PlanningRegister.ie
Planning report · South Dublin County Council · 500 m around the house · the last 12 months · 18 Oct 2026, 19:48

Ard Mor Drive

53.28811, -6.41470

Homes here mostly date from the 2000s. Home extensions nearby almost always get approved (93%). 12 homes approved 256 m away haven't started.

See on the mapWatch this area

How planning works, with this area's numbers

steps can overlap · medians for home extensions within 1.5 km, 10 years
  1. 1ApplySite notice up, plans online
  2. 2Comments5 weeks, €20. Comment to keep your right to appeal
  3. 3Decision8 weeks by law. Here 54 days
  4. 4Appeal window4 weeks after the decision
  5. 5AppealHere about 4 months
  6. 6PermissionLasts 5 years
  7. 7StartStart notice to the council. Here about 4 months after
  8. 8Sign-offCompletion cert, or the owner opts out
Question 1

What's the planning story of this house?

Figure 1

When it was built, and the rules since

Most homes here were built 2001–10, under planning permission and building regulations.

Timeline from 1955: planning permission needed from October 1964, building regulations from June 1992, building records online from March 2014, sign-off opt-out from September 2015. Most homes here were built 2001–2010.1960197019801990200020102020Oct 1964permission neededJun 1992building regulationsMar 2014building records onlineSep 2015owners may opt out of sign-offThis houseBuilt: most homes in this small area date from 2001–2010 (census estimate)most built

Each line is a rule that applies to work done after it.

MeasuredEstimatecouncil register via NPAD · build years: CSO Census 2022, small area

On this site
R2
Zoning · Existing residential
No
Protected or listed · on the council's list
No
Vacant land tax · lived-in homes don't pay it
1 in 20
Radon (EPA) · homes with high radon
Zoning, protection, tax and flood: the detail
ZoningR2 · Existing residential
What it says

RES: To protect and/or improve residential amenity

An established residential area. The objective is to protect existing residential amenity as well as to provide housing — which is the objective a neighbour's objection to an overbearing extension is usually argued under.

south dublin county development plan 2022 2028 · 8 Mar 2022 – 8 Mar 2028

Radon1 in 20 homes have high radon (EPA)

Not on this site: protected building, heritage inventory, monument zone, conservation area, EU nature site, EU bird site, natural heritage area, tree order, landslide risk, derelict list.

Vacant land taxNo lived-in homes don't pay it
Flood riskNearby OPW map area within 500 m · floodinfo.ie
Within 500 mCountFor example
Radon grid squares4
How we work this out
'On this site' means the record's own map outline touches the registered parcel (or a 12 m circle round the point where there is no parcel). Only the council's own list confirms a protected building; ask the council if in doubt. The council's map for the vacant land tax shows this spot inside an area of existing homes. Homes people live in, and their gardens, don't pay the tax. The OPW flood map's licence lets us show a yes/no only. Land on the vacant land tax map nearby: 4 on the draft 2027 map; 4 on the final 2026 map.
Sources: Development plan zoning (councils), EPA radon map, Residential Zoned Land Tax maps, Constraint layers (bundle), OPW flood maps (CFRAM) · fetched 12 Oct 2026, 00:14
SourceLicenceFetchedLink
Development plan zoning (councils)CC BY 4.011 Oct 2026, 23:18open
EPA radon mapCC BY 4.027 Sept 2026, 19:36open
Residential Zoned Land Tax mapsCC BY 4.012 Oct 2026, 00:14open
Constraint layers (bundle)CC BY 4.0, CC BY-NC-ND 4.027 Sept 2026, 19:37open
OPW flood maps (CFRAM)CC BY-NC-ND 4.0 · shown as a yes/no only11 Sept 2026, 19:11open
How we work this out
Applications whose site outline (or map point) falls on this property. 'No sign building has started' means we found no notice to the council's building control office; small jobs don't always file one, so ask. A missing completion certificate is not proof of a problem: an owner can opt out of official sign-off for a house or extension built for themselves.
Sources: Building Control Management System (commencement notices), National Planning Application Database · fetched 18 Oct 2026, 02:06
SourceLicenceFetchedLink
Building Control Management System (commencement notices)CC BY 4.018 Oct 2026, 01:21open
National Planning Application DatabaseCC BY 4.018 Oct 2026, 02:06open
Question 2

Could you extend?

Nothing on this site restricts it: not protected, not in a conservation area.

Figure 2

What happened to applications like yours

Extensions are almost always approved here: 85–92% by type. A new house in a garden is harder: 50% approved, and 1 in 2 are asked for more information.

Single-storey rear13 decided · more info asked 31%
92% · council 94%
Attic or dormer27 decided · more info asked 19%
85% · council 95%
New house in a garden or site6 decided · more info asked 50%
50% · council 62%
Approved nearbySouth Dublin overall

Decided applications within 1.5 km, received in the last 10 years. The kind of work is read from each description.

CalculatedOur classificationcouncil register via NPAD · 46 nearby, 3,550 council-wide

Extensions and refusals right beside you 0 within 250 m · 0 refused within 100 m

Extensions and refusals near you 0 extensions within 250 m · the last 12 months

No home extensions within 250 m in the last 12 months.

Refused within 100 m 0 in the last 12 months

Nothing refused this close in the last 12 months.

    How we work this out
    Home extensions are read from the application's description (extension, attic or dormer, porch, garage conversion, garden room), so a few may be missed or mislabelled. The kind is the first that fits: a dormer with a rear extension counts as a dormer. Refusal reasons come from An Coimisiún Pleanála's inspector reports, so they exist only where the refusal was appealed (Dún Laoghaire-Rathdown so far). The council's own reasons are on its planning file.
    Sources: National Planning Application Database, An Coimisiún Pleanála cases (ArcGIS feed) · fetched 18 Oct 2026, 02:06
    SourceLicenceFetchedLink
    National Planning Application DatabaseCC BY 4.018 Oct 2026, 02:06open
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.016 Oct 2026, 23:06open
    Sources: An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices), National Planning Application Database · fetched 18 Oct 2026, 02:06
    SourceLicenceFetchedLink
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.016 Oct 2026, 23:06open
    Building Control Management System (commencement notices)CC BY 4.018 Oct 2026, 01:21open
    National Planning Application DatabaseCC BY 4.018 Oct 2026, 02:06open
    Question 3

    How long, and what if someone objects?

    Figure 3

    A home extension's journey here

    A decision takes 54 days. 1 in 3 is asked for more information, which adds about 72 days. Building starts about 4 months after permission.

    Comments open: 5 weeks · €20; Council decision: 54 days; If more info asked (1 in 3): 127 days; Appeal window: 4 weeks; If appealed: +124 days; Building starts: 130 days after permission0 mo3 mo6 mo9 mo12 mo15 moComments openComments close 5 weeks after the application is lodged5 weeks · €20Council decisionDecision: median 54 days, middle half 52–55 (n=70)54 daysIf more info asked (1 in 3)With further information: median 127 days (n=32)127 daysAppeal windowAnyone who commented can appeal within 4 weeks of the decision4 weeksIf appealedAt An Coimisiún Pleanála: median 124 days (n=18, all appeals within 1.5 km)+124 daysBuilding startsStart notice: median 130 days after permission (n=28)130 days after permissionSigned off31% of owners opt out of sign-off

    Bars are medians; whiskers show the middle half. Medians of separate steps don't add up exactly.

    Calculated102 decided home extensions, 29 start notices, 18 decided appeals · within 1.5 km, 10 years · NPAD, BCMS, An Coimisiún Pleanála

    Figure 4

    What appeals changed

    2 of 10 appealed refusals became permissions. 2 of 9 appealed approvals were reversed.

    Refusals appealed10 decided
    2 became permissions
    Approvals appealed9 decided
    2 reversed
    Ended approvedEnded refusedWithdrawn, invalid or other

    Every appeal decided within 1.5 km in 10 years, any kind of development.

    CalculatedAn Coimisiún Pleanála cases linked to the council file

    Question 4

    What's changing around you?

    Street map around Ard Mor Drive with 5 numbered planning items
    ⌖ the houseWindow closingApproved, not startedEmpty land zoned for homes
    1. 18, The Way SD26B/0274WApproved · 422 m
    2. 2Citywest Village SD25A/0051WApproved, no sign building has started · 256 m
    3. 37.3 ha zoned for homesEmpty land zoned for homes · 122 m
    4. 40.6 ha zoned for homesEmpty land zoned for homes · 217 m
    5. 51.0 ha zoned for homesEmpty land zoned for homes · 217 m
    Figure 5

    What happens to applications within 500 m

    Permission isn't building. Of 38 permissions since 2016, 12 show a start notice and 6 have a completion certificate.

    45 applications lodged within 500 m. Council: 38 approved, 3 refused. After appeals: 38 approved. Of those: 6 signed off, 1 built with the owner's opt-out, 5 started, 25 with no start notice found, 1 ran out.LODGEDCOUNCIL DECISIONAFTER APPEALSWHAT HAPPENED NEXT38: lodged → approved3: lodged → refused3: lodged → withdrawn or invalid1: lodged → undecided38: approved → approved2: refused → refused3: withdrawn or invalid → withdrawn1: undecided → undecided1 refused by the council, withdrawn or invalid after an appeal25: approved → no start notice found1: approved → built, owner opted out5: approved → started, not signed off6: approved → signed off1: approved → ran out45 lodged45 lodged38 approved38 approved3 refused3 refused3 withdrawn or invalid3 withdrawn or invalid1 undecided1 undecided38 approved38 approved2 refused2 refused4 withdrawn4 withdrawn1 undecided1 undecided25 no start notice found25 no start notice found1 built, owner opted out1 built, owner opted out5 started, not signed off5 started, not signed off6 signed off6 signed off1 ran out1 ran out

    Purple bands are refusals turned into permissions on appeal. "No start notice found" includes small jobs that never needed one and notices we couldn't match.

    Measured45 applications in 10 years · NPAD, An Coimisiún Pleanála, BCMS start notices and completion certificates

    Figure 6

    The next 30 days

    1 deadline within 500 m; the first closes 20 Oct 2026.

    1 deadlines in the next 30 days: 2026-10-20 SD26B/0274W: Grant Permission — An attic conversion , including a dormer window to the rear , 4 no roof lights to the rear elevation and a new window intoday23 Oct28 Oct2 Nov7 Nov12 Nov17 NovSD26B/0274W: Grant Permission — An attic conversion , including a dormer window to the rear , 4 no roof lights to the rear elevation and a new window in · 422 m away · 2026-10-20
    Time to appeal ends
    • Time to appeal ends 20 Oct 20262 days left
      1SD26B/0274W · Grant Permission — An attic conversion , including a dormer window to the rear , 4 no roof lights to the rear elevation…
      €220 to An Coimisiún Pleanála (€110 observer) · 422 m away

    Measuredcouncil registers and An Coimisiún Pleanála · deadlines worked out from the dates on file

    Figure 7

    Approved, stalled or planned, not built yet

    12 homes 256 m away were approved Sept 2025 with no start notice yet; the permission runs to Sept 2030.

    Citywest Village · 12 homes: 12 homes approved Sep 2025, not started20242025202620272028202920302031Citywest Village · 12 homes256 m · SD25A/0051W12 homes approved Sep 2025, not started12 homes approved Sep 2025, not startedtoday

    Each row is a dated fact from a public register: no score and no forecast.

    Measuredcouncil registers, BCMS, derelict sites registers, development plan layers (CC BY 4.0)

    Sites that could change 4 within 500 m

    Approved, not started 1

    Empty land zoned for homes 3

    • 37.3 ha zoned for homes · no homes built on it yet · 122 m
    • 40.6 ha zoned for homes · no homes built on it yet · 217 m
    • 51.0 ha zoned for homes · no homes built on it yet · 217 m
    Sources: An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices), Derelict sites registers, Council meetings (ModernGov), National Planning Application Database, Residential Zoned Land Tax maps · fetched 18 Oct 2026, 02:18
    SourceLicenceFetchedLink
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.016 Oct 2026, 23:06open
    Building Control Management System (commencement notices)CC BY 4.018 Oct 2026, 01:21open
    Derelict sites registersCC BY 4.012 Oct 2026, 23:08open
    Council meetings (ModernGov)Public18 Oct 2026, 02:18open
    National Planning Application DatabaseCC BY 4.018 Oct 2026, 02:06open
    Residential Zoned Land Tax mapsCC BY 4.012 Oct 2026, 00:14open
    Figure 8

    Applications within 500 m, by year

    Between 2 and 11 a year; busiest 2017. 93% of decisions were approvals.

    2016: 2, 2017: 11, 2018: 6, 2019: 3, 2020: 3, 2021: 2, 2022: 8, 2023: 4, 2024: 3, 2025: 2, 2026: 1051015202016: 2 approved2’16*2017: 10 approved2017: 1 refused11’172018: 5 approved2018: 1 withdrawn or invalid6’182019: 2 approved2019: 1 refused3’192020: 2 approved2020: 1 refused3’202021: 1 approved2021: 1 undecided2’212022: 6 approved2022: 2 withdrawn or invalid8’222023: 4 approved4’232024: 3 approved3’242025: 2 approved2’252026: 1 approved1’26*
    ApprovedRefusedWithdrawn or invalidUndecided

    2016 and 2026 are part years (*). Exemption requests and time extensions are left out.

    Measuredcouncil register via NPAD

    Every application within 500 m 1 in the last 12 months

    See every application on the map

    How we work this out
    Descriptions are shortened by the national planning database (to 80 characters in Dún Laoghaire-Rathdown, 70 in Fingal), and it does not publish applicants' names.
    Sources: National Planning Application Database, An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices) · fetched 18 Oct 2026, 02:06
    SourceLicenceFetchedLink
    National Planning Application DatabaseCC BY 4.018 Oct 2026, 02:06open
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.016 Oct 2026, 23:06open
    Building Control Management System (commencement notices)CC BY 4.018 Oct 2026, 01:21open
    Homes coming 12 not started
    How we work this out
    Schemes of 10 or more homes approved since 2019, from the council and An Coimisiún Pleanála registers. 'Building started' means the builder told the council's building control office that work was starting (a commencement notice).
    Sources: An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices), National Planning Application Database, Social housing construction status report · fetched 18 Oct 2026, 02:06
    SourceLicenceFetchedLink
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.016 Oct 2026, 23:06open
    Building Control Management System (commencement notices)CC BY 4.018 Oct 2026, 01:21open
    National Planning Application DatabaseCC BY 4.018 Oct 2026, 02:06open
    Social housing construction status reportCC BY-SA 4.09 Oct 2026, 23:01open
    Named places nearby: estate, schemes, crèches, schools

    Named places estate, developments, inspections

    Developments within 1.0 km

    SchemeHomesProgressDistance
    Lands south of Citywest Avenue384—124 m
    Brownsbarn Residential Development384—124 m
    Citywest20— (2025-Q3)139 m
    Citywest Residential Development400—146 m
    Magna Park Residential Development52—485 m
    Citywest Road and Garter Avenue Development11222 built · 90 being built (2026-Q2)517 m
    Citywest Business Campus206—517 m
    Citywest Avenue Development116—523 m

    Crèches and schools inspected

    NameLatest inspectionDistance
    Respond Early Years Service, Ard Mor · Crèche22 May 2024 · report · Tusla Early Years Inspectorate100 m
    StartBright Brookview · Crèche11 Mar 2026 · report · Tusla Early Years Inspectorate431 m
    Links Childcare · Crèche30 Oct 2025 · report · Tusla Early Years Inspectorate997 m
    How we work this out
    Organisations only: a person named on an application is never listed. Inspection dates and links are the publisher's; read their report for the findings.
    Sources: Dublin housing delivery pipeline, National Planning Application Database, Department of Education school list, Tusla early years register · fetched 18 Oct 2026, 02:06
    SourceLicenceFetchedLink
    Dublin housing delivery pipelineCC BY 4.012 Oct 2026, 23:02open
    National Planning Application DatabaseCC BY 4.018 Oct 2026, 02:06open
    Department of Education school listCC BY 4.027 Sept 2026, 23:32open
    Tusla early years registerPublic register14 Oct 2026, 23:20open
    How busy is this area Busier than most of South Dublin County Council.
    Homes approved
    Here102
    Council middle0
    Homes started
    Here489
    Council middle5
    How we work this out
    Homes approved counts schemes of 10 or more homes (one-off houses are not included). Homes started counts every home in a notice that building work was starting. The council figure is the middle value across the council's built-up squares of the same area (3.1 km², about a 1 km circle), so half of them saw more and half fewer.
    Sources: An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices), National Planning Application Database · fetched 18 Oct 2026, 02:06
    SourceLicenceFetchedLink
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.016 Oct 2026, 23:06open
    Building Control Management System (commencement notices)CC BY 4.018 Oct 2026, 01:21open
    National Planning Application DatabaseCC BY 4.018 Oct 2026, 02:06open
    Question 5

    What's the area like?

    Figure 9

    This street block against the council

    6% of homes built before 1971 (council 18%). 29% owner-occupied (council 67%).

    Homes built before 1971
    6% · council 18%
    Homes built since 2001
    46% · council 27%
    Owner-occupied
    29% · council 67%
    Rented
    67% · council 29%
    Children under 15
    26% · council 21%
    Aged 65 and over
    1% · council 13%
    Households with 2+ cars
    33% · council 40%
    Work mainly from home
    1% · council 10%
    This small area (380 people)South Dublin

    MeasuredCSO Census 2022, Small Area Population Statistics (CC BY 4.0) · small area 267138014

    Luas
    277 m
    Citywest · Red · busiest stop within 500 m: 11 an hour at peak
    Radon
    1 in 20
    homes here likely high (EPA). Test it
    Flood
    Within 500 m
    OPW flood map area, not beside the house
    Nearest school
    221 m
    St Aidan's Community School, 561 pupils
    Homes sold nearby
    37
    in 3 years, 11 new (Property Price Register)
    Schools, stops and the council

    Schools

    • St Aidan's Community School · postprimary · 561 pupils · 221 m
    • Scoil Aoife CNS · primary · 342 pupils · 432 m
    • St Aidans Ns · primary · 244 pupils · 698 m
    • St Brigids NS · primary · 206 pupils · 702 m

    Stops 38

    • Citywest · Red · 11/hour at peak · 277 m
    • Citywest · Red · 10/hour at peak · 284 m
    • Mac Uilliam · W6 · 2/hour at peak · 371 m
    • Brookview · W6 · 2/hour at peak · 403 m
    • Brookview · W6 · 2/hour at peak · 416 m
    • Citywest Rd · 65B, 77A, S8, W6 · 9/hour at peak · 523 m
    • Brookview Road · 27, W6 · 8/hour at peak · 544 m
    • Brookview Road · 27, W6 · 7/hour at peak · 548 m

    Schools growing or shrinking planning in 3 years · pupils last year

    • St Aidan's Community School · 221 m0% pupils (561)
    • Scoil Aoife CNS · 432 m-4.2% pupils (342)
    • St Aidans Ns · 697 m0% pupils (244)
    • St Brigids NS · 702 m-2.8% pupils (206)

    Open consultations

    Council meetings 30 items

    Public land

    • The Minister for Education and Skills · 1.8 ha · 80 m
    • The Minister for Education and Skills · 0.66 ha · 81 m
    • Dublin City Council · 0.1 ha · 87 m
    • Railway Procurement Agency · 0.11 ha · 113 m
    • Railway Procurement Agency · 0.11 ha · 118 m
    • Electricity Supply Board · 0.17 ha · 124 m
    Sources: Public transport stops and routes (NTA GTFS), Department of Education school list, National Planning Application Database, Council consultation portals, Council meetings (ModernGov), Land Development Agency public land register, cso_saps_2022, National Transport Authority, Fingal County Council and Dún Laoghaire-Rathdown County Council development plan layers (CC BY 4.0), dartplus.ie project extents over NTA GTFS rail shapes (CC BY 4.0), EPA strategic noise maps, Fingal County Council · fetched 18 Oct 2026, 02:18
    SourceLicenceFetchedLink
    Public transport stops and routes (NTA GTFS)CC BY 4.011 Oct 2026, 23:43open
    Department of Education school listCC BY 4.027 Sept 2026, 23:32open
    National Planning Application DatabaseCC BY 4.018 Oct 2026, 02:06open
    Council consultation portalsPublic18 Oct 2026, 01:37open
    Council meetings (ModernGov)Public18 Oct 2026, 02:18open
    Land Development Agency public land registerCC BY 4.011 Sept 2026, 16:43open
    cso_saps_2022CC BY 4.0—open
    National Transport AuthorityCC BY 4.0——
    Fingal County Council and Dún Laoghaire-Rathdown County Council development plan layers (CC BY 4.0)CC BY 4.0——
    dartplus.ie project extents over NTA GTFS rail shapes (CC BY 4.0)CC BY 4.0——
    EPA strategic noise mapsCC BY 4.0——
    Fingal County CouncilCC BY 4.0——
    Question 6

    What to ask, and who

    1. Planning here goes back to 2000: is the house built as approved?
      Ask for: The original planning grant and an opinion of compliance.
      Solicitor
    2. Any work done without planning permission?
      Ask for: An opinion of compliance for the whole house.
      Seller · solicitor
    Reference

    Where this is, the terms, the sources

    Townland
    Fortunestown
    Electoral division
    Tallaght-Fettercairn
    Electoral area
    Tallaght South
    Council
    South Dublin County Council
    Everything we found, as a list 8 lines
    • Zoned R2 (existing residential); not protected; no vacant land tax.
    • 4 sites nearby could change: 1 approved scheme, 3 empty zoned plots.
    • 12 homes approved nearby, not started; largest 12 at Citywest Village.
    • Citywest (Luas Red) 277 m away: 11 an hour at morning peak; 27 from all stops within 500 m.
    • Here (2022 census): 67% rent (council 29%); 6% of homes empty (council 4%); most built 2001–2010; 57% drive to work (council 54%); population up 35% since 2016.
    • Around here the council decides in a median 55 days (about 8 weeks); 37% are asked for more information.
    • Homes started within 1 km: 0 in the last year, 696 three years before.
    • 1 applications nearby in the last 12 months.
    What the terms mean 4 terms
    • Vacant land tax (Residential Zoned Land Tax (RZLT)): A yearly tax of 3% of the land's value on land that is zoned for homes and serviced but left unbuilt.
    • Approved (Grant of permission): The council said yes, usually with conditions.
    • Appeal (Appeal to An Coimisiún Pleanála): The applicant, or anyone who commented in time, can appeal the council's decision within four weeks.
    • What the land is zoned for (Zoning objective): The council's development plan sets what each area is for: homes, shops, open space and so on.
    Sources and licences 28
    SourcePublisherLicenceFetched
    EPA strategic noise maps—CC BY 4.0—
    Fingal County Council—CC BY 4.0—
    Fingal County Council and Dún Laoghaire-Rathdown County Council development plan layers (CC BY 4.0)—CC BY 4.0—
    National Transport Authority—CC BY 4.0—
    services-eu1.arcgis.comAn Coimisiún PleanálaCC BY 4.016 Oct 2026
    data.nbco.gov.ieNational Building Control Office (BCMS)CC BY 4.018 Oct 2026
    data.gov.ieVarious (see each layer)CC BY 4.0, CC BY-NC-ND 4.027 Sept 2026
    s3.eu-west-1.amazonaws.comOffice of Public WorksCC BY-NC-ND 4.0 · flag only11 Sept 2026
    gis.epa.ieEnvironmental Protection AgencyCC BY 4.027 Sept 2026
    dlrcoco.citizenspace.comLocal authorities (consultation portals)Public18 Oct 2026
    www2.courts.ie—© the publisher18 Oct 2026
    cso.ie—CC BY 4.0—
    dartplus.ie project extents over NTA GTFS rail shapes (CC BY 4.0)—CC BY 4.0—
    services-eu1.arcgis.comLocal authorities (derelict sites registers)CC BY 4.012 Oct 2026
    services.arcgis.comDublin local authorities (housing delivery pipeline)CC BY 4.012 Oct 2026
    esbnetworks.ie—© the publisher · flag only11 Sept 2026
    transportforireland.ieNational Transport AuthorityCC BY 4.011 Oct 2026
    lda.ieLand Development AgencyCC BY 4.011 Sept 2026
    meetings.fingal.ieLocal authorities (council meetings)Public18 Oct 2026
    services.arcgis.comDepartment of Housing (National Planning Application Database)CC BY 4.018 Oct 2026
    services-eu1.arcgis.comTailte ÉireannCC BY 4.011 Sept 2026
    services-eu1.arcgis.comCSO, Tailte Éireann, OpenStreetMap contributorsCC BY 4.04 Oct 2026
    propertypriceregister.ieProperty Services Regulatory Authority (PPR)© PSRA, PSI licence18 Oct 2026
    services.arcgis.comLocal authorities (RZLT maps)CC BY 4.011 Oct 2026
    gov.ieDepartment of EducationCC BY 4.027 Sept 2026
    gov.ieDepartment of HousingCC BY-SA 4.09 Oct 2026
    tusla.ieTusla (Early Years Inspectorate)Public register14 Oct 2026
    services.arcgis.comLocal authorities via the Department of Housing (GZT / MyPlan)CC BY 4.011 Oct 2026
    Measured
    counted from a public register
    Calculated
    a rate or median we worked out from those counts
    Our classification
    we sorted it by reading each description
    Estimate
    inferred from another source (census, map data)
    Rule summary
    the law, simplified: check before relying on it
    How we work this out
    Generated 18 Oct 2026, 19:48 from the Planning Register store; nothing was fetched live. Not a legal search: the council's planning file is the record. Deadlines come from published dates under the Planning and Development Act 2000: confirm with the council before relying on them. Street map © OpenStreetMap contributors; building outlines © Overture Maps Foundation. The text version carries every figure with its source, for an AI assistant.