Homes here mostly date from the 2000s. Home extensions nearby almost always get approved (93%). 129 homes approved 330 m away haven't started.

See on the mapWatch this area

Not held yet for Galway City Council: council consultations.

How planning works, with this area's numbers

steps can overlap · medians for home extensions within 1.5 km, 10 years
  1. 1ApplySite notice up, plans online
  2. 2Comments5 weeks, €20. Comment to keep your right to appeal
  3. 3Decision8 weeks by law. Here 52 days
  4. 4Appeal window4 weeks after the decision
  5. 5AppealAt An Coimisiún Pleanála
  6. 6PermissionLasts 5 years
  7. 7StartStart notice to the council. Here about 4 months after
  8. 8Sign-offCompletion cert, or the owner opts out
Question 1

What's the planning story of this house?

Figure 1

When it was built, and the rules since

Most homes here were built 2001–10, under planning permission and building regulations.

Timeline from 1955: planning permission needed from October 1964, building regulations from June 1992, building records online from March 2014, sign-off opt-out from September 2015. Most homes here were built 2001–2010.1960197019801990200020102020Oct 1964permission neededJun 1992building regulationsMar 2014building records onlineSep 2015owners may opt out of sign-offThis houseBuilt: most homes in this small area date from 2001–2010 (census estimate)most built

Each line is a rule that applies to work done after it.

MeasuredEstimatecouncil register via NPAD · build years: CSO Census 2022, small area

On this site
C2.1
Zoning · Economic development and employment
No
Protected or listed · on the council's list
No
Vacant land tax · not on the map
Zoning, protection, tax and flood: the detail
ZoningC2.1 · Economic development and employment
What it says

Enterprise Light Industry and Commercial: To provide for light industry and commercial uses other than those reserved in the CC zone

Zoned for employment uses. Housing is not the intended use here.

galway city development plan 2023 2029 · 4 Jan 2023 – 4 Jan 2029

ZoningC2.1 · Economic development and employment
What it says

Enterprise Light Industry and Commercial: To provide for light industry and commercial uses other than those reserved in the CC zone

Zoned for employment uses. Housing is not the intended use here.

galway city development plan 2023 2029 variations 1 2 3 · 4 Jan 2023 – 4 Jan 2029

Not on this site: protected building, heritage inventory, monument zone, conservation area, EU nature site, EU bird site, natural heritage area, tree order, landslide risk, derelict list.

Licensed industrial sites within 1.0 km: Thermo King Ireland Limited (666 m); Trane Technologies International Limited (670 m); Heiton Buckley Limited (Galway) (831 m)

Vacant land taxNo not on the map
Flood riskNone mapped within 500 m
Within 500 mCountFor example
Monuments1Quarry
How we work this out
'On this site' means the record's own map outline touches the registered parcel (or a 12 m circle round the point where there is no parcel). Only the council's own list confirms a protected building; ask the council if in doubt. The OPW flood map's licence lets us show a yes/no only. Land on the vacant land tax map nearby: 19 on the draft 2027 map; 19 on the final 2026 map.
Sources: Development plan zoning (councils), EPA licensed facilities (LEAP), Residential Zoned Land Tax maps, Constraint layers (bundle), Sites and Monuments Record · fetched 2 Nov 2026, 23:44
SourceLicenceFetchedLink
Development plan zoning (councils)CC BY 4.01 Nov 2026, 23:13open
EPA licensed facilities (LEAP)CC BY 4.02 Nov 2026, 23:44open
Residential Zoned Land Tax mapsCC BY 4.01 Nov 2026, 23:58open
Constraint layers (bundle)CC BY 4.0, CC BY-NC-ND 4.027 Sept 2026, 19:37open
Sites and Monuments RecordCC BY 4.027 Sept 2026, 19:29open
How we work this out
Applications whose site outline (or map point) falls on this property. 'No sign building has started' means we found no notice to the council's building control office; small jobs don't always file one, so ask. A missing completion certificate is not proof of a problem: an owner can opt out of official sign-off for a house or extension built for themselves.
Sources: Building Control Management System (commencement notices), National Planning Application Database · fetched 5 Nov 2026, 05:03
SourceLicenceFetchedLink
Building Control Management System (commencement notices)CC BY 4.05 Nov 2026, 03:55open
National Planning Application DatabaseCC BY 4.05 Nov 2026, 05:03open
Question 2

Could you extend?

Nothing on this site restricts it: not protected, not in a conservation area.

Figure 2

What happened to applications like yours

Extensions are almost always approved here: 90–91% by type. A new house in a garden is harder: 91% approved, and 1 in 2 are asked for more information.

Two-storey rear11 decided · more info asked 0%
91% · council 92%
Attic or dormer10 decided · more info asked 10%
90% · council 88%
New house in a garden or site11 decided · more info asked 55%
91% · council 85%
Approved nearbyGalway overall

Decided applications within 1.5 km, received in the last 10 years. The kind of work is read from each description.

CalculatedOur classificationcouncil register via NPAD · 32 nearby, 355 council-wide

Extensions and refusals right beside you 0 within 250 m · 0 refused within 100 m

Extensions and refusals near you 0 extensions within 250 m · the last 12 months

No home extensions within 250 m in the last 12 months.

Refused within 100 m 0 in the last 12 months

Nothing refused this close in the last 12 months.

    How we work this out
    Home extensions are read from the application's description (extension, attic or dormer, porch, garage conversion, garden room), so a few may be missed or mislabelled. The kind is the first that fits: a dormer with a rear extension counts as a dormer. Refusal reasons come from An Coimisiún Pleanála's inspector reports, so they exist only where the refusal was appealed (Dún Laoghaire-Rathdown so far). The council's own reasons are on its planning file.
    Sources: National Planning Application Database, An Coimisiún Pleanála cases (ArcGIS feed) · fetched 5 Nov 2026, 05:03
    SourceLicenceFetchedLink
    National Planning Application DatabaseCC BY 4.05 Nov 2026, 05:03open
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.030 Oct 2026, 23:01open
    Sources: An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices), National Planning Application Database · fetched 5 Nov 2026, 05:03
    SourceLicenceFetchedLink
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.030 Oct 2026, 23:01open
    Building Control Management System (commencement notices)CC BY 4.05 Nov 2026, 03:55open
    National Planning Application DatabaseCC BY 4.05 Nov 2026, 05:03open
    Question 3

    How long, and what if someone objects?

    Figure 3

    A home extension's journey here

    A decision takes 52 days. 1 in 8 is asked for more information, which adds about 71 days. Building starts about 4 months after permission.

    Comments open: 5 weeks · €20; Council decision: 52 days; If more info asked (1 in 8): 123 days; Appeal window: 4 weeks; Building starts: 130 days after permission0 mo3 mo6 mo9 mo12 mo15 mo18 moComments openComments close 5 weeks after the application is lodged5 weeks · €20Council decisionDecision: median 52 days, middle half 48–54 (n=66)52 daysIf more info asked (1 in 8)With further information: median 123 days (n=9)123 daysAppeal windowAnyone who commented can appeal within 4 weeks of the decision4 weeksBuilding startsStart notice: median 130 days after permission (n=26)130 days after permissionSigned off334 days after the start, for the few who file. 58% of owners opt out of sign-off

    Bars are medians; whiskers show the middle half. Medians of separate steps don't add up exactly.

    Calculated75 decided home extensions, 26 start notices · within 1.5 km, 10 years · NPAD, BCMS, An Coimisiún Pleanála

    Figure 4

    What appeals changed

    3 of 7 appealed refusals became permissions. 1 of 7 appealed approvals were reversed.

    Refusals appealed7 decided
    3 became permissions
    Approvals appealed7 decided
    1 reversed
    Ended approvedEnded refusedWithdrawn, invalid or other

    Every appeal decided within 1.5 km in 10 years, any kind of development.

    CalculatedAn Coimisiún Pleanála cases linked to the council file

    Appeals nearby 1 in the last 12 months
    • 500690 Granted with conditions · Lands known as Glasshouse Commercial Site , Radharc na Gr?ine ,… · 494 m
    Sources: An Coimisiún Pleanála cases (ArcGIS feed), Courts Service legal diary (judicial reviews), National Planning Application Database · fetched 5 Nov 2026, 05:03
    SourceLicenceFetchedLink
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.030 Oct 2026, 23:01open
    Courts Service legal diary (judicial reviews)© the publisher4 Nov 2026, 23:17open
    National Planning Application DatabaseCC BY 4.05 Nov 2026, 05:03open
    Question 4

    What's changing around you?

    Street map around Bóthar Na dTreabh with 15 numbered planning items
    ⌖ the houseOpen for commentsWindow closingApproved, not startedEmpty land zoned for homesApprovedNo decision yetRefused
    1. 1Estelle, Tuam Road 2660364No decision yet · 353 m
    2. 2Block J Crown Square, located at the junction of Monivea Road and Joyces Road 2660358No decision yet · 436 m
    3. 3Crown Square, Monivea Road 2626Approved · 272 m
    4. 4Crown Square 2660287Approved, no sign building has started · 331 m
    5. 50.7 ha zoned for homesEmpty land zoned for homes · 175 m
    6. 60.3 ha zoned for homesEmpty land zoned for homes · 190 m
    7. 70.3 ha zoned for homesEmpty land zoned for homes · 195 m
    8. 80.3 ha zoned for homesEmpty land zoned for homes · 213 m
    9. 90.2 ha zoned for homesEmpty land zoned for homes · 224 m
    10. 100.2 ha zoned for homesEmpty land zoned for homes · 238 m
    11. 11Riverside Industrial Estate, Tuam Road 2620Approved with conditions · 146 m
    12. 12Harris House, IDA Small Business Centre 2660202No decision yet · 261 m
    13. 13Crown Square, Monivea Road 267Refused · 280 m
    14. 1422 Seaman Drive, Riverside 2660173Approved with conditions · 349 m
    15. 1512 Seaman Drive, Riverside Estate 2614Approved with conditions · 358 m
    Figure 5

    What happens to applications within 500 m

    Permission isn't building. Of 26 permissions since 2016, 6 show a start notice and 3 have a completion certificate.

    31 applications lodged within 500 m. Council: 24 approved, 7 refused. After appeals: 26 approved. Of those: 3 signed off, 1 built with the owner's opt-out, 2 started, 19 with no start notice found, 1 ran out.LODGEDCOUNCIL DECISIONAFTER APPEALSWHAT HAPPENED NEXT24: lodged → approved7: lodged → refused24: approved → approved5: refused → refused2 refused by the council, approved after an appeal19: approved → no start notice found1: approved → built, owner opted out2: approved → started, not signed off3: approved → signed off1: approved → ran out31 lodged31 lodged24 approved24 approved7 refused7 refused26 approved26 approved5 refused5 refused19 no start notice found19 no start notice found1 built, owner opted out1 built, owner opted out2 started, not signed off2 started, not signed off3 signed off3 signed off1 ran out1 ran out

    Purple bands are refusals turned into permissions on appeal. "No start notice found" includes small jobs that never needed one and notices we couldn't match.

    Measured31 applications in 10 years · NPAD, An Coimisiún Pleanála, BCMS start notices and completion certificates

    Figure 6

    The next 30 days

    4 deadlines within 500 m; the first closes 6 Nov 2026.

    4 deadlines in the next 30 days: 2026-11-06 2660358: application received — Permission for development which consists of: permission for a Proposed Development within Block J (c. 480 sq. m. Site ; 2026-11-13 2660364: application received — Permission for development which consists of: • Demolition of existing Chiropractic Clinic & Garage. • Construction of ; 2026-11-26 2626: UNCONDITIONAL — Permission for development which consists of: Extension of Duration - 288 no. Build-to-Rent apartments and associated si; 2026-11-26 2627: UNCONDITIONAL — Permission for development which consists of: Extension of Duration - 345 no. Build-to-Rent apartments and associated wotoday10 Nov15 Nov20 Nov25 Nov30 Nov5 Dec2660358: application received — Permission for development which consists of: permission for a Proposed Development within Block J (c. 480 sq. m. Site · 436 m away · 2026-11-062660364: application received — Permission for development which consists of: • Demolition of existing Chiropractic Clinic & Garage. • Construction of · 353 m away · 2026-11-132626: UNCONDITIONAL — Permission for development which consists of: Extension of Duration - 288 no. Build-to-Rent apartments and associated si · 272 m away · 2026-11-262627: UNCONDITIONAL — Permission for development which consists of: Extension of Duration - 345 no. Build-to-Rent apartments and associated wo · 272 m away · 2026-11-26
    Comments closeTime to appeal ends
    • Comments close 6 Nov 20261 day left
      22660358 · application received — Permission for development which consists of: permission for a Proposed Development within Block…
      €20 to the council · 436 m away
    • Comments close 13 Nov 20268 days left
      12660364 · application received — Permission for development which consists of: • Demolition of existing Chiropractic Clinic &…
      €20 to the council · 353 m away
    • Time to appeal ends 26 Nov 202621 days left
      32626 · UNCONDITIONAL — Permission for development which consists of: Extension of Duration - 288 no. Build-to-Rent apartments…
      €220 to An Coimisiún Pleanála (€110 observer) · 272 m away
    • Time to appeal ends 26 Nov 202621 days left
      2627 · UNCONDITIONAL — Permission for development which consists of: Extension of Duration - 345 no. Build-to-Rent apartments…
      €220 to An Coimisiún Pleanála (€110 observer) · 272 m away

    Measuredcouncil registers and An Coimisiún Pleanála · deadlines worked out from the dates on file

    Figure 7

    Approved, stalled or planned, not built yet

    129 homes 330 m away were approved Oct 2026 with no start notice yet; the permission runs to Oct 2031.

    Crown Square · 129 homes: 129 homes approved Oct 2026, not started202420252026202720282029203020312032Crown Square · 129 homes330 m · 2660287129 homes approved Oct 2026, not started129 homes approved Oct 2026, not startedtoday

    Each row is a dated fact from a public register: no score and no forecast.

    Measuredcouncil registers, BCMS, derelict sites registers, development plan layers (CC BY 4.0)

    Sites that could change 11 within 500 m

    Approved, not started 1

    • Crown Square · 129 homes approved Oct 2026, not started · 330 m

    Empty land zoned for homes 10

    • 50.7 ha zoned for homes · no homes built on it yet · 175 m
    • 60.3 ha zoned for homes · no homes built on it yet · 190 m
    • 70.3 ha zoned for homes · no homes built on it yet · 195 m
    • 80.3 ha zoned for homes · no homes built on it yet · 213 m
    • 90.2 ha zoned for homes · no homes built on it yet · 224 m
    • 100.2 ha zoned for homes · no homes built on it yet · 238 m
    • 0.3 ha zoned for homes · no homes built on it yet · 249 m
    • 0.7 ha zoned for homes · no homes built on it yet · 252 m
    • 0.4 ha zoned for homes · no homes built on it yet · 268 m
    • 0.4 ha zoned for homes · no homes built on it yet · 271 m

    Not covered here: council land to be sold (Dublin only).

    Sources: An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices), Derelict sites registers, National Planning Application Database, Residential Zoned Land Tax maps · fetched 5 Nov 2026, 05:03
    SourceLicenceFetchedLink
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.030 Oct 2026, 23:01open
    Building Control Management System (commencement notices)CC BY 4.05 Nov 2026, 03:55open
    Derelict sites registersCC BY 4.02 Nov 2026, 23:17open
    National Planning Application DatabaseCC BY 4.05 Nov 2026, 05:03open
    Residential Zoned Land Tax mapsCC BY 4.01 Nov 2026, 23:58open
    Figure 8

    Applications within 500 m, by year

    Between 1 and 9 a year; busiest 2025. 77% of decisions were approvals.

    2021: 4, 2022: 1, 2023: 8, 2024: 4, 2025: 9, 2026: 505102021: 4 approved4’21*2022: 1 refused1’222023: 5 approved2023: 3 refused8’232024: 3 approved2024: 1 refused4’242025: 8 approved2025: 1 refused9’252026: 4 approved2026: 1 refused5’26*
    ApprovedRefusedWithdrawn or invalidUndecided

    2021 and 2026 are part years (*). Exemption requests and time extensions are left out.

    Measuredcouncil register via NPAD

    Open for comments €20 to comment

    Every application within 500 m 14 in the last 12 months

    See every application on the map

    How we work this out
    Descriptions are shortened by the national planning database (to 80 characters in Dún Laoghaire-Rathdown, 70 in Fingal), and it does not publish applicants' names.
    Sources: National Planning Application Database, An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices) · fetched 5 Nov 2026, 05:03
    SourceLicenceFetchedLink
    National Planning Application DatabaseCC BY 4.05 Nov 2026, 05:03open
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.030 Oct 2026, 23:01open
    Building Control Management System (commencement notices)CC BY 4.05 Nov 2026, 03:55open
    Building work nearby 3 in the last 12 months
    3 not signed off
    • Three Crown Square, Monivea Road, Galway, 00000 · 16 Apr 2026 · 7-day notice not signed off · PT8GY295 · 396 m
    • Tuam Road, Galway · 12 Mar 2026 · 7-day notice not signed off · 2460118 · 23 m
    • Tuam Road, Galway, H91E9T1 · 11 Nov 2025 · 7-day notice not signed off · 23/60060 · 112 m
    How we work this out
    Each row is a notice the builder sent to the council's building control office before work started. One notice can cover many homes. 'Signed off as finished' means a completion certificate is on file; work done under an opt-out or a short notice doesn't need one.
    Source: Building Control Management System (commencement notices) · fetched 5 Nov 2026, 03:55
    SourceLicenceFetchedLink
    Building Control Management System (commencement notices)CC BY 4.05 Nov 2026, 03:55open
    Homes coming 129 not started
    • 4Crown Square · 129 homes · not started · runs out 2 Oct 2031 · 331 m
    • Glenanail · 26 homes · building started · 24 m
    How we work this out
    Schemes of 10 or more homes approved since 2021, from the council and An Coimisiún Pleanála registers. 'Building started' means the builder told the council's building control office that work was starting (a commencement notice).
    Sources: An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices), National Planning Application Database, Social housing construction status report · fetched 5 Nov 2026, 05:03
    SourceLicenceFetchedLink
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.030 Oct 2026, 23:01open
    Building Control Management System (commencement notices)CC BY 4.05 Nov 2026, 03:55open
    National Planning Application DatabaseCC BY 4.05 Nov 2026, 05:03open
    Social housing construction status reportCC BY-SA 4.023 Oct 2026, 23:02open
    Named places nearby: estate, schemes, crèches, schools

    Named places estate, developments, inspections

    Crèches and schools inspected

    NameLatest inspectionDistance
    Sunny Meadow Pre- School CLG · Crèche13 Mar 2024 · report · Tusla Early Years Inspectorate879 m
    Acorn Pre-School · Crèche23 Feb 2026 · report · Tusla Early Years Inspectorate970 m
    How we work this out
    Organisations only: a person named on an application is never listed. Inspection dates and links are the publisher's; read their report for the findings.
    Sources: Department of Education school list, Tusla early years register · fetched 4 Nov 2026, 23:36
    SourceLicenceFetchedLink
    Department of Education school listCC BY 4.027 Oct 2026, 23:04open
    Tusla early years registerPublic register4 Nov 2026, 23:36open
    How busy is this area Busier than most of Galway City Council.
    Homes approved
    Here393
    Council middle0
    Homes started
    Here142
    Council middle12
    How we work this out
    Homes approved counts schemes of 10 or more homes (one-off houses are not included). Homes started counts every home in a notice that building work was starting. The council figure is the middle value across the council's built-up squares of the same area (3.1 km², about a 1 km circle), so half of them saw more and half fewer.
    Sources: An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices), National Planning Application Database · fetched 5 Nov 2026, 05:03
    SourceLicenceFetchedLink
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.030 Oct 2026, 23:01open
    Building Control Management System (commencement notices)CC BY 4.05 Nov 2026, 03:55open
    National Planning Application DatabaseCC BY 4.05 Nov 2026, 05:03open
    Question 5

    What's the area like?

    Figure 9

    This street block against the council

    1% of homes built before 1971 (council 17%). 16% owner-occupied (council 46%).

    Homes built before 1971
    1% · council 17%
    Homes built since 2001
    67% · council 31%
    Owner-occupied
    16% · council 46%
    Rented
    76% · council 47%
    Children under 15
    17% · council 15%
    Aged 65 and over
    2% · council 13%
    Households with 2+ cars
    28% · council 29%
    Work mainly from home
    13% · council 11%
    This small area (292 people)Galway

    MeasuredCSO Census 2022, Small Area Population Statistics (CC BY 4.0) · small area 068004002

    Road noise
    55–59 dB
    day–night average (EPA 2022)
    Bus
    181 m
    Trappers Inn · 427 · busiest stop within 500 m: 5 an hour at peak
    Nearest school
    986 m
    Galway Community College, 395 pupils
    Schools, stops and the council

    Schools

    • Galway Community College · postprimary · 395 pupils · 986 m

    Stops 37

    • Trappers Inn · 427 · 1/hour at peak · 181 m
    • Riverside IE · 405, 425, 427 · 5/hour at peak · 202 m
    • Riverside IE · 405, 425 · 3/hour at peak · 215 m
    • Mervue Ind Estate · 405, 425, 427 · 5/hour at peak · 366 m
    • Mervue Ind Estate · 405, 425 · 3/hour at peak · 368 m
    • Ballybane Industrial Estate · 427 · 3/hour at peak · 429 m
    • Monivea Road · 401, 425A · 3/hour at peak · 445 m
    • Monivea Road · 401, 425A · 3/hour at peak · 453 m

    Schools growing or shrinking planning in 3 years · pupils last year

    • Galway Community College · 986 m-13% pupils (395)
    Sources: Public transport stops and routes (NTA GTFS), Department of Education school list, National Planning Application Database, Council consultation portals, Council meetings (ModernGov), Land Development Agency public land register, cso_saps_2022, National Transport Authority, Fingal County Council and Dún Laoghaire-Rathdown County Council development plan layers (CC BY 4.0), dartplus.ie project extents over NTA GTFS rail shapes (CC BY 4.0), EPA strategic noise maps, Fingal County Council · fetched 5 Nov 2026, 05:03
    SourceLicenceFetchedLink
    Public transport stops and routes (NTA GTFS)CC BY 4.01 Nov 2026, 23:05open
    Department of Education school listCC BY 4.027 Oct 2026, 23:04open
    National Planning Application DatabaseCC BY 4.05 Nov 2026, 05:03open
    Council consultation portalsPublic5 Nov 2026, 01:15open
    Council meetings (ModernGov)Public5 Nov 2026, 02:33open
    Land Development Agency public land registerCC BY 4.011 Sept 2026, 16:43open
    cso_saps_2022CC BY 4.0—open
    National Transport AuthorityCC BY 4.0——
    Fingal County Council and Dún Laoghaire-Rathdown County Council development plan layers (CC BY 4.0)CC BY 4.0——
    dartplus.ie project extents over NTA GTFS rail shapes (CC BY 4.0)CC BY 4.0——
    EPA strategic noise mapsCC BY 4.0——
    Fingal County CouncilCC BY 4.0——
    Question 6

    What to ask, and who

    1. Zoned C2.1 (economic development and employment), not for homes: could you extend?
      Ask for: A solicitor's or planner's view.
      Solicitor · planner
    2. Application 353 m away open for comments until 13 Nov 2026: comment?
      Ask for: The plans on the council's website (€20 to comment).
      Council
    3. Any work done without planning permission?
      Ask for: An opinion of compliance for the whole house.
      Seller · solicitor
    Reference

    Where this is, the terms, the sources

    Electoral division
    Castlegar
    Electoral area
    Galway City East
    Council
    Galway City Council
    Everything we found, as a list 8 lines
    • Zoned C2.1 (economic development and employment); not protected; no vacant land tax.
    • 11 sites nearby could change: 1 approved scheme, 10 empty zoned plots.
    • 2 applications open for comments nearby; nearest closes 13 Nov 2026.
    • 129 homes approved nearby, not started; largest 129 at Crown Square.
    • Riverside IE (bus 405, 425) 202 m away: 5 an hour at morning peak; 26 from all stops within 500 m.
    • Noise from road traffic mapped at 55–59 dB (day-evening-night average, EPA 2022).
    • Here (2022 census): 76% rent (council 47%); 9% of homes empty (council 10%); most built 2001–2010; 49% drive to work (council 47%); population up 6% since 2016.
    • The council decides in a median 55 days (about 8 weeks); 1 in 4 is asked for more information.
    What the terms mean 7 terms
    • Vacant land tax (Residential Zoned Land Tax (RZLT)): A yearly tax of 3% of the land's value on land that is zoned for homes and serviced but left unbuilt.
    • Building started (Commencement notice (BCMS)): The builder must tell the council's building control office 14 to 28 days before work starts.
    • Signed off as finished (Certificate of Compliance on Completion): A certificate filed when a building is finished, confirming it meets the building regulations.
    • Approved (Grant of permission): The council said yes, usually with conditions.
    • Comment on an application (Observation / submission): Anyone can comment on a planning application within five weeks of it being lodged, for a €20 fee.
    • Appeal (Appeal to An Coimisiún Pleanála): The applicant, or anyone who commented in time, can appeal the council's decision within four weeks.
    • What the land is zoned for (Zoning objective): The council's development plan sets what each area is for: homes, shops, open space and so on.
    Sources and licences 26
    SourcePublisherLicenceFetched
    EPA strategic noise maps—CC BY 4.0—
    Fingal County Council—CC BY 4.0—
    Fingal County Council and Dún Laoghaire-Rathdown County Council development plan layers (CC BY 4.0)—CC BY 4.0—
    National Transport Authority—CC BY 4.0—
    services-eu1.arcgis.comAn Coimisiún PleanálaCC BY 4.030 Oct 2026
    data.nbco.gov.ieNational Building Control Office (BCMS)CC BY 4.05 Nov 2026
    data.gov.ieVarious (see each layer)CC BY 4.0, CC BY-NC-ND 4.027 Sept 2026
    services-eu1.arcgis.comNational Monuments Service (SMR)CC BY 4.027 Sept 2026
    dlrcoco.citizenspace.comLocal authorities (consultation portals)Public5 Nov 2026
    www2.courts.ie—© the publisher4 Nov 2026
    cso.ie—CC BY 4.0—
    dartplus.ie project extents over NTA GTFS rail shapes (CC BY 4.0)—CC BY 4.0—
    services-eu1.arcgis.comLocal authorities (derelict sites registers)CC BY 4.02 Nov 2026
    data.epa.ieEnvironmental Protection Agency (LEAP licence register)CC BY 4.02 Nov 2026
    transportforireland.ieNational Transport AuthorityCC BY 4.01 Nov 2026
    lda.ieLand Development AgencyCC BY 4.011 Sept 2026
    meetings.fingal.ieLocal authorities (council meetings)Public5 Nov 2026
    services.arcgis.comDepartment of Housing (National Planning Application Database)CC BY 4.05 Nov 2026
    services-eu1.arcgis.comTailte ÉireannCC BY 4.011 Sept 2026
    services-eu1.arcgis.comCSO, Tailte Éireann, OpenStreetMap contributorsCC BY 4.04 Oct 2026
    propertypriceregister.ieProperty Services Regulatory Authority (PPR)© PSRA, PSI licence5 Nov 2026
    services.arcgis.comLocal authorities (RZLT maps)CC BY 4.01 Nov 2026
    gov.ieDepartment of EducationCC BY 4.027 Oct 2026
    gov.ieDepartment of HousingCC BY-SA 4.023 Oct 2026
    tusla.ieTusla (Early Years Inspectorate)Public register4 Nov 2026
    services.arcgis.comLocal authorities via the Department of Housing (GZT / MyPlan)CC BY 4.01 Nov 2026
    Measured
    counted from a public register
    Calculated
    a rate or median we worked out from those counts
    Our classification
    we sorted it by reading each description
    Estimate
    inferred from another source (census, map data)
    Rule summary
    the law, simplified: check before relying on it
    How we work this out
    Generated 5 Nov 2026, 09:51 from the Planning Register store; nothing was fetched live. Not a legal search: the council's planning file is the record. Deadlines come from published dates under the Planning and Development Act 2000: confirm with the council before relying on them. Street map © OpenStreetMap contributors; building outlines © Overture Maps Foundation. The text version carries every figure with its source, for an AI assistant.