Planning report · South Dublin County Council · 1000 m around the house · the last 12 months · 1 Nov 2026, 04:45

Mill Road, Rathcoole, Collegeland

53.28480, -6.45247

Homes here mostly date from the 2000s. Home extensions nearby almost always get approved (95%). 1 application nearby open for comments.

See on the mapWatch this area

How planning works, with this area's numbers

steps can overlap · medians for home extensions within 1.5 km, 10 years
  1. 1ApplySite notice up, plans online
  2. 2Comments5 weeks, €20. Comment to keep your right to appeal
  3. 3Decision8 weeks by law. Here 55 days
  4. 4Appeal window4 weeks after the decision
  5. 5AppealHere about 5 months
  6. 6PermissionLasts 5 years
  7. 7StartStart notice to the council. Here about 4 months after
  8. 8Sign-offCompletion cert, or the owner opts out
Question 1

What's the planning story of this house?

Figure 1

When it was built, and the rules since

Most homes here were built 2001–10, under planning permission and building regulations.

Timeline from 1955: planning permission needed from October 1964, building regulations from June 1992, building records online from March 2014, sign-off opt-out from September 2015. Most homes here were built 2001–2010.1960197019801990200020102020Oct 1964permission neededJun 1992building regulationsMar 2014building records onlineSep 2015owners may opt out of sign-offThis houseAll of CollegelandBuilt: most homes in this small area date from 2001–2010 (census estimate)most built2021: 2 files on Collegeland2022: 3 files on Collegeland2023: 1 file on Collegeland6 files

Each line is a rule that applies to work done after it.

MeasuredEstimatecouncil register via NPAD · build years: CSO Census 2022, small area

On this site
R1
Zoning · New residential
No
Protected or listed · on the council's list
Yes
Vacant land tax · 3% of land value a year
1 in 10
Radon (EPA) · homes with high radon
Zoning, protection, tax and flood: the detail
ZoningR1 · New residential
What it says

RES-N: To provide for new residential communities in accordance with approved area plans

Zoned for new residential communities. This is where large housing schemes are expected to go, subject to the social and physical infrastructure arriving with them.

south dublin county development plan 2022 2028 · 8 Mar 2022 – 8 Mar 2028

Radon1 in 10 homes have high radon (EPA)

Not on this site: protected building, heritage inventory, monument zone, conservation area, EU nature site, EU bird site, natural heritage area, tree order, landslide risk, derelict list.

Licensed industrial sites within 1.0 km: Brittas Plastics Ltd. (705 m)

Vacant land taxYes 3% of the land's value a year
Flood riskNearby OPW map area within 1.0 km · floodinfo.ie
Within 1.0 kmCountFor example
Licensed industrial sites1Brittas Plastics Ltd.
Heritage inventory buildings18Rathcoole Lodge; Rathcoole Church
Radon grid squares6
Monuments28Church; Graveyard
How we work this out
'On this site' means the record's own map outline touches the registered parcel (or a 12 m circle round the point where there is no parcel). Only the council's own list confirms a protected building; ask the council if in doubt. This land is on the council's final map for the vacant land tax. Unless it is a home someone lives in (or its garden), the owner pays 3% of the land's value a year until homes are built or the zoning changes. The OPW flood map's licence lets us show a yes/no only. Land on the vacant land tax map nearby: 7 on the draft 2027 map; 6 on the final 2026 map.
Sources: Development plan zoning (councils), EPA radon map, EPA licensed facilities (LEAP), Residential Zoned Land Tax maps, Constraint layers (bundle), EPA licensed sites, OPW flood maps (CFRAM), National Inventory of Architectural Heritage, Sites and Monuments Record · fetched 26 Oct 2026, 23:21
SourceLicenceFetchedLink
Development plan zoning (councils)CC BY 4.025 Oct 2026, 23:06open
EPA radon mapCC BY 4.027 Sept 2026, 19:36open
EPA licensed facilities (LEAP)CC BY 4.026 Oct 2026, 23:21open
Residential Zoned Land Tax mapsCC BY 4.025 Oct 2026, 23:43open
Constraint layers (bundle)CC BY 4.0, CC BY-NC-ND 4.027 Sept 2026, 19:37open
EPA licensed sitesCC BY 4.027 Sept 2026, 19:36open
OPW flood maps (CFRAM)CC BY-NC-ND 4.0 · shown as a yes/no only11 Sept 2026, 19:11open
National Inventory of Architectural HeritageCC BY 4.027 Sept 2026, 19:35open
Sites and Monuments RecordCC BY 4.027 Sept 2026, 19:29open
How we work this out
Applications whose site outline (or map point) falls on this property. 'No sign building has started' means we found no notice to the council's building control office; small jobs don't always file one, so ask. A missing completion certificate is not proof of a problem: an owner can opt out of official sign-off for a house or extension built for themselves.
Sources: Building Control Management System (commencement notices), National Planning Application Database · fetched 1 Nov 2026, 03:07
SourceLicenceFetchedLink
Building Control Management System (commencement notices)CC BY 4.01 Nov 2026, 03:07open
National Planning Application DatabaseCC BY 4.01 Nov 2026, 02:01open
Question 2

Could you extend?

Nothing on this site restricts it: not protected, not in a conservation area.

Figure 2

What happened to applications like yours

Extensions are almost always approved here: 100% by type. A new house in a garden is harder: 50% approved, and 1 in 3 is asked for more information.

Attic or dormer12 decided · more info asked 25%
100% · council 98%
New house in a garden or site8 decided · more info asked 38%
50% · council 62%
Approved nearbySouth Dublin overall

Decided applications within 1.5 km, received in the last 10 years. The kind of work is read from each description.

CalculatedOur classificationcouncil register via NPAD · 20 nearby, 1,731 council-wide

Figure 3

Collegeland, file by file since 2021

6 planning files on Collegeland since 2021, by kind and decision.202120222023202420252026Extensions, atticsPorches, roofs, otherNo number · 2021 · other work · approved · SD21A/0230No number · 2021 · other work · approved · SD21A/0320No number · 2022 · other work · approved · SD22A/0026No number · 2022 · other work · approved · SD22A/0269No number · 2022 · other work · approved · SD22A/0453No number · 2023 · other work · approved · SD23A/0141New house in a side garden
ApprovedRefusedWithdrawn or invalid

6 files with "Collegeland" in the address within 600 m, other roads of the same name left out. Hover a dot for the house number and reference.

MeasuredOur classificationcouncil register via NPAD · 2021–2026

Extensions and refusals right beside you 0 within 250 m · 0 refused within 100 m

Extensions and refusals near you 0 extensions within 250 m · the last 12 months

No home extensions within 250 m in the last 12 months.

Refused within 100 m 0 in the last 12 months

Nothing refused this close in the last 12 months.

    How we work this out
    Home extensions are read from the application's description (extension, attic or dormer, porch, garage conversion, garden room), so a few may be missed or mislabelled. The kind is the first that fits: a dormer with a rear extension counts as a dormer. Refusal reasons come from An Coimisiún Pleanála's inspector reports, so they exist only where the refusal was appealed (Dún Laoghaire-Rathdown so far). The council's own reasons are on its planning file.
    Sources: National Planning Application Database, An Coimisiún Pleanála cases (ArcGIS feed) · fetched 1 Nov 2026, 02:01
    SourceLicenceFetchedLink
    National Planning Application DatabaseCC BY 4.01 Nov 2026, 02:01open
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.030 Oct 2026, 23:01open
    Sources: An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices), National Planning Application Database · fetched 1 Nov 2026, 03:07
    SourceLicenceFetchedLink
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.030 Oct 2026, 23:01open
    Building Control Management System (commencement notices)CC BY 4.01 Nov 2026, 03:07open
    National Planning Application DatabaseCC BY 4.01 Nov 2026, 02:01open
    Question 3

    How long, and what if someone objects?

    Figure 4

    A home extension's journey here

    A decision takes 55 days. 1 in 3 is asked for more information, which adds about 65 days. Building starts about 4 months after permission.

    Comments open: 5 weeks · €20; Council decision: 55 days; If more info asked (1 in 3): 122 days; Appeal window: 4 weeks; If appealed: +141 days; Building starts: 114 days after permission0 mo3 mo6 mo9 mo12 mo15 moComments openComments close 5 weeks after the application is lodged5 weeks · €20Council decisionDecision: median 55 days, middle half 54–55 (n=29)55 daysIf more info asked (1 in 3)With further information: median 122 days (n=12)122 daysAppeal windowAnyone who commented can appeal within 4 weeks of the decision4 weeksIf appealedAt An Coimisiún Pleanála: median 141 days (n=13, all appeals within 1.5 km)+141 daysBuilding startsStart notice: median 114 days after permission (n=10)114 days after permissionSigned off58% of owners opt out of sign-off

    Bars are medians; whiskers show the middle half. Medians of separate steps don't add up exactly.

    Calculated41 decided home extensions, 12 start notices, 13 decided appeals · within 1.5 km, 10 years · NPAD, BCMS, An Coimisiún Pleanála

    Figure 5

    What appeals changed

    1 of 5 appealed refusals became permissions. 1 of 8 appealed approvals were reversed.

    Refusals appealed5 decided
    1 became permissions
    Approvals appealed8 decided
    1 reversed
    Ended approvedEnded refusedWithdrawn, invalid or other

    Every appeal decided within 1.5 km in 10 years, any kind of development.

    CalculatedAn Coimisiún Pleanála cases linked to the council file

    Appeals nearby 2 in the last 12 months
    • 501589 Open · Muldowney's Pub, Main Street, Rathcoole, Co. Dublin, D24 AE33 · 927 m
    • 501581 Open · 13, Mill Road, Saggart, Dublin · 348 m
    Sources: An Coimisiún Pleanála cases (ArcGIS feed), Courts Service legal diary (judicial reviews), National Planning Application Database · fetched 1 Nov 2026, 02:01
    SourceLicenceFetchedLink
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.030 Oct 2026, 23:01open
    Courts Service legal diary (judicial reviews)© the publisher31 Oct 2026, 23:12open
    National Planning Application DatabaseCC BY 4.01 Nov 2026, 02:01open
    Question 4

    What's changing around you?

    Street map around Mill Road, Rathcoole, Collegeland with 15 numbered planning items
    ⌖ the houseOpen for commentsWindow closingDerelict buildingEmpty land zoned for homesApprovedOtherNo decision yet
    1. 153 Coolamber Drive, Rathcoole SD26B/0465WNo decision yet · 869 m
    2. 2UNIT 5, Baldonnell Business Park SD26A/0204WApproved · 932 m
    3. 319 Páirc Mhúire, Saggart 1864Derelict building · 903 m
    4. 40.2 ha zoned for homesEmpty land zoned for homes · 118 m
    5. 50.5 ha zoned for homesEmpty land zoned for homes · 717 m
    6. 613.9 ha zoned for homesEmpty land zoned for homes · 813 m
    7. 74.0 ha zoned for homesEmpty land zoned for homes · 0 m
    8. 813, Mill Road SD26B/0174WApproved · 348 m
    9. 934, Millrace Avenue ED26/0074Section 5: needs permission · 496 m
    10. 1024, Beechwood Lawns ED26/0080Section 5: exempt · 660 m
    11. 11Saggart Village Heritage & Arts Centre, Garters Lane ED26/0077Section 5: awaiting decision · 775 m
    12. 12Garters Lane, Saggart LRD25A/0010WApproved · 813 m
    13. 13St Marys GFC, Pairc Mhure SD25A/0273WApproved · 842 m
    14. 14313, Swiftwood SD26A/0188WNo decision yet · 888 m
    15. 1521, Pairc Mhuire SD26A/0176WApproved · 904 m
    Figure 6

    What happens to applications within 500 m

    Permission isn't building. Of 19 permissions since 2016, 8 show a start notice and 3 have a completion certificate.

    28 applications lodged within 500 m. Council: 20 approved, 3 refused. After appeals: 19 approved. Of those: 3 signed off, 1 built with the owner's opt-out, 4 started, 11 with no start notice found, 0 ran out.LODGEDCOUNCIL DECISIONAFTER APPEALSWHAT HAPPENED NEXT20: lodged → approved3: lodged → refused5: lodged → withdrawn or invalid19: approved → approved3: refused → refused5: withdrawn or invalid → withdrawn1 approved by the council, undecided after an appeal11: approved → no start notice found1: approved → built, owner opted out4: approved → started, not signed off3: approved → signed off28 lodged28 lodged20 approved20 approved3 refused3 refused5 withdrawn or invalid5 withdrawn or invalid19 approved19 approved3 refused3 refused5 withdrawn5 withdrawn1 undecided1 undecided11 no start notice found11 no start notice found1 built, owner opted out1 built, owner opted out4 started, not signed off4 started, not signed off3 signed off3 signed off

    Purple bands are refusals turned into permissions on appeal. "No start notice found" includes small jobs that never needed one and notices we couldn't match.

    Measured28 applications in 10 years · NPAD, An Coimisiún Pleanála, BCMS start notices and completion certificates

    Figure 7

    The next 30 days

    2 deadlines within 1.0 km; the first closes 16 Nov 2026.

    2 deadlines in the next 30 days: 2026-11-16 SD26A/0204W: Grant Permission — The retention permission for the external doors to existing warehouse storage building and external keg restraints struc; 2026-11-18 SD26B/0465W: application received — Planning permission is sought for: construction of upper storey bedroom extension to the side. Construction of single sttoday6 Nov11 Nov16 Nov21 Nov26 Nov1 DecSD26A/0204W: Grant Permission — The retention permission for the external doors to existing warehouse storage building and external keg restraints struc · 932 m away · 2026-11-16SD26B/0465W: application received — Planning permission is sought for: construction of upper storey bedroom extension to the side. Construction of single st · 869 m away · 2026-11-18
    Comments closeTime to appeal ends
    • Time to appeal ends 16 Nov 202615 days left
      2SD26A/0204W · Grant Permission — The retention permission for the external doors to existing warehouse storage building and external…
      €220 to An Coimisiún Pleanála (€110 observer) · 932 m away
    • Comments close 18 Nov 202617 days left
      1SD26B/0465W · application received — Planning permission is sought for: construction of upper storey bedroom extension to the side.…
      €20 to the council · 869 m away

    Measuredcouncil registers and An Coimisiún Pleanála · deadlines worked out from the dates on file

    Sites that could change 5 within 1.0 km

    Derelict building 1

    • 319 Páirc Mhúire, Saggart · derelict since May 2024 · 903 m

    Empty land zoned for homes 4

    • 40.2 ha zoned for homes · no homes built on it yet · 118 m
    • 50.5 ha zoned for homes · no homes built on it yet · 717 m
    • 613.9 ha zoned for homes · no homes built on it yet · 813 m
    • 74.0 ha zoned for homes · no homes built on it yet · 0 m
    Sources: An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices), Derelict sites registers, Council meetings (ModernGov), National Planning Application Database, Residential Zoned Land Tax maps · fetched 1 Nov 2026, 03:07
    SourceLicenceFetchedLink
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.030 Oct 2026, 23:01open
    Building Control Management System (commencement notices)CC BY 4.01 Nov 2026, 03:07open
    Derelict sites registersCC BY 4.026 Oct 2026, 23:09open
    Council meetings (ModernGov)Public1 Nov 2026, 02:24open
    National Planning Application DatabaseCC BY 4.01 Nov 2026, 02:01open
    Residential Zoned Land Tax mapsCC BY 4.025 Oct 2026, 23:43open
    Figure 8

    Applications within 500 m, by year

    Between 4 and 8 a year; busiest 2023. 87% of decisions were approvals.

    2021: 4, 2022: 4, 2023: 8, 2024: 6, 2025: 5, 2026: 105102021: 3 approved2021: 1 withdrawn or invalid4’21*2022: 4 approved4’222023: 5 approved2023: 2 refused2023: 1 withdrawn or invalid8’232024: 3 approved2024: 1 refused2024: 2 withdrawn or invalid6’242025: 4 approved2025: 1 withdrawn or invalid5’252026: 1 approved1’26*
    ApprovedRefusedWithdrawn or invalidUndecided

    2021 and 2026 are part years (*). Exemption requests and time extensions are left out.

    Measuredcouncil register via NPAD

    Open for comments €20 to comment

    Every application within 1.0 km 21 in the last 12 months

    See every application on the map

    How we work this out
    Descriptions are shortened by the national planning database (to 80 characters in Dún Laoghaire-Rathdown, 70 in Fingal), and it does not publish applicants' names.
    Sources: National Planning Application Database, An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices) · fetched 1 Nov 2026, 03:07
    SourceLicenceFetchedLink
    National Planning Application DatabaseCC BY 4.01 Nov 2026, 02:01open
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.030 Oct 2026, 23:01open
    Building Control Management System (commencement notices)CC BY 4.01 Nov 2026, 03:07open
    Building work nearby 11 in the last 12 months
    1 signed off as finished7 not signed off3 no sign-off needed
    • Lána Gairtéir, Saggart, Dublin · 4 Nov 2026 · start notice not signed off · SD22A/0357 · 842 m
    • Land adjacent to Drury Mills & Drury Park, Swiftbrook, Saggart, Co. Dublin, Saggart, Dublin, N/A · 21 Oct 2026 · 72 homes · start notice not signed off · SD24A/0092W ABP-322539-25 · 618 m
    • Muldowney’s Pub, Main Street, Rathcoole, Co. Dublin, D24 AE33, Rathcoole, Dublin, D24 AE33 · 8 Oct 2026 · 9 homes · 7-day notice not signed off · SD25A/0266W · 942 m
    • 24 Páirc Mhuire, Saggart, Dublin, D24 ND36 · 21 Aug 2026 · start notice, opted out no sign-off needed · SD26B/0151W · 937 m
    • Lána Gairtéir, Saggart, Dublin · 27 Jul 2026 · start notice not signed off · SD22A/0357 · 835 m
    • Garter Lane, Saggart, Dublin, D24 VK58 · 6 Jul 2026 · start notice signed off · 876 m
    • 93 Beechwood Lawns, Rathcoole, South Dublin, D24 YX28 · 5 Mar 2026 · start notice, opted out no sign-off needed · SD24B/0472W · 725 m
    • 39 Coolamber Drive, Rathcoole, South Dublin, D24 HR82 · 26 Jan 2026 · short notice no sign-off needed · SD25B/0427 · 950 m
    • Garter Lane, Saggart, Saggart, South Dublin · 18 Dec 2025 · 223 homes · 7-day notice not signed off · SD22A/0357 · 848 m
    • Garter Lane, Saggart, Saggart, South Dublin · 18 Dec 2025 · 223 homes · 7-day notice not signed off · SD22A/0357 · 842 m
    • Garters Lane, Saggart,, Co. Dublin, South Dublin · 11 Nov 2025 · 7-day notice not signed off · SD24A/0187W · 665 m
    How we work this out
    Each row is a notice the builder sent to the council's building control office before work started. One notice can cover many homes. 'Signed off as finished' means a completion certificate is on file; work done under an opt-out or a short notice doesn't need one.
    Source: Building Control Management System (commencement notices) · fetched 1 Nov 2026, 03:07
    SourceLicenceFetchedLink
    Building Control Management System (commencement notices)CC BY 4.01 Nov 2026, 03:07open
    Homes coming 0 not started
    • Garter’s Lane, Saggart, Dublin 24 (Phase 1)* · On site · 223 homes · 706 m
    • Slade Square, Saggart, Dublin 24 (Phase 1)* · On site · 28 homes · 706 m
    • Swiftbanks, Mill Road, Saggart, Dublin 24 (Phase 1) · Completed · 25 homes · 706 m
    • Swiftbanks, Mill Road, Saggart, Dublin 24 (Phase 2)* · On site · 118 homes · 706 m
    How we work this out
    Schemes of 10 or more homes approved since 2021, from the council and An Coimisiún Pleanála registers. 'Building started' means the builder told the council's building control office that work was starting (a commencement notice).
    Sources: An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices), National Planning Application Database, Social housing construction status report · fetched 1 Nov 2026, 03:07
    SourceLicenceFetchedLink
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.030 Oct 2026, 23:01open
    Building Control Management System (commencement notices)CC BY 4.01 Nov 2026, 03:07open
    National Planning Application DatabaseCC BY 4.01 Nov 2026, 02:01open
    Social housing construction status reportCC BY-SA 4.023 Oct 2026, 23:02open
    Named places nearby: estate, schemes, crèches, schools

    Named places estate, developments, inspections

    Developments within 1.0 km

    SchemeHomesProgressDistance
    Mill Road Development274—0 m
    Drury Mills and Drury Park Extension73—569 m
    Garters Lane223223 not started (2026-Q2)813 m
    Garters Lane Development224no activity on site reported (2025-Q4)813 m
    Fortunestown Lane526526 built (2025-Q2)866 m
    Fortunestown Lane Development524—868 m
    Fortunestown Lane and Parklands Parade86—869 m
    Muldowney's Pub2323 being built (2026-Q2)919 m

    Who applies most nearby

    Crèches and schools inspected

    NameLatest inspectionDistance
    Kidorama Ltd · Crèche31 Mar 2026 · report · Tusla Early Years Inspectorate790 m
    How we work this out
    Organisations only: a person named on an application is never listed. Inspection dates and links are the publisher's; read their report for the findings.
    Sources: Dublin housing delivery pipeline, National Planning Application Database, Applicant organisations (from the CRO), Department of Education school list, Tusla early years register · fetched 1 Nov 2026, 02:01
    SourceLicenceFetchedLink
    Dublin housing delivery pipelineCC BY 4.026 Oct 2026, 23:00open
    National Planning Application DatabaseCC BY 4.01 Nov 2026, 02:01open
    Applicant organisations (from the CRO)Derived by Planning Register25 Oct 2026, 23:01—
    Department of Education school listCC BY 4.027 Oct 2026, 23:04open
    Tusla early years registerPublic register28 Oct 2026, 23:19open
    How busy is this area Busier than most of South Dublin County Council.
    Homes approved
    Here83
    Council middle0
    Homes started
    Here789
    Council middle4
    How we work this out
    Homes approved counts schemes of 10 or more homes (one-off houses are not included). Homes started counts every home in a notice that building work was starting. The council figure is the middle value across the council's built-up squares of the same area (3.1 km², about a 1 km circle), so half of them saw more and half fewer.
    Sources: An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices), National Planning Application Database · fetched 1 Nov 2026, 03:07
    SourceLicenceFetchedLink
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.030 Oct 2026, 23:01open
    Building Control Management System (commencement notices)CC BY 4.01 Nov 2026, 03:07open
    National Planning Application DatabaseCC BY 4.01 Nov 2026, 02:01open
    Question 5

    What's the area like?

    Figure 9

    This street block against the council

    41% of homes built before 1971 (council 18%). 45% owner-occupied (council 67%).

    Homes built before 1971
    41% · council 18%
    Homes built since 2001
    27% · council 27%
    Owner-occupied
    45% · council 67%
    Rented
    43% · council 29%
    Children under 15
    50% · council 21%
    Aged 65 and over
    5% · council 13%
    Households with 2+ cars
    27% · council 40%
    Work mainly from home
    7% · council 10%
    This small area (1471 people)South Dublin

    MeasuredCSO Census 2022, Small Area Population Statistics (CC BY 4.0) · small area 267119013/01

    Road noise
    65–69 dB
    day–night average (EPA 2022)
    Bus
    196 m
    Springbank · 69, 69n, W6 · busiest stop within 500 m: 4 an hour at peak
    Radon
    1 in 10
    homes here likely high (EPA). Test it
    Flood
    Within 1.0 km
    OPW flood map area, not beside the house
    Nearest school
    867 m
    S N Naomh Mhuire, 666 pupils
    Homes sold nearby
    103
    in 3 years, 41 new (Property Price Register)
    Schools, stops and the council

    Schools

    • S N Naomh Mhuire · primary · 666 pupils · 867 m
    • Rathcoole ETNS · primary · 114 pupils · 913 m
    • Citywest & Saggart Community National School · primary · 413 pupils · 964 m
    • Gaelscoil Lir · primary · 53 pupils · 964 m
    • Coláiste pobail Fóla · postprimary · 758 pupils · 977 m

    Stops 17

    • Springbank · 69, 69n, W6 · 3/hour at peak · 196 m
    • Springbank · 69, 69X, W6 · 3/hour at peak · 206 m
    • Millrace Wk · 69, 69n, W6 · 3/hour at peak · 358 m
    • Fitzmaurice Road · 69, 69X, W6 · 3/hour at peak · 454 m
    • Fitzmaurice Road · 69, 69n, W6 · 3/hour at peak · 455 m
    • Millrace Ct · 69, 69X, 69n, W6 · 4/hour at peak · 474 m
    • Saggart Village · 69, 69X, 69n, W6 · 3/hour at peak · 711 m
    • Saggart Village · 69, 69X, W6 · 3/hour at peak · 722 m

    Schools growing or shrinking planning in 3 years · pupils last year

    • S N Naomh Mhuire · 867 m-1% pupils (666) · a pitch or play area 2025, approved
    • Rathcoole ETNS · 913 m-4.2% pupils (114)
    • Gaelscoil Lir · 964 m+10.4% pupils (53)
    • Citywest & Saggart Community National School · 964 m-1.4% pupils (413) · 22 classrooms 2025, approved
    • Coláiste pobail Fóla · 977 m+15.2% pupils (758)

    Open consultations

    Council meetings 30 items

    Public land

    • South Dublin County Council · 0.32 ha · 832 m
    Sources: Public transport stops and routes (NTA GTFS), Department of Education school list, National Planning Application Database, Council consultation portals, Council meetings (ModernGov), Land Development Agency public land register, cso_saps_2022, National Transport Authority, Fingal County Council and Dún Laoghaire-Rathdown County Council development plan layers (CC BY 4.0), dartplus.ie project extents over NTA GTFS rail shapes (CC BY 4.0), EPA strategic noise maps, Fingal County Council · fetched 1 Nov 2026, 02:24
    SourceLicenceFetchedLink
    Public transport stops and routes (NTA GTFS)CC BY 4.025 Oct 2026, 23:02open
    Department of Education school listCC BY 4.027 Oct 2026, 23:04open
    National Planning Application DatabaseCC BY 4.01 Nov 2026, 02:01open
    Council consultation portalsPublic1 Nov 2026, 01:08open
    Council meetings (ModernGov)Public1 Nov 2026, 02:24open
    Land Development Agency public land registerCC BY 4.011 Sept 2026, 16:43open
    cso_saps_2022CC BY 4.0—open
    National Transport AuthorityCC BY 4.0——
    Fingal County Council and Dún Laoghaire-Rathdown County Council development plan layers (CC BY 4.0)CC BY 4.0——
    dartplus.ie project extents over NTA GTFS rail shapes (CC BY 4.0)CC BY 4.0——
    EPA strategic noise mapsCC BY 4.0——
    Fingal County CouncilCC BY 4.0——
    Question 6

    What to ask, and who

    1. On the vacant land tax map: is the 3% tax being paid?
      Ask for: Your solicitor's check of liability or exemption.
      Solicitor
    2. High radon area (1 in 10 homes): has it been tested?
      Ask for: Radon test results.
      Seller
    3. Application 869 m away open for comments until 18 Nov 2026: comment?
      Ask for: The plans on the council's website (€20 to comment).
      Council
    4. Mapped at 65–69 dB from road traffic: will you hear it inside?
      Ask for: A visit at rush hour (and at night), and the windows' glazing specification.
      Visit at rush hour
    5. Any work done without planning permission?
      Ask for: An opinion of compliance for the whole house.
      Seller · solicitor
    Reference

    Where this is, the terms, the sources

    Townland
    Collegeland
    Electoral division
    Saggart
    Electoral area
    Clondalkin
    Council
    South Dublin County Council
    Everything we found, as a list 8 lines
    • Zoned R1 (new residential); not protected; on the vacant land tax map; high radon area.
    • 5 sites nearby could change: 1 derelict, 4 empty zoned plots.
    • 1 application open for comments nearby; nearest closes 18 Nov 2026.
    • Millrace Ct (bus 69, 69X) 474 m away: 4 an hour at morning peak; 19 from all stops within 500 m.
    • Noise from road traffic mapped at 65–69 dB (day-evening-night average, EPA 2022).
    • Here (2022 census): 45% owner-occupied (council 66%); 23% of homes empty (council 4%); most built 2001–2010; 44% drive to work (council 54%); population up 35% since 2016.
    • Around here the council decides in a median 56 days (about 8 weeks); 1 in 3 is asked for more information.
    • Homes started within 1 km: 304 in the last year, 181 three years before.
    What the terms mean 8 terms
    • Vacant land tax (Residential Zoned Land Tax (RZLT)): A yearly tax of 3% of the land's value on land that is zoned for homes and serviced but left unbuilt.
    • Building started (Commencement notice (BCMS)): The builder must tell the council's building control office 14 to 28 days before work starts.
    • Signed off as finished (Certificate of Compliance on Completion): A certificate filed when a building is finished, confirming it meets the building regulations.
    • Approved (Grant of permission): The council said yes, usually with conditions.
    • Listed by the council as derelict (Derelict Sites Register): Councils keep a public list of land and buildings in a ruinous or dangerous state.
    • Comment on an application (Observation / submission): Anyone can comment on a planning application within five weeks of it being lodged, for a €20 fee.
    • Appeal (Appeal to An Coimisiún Pleanála): The applicant, or anyone who commented in time, can appeal the council's decision within four weeks.
    • What the land is zoned for (Zoning objective): The council's development plan sets what each area is for: homes, shops, open space and so on.
    Sources and licences 35
    SourcePublisherLicenceFetched
    EPA strategic noise maps—CC BY 4.0—
    Fingal County Council—CC BY 4.0—
    Fingal County Council and Dún Laoghaire-Rathdown County Council development plan layers (CC BY 4.0)—CC BY 4.0—
    National Transport Authority—CC BY 4.0—
    services-eu1.arcgis.comAn Coimisiún PleanálaCC BY 4.030 Oct 2026
    data.nbco.gov.ieNational Building Control Office (BCMS)CC BY 4.01 Nov 2026
    data.gov.ieVarious (see each layer)CC BY 4.0, CC BY-NC-ND 4.027 Sept 2026
    gis.epa.ieEnvironmental Protection AgencyCC BY 4.027 Sept 2026
    s3.eu-west-1.amazonaws.comOffice of Public WorksCC BY-NC-ND 4.0 · flag only11 Sept 2026
    services-eu1.arcgis.comNational Inventory of Architectural HeritageCC BY 4.027 Sept 2026
    gis.epa.ieEnvironmental Protection AgencyCC BY 4.027 Sept 2026
    services-eu1.arcgis.comNational Monuments Service (SMR)CC BY 4.027 Sept 2026
    dlrcoco.citizenspace.comLocal authorities (consultation portals)Public1 Nov 2026
    www2.courts.ie—© the publisher31 Oct 2026
    cso.ie—CC BY 4.0—
    dartplus.ie project extents over NTA GTFS rail shapes (CC BY 4.0)—CC BY 4.0—
    services-eu1.arcgis.comLocal authorities (derelict sites registers)CC BY 4.026 Oct 2026
    services.arcgis.comDublin local authorities (housing delivery pipeline)CC BY 4.026 Oct 2026
    data.epa.ieEnvironmental Protection Agency (LEAP licence register)CC BY 4.026 Oct 2026
    esbnetworks.ie—© the publisher · flag only11 Sept 2026
    transportforireland.ieNational Transport AuthorityCC BY 4.025 Oct 2026
    lda.ieLand Development AgencyCC BY 4.011 Sept 2026
    meetings.fingal.ieLocal authorities (council meetings)Public1 Nov 2026
    services.arcgis.comDepartment of Housing (National Planning Application Database)CC BY 4.01 Nov 2026
    organisationsPlanning Register (derived from applications and the CRO register)Derived by Planning Register25 Oct 2026
    services-eu1.arcgis.comTailte ÉireannCC BY 4.011 Sept 2026
    services-eu1.arcgis.comCSO, Tailte Éireann, OpenStreetMap contributorsCC BY 4.04 Oct 2026
    propertypriceregister.ieProperty Services Regulatory Authority (PPR)© PSRA, PSI licence1 Nov 2026
    services.arcgis.comLocal authorities (RZLT maps)CC BY 4.025 Oct 2026
    gov.ieDepartment of EducationCC BY 4.027 Oct 2026
    gov.ieDepartment of HousingCC BY-SA 4.023 Oct 2026
    tusla.ieTusla (Early Years Inspectorate)Public register28 Oct 2026
    water.ie—© the publisher · flag only—
    water.ie—© the publisher · flag only—
    services.arcgis.comLocal authorities via the Department of Housing (GZT / MyPlan)CC BY 4.025 Oct 2026
    Measured
    counted from a public register
    Calculated
    a rate or median we worked out from those counts
    Our classification
    we sorted it by reading each description
    Estimate
    inferred from another source (census, map data)
    Rule summary
    the law, simplified: check before relying on it
    How we work this out
    Generated 1 Nov 2026, 04:45 from the Planning Register store; nothing was fetched live. Not a legal search: the council's planning file is the record. Deadlines come from published dates under the Planning and Development Act 2000: confirm with the council before relying on them. Street map © OpenStreetMap contributors; building outlines © Overture Maps Foundation. The text version carries every figure with its source, for an AI assistant.