart notice to the council. Here about 6 months after
  8. 8Sign-offCompletion cert, or the owner opts out
Question 1

What's the planning story of this house?

Figure 1

When it was built, and the rules since

Most homes here were built 1919–45, before planning permission was needed.

Timeline from 1915: planning permission needed from October 1964, building regulations from June 1992, building records online from March 2014, sign-off opt-out from September 2015. Most homes here were built 1919–1945.19201930194019501960197019801990200020102020Oct 1964permission neededJun 1992building regulationsMar 2014building records onlineSep 2015owners may opt out of sign-offThis houseAll of Corrig RoadBuilt: most homes in this small area date from 1919–1945 (census estimate)most built2021: 1 file on Corrig Road2022: 3 files on Corrig Road2023: 1 file on Corrig Road2024: 4 files on Corrig Road9 files

Each line is a rule that applies to work done after it.

MeasuredEstimatecouncil register via NPAD · build years: CSO Census 2022, small area

On this site
R2
Zoning · Existing residential
No
Protected or listed · on the council's list
No
Vacant land tax · lived-in homes don't pay it
1 in 5
Radon (EPA) · homes with high radon
Zoning, protection, tax and flood: the detail
ZoningR2 · Existing residential
What it says

Objective A: A To provide residential development and improve residential amenity while protecting the existing residential amenities

An established residential area. The objective is to protect existing residential amenity as well as to provide housing — which is the objective a neighbour's objection to an overbearing extension is usually argued under.

county development plan 2022 2028 · 1 Apr 2022 – 1 Apr 2028

ZoningR2 · Existing residential
What it says

Objective A: A To provide residential development and improve residential amenity while protecting the existing residential amenities

An established residential area. The objective is to protect existing residential amenity as well as to provide housing — which is the objective a neighbour's objection to an overbearing extension is usually argued under.

d n laoghaire rathdown county development plan 2022 2028 variation no 1 · 21 Apr 2022 – 20 Apr 2028

Protected building1 within 100 m Shamrock Hill House
Conservation area1 within 100 m Dalkey Village
Radon1 in 5 homes have high radon (EPA)

Not on this site: heritage inventory, monument zone, EU nature site, EU bird site, natural heritage area, tree order, landslide risk, derelict list.

Vacant land taxNo lived-in homes don't pay it
Flood riskNone mapped within 500 m
Within 500 mCountFor example
Conservation areas1Dalkey Village
Natural heritage areas1Dalkey Coastal Zone And Killiney Hill
Radon grid squares9
Protected buildings51Verona; Martello Tower
Monuments26Martello tower; Historic town
How we work this out
'On this site' means the record's own map outline touches the registered parcel (or a 12 m circle round the point where there is no parcel). Only the council's own list confirms a protected building; ask the council if in doubt. The council's map for the vacant land tax shows this spot inside an area of existing homes. Homes people live in, and their gardens, don't pay the tax. The OPW flood map's licence lets us show a yes/no only. Land on the vacant land tax map nearby: 3 on the draft 2027 map; 3 on the final 2026 map.
Sources: Development plan zoning (councils), Architectural Conservation Areas, EPA radon map, Records of Protected Structures, Residential Zoned Land Tax maps, Constraint layers (bundle), Natural Heritage Areas (NPWS), Sites and Monuments Record · fetched 25 Oct 2026, 23:43
SourceLicenceFetchedLink
Development plan zoning (councils)CC BY 4.025 Oct 2026, 23:06open
Architectural Conservation AreasCC BY 4.027 Sept 2026, 19:36open
EPA radon mapCC BY 4.027 Sept 2026, 19:36open
Records of Protected StructuresCC BY 4.027 Sept 2026, 19:36open
Residential Zoned Land Tax mapsCC BY 4.025 Oct 2026, 23:43open
Constraint layers (bundle)CC BY 4.0, CC BY-NC-ND 4.027 Sept 2026, 19:37open
Natural Heritage Areas (NPWS)CC BY 4.027 Sept 2026, 19:27open
Sites and Monuments RecordCC BY 4.027 Sept 2026, 19:29open
How we work this out
Applications whose site outline (or map point) falls on this property. 'No sign building has started' means we found no notice to the council's building control office; small jobs don't always file one, so ask. A missing completion certificate is not proof of a problem: an owner can opt out of official sign-off for a house or extension built for themselves.
Sources: Building Control Management System (commencement notices), National Planning Application Database · fetched 1 Nov 2026, 02:01
SourceLicenceFetchedLink
Building Control Management System (commencement notices)CC BY 4.031 Oct 2026, 02:56open
National Planning Application DatabaseCC BY 4.01 Nov 2026, 02:01open
Question 2

Could you extend?

Nothing on this site restricts it: not protected, not in a conservation area.

Figure 2

What happened to applications like yours

Extensions are almost always approved here: 92–100% by type. A new house in a garden is harder: 60% approved, and 1 in 4 is asked for more information.

Single-storey rear60 decided · more info asked 15%
98% · council 96%
Two-storey rear40 decided · more info asked 18%
95% · council 92%
Two-storey side21 decided · more info asked 24%
100% · council 95%
Single-storey side13 decided · more info asked 8%
100% · council 96%
Attic or dormer84 decided · more info asked 6%
95% · council 94%
First-floor37 decided · more info asked 14%
92% · council 90%
Garage conversion17 decided · more info asked 6%
100% · council 99%
Porch or front20 decided · more info asked 5%
95% · council 98%
New house in a garden or site43 decided · more info asked 28%
60% · council 63%
Approved nearbyDún Laoghaire-Rathdown overall

Decided applications within 1.5 km, received in the last 10 years. The kind of work is read from each description.

CalculatedOur classificationcouncil register via NPAD · 335 nearby, 3,892 council-wide

Figure 3

Corrig Road, file by file since 2021

7 of 7 decided extensions on the road were approved.

9 planning files on Corrig Road since 2021, by kind and decision.202120222023202420252026Extensions, atticsNo. 33 · 2022 · two-storey rear · approved · D22A/0443No. 23 · 2022 · two-storey rear · approved · D22A/1001No. 35 · 2022 · porch / front · approved · D22B/0361No. 26 · 2023 · two-storey rear · approved · D23A/0764No. 26 · 2024 · porch / front · approved · D24A/0625/WEBNo. 25 · 2024 · single-storey rear · approved · D24B/0074No. 35 · 2024 · two-storey side · withdrawn or invalid · D24B/0244/WEBNo. 35 · 2024 · two-storey side · approved · D24B/0273/WEBPorches, roofs, otherNo. 11 · 2021 · other work · approved · D21B/0202New house in a side garden
ApprovedRefusedWithdrawn or invalid

9 files with "Corrig Road" in the address within 600 m, other roads of the same name left out. Hover a dot for the house number and reference.

MeasuredOur classificationcouncil register via NPAD · 2021–2026

Extensions and refusals right beside you 13 within 250 m · 0 refused within 100 m

Extensions and refusals near you 13 extensions within 250 m · the last 12 months

7 of 7 approved (100%) · most common: dormer or attic

7 approved6 no decision or withdrawn
KindAppliedApprovedRefused
Dormer or attic43—
Two-storey rear41—
Porch21—
Rear21—
First-floor11—

Refused within 100 m 0 in the last 12 months

Nothing refused this close in the last 12 months.

    How we work this out
    Home extensions are read from the application's description (extension, attic or dormer, porch, garage conversion, garden room), so a few may be missed or mislabelled. The kind is the first that fits: a dormer with a rear extension counts as a dormer. Refusal reasons come from An Coimisiún Pleanála's inspector reports, so they exist only where the refusal was appealed (Dún Laoghaire-Rathdown so far). The council's own reasons are on its planning file.
    Sources: National Planning Application Database, An Coimisiún Pleanála cases (ArcGIS feed) · fetched 1 Nov 2026, 02:01
    SourceLicenceFetchedLink
    National Planning Application DatabaseCC BY 4.01 Nov 2026, 02:01open
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.030 Oct 2026, 23:01open
    Sources: An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices), National Planning Application Database · fetched 1 Nov 2026, 02:01
    SourceLicenceFetchedLink
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.030 Oct 2026, 23:01open
    Building Control Management System (commencement notices)CC BY 4.031 Oct 2026, 02:56open
    National Planning Application DatabaseCC BY 4.01 Nov 2026, 02:01open
    Question 3

    How long, and what if someone objects?

    Figure 4

    A home extension's journey here

    A decision takes 52 days. 1 in 8 is asked for more information, which adds about 63 days. Building starts about 6 months after permission.

    Comments open: 5 weeks · €20; Council decision: 52 days; If more info asked (1 in 8): 114 days; Appeal window: 4 weeks; If appealed: +175 days; Building starts: 178 days after permission0 mo3 mo6 mo9 mo12 mo15 moComments openComments close 5 weeks after the application is lodged5 weeks · €20Council decisionDecision: median 52 days, middle half 49–54 (n=343)52 daysIf more info asked (1 in 8)With further information: median 114 days (n=47)114 daysAppeal windowAnyone who commented can appeal within 4 weeks of the decision4 weeksIf appealedAt An Coimisiún Pleanála: median 175 days (n=120, all appeals within 1.5 km)+175 daysBuilding startsStart notice: median 178 days after permission (n=188)178 days after permissionSigned off475 days after the start, for the few who file. 68% of owners opt out of sign-off

    Bars are medians; whiskers show the middle half. Medians of separate steps don't add up exactly.

    Calculated390 decided home extensions, 193 start notices, 120 decided appeals · within 1.5 km, 10 years · NPAD, BCMS, An Coimisiún Pleanála

    Figure 5

    What appeals changed

    21 of 52 appealed refusals became permissions. 4 of 70 appealed approvals were reversed.

    Refusals appealed52 decided
    21 became permissions
    Approvals appealed70 decided
    4 reversed
    Ended approvedEnded refusedWithdrawn, invalid or other

    Every appeal decided within 1.5 km in 10 years, any kind of development.

    CalculatedAn Coimisiún Pleanála cases linked to the council file

    Appeals nearby 3 in the last 12 months

    None of 2 changed the council's decision

    • 502139 Pending · 5, Sorrento Road, Dalkey, Dublin, A96F6W4 (ACA) · 397 m
    • 500438 Granted · 2, Coliemore Road, Dalkey, Dublin, A96F227 · 260 m report
    • 500418 Granted · Miroka Bungalow, 106 Coliemore Road, Dalkey, Co. Dublin, A96DN40 · 285 m report
    Sources: An Coimisiún Pleanála cases (ArcGIS feed), Courts Service legal diary (judicial reviews), National Planning Application Database · fetched 1 Nov 2026, 02:01
    SourceLicenceFetchedLink
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.030 Oct 2026, 23:01open
    Courts Service legal diary (judicial reviews)© the publisher31 Oct 2026, 23:12open
    National Planning Application DatabaseCC BY 4.01 Nov 2026, 02:01open
    Question 4

    What's changing around you?

    Street map around Corrig Road with 15 numbered planning items
    ⌖ the houseOpen for commentsWindow closingBuilding startedEmpty land zoned for homesOtherApprovedNo decision yet
    1. 17, Hyde Road D26B/0553/WEBNo decision yet · 289 m
    2. 23, Rockfort Avenue D26A/0798/WEBNo decision yet · 365 m
    3. 329 Convent Road, Dalkey D26A/0548/WEBApproved · 97 m
    4. 4Hyde Road, Dalkey D26A/0603/WEBRefused · 283 m
    5. 525 Corrig Road, Dublin D24B/0074Building started · 49 m
    6. 610 Church Road, Dublin D26B/0017/WEBBuilding started · 110 m
    7. 712 White's Villas, Dalkey D26A/0203/WEBBuilding started · 167 m
    8. 80.3 ha zoned for homesEmpty land zoned for homes · 178 m
    9. 930 Carysfort Road, Dalkey REF11526Section 5: exempt · 64 m
    10. 1010, Church Road D26B/0017/WEBApproved · 107 m
    11. 114, Mayville Terrace D26A/0096/WEBApproved · 118 m
    12. 1233 Convent Rd, Dalkey Commons D26A/0592/WEBNo decision yet · 131 m
    13. 136, White's Villas D25A/0831/WEBApproved · 143 m
    14. 1418, Ulverton Road REF8026Section 5: awaiting decision · 169 m
    15. 159, Barnacoille Park D26B/0151/WEBApproved · 193 m
    Figure 6

    What happens to applications within 500 m

    Permission isn't building. Of 147 permissions since 2016, 62 show a start notice and 4 have a completion certificate. Most owners opt out of sign-off.

    205 applications lodged within 500 m. Council: 141 approved, 35 refused. After appeals: 147 approved. Of those: 4 signed off, 38 built with the owner's opt-out, 20 started, 84 with no start notice found, 1 ran out.LODGEDCOUNCIL DECISIONAFTER APPEALSWHAT HAPPENED NEXT141: lodged → approved35: lodged → refused24: lodged → withdrawn or invalid5: lodged → undecided139: approved → approved24: refused → refused24: withdrawn or invalid → withdrawn5: undecided → undecided2 approved by the council, withdrawn or invalid after an appeal8 refused by the council, approved after an appeal1 refused by the council, undecided after an appeal2 refused by the council, withdrawn or invalid after an appeal84: approved → no start notice found38: approved → built, owner opted out20: approved → started, not signed off4: approved → signed off1: approved → ran out205 lodged205 lodged141 approved141 approved35 refused35 refused24 withdrawn or invalid24 withdrawn or invalid5 undecided5 undecided147 approved147 approved24 refused24 refused28 withdrawn28 withdrawn6 undecided6 undecided84 no start notice found84 no start notice found38 built, owner opted out38 built, owner opted out20 started, not signed off20 started, not signed off4 signed off4 signed off1 ran out1 ran out

    Purple bands are refusals turned into permissions on appeal. "No start notice found" includes small jobs that never needed one and notices we couldn't match.

    Measured205 applications in 10 years · NPAD, An Coimisiún Pleanála, BCMS start notices and completion certificates

    Figure 7

    The next 30 days

    4 deadlines within 500 m; the first closes 3 Nov 2026.

    4 deadlines in the next 30 days: 2026-11-03 D26A/0603/WEB: REFUSE PERMISSION — - Construction of a part 3-storey, part 4-storey apartment building providing 7; 2026-11-09 D26A/0548/WEB: GRANT PERMISSION — (1) The removal of the existing conservatory to the rear of the existing house,; 2026-11-24 D26B/0553/WEB: application received — New two storey extension to rear comprising new kitchen/lounge on ground floor and new bedroom with ensuite on first flo; 2026-11-27 D26A/0798/WEB: application received — The development will consist of to the main house roof; the replacement of non-original fibre cement tiles with slate, otoday6 Nov11 Nov16 Nov21 Nov26 Nov1 DecD26A/0603/WEB: REFUSE PERMISSION — - Construction of a part 3-storey, part 4-storey apartment building providing 7 · 283 m away · 2026-11-03D26A/0548/WEB: GRANT PERMISSION — (1) The removal of the existing conservatory to the rear of the existing house, · 97 m away · 2026-11-09D26B/0553/WEB: application received — New two storey extension to rear comprising new kitchen/lounge on ground floor and new bedroom with ensuite on first flo · 289 m away · 2026-11-24D26A/0798/WEB: application received — The development will consist of to the main house roof; the replacement of non-original fibre cement tiles with slate, o · 365 m away · 2026-11-27
    Comments closeTime to appeal ends
    • Time to appeal ends 3 Nov 20262 days left
      4D26A/0603/WEB · REFUSE PERMISSION — - Construction of a part 3-storey, part 4-storey apartment building providing 7
      €220 to An Coimisiún Pleanála (€110 observer) · 283 m away
    • Time to appeal ends 9 Nov 20268 days left
      3D26A/0548/WEB · GRANT PERMISSION — (1) The removal of the existing conservatory to the rear of the existing house,
      €220 to An Coimisiún Pleanála (€110 observer) · 97 m away
    • Comments close 24 Nov 202623 days left
      1D26B/0553/WEB · application received — New two storey extension to rear comprising new kitchen/lounge on ground floor and new bedroom…
      €20 to the council · 289 m away
    • Comments close 27 Nov 202626 days left
      2D26A/0798/WEB · application received — The development will consist of to the main house roof; the replacement of non-original fibre…
      €20 to the council · 365 m away

    Measuredcouncil registers and An Coimisiún Pleanála · deadlines worked out from the dates on file

    Sites that could change 1 within 500 m

    Empty land zoned for homes 1

    • 80.3 ha zoned for homes · no homes built on it yet · 178 m
    Sources: An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices), Derelict sites registers, Council meetings (ModernGov), National Planning Application Database, Residential Zoned Land Tax maps · fetched 1 Nov 2026, 02:01
    SourceLicenceFetchedLink
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.030 Oct 2026, 23:01open
    Building Control Management System (commencement notices)CC BY 4.031 Oct 2026, 02:56open
    Derelict sites registersCC BY 4.026 Oct 2026, 23:09open
    Council meetings (ModernGov)Public31 Oct 2026, 02:21open
    National Planning Application DatabaseCC BY 4.01 Nov 2026, 02:01open
    Residential Zoned Land Tax mapsCC BY 4.025 Oct 2026, 23:43open
    Figure 8

    Applications within 500 m, by year

    Between 25 and 35 a year; busiest 2024. 80% of decisions were approvals.

    2021: 55, 2022: 31, 2023: 25, 2024: 35, 2025: 32, 2026: 2702040602021: 40 approved2021: 13 refused2021: 2 withdrawn or invalid55’21*2022: 23 approved2022: 8 refused31’222023: 20 approved2023: 5 refused25’232024: 19 approved2024: 4 refused2024: 12 withdrawn or invalid35’242025: 26 approved2025: 3 refused2025: 3 withdrawn or invalid32’252026: 13 approved2026: 2 refused2026: 7 withdrawn or invalid2026: 5 undecided27’26*
    ApprovedRefusedWithdrawn or invalidUndecided

    2021 and 2026 are part years (*). Exemption requests and time extensions are left out.

    Measuredcouncil register via NPAD

    Open for comments €20 to comment

    Every application within 500 m 46 in the last 12 months

    See every application on the map

    How we work this out
    Descriptions are shortened by the national planning database (to 80 characters in Dún Laoghaire-Rathdown, 70 in Fingal), and it does not publish applicants' names.
    Sources: National Planning Application Database, An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices) · fetched 1 Nov 2026, 02:01
    SourceLicenceFetchedLink
    National Planning Application DatabaseCC BY 4.01 Nov 2026, 02:01open
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.030 Oct 2026, 23:01open
    Building Control Management System (commencement notices)CC BY 4.031 Oct 2026, 02:56open
    Building work nearby 18 in the last 12 months
    2 not signed off16 no sign-off needed
    • Sorrento Road, Dalkey, Dublin · 1 Oct 2026 · short notice no sign-off needed · D25B/0723/WEB · 483 m
    • 712 White's Villas, Dalkey, Dublin, A96 HX93 · 7 Sept 2026 · 1 homes · start notice, opted out no sign-off needed · D26A/0203/WEB · 167 m
    • 525 Corrig Road, Dublin, A96 Y9Y6 · 17 Aug 2026 · start notice, opted out no sign-off needed · D24B/0074 · 49 m
    • 3 Saint Patrick's Road, Dalkey, Dublin · 24 Jul 2026 · 6 homes · 7-day notice not signed off · D25A/0326/WEB · 238 m
    • 6 Saint Begnet's Villas, Dublin, A96 HR64 · 8 Jul 2026 · 1 homes · start notice, opted out no sign-off needed · D25A/0751/WEB · 386 m
    • 610 Church Road, Dublin, A96 Y270 · 2 Jun 2026 · 1 homes · start notice, opted out no sign-off needed · D26B/0017/WEB · 110 m
    • 6 Ulverton Road, Dalkey, Dún Laoghaire-Rathdown · 8 May 2026 · 1 homes · start notice not signed off · D24A/0084 · 263 m
    • Ulverton Road, Dalkey, Dún Laoghaire-Rathdown · 24 Apr 2026 · 1 homes · start notice, opted out no sign-off needed · D25A/0993/WEB · 322 m
    • 3 Saint Patrick's Road, Dalkey, Dún Laoghaire-Rathdown, A96 VW50 · 16 Apr 2026 · short notice no sign-off needed · D25A/0326/WEB · 238 m
    • 4 Tubbermore Avenue, Dalkey, Dún Laoghaire-Rathdown, A96 N738 · 5 Mar 2026 · 1 homes · short notice no sign-off needed · D25A/0770 · 437 m
    • 29 Saint Begnet's Villas, DALKEY, Dún Laoghaire-Rathdown, A96 YF25 · 23 Dec 2025 · 1 homes · start notice, opted out no sign-off needed · D25A/0437/WEB · 476 m
    • 2 Seafield Terrace, Dalkey, Dún Laoghaire-Rathdown, A96 XY60 · 19 Dec 2025 · start notice, opted out no sign-off needed · D22A0817 · 457 m
    • Rockfort Avenue, Dublin, Dún Laoghaire-Rathdown, A96 YW35 · 11 Dec 2025 · 1 homes · short notice no sign-off needed · D25A/0676/WEB · 471 m
    • 35 Corrig Road, Dalkey, Dún Laoghaire-Rathdown, A96 X2P1 · 10 Dec 2025 · 1 homes · start notice, opted out no sign-off needed · D24B/0273/WEB · 91 m
    • 2 Ulverton Close, Dublin, Dún Laoghaire-Rathdown, A96 df44 · 2 Dec 2025 · 1 homes · short notice no sign-off needed · D25B/0257 · 300 m
    • 6 Barnacoille Park, Dalkey, Dún Laoghaire-Rathdown, A96 T6T4 · 27 Nov 2025 · 1 homes · start notice, opted out no sign-off needed · D25B/0018/WEB · 234 m
    • Beulah Court, Dublin, Dún Laoghaire-Rathdown, A96TK79 · 21 Nov 2025 · 1 homes · start notice, opted out no sign-off needed · D25B/0101 · 247 m
    • 14 WHITES VILLAS, Dalkey, Dún Laoghaire-Rathdown, A96 Y190 · 5 Nov 2025 · short notice no sign-off needed · D25A/0384/WEB · 180 m
    How we work this out
    Each row is a notice the builder sent to the council's building control office before work started. One notice can cover many homes. 'Signed off as finished' means a completion certificate is on file; work done under an opt-out or a short notice doesn't need one.
    Source: Building Control Management System (commencement notices) · fetched 31 Oct 2026, 02:56
    SourceLicenceFetchedLink
    Building Control Management System (commencement notices)CC BY 4.031 Oct 2026, 02:56open
    0
    Named places nearby: estate, schemes, crèches, schools

    Named places estate, developments, inspections

    Developments within 1.0 km

    SchemeHomesProgressDistance
    'Yonder'2424 not started (2025-Q2)242 m
    The Barn, Atmospheric Road2222 not started (2026-Q2)553 m
    Lands at3636 built (2025-Q4)579 m
    0.464 hectares2424 being built (2026-Q2)645 m
    Former Dalkey Lodge Nursing Home22— (2026-Q2)908 m

    Crèches and schools inspected

    NameLatest inspectionDistance
    Dalkey Community Pre School Playgroup Limited · Crèche6 Dec 2024 · report · Tusla Early Years Inspectorate141 m
    Smart Cookies Montessori · Crèche13 Jan 2026 · report · Tusla Early Years Inspectorate197 m
    Castle Park School · Crèche12 Feb 2025 · report · Tusla Early Years Inspectorate533 m
    Bayview Montessori Ltd · Crèche4 Apr 2025 · report · Tusla Early Years Inspectorate829 m
    How we work this out
    Organisations only: a person named on an application is never listed. Inspection dates and links are the publisher's; read their report for the findings.
    Sources: Dublin housing delivery pipeline, National Planning Application Database, Department of Education school list, Tusla early years register · fetched 1 Nov 2026, 02:01
    SourceLicenceFetchedLink
    Dublin housing delivery pipelineCC BY 4.026 Oct 2026, 23:00open
    National Planning Application DatabaseCC BY 4.01 Nov 2026, 02:01open
    Department of Education school listCC BY 4.027 Oct 2026, 23:04open
    Tusla early years registerPublic register28 Oct 2026, 23:19open
    How busy is this area Busier than most of Dún Laoghaire-Rathdown County Council.
    Homes approved
    Here44
    Council middle46
    Homes started
    Here157
    Council middle81
    How we work this out
    Homes approved counts schemes of 10 or more homes (one-off houses are not included). Homes started counts every home in a notice that building work was starting. The council figure is the middle value across the council's built-up squares of the same area (3.1 km², about a 1 km circle), so half of them saw more and half fewer.
    Sources: An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices), National Planning Application Database · fetched 1 Nov 2026, 02:01
    SourceLicenceFetchedLink
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.030 Oct 2026, 23:01open
    Building Control Management System (commencement notices)CC BY 4.031 Oct 2026, 02:56open
    National Planning Application DatabaseCC BY 4.01 Nov 2026, 02:01open
    Question 5

    What's the area like?

    Figure 9

    This street block against the council

    76% of homes built before 1971 (council 38%). 79% owner-occupied (council 68%).

    Homes built before 1971
    76% · council 38%
    Homes built since 2001
    7% · council 25%
    Owner-occupied
    79% · council 68%
    Rented
    15% · council 29%
    Children under 15
    15% · council 18%
    Aged 65 and over
    31% · council 17%
    Households with 2+ cars
    42% · council 39%
    Work mainly from home
    25% · council 19%
    This small area (318 people)Dún Laoghaire-Rathdown

    MeasuredCSO Census 2022, Small Area Population Statistics (CC BY 4.0) · small area 267064006

    Bus
    244 m
    Church Road · 111, 59, 7D · busiest stop within 500 m: 12 an hour at peak
    Radon
    1 in 5
    homes here likely high (EPA). Test it
    Nearest school
    150 m
    Loreto National School, 314 pupils
    Homes sold nearby
    47
    in 3 years (Property Price Register)
    Schools, stops and the council

    Schools

    • Loreto National School · primary · 314 pupils · 150 m
    • Harold Boys NS · primary · 106 pupils · 162 m
    • Dalkey NS (2) · primary · 101 pupils · 195 m
    • Loreto Abbey Secondary School · postprimary · 757 pupils · 246 m

    Stops 13

    • Church Road · 111, 59, 7D · 2/hour at peak · 244 m
    • Church Road · 111, 59, 7D, 7n · 2/hour at peak · 247 m
    • Dalkey Village · 111, 59, 702, 7D, 7E, 7n · 1/hour at peak · 284 m
    • South Winds · 111, 59, 7D, 7n · 2/hour at peak · 317 m
    • Hyde Road · 111, 59, 702 · 3/hour at peak · 336 m
    • The Paddocks · 111, 59, 7D · 2/hour at peak · 346 m
    • Dalkey · DART · 12/hour at peak · 445 m
    • Ulverton Road · 111, 59, 7D, 7n · 2/hour at peak · 547 m

    Schools growing or shrinking planning in 3 years · pupils last year

    • Loreto National School · 150 m+1.6% pupils (314)
    • Harold Boys NS · 162 m-6.2% pupils (106)
    • Dalkey NS (2) · 195 m0% pupils (101) · 4 classrooms 2026, section 5: exempt
    • Loreto Abbey Secondary School · 246 m+2% pupils (757) · 4 classrooms 2026, section 5: exempt

    Council meetings 16 items

    Sources: Public transport stops and routes (NTA GTFS), Department of Education school list, National Planning Application Database, Council consultation portals, Council meetings (ModernGov), Land Development Agency public land register, cso_saps_2022, National Transport Authority, Fingal County Council and Dún Laoghaire-Rathdown County Council development plan layers (CC BY 4.0), dartplus.ie project extents over NTA GTFS rail shapes (CC BY 4.0), EPA strategic noise maps, Fingal County Council · fetched 1 Nov 2026, 02:01
    SourceLicenceFetchedLink
    Public transport stops and routes (NTA GTFS)CC BY 4.025 Oct 2026, 23:02open
    Department of Education school listCC BY 4.027 Oct 2026, 23:04open
    National Planning Application DatabaseCC BY 4.01 Nov 2026, 02:01open
    Council consultation portalsPublic1 Nov 2026, 01:08open
    Council meetings (ModernGov)Public31 Oct 2026, 02:21open
    Land Development Agency public land registerCC BY 4.011 Sept 2026, 16:43open
    cso_saps_2022CC BY 4.0—open
    National Transport AuthorityCC BY 4.0——
    Fingal County Council and Dún Laoghaire-Rathdown County Council development plan layers (CC BY 4.0)CC BY 4.0——
    dartplus.ie project extents over NTA GTFS rail shapes (CC BY 4.0)CC BY 4.0——
    EPA strategic noise mapsCC BY 4.0——
    Fingal County CouncilCC BY 4.0——
    Question 6

    What to ask, and who

    1. High radon area (1 in 5 homes): has it been tested?
      Ask for: Radon test results.
      Seller
    2. Application 289 m away open for comments until 24 Nov 2026: comment?
      Ask for: The plans on the council's website (€20 to comment).
      Council
    3. Decision 97 m away can be appealed until 9 Nov 2026: appeal?
      Ask for: The decision on the council's website (€220 to appeal).
      Council
    4. Building work started 49 m away: for how long?
      Ask for: The planning conditions for D24B/0074.
      Agent · council
    5. Any work done without planning permission?
      Ask for: An opinion of compliance for the whole house.
      Seller · solicitor
    Reference

    Where this is, the terms, the sources

    Townland
    Dalkey
    Electoral division
    Dalkey-Coliemore
    Electoral area
    Dún Laoghaire
    Council
    Dun Laoghaire-Rathdown County Council
    Everything we found, as a list 8 lines
    • Zoned R2 (existing residential); not protected; no vacant land tax; high radon area.
    • 1 site nearby could change: 1 empty zoned plot.
    • 2 applications open for comments nearby; nearest closes 24 Nov 2026.
    • Dalkey (train DART) 445 m away: 12 an hour at morning peak; 25 from all stops within 500 m.
    • Here (2022 census): 79% owner-occupied (council 68%); 12% of homes empty (council 6%); most built 1919–1945; 33% drive to work (council 43%).
    • 13 home extensions within 250 m since 2025: 7 approved (100%). Most were dormers or attic conversions.
    • Around here the council decides in a median 50 days (about 7 weeks); 1 in 9 is asked for more information.
    • 2 appeals nearby decided in the last 12 months; none changed the council's decision.
    What the terms mean 9 terms
    • Vacant land tax (Residential Zoned Land Tax (RZLT)): A yearly tax of 3% of the land's value on land that is zoned for homes and serviced but left unbuilt.
    • Building started (Commencement notice (BCMS)): The builder must tell the council's building control office 14 to 28 days before work starts.
    • Signed off as finished (Certificate of Compliance on Completion): A certificate filed when a building is finished, confirming it meets the building regulations.
    • Approved (Grant of permission): The council said yes, usually with conditions.
    • Protected building (Protected structure (Record of Protected Structures)): A building the council has listed for its heritage value.
    • Conservation area (Architectural Conservation Area (ACA)): A street or area whose character is protected.
    • Comment on an application (Observation / submission): Anyone can comment on a planning application within five weeks of it being lodged, for a €20 fee.
    • Appeal (Appeal to An Coimisiún Pleanála): The applicant, or anyone who commented in time, can appeal the council's decision within four weeks.
    • What the land is zoned for (Zoning objective): The council's development plan sets what each area is for: homes, shops, open space and so on.
    Sources and licences 32
    SourcePublisherLicenceFetched
    EPA strategic noise maps—CC BY 4.0—
    Fingal County Council—CC BY 4.0—
    Fingal County Council and Dún Laoghaire-Rathdown County Council development plan layers (CC BY 4.0)—CC BY 4.0—
    National Transport Authority—CC BY 4.0—
    services-eu1.arcgis.comAn Coimisiún PleanálaCC BY 4.030 Oct 2026
    data.nbco.gov.ieNational Building Control Office (BCMS)CC BY 4.031 Oct 2026
    data.gov.ieVarious (see each layer)CC BY 4.0, CC BY-NC-ND 4.027 Sept 2026
    services.arcgis.comLocal authorities (ACAs)CC BY 4.027 Sept 2026
    services-eu1.arcgis.comNational Parks and Wildlife ServiceCC BY 4.027 Sept 2026
    gis.epa.ieEnvironmental Protection AgencyCC BY 4.027 Sept 2026
    services.arcgis.comLocal authorities (Record of Protected Structures)CC BY 4.027 Sept 2026
    services-eu1.arcgis.comNational Monuments Service (SMR)CC BY 4.027 Sept 2026
    dlrcoco.citizenspace.comLocal authorities (consultation portals)Public1 Nov 2026
    www2.courts.ie—© the publisher31 Oct 2026
    cso.ie—CC BY 4.0—
    dartplus.ie project extents over NTA GTFS rail shapes (CC BY 4.0)—CC BY 4.0—
    services-eu1.arcgis.comLocal authorities (derelict sites registers)CC BY 4.026 Oct 2026
    services.arcgis.comDublin local authorities (housing delivery pipeline)CC BY 4.026 Oct 2026
    esbnetworks.ie—© the publisher · flag only11 Sept 2026
    transportforireland.ieNational Transport AuthorityCC BY 4.025 Oct 2026
    lda.ieLand Development AgencyCC BY 4.011 Sept 2026
    meetings.fingal.ieLocal authorities (council meetings)Public31 Oct 2026
    services.arcgis.comDepartment of Housing (National Planning Application Database)CC BY 4.01 Nov 2026
    services-eu1.arcgis.comTailte ÉireannCC BY 4.011 Sept 2026
    services-eu1.arcgis.comCSO, Tailte Éireann, OpenStreetMap contributorsCC BY 4.04 Oct 2026
    propertypriceregister.ieProperty Services Regulatory Authority (PPR)© PSRA, PSI licence1 Nov 2026
    data.gov.ieLocal authorities (Record of Protected Structures)CC BY 4.0—
    services.arcgis.comLocal authorities (RZLT maps)CC BY 4.025 Oct 2026
    gov.ieDepartment of EducationCC BY 4.027 Oct 2026
    gov.ieDepartment of HousingCC BY-SA 4.023 Oct 2026
    tusla.ieTusla (Early Years Inspectorate)Public register28 Oct 2026
    services.arcgis.comLocal authorities via the Department of Housing (GZT / MyPlan)CC BY 4.025 Oct 2026
    Measured
    counted from a public register
    Calculated
    a rate or median we worked out from those counts
    Our classification
    we sorted it by reading each description
    Estimate
    inferred from another source (census, map data)
    Rule summary
    the law, simplified: check before relying on it
    How we work this out
    Generated 1 Nov 2026, 02:05 from the Planning Register store; nothing was fetched live. Not a legal search: the council's planning file is the record. Deadlines come from published dates under the Planning and Development Act 2000: confirm with the council before relying on them. Street map © OpenStreetMap contributors; building outlines © Overture Maps Foundation. The text version carries every figure with its source, for an AI assistant.