PlanningRegister.ie
Planning report · South Dublin County Council · 1000 m around the house · the last 12 months · 21 Oct 2026, 23:57

Bawnville Park

53.28031, -6.35005

Homes here mostly date from the 1970s. Home extensions nearby almost always get approved (96%). 55 homes approved 631 m away haven't started.

See on the mapWatch this area

How planning works, with this area's numbers

steps can overlap · medians for home extensions within 1.5 km, 10 years
  1. 1ApplySite notice up, plans online
  2. 2Comments5 weeks, €20. Comment to keep your right to appeal
  3. 3Decision8 weeks by law. Here 55 days
  4. 4Appeal window4 weeks after the decision
  5. 5AppealHere about 4 months
  6. 6PermissionLasts 5 years
  7. 7StartStart notice to the council. Here about 4 months after
  8. 8Sign-offCompletion cert, or the owner opts out
Question 1

What's the planning story of this house?

Figure 1

When it was built, and the rules since

Most homes here were built 1971–80, after planning permission began and before building regulations (1992).

Timeline from 1955: planning permission needed from October 1964, building regulations from June 1992, building records online from March 2014, sign-off opt-out from September 2015. Most homes here were built 1971–1980.1960197019801990200020102020Oct 1964permission neededJun 1992building regulationsMar 2014building records onlineSep 2015owners may opt out of sign-offThis houseBuilt: most homes in this small area date from 1971–1980 (census estimate)most built

Each line is a rule that applies to work done after it.

MeasuredEstimatecouncil register via NPAD · build years: CSO Census 2022, small area

On this site
G3
Zoning · High amenity
No
Protected or listed · on the council's list
No
Vacant land tax · not on the map
1 in 20
Radon (EPA) · homes with high radon
Zoning, protection, tax and flood: the detail
ZoningG3 · High amenity
What it says

HA-DV: To protect and enhance the outstanding character and amenity of the Dodder Valley

Protected high-amenity landscape. Development is resisted to preserve the character of the area.

south dublin county development plan 2022 2028 · 8 Mar 2022 – 8 Mar 2028

Radon1 in 20 homes have high radon (EPA)

Not on this site: protected building, heritage inventory, monument zone, conservation area, EU nature site, EU bird site, natural heritage area, tree order, landslide risk, derelict list.

Vacant land taxNo not on the map
Flood riskNearby OPW map area within 1.0 km · floodinfo.ie
Within 1.0 kmCountFor example
Natural heritage areas1Dodder Valley
Heritage inventory buildings3weir; Oldbawn Bridge
Radon grid squares2
Monuments8Church; Graveyard
How we work this out
'On this site' means the record's own map outline touches the registered parcel (or a 12 m circle round the point where there is no parcel). Only the council's own list confirms a protected building; ask the council if in doubt. The OPW flood map's licence lets us show a yes/no only. Land on the vacant land tax map nearby: 1 on the draft 2027 map; 1 on the final 2026 map.
Sources: Development plan zoning (councils), EPA radon map, Residential Zoned Land Tax maps, Constraint layers (bundle), OPW flood maps (CFRAM), Natural Heritage Areas (NPWS), National Inventory of Architectural Heritage, Sites and Monuments Record · fetched 19 Oct 2026, 00:29
SourceLicenceFetchedLink
Development plan zoning (councils)CC BY 4.018 Oct 2026, 23:24open
EPA radon mapCC BY 4.027 Sept 2026, 19:36open
Residential Zoned Land Tax mapsCC BY 4.019 Oct 2026, 00:29open
Constraint layers (bundle)CC BY 4.0, CC BY-NC-ND 4.027 Sept 2026, 19:37open
OPW flood maps (CFRAM)CC BY-NC-ND 4.0 · shown as a yes/no only11 Sept 2026, 19:11open
Natural Heritage Areas (NPWS)CC BY 4.027 Sept 2026, 19:27open
National Inventory of Architectural HeritageCC BY 4.027 Sept 2026, 19:35open
Sites and Monuments RecordCC BY 4.027 Sept 2026, 19:29open
How we work this out
Applications whose site outline (or map point) falls on this property. 'No sign building has started' means we found no notice to the council's building control office; small jobs don't always file one, so ask. A missing completion certificate is not proof of a problem: an owner can opt out of official sign-off for a house or extension built for themselves.
Sources: Building Control Management System (commencement notices), National Planning Application Database · fetched 21 Oct 2026, 02:27
SourceLicenceFetchedLink
Building Control Management System (commencement notices)CC BY 4.021 Oct 2026, 01:58open
National Planning Application DatabaseCC BY 4.021 Oct 2026, 02:27open
Question 2

Could you extend?

Nothing on this site restricts it: not protected, not in a conservation area.

Figure 2

What happened to applications like yours

Extensions are almost always approved here: 86–100% by type. A new house in a garden is harder: 77% approved, and 1 in 2 are asked for more information.

Single-storey rear48 decided · more info asked 21%
94% · council 94%
Two-storey rear22 decided · more info asked 32%
95% · council 94%
Two-storey side22 decided · more info asked 27%
95% · council 94%
Single-storey side26 decided · more info asked 8%
96% · council 95%
Attic or dormer296 decided · more info asked 13%
97% · council 95%
First-floor22 decided · more info asked 27%
86% · council 92%
Garage conversion20 decided · more info asked 25%
100% · council 99%
Porch or front32 decided · more info asked 12%
100% · council 95%
New house in a garden or site44 decided · more info asked 52%
77% · council 62%
Approved nearbySouth Dublin overall

Decided applications within 1.5 km, received in the last 10 years. The kind of work is read from each description.

CalculatedOur classificationcouncil register via NPAD · 532 nearby, 4,865 council-wide

Extensions and refusals right beside you 0 within 250 m · 0 refused within 100 m

Extensions and refusals near you 0 extensions within 250 m · the last 12 months

No home extensions within 250 m in the last 12 months.

Refused within 100 m 0 in the last 12 months

Nothing refused this close in the last 12 months.

    How we work this out
    Home extensions are read from the application's description (extension, attic or dormer, porch, garage conversion, garden room), so a few may be missed or mislabelled. The kind is the first that fits: a dormer with a rear extension counts as a dormer. Refusal reasons come from An Coimisiún Pleanála's inspector reports, so they exist only where the refusal was appealed (Dún Laoghaire-Rathdown so far). The council's own reasons are on its planning file.
    Sources: National Planning Application Database, An Coimisiún Pleanála cases (ArcGIS feed) · fetched 21 Oct 2026, 02:27
    SourceLicenceFetchedLink
    National Planning Application DatabaseCC BY 4.021 Oct 2026, 02:27open
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.016 Oct 2026, 23:06open
    Sources: An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices), National Planning Application Database · fetched 21 Oct 2026, 02:27
    SourceLicenceFetchedLink
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.016 Oct 2026, 23:06open
    Building Control Management System (commencement notices)CC BY 4.021 Oct 2026, 01:58open
    National Planning Application DatabaseCC BY 4.021 Oct 2026, 02:27open
    Question 3

    How long, and what if someone objects?

    Figure 3

    A home extension's journey here

    A decision takes 55 days. 1 in 6 is asked for more information, which adds about 63 days. Building starts about 4 months after permission.

    Comments open: 5 weeks · €20; Council decision: 55 days; If more info asked (1 in 6): 119 days; Appeal window: 4 weeks; If appealed: +126 days; Building starts: 132 days after permission0 mo3 mo6 mo9 mo12 mo15 moComments openComments close 5 weeks after the application is lodged5 weeks · €20Council decisionDecision: median 55 days, middle half 52–56 (n=447)55 daysIf more info asked (1 in 6)With further information: median 119 days (n=96)119 daysAppeal windowAnyone who commented can appeal within 4 weeks of the decision4 weeksIf appealedAt An Coimisiún Pleanála: median 126 days (n=41, all appeals within 1.5 km)+126 daysBuilding startsStart notice: median 132 days after permission (n=197)132 days after permissionSigned off518 days after the start, for the few who file. 32% of owners opt out of sign-off

    Bars are medians; whiskers show the middle half. Medians of separate steps don't add up exactly.

    Calculated543 decided home extensions, 200 start notices, 41 decided appeals · within 1.5 km, 10 years · NPAD, BCMS, An Coimisiún Pleanála

    Figure 4

    What appeals changed

    4 of 14 appealed refusals became permissions. 3 of 30 appealed approvals were reversed.

    Refusals appealed14 decided
    4 became permissions
    Approvals appealed30 decided
    3 reversed
    Ended approvedEnded refusedWithdrawn, invalid or other

    Every appeal decided within 1.5 km in 10 years, any kind of development.

    CalculatedAn Coimisiún Pleanála cases linked to the council file

    Appeals nearby 6 in the last 12 months

    1 of 2 changed the council's decision

    • 500879 Refused · Site formerly known as Bruce House, Main Road, Tallaght, Dublin 24,… · 837 m report
    • 324381 Open · Firhouse Road, Firshouse, Co. Dublin · 589 m
    • 501552 Open · Old Bawn Way, Tallaght, Co.Dublin · 786 m
    • 500614 Granted with conditions · 11, The Park, Millbrook Lawns, Dublin 24, D24 HX4C · 334 m report
    • 500367 Pending · 24, Main Street, Tallaght, Dublin 24, D24 Y033 · 989 m
    • 500238 Pending · UNIT 06, Oldcourt Shopping Centre, Parklands Road, Ballycullen,… · 686 m
    Sources: An Coimisiún Pleanála cases (ArcGIS feed), Courts Service legal diary (judicial reviews), National Planning Application Database · fetched 21 Oct 2026, 02:27
    SourceLicenceFetchedLink
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.016 Oct 2026, 23:06open
    Courts Service legal diary (judicial reviews)© the publisher21 Oct 2026, 01:40open
    National Planning Application DatabaseCC BY 4.021 Oct 2026, 02:27open
    Question 4

    What's changing around you?

    Street map around Bawnville Park with 15 numbered planning items
    ⌖ the houseWindow closingApproved, not startedDerelict buildingEmpty land zoned for homesApprovedNo decision yet
    1. 1104, St Maelruan’s Park SD26B/0301WApproved · 889 m
    2. 223A, Kiltipper drive SD26B/0373WNo decision yet · 942 m
    3. 3Speaker Connolly Tavern SD24A/0228WApproved, no sign building has started · 631 m
    4. 4Sites at 10 & 11 Old Bawn Road, Tallaght 1940Derelict building · 728 m
    5. 576 Allenton Drive, Tallaght 1973Derelict building · 982 m
    6. 60.2 ha zoned for homesEmpty land zoned for homes · 896 m
    7. 7Kilakee Green, Ballycragh SD25A/0296WApproved · 330 m
    8. 8Hawthorns, Killakee Lawns SD21A/0255/EPApproved · 334 m
    9. 940, Homelawn Gardens SD26B/0327WNo decision yet · 345 m
    10. 1023 New Bawn Park, Oldbawn SD26B/0436WNo decision yet · 372 m
    11. 1118 Killakee Green, Firhouse SD26B/0303WApproved · 421 m
    12. 1216, Killkaee Way SD26B/0172WApproved · 452 m
    13. 131 Killakee View, Firhouse SD26B/0267Approved · 508 m
    14. 1418, Glencarrig Green SD26B/0085Approved · 562 m
    15. 15SDCC Lands @28 Locations PT8SD422No decision yet · 576 m
    Figure 5

    What happens to applications within 500 m

    Permission isn't building. Of 68 permissions since 2016, 22 show a start notice and 2 have a completion certificate.

    81 applications lodged within 500 m. Council: 68 approved, 8 refused. After appeals: 68 approved. Of those: 2 signed off, 7 built with the owner's opt-out, 13 started, 44 with no start notice found, 2 ran out.LODGEDCOUNCIL DECISIONAFTER APPEALSWHAT HAPPENED NEXT68: lodged → approved8: lodged → refused2: lodged → withdrawn or invalid3: lodged → undecided67: approved → approved7: refused → refused2: withdrawn or invalid → withdrawn3: undecided → undecided1 approved by the council, withdrawn or invalid after an appeal1 refused by the council, approved after an appeal44: approved → no start notice found7: approved → built, owner opted out13: approved → started, not signed off2: approved → signed off2: approved → ran out81 lodged81 lodged68 approved68 approved8 refused8 refused2 withdrawn or invalid2 withdrawn or invalid3 undecided3 undecided68 approved68 approved7 refused7 refused3 withdrawn3 withdrawn3 undecided3 undecided44 no start notice found44 no start notice found7 built, owner opted out7 built, owner opted out13 started, not signed off13 started, not signed off2 signed off2 signed off2 ran out2 ran out

    Purple bands are refusals turned into permissions on appeal. "No start notice found" includes small jobs that never needed one and notices we couldn't match.

    Measured81 applications in 10 years · NPAD, An Coimisiún Pleanála, BCMS start notices and completion certificates

    Figure 6

    The next 30 days

    2 deadlines within 1.0 km; the first closes 22 Oct 2026.

    2 deadlines in the next 30 days: 2026-10-22 SD26B/0301W: Grant Permission — Construction of a two storey side extension, a first floor rear extension, a new front porch, alterations to the fenestr; 2026-11-05 SD26B/0373W: Request Additional Information — Retention for detached single storey timber clad garden room and office and detached single storey shed, all to rear gartoday26 Oct31 Oct5 Nov10 Nov15 Nov20 NovSD26B/0301W: Grant Permission — Construction of a two storey side extension, a first floor rear extension, a new front porch, alterations to the fenestr · 889 m away · 2026-10-22SD26B/0373W: Request Additional Information — Retention for detached single storey timber clad garden room and office and detached single storey shed, all to rear gar · 942 m away · 2026-11-05
    Time to appeal ends
    • Time to appeal ends 22 Oct 20261 day left
      1SD26B/0301W · Grant Permission — Construction of a two storey side extension, a first floor rear extension, a new front porch,…
      €220 to An Coimisiún Pleanála (€110 observer) · 889 m away
    • Time to appeal ends 5 Nov 202615 days left
      2SD26B/0373W · Request Additional Information — Retention for detached single storey timber clad garden room and office and detached…
      €220 to An Coimisiún Pleanála (€110 observer) · 942 m away

    Measuredcouncil registers and An Coimisiún Pleanála · deadlines worked out from the dates on file

    Figure 7

    Approved, stalled or planned, not built yet

    55 homes 631 m away were approved Aug 2025 with no start notice yet; the permission runs to Aug 2030.

    Speaker Connolly Tavern · 55 homes: 55 homes approved Aug 2025, not started20242025202620272028202920302031Speaker Connolly Tavern · 55 homes631 m · SD24A/0228W55 homes approved Aug 2025, not started55 homes approved Aug 2025, not startedtoday

    Each row is a dated fact from a public register: no score and no forecast.

    Measuredcouncil registers, BCMS, derelict sites registers, development plan layers (CC BY 4.0)

    Sites that could change 4 within 1.0 km

    Derelict building 2

    • 4Sites at 10 & 11 Old Bawn Road, Tallaght · derelict since Oct 2024 · 728 m
    • 576 Allenton Drive, Tallaght · derelict since Jun 2023 · 982 m

    Approved, not started 1

    Empty land zoned for homes 1

    • 60.2 ha zoned for homes · no homes built on it yet · 896 m
    Sources: An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices), Derelict sites registers, Council meetings (ModernGov), National Planning Application Database, Residential Zoned Land Tax maps · fetched 21 Oct 2026, 02:35
    SourceLicenceFetchedLink
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.016 Oct 2026, 23:06open
    Building Control Management System (commencement notices)CC BY 4.021 Oct 2026, 01:58open
    Derelict sites registersCC BY 4.019 Oct 2026, 23:17open
    Council meetings (ModernGov)Public21 Oct 2026, 02:35open
    National Planning Application DatabaseCC BY 4.021 Oct 2026, 02:27open
    Residential Zoned Land Tax mapsCC BY 4.019 Oct 2026, 00:29open
    Figure 8

    Applications within 500 m, by year

    Between 5 and 15 a year; busiest 2021. 89% of decisions were approvals.

    2016: 1, 2017: 8, 2018: 8, 2019: 10, 2020: 9, 2021: 15, 2022: 8, 2023: 5, 2024: 5, 2025: 8, 2026: 4051015202016: 1 approved1’16*2017: 7 approved2017: 1 refused8’172018: 7 approved2018: 1 refused8’182019: 9 approved2019: 1 withdrawn or invalid10’192020: 9 approved9’202021: 12 approved2021: 3 refused15’212022: 6 approved2022: 1 refused2022: 1 undecided8’222023: 3 approved2023: 1 refused2023: 1 withdrawn or invalid5’232024: 5 approved5’242025: 7 approved2025: 1 refused8’252026: 2 approved2026: 2 undecided4’26*
    ApprovedRefusedWithdrawn or invalidUndecided

    2016 and 2026 are part years (*). Exemption requests and time extensions are left out.

    Measuredcouncil register via NPAD

    Every application within 1.0 km 34 in the last 12 months

    See every application on the map

    How we work this out
    Descriptions are shortened by the national planning database (to 80 characters in Dún Laoghaire-Rathdown, 70 in Fingal), and it does not publish applicants' names.
    Sources: National Planning Application Database, An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices) · fetched 21 Oct 2026, 02:27
    SourceLicenceFetchedLink
    National Planning Application DatabaseCC BY 4.021 Oct 2026, 02:27open
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.016 Oct 2026, 23:06open
    Building Control Management System (commencement notices)CC BY 4.021 Oct 2026, 01:58open
    Building work nearby 19 in the last 12 months
    2 not signed off17 no sign-off needed
    • 18 Killakee Green, Dublin 24, Dublin, D24 C7VT · 26 Oct 2026 · short notice no sign-off needed · SD26B/0303W · 426 m
    • 2A Kiltipper Close, Dublin 24, Dublin, D24 K1K0 · 30 Sept 2026 · short notice no sign-off needed · SD25B/0216 · 807 m
    • Ballycullen Avenue, Dublin 24, Dublin · 28 Sept 2026 · 7-day notice not signed off · 742 m
    • 32 Oldcourt Farm, Dublin 24, Dublin, D24 EYF3 · 27 Aug 2026 · short notice no sign-off needed · SD25B/0684W · 650 m
    • 27 Carriglea Drive, Dublin 24, Dublin, D24 YP2K · 11 Aug 2026 · start notice, opted out no sign-off needed · SD24B/0509W · 714 m
    • 36 Killakee Walk, Dublin 24, Dublin, D24 YWR5 · 31 Jul 2026 · start notice, opted out no sign-off needed · SD25B/0397W · 505 m
    • 37 Killakee Avenue, Dublin 24, Dublin, D24 ER2V · 30 Jul 2026 · short notice no sign-off needed · SD24B/0032 · 423 m
    • Main Road, Tallaght, Dublin 24, Dublin, D24 YYK4 · 6 Jul 2026 · 7-day notice not signed off · SD23A/0337 · 802 m
    • 7 Bolbrook Grove, Dublin 24, Dublin, D24 K84W · 22 Jun 2026 · short notice no sign-off needed · SD24B/0343W · 704 m
    • 55 Old Bawn Way, Old Bawn, South Dublin, D24 YKV0 · 25 May 2026 · start notice, opted out no sign-off needed · SD25B/0679W · 923 m
    • 39 Killakee Park, Firhouse, dublin 24, Dublin, D24 E8V0 · 22 May 2026 · short notice no sign-off needed · SD22B/0172 · 605 m
    • 25 Killakee Rise, Dublin, South Dublin, D24 NR4K · 27 Apr 2026 · start notice, opted out no sign-off needed · SD25B/0446W · 588 m
    • 223 Glenview Park, Tallaght, South Dublin, D24 KV4Y · 13 Apr 2026 · short notice no sign-off needed · SD25B/0615W · 969 m
    • 115 Saint Maelruan's Park, South Dublin, D24 N1WK · 15 Mar 2026 · start notice, opted out no sign-off needed · SD25B/0294 · 902 m
    • 65 Woodlawn Park Drive, Dublin, D24 VH2R · 9 Mar 2026 · short notice no sign-off needed · SD25B/0579W · 981 m
    • 19 Saint Dominic's Avenue, tallaght, South Dublin, D24 R2RE · 23 Feb 2026 · start notice, opted out no sign-off needed · SD25B/0495 · 662 m
    • 9 Avonbeg Drive, Tallaght, South Dublin, D24 AYH2 · 5 Jan 2026 · short notice no sign-off needed · SD25B/0314W · 630 m
    • Killininny Cottages, Firhouse Road West, Dublin 24, South Dublin, D24 KDX3 · 22 Dec 2025 · start notice, opted out no sign-off needed · SD25B/0011W · 310 m
    • 26 Old Bawn Way, Tallaght, Dublin 24, South Dublin, D24 Y03K · 12 Nov 2025 · start notice, opted out no sign-off needed · SD25B/0435W · 814 m
    How we work this out
    Each row is a notice the builder sent to the council's building control office before work started. One notice can cover many homes. 'Signed off as finished' means a completion certificate is on file; work done under an opt-out or a short notice doesn't need one.
    Source: Building Control Management System (commencement notices) · fetched 21 Oct 2026, 01:58
    SourceLicenceFetchedLink
    Building Control Management System (commencement notices)CC BY 4.021 Oct 2026, 01:58open
    Homes coming 55 not started
    How we work this out
    Schemes of 10 or more homes approved since 2019, from the council and An Coimisiún Pleanála registers. 'Building started' means the builder told the council's building control office that work was starting (a commencement notice).
    Sources: An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices), National Planning Application Database, Social housing construction status report · fetched 21 Oct 2026, 02:27
    SourceLicenceFetchedLink
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.016 Oct 2026, 23:06open
    Building Control Management System (commencement notices)CC BY 4.021 Oct 2026, 01:58open
    National Planning Application DatabaseCC BY 4.021 Oct 2026, 02:27open
    Social housing construction status reportCC BY-SA 4.09 Oct 2026, 23:01open
    Named places nearby: estate, schemes, crèches, schools

    Named places estate, developments, inspections

    Developments within 1.0 km

    SchemeHomesProgressDistance
    Dodder Valley Park——50 m
    D24 Neighbourhood——317 m
    SDCC Lands @28 Locations——576 m
    Old Bawn Road/Old Bawn Way12—582 m
    Speaker Connolly Tavern55—585 m
    Speaker Connolly Public House85—586 m
    Bruce House38no activity on site reported (2026-Q2)837 m
    Former Iceland Site213—844 m

    Who applies most nearby

    • South Dublin County Council — 2 applications, latest 1 Jul 2026

    Crèches and schools inspected

    NameLatest inspectionDistance
    Killakee Montessori · Crèche22 Jun 2026 · report · Tusla Early Years Inspectorate450 m
    Naíonra Santain Teoranta · Crèche1 Dec 2025 · report · Tusla Early Years Inspectorate473 m
    Young Explorers' Preschool and Afterschool · Crèche29 Apr 2026 · report · Tusla Early Years Inspectorate503 m
    Barnardos Child & Family Service Millbrook · Crèche9 Jun 2025 · report · Tusla Early Years Inspectorate672 m
    Tallaght Child Care Centre · Crèche24 Jul 2024 · report · Tusla Early Years Inspectorate672 m
    Curiosity House Creche & Montessori Ltd · Crèche10 Apr 2026 · report · Tusla Early Years Inspectorate723 m
    Mary’s House Tallaght · Crèche9 May 2024 · report · Tusla Early Years Inspectorate732 m
    Little Penguins Firhouse T/A Firhouse Childcare · Crèche29 Oct 2025 · report · Tusla Early Years Inspectorate750 m
    How we work this out
    Organisations only: a person named on an application is never listed. Inspection dates and links are the publisher's; read their report for the findings.
    Sources: Dublin housing delivery pipeline, National Planning Application Database, Applicant organisations (from the CRO), Department of Education school list, Tusla early years register · fetched 21 Oct 2026, 23:37
    SourceLicenceFetchedLink
    Dublin housing delivery pipelineCC BY 4.019 Oct 2026, 23:03open
    National Planning Application DatabaseCC BY 4.021 Oct 2026, 02:27open
    Applicant organisations (from the CRO)Derived by Planning Register18 Oct 2026, 23:06—
    Department of Education school listCC BY 4.027 Sept 2026, 23:32open
    Tusla early years registerPublic register21 Oct 2026, 23:37open
    How busy is this area About as busy as most of South Dublin County Council.
    Homes approved
    Here55
    Council middle0
    Homes started
    Here1
    Council middle4
    How we work this out
    Homes approved counts schemes of 10 or more homes (one-off houses are not included). Homes started counts every home in a notice that building work was starting. The council figure is the middle value across the council's built-up squares of the same area (3.1 km², about a 1 km circle), so half of them saw more and half fewer.
    Sources: An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices), National Planning Application Database · fetched 21 Oct 2026, 02:27
    SourceLicenceFetchedLink
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.016 Oct 2026, 23:06open
    Building Control Management System (commencement notices)CC BY 4.021 Oct 2026, 01:58open
    National Planning Application DatabaseCC BY 4.021 Oct 2026, 02:27open
    Question 5

    What's the area like?

    Figure 9

    This street block against the council

    31% of homes built before 1971 (council 18%). 89% owner-occupied (council 67%).

    Homes built before 1971
    31% · council 18%
    Homes built since 2001
    2% · council 27%
    Owner-occupied
    89% · council 67%
    Rented
    7% · council 29%
    Children under 15
    13% · council 21%
    Aged 65 and over
    31% · council 13%
    Households with 2+ cars
    28% · council 40%
    Work mainly from home
    8% · council 10%
    This small area (328 people)South Dublin

    MeasuredCSO Census 2022, Small Area Population Statistics (CC BY 4.0) · small area 267145001

    Bus
    131 m
    Seskin Vw Rd · 77A · busiest stop within 500 m: 8 an hour at peak
    Radon
    1 in 20
    homes here likely high (EPA). Test it
    Flood
    Within 1.0 km
    OPW flood map area, not beside the house
    Nearest school
    459 m
    Scoil Santain, 262 pupils
    Homes sold nearby
    126
    in 3 years, 1 new (Property Price Register)
    Schools, stops and the council

    Schools

    • Scoil Santain · primary · 262 pupils · 459 m
    • Firhouse Community College · postprimary · 825 pupils · 466 m
    • Scoil Treasa Firhouse · primary · 377 pupils · 738 m
    • St Dominic's National School · primary · 410 pupils · 797 m
    • Holy Rosary Primary School · primary · 525 pupils · 831 m
    • Scoil Maelruain Senior · primary · 386 pupils · 881 m
    • Gaelscoil na Giúise · primary · 278 pupils · 899 m
    • Scoil Maelruain Junior · primary · 369 pupils · 899 m

    Stops 45

    • Seskin Vw Rd · 77A · 3/hour at peak · 131 m
    • Seskin Vw Rd · 77A, 77X · 4/hour at peak · 147 m
    • Homelawn · 77A · 3/hour at peak · 285 m
    • Ballycullen Drive · 49n, S6 · 4/hour at peak · 307 m
    • Homelawn · 77A, 77X · 4/hour at peak · 310 m
    • Firhouse Road · S6 · 4/hour at peak · 331 m
    • New Bawn Pk · 77A · 3/hour at peak · 342 m
    • Firhouse Coll · 49n, F1, S6, UM08 · 8/hour at peak · 367 m

    Schools growing or shrinking planning in 3 years · pupils last year

    • Scoil Santain · 459 m-2.6% pupils (262)
    • Firhouse Community College · 466 m+0.1% pupils (825)
    • Scoil Treasa Firhouse · 738 m-2.3% pupils (377)
    • St Dominic's National School · 797 m-0.2% pupils (410)
    • Holy Rosary Primary School · 831 m-3.5% pupils (525)
    • Scoil Maelruain Senior · 881 m-0.5% pupils (386)

    Open consultations

    Council meetings 30 items

    Public land

    • Dublin City Council · 2.46 ha · 0 m
    • Dublin City Council · 2.21 ha · 58 m
    • South Dublin County Council · 0.25 ha · 198 m
    • South Dublin County Council · 20.58 ha · 231 m
    • Dublin City Council · 0.12 ha · 241 m
    • South Dublin County Council · 0.15 ha · 242 m
    Sources: Public transport stops and routes (NTA GTFS), Department of Education school list, National Planning Application Database, Council consultation portals, Council meetings (ModernGov), Land Development Agency public land register, cso_saps_2022, National Transport Authority, Fingal County Council and Dún Laoghaire-Rathdown County Council development plan layers (CC BY 4.0), dartplus.ie project extents over NTA GTFS rail shapes (CC BY 4.0), EPA strategic noise maps, Fingal County Council · fetched 21 Oct 2026, 02:35
    SourceLicenceFetchedLink
    Public transport stops and routes (NTA GTFS)CC BY 4.018 Oct 2026, 23:44open
    Department of Education school listCC BY 4.027 Sept 2026, 23:32open
    National Planning Application DatabaseCC BY 4.021 Oct 2026, 02:27open
    Council consultation portalsPublic21 Oct 2026, 01:42open
    Council meetings (ModernGov)Public21 Oct 2026, 02:35open
    Land Development Agency public land registerCC BY 4.011 Sept 2026, 16:43open
    cso_saps_2022CC BY 4.0—open
    National Transport AuthorityCC BY 4.0——
    Fingal County Council and Dún Laoghaire-Rathdown County Council development plan layers (CC BY 4.0)CC BY 4.0——
    dartplus.ie project extents over NTA GTFS rail shapes (CC BY 4.0)CC BY 4.0——
    EPA strategic noise mapsCC BY 4.0——
    Fingal County CouncilCC BY 4.0——
    Question 6

    What to ask, and who

    1. Planning here goes back to 2012: is the house built as approved?
      Ask for: The original planning grant and an opinion of compliance.
      Solicitor
    2. Zoned G3 (high amenity), not for homes: could you extend?
      Ask for: A solicitor's or planner's view.
      Solicitor · planner
    3. Any work done without planning permission?
      Ask for: An opinion of compliance for the whole house.
      Seller · solicitor
    Reference

    Where this is, the terms, the sources

    Townland
    Oldbawn
    Electoral division
    Tallaght-Millbrook
    Electoral area
    Tallaght Central
    Council
    South Dublin County Council
    Everything we found, as a list 8 lines
    • Zoned G3 (high amenity); not protected; no vacant land tax.
    • 4 sites nearby could change: 2 derelict, 1 approved scheme, 1 empty zoned plot.
    • 55 homes approved nearby, not started; largest 55 at Speaker Connolly Tavern.
    • Firhouse Coll (bus 49n, F1) 367 m away: 8 an hour at morning peak; 53 from all stops within 500 m.
    • Here (2022 census): 89% owner-occupied (council 66%); 3% of homes empty (council 4%); most built 1971–1980; 54% drive to work (council 54%); population down 1% since 2016.
    • The council decides in a median 55 days (about 8 weeks); 1 in 5 is asked for more information.
    • 2 appeals nearby decided in the last 12 months; 1 overturned an approval.
    • 34 applications nearby in the last 12 months; 95% approved (council 88%); 12% for work already built (council 15%).
    What the terms mean 8 terms
    • Vacant land tax (Residential Zoned Land Tax (RZLT)): A yearly tax of 3% of the land's value on land that is zoned for homes and serviced but left unbuilt.
    • Building started (Commencement notice (BCMS)): The builder must tell the council's building control office 14 to 28 days before work starts.
    • Signed off as finished (Certificate of Compliance on Completion): A certificate filed when a building is finished, confirming it meets the building regulations.
    • Approved (Grant of permission): The council said yes, usually with conditions.
    • Approval ran out without being built (Permission lapsed / expired): Most permissions last five years.
    • Listed by the council as derelict (Derelict Sites Register): Councils keep a public list of land and buildings in a ruinous or dangerous state.
    • Appeal (Appeal to An Coimisiún Pleanála): The applicant, or anyone who commented in time, can appeal the council's decision within four weeks.
    • What the land is zoned for (Zoning objective): The council's development plan sets what each area is for: homes, shops, open space and so on.
    Sources and licences 32
    SourcePublisherLicenceFetched
    EPA strategic noise maps—CC BY 4.0—
    Fingal County Council—CC BY 4.0—
    Fingal County Council and Dún Laoghaire-Rathdown County Council development plan layers (CC BY 4.0)—CC BY 4.0—
    National Transport Authority—CC BY 4.0—
    services-eu1.arcgis.comAn Coimisiún PleanálaCC BY 4.016 Oct 2026
    data.nbco.gov.ieNational Building Control Office (BCMS)CC BY 4.021 Oct 2026
    data.gov.ieVarious (see each layer)CC BY 4.0, CC BY-NC-ND 4.027 Sept 2026
    s3.eu-west-1.amazonaws.comOffice of Public WorksCC BY-NC-ND 4.0 · flag only11 Sept 2026
    services-eu1.arcgis.comNational Parks and Wildlife ServiceCC BY 4.027 Sept 2026
    services-eu1.arcgis.comNational Inventory of Architectural HeritageCC BY 4.027 Sept 2026
    gis.epa.ieEnvironmental Protection AgencyCC BY 4.027 Sept 2026
    services-eu1.arcgis.comNational Monuments Service (SMR)CC BY 4.027 Sept 2026
    dlrcoco.citizenspace.comLocal authorities (consultation portals)Public21 Oct 2026
    www2.courts.ie—© the publisher21 Oct 2026
    cso.ie—CC BY 4.0—
    dartplus.ie project extents over NTA GTFS rail shapes (CC BY 4.0)—CC BY 4.0—
    services-eu1.arcgis.comLocal authorities (derelict sites registers)CC BY 4.019 Oct 2026
    services.arcgis.comDublin local authorities (housing delivery pipeline)CC BY 4.019 Oct 2026
    esbnetworks.ie—© the publisher · flag only11 Sept 2026
    transportforireland.ieNational Transport AuthorityCC BY 4.018 Oct 2026
    lda.ieLand Development AgencyCC BY 4.011 Sept 2026
    meetings.fingal.ieLocal authorities (council meetings)Public21 Oct 2026
    services.arcgis.comDepartment of Housing (National Planning Application Database)CC BY 4.021 Oct 2026
    organisationsPlanning Register (derived from applications and the CRO register)Derived by Planning Register18 Oct 2026
    services-eu1.arcgis.comTailte ÉireannCC BY 4.011 Sept 2026
    services-eu1.arcgis.comCSO, Tailte Éireann, OpenStreetMap contributorsCC BY 4.04 Oct 2026
    propertypriceregister.ieProperty Services Regulatory Authority (PPR)© PSRA, PSI licence21 Oct 2026
    services.arcgis.comLocal authorities (RZLT maps)CC BY 4.018 Oct 2026
    gov.ieDepartment of EducationCC BY 4.027 Sept 2026
    gov.ieDepartment of HousingCC BY-SA 4.09 Oct 2026
    tusla.ieTusla (Early Years Inspectorate)Public register21 Oct 2026
    services.arcgis.comLocal authorities via the Department of Housing (GZT / MyPlan)CC BY 4.018 Oct 2026
    Measured
    counted from a public register
    Calculated
    a rate or median we worked out from those counts
    Our classification
    we sorted it by reading each description
    Estimate
    inferred from another source (census, map data)
    Rule summary
    the law, simplified: check before relying on it
    How we work this out
    Generated 21 Oct 2026, 23:57 from the Planning Register store; nothing was fetched live. Not a legal search: the council's planning file is the record. Deadlines come from published dates under the Planning and Development Act 2000: confirm with the council before relying on them. Street map © OpenStreetMap contributors; building outlines © Overture Maps Foundation. The text version carries every figure with its source, for an AI assistant.