Bóthar Na dTreabh
Homes here mostly date from the 2000s. Home extensions nearby almost always get approved (93%). 129 homes approved 330 m away haven't started.
Not held yet for Galway City Council: council consultations.
How planning works, with this area's numbers
steps can overlap · medians for home extensions within 1.5 km, 10 years- 1ApplySite notice up, plans online
- 2Comments5 weeks, €20. Comment to keep your right to appeal
- 3Decision8 weeks by law. Here 52 days
- 4Appeal window4 weeks after the decision
- 5AppealAt An Coimisiún Pleanála
- 6PermissionLasts 5 years
- 7StartStart notice to the council. Here about 4 months after
- 8Sign-offCompletion cert, or the owner opts out
What's the planning story of this house?
When it was built, and the rules since
Most homes here were built 2001–10, under planning permission and building regulations.
Each line is a rule that applies to work done after it.
MeasuredEstimatecouncil register via NPAD · build years: CSO Census 2022, small area
Zoning, protection, tax and flood: the detail
What it says
Enterprise Light Industry and Commercial: To provide for light industry and commercial uses other than those reserved in the CC zone
Zoned for employment uses. Housing is not the intended use here.
galway city development plan 2023 2029 · 4 Jan 2023 – 4 Jan 2029
What it says
Enterprise Light Industry and Commercial: To provide for light industry and commercial uses other than those reserved in the CC zone
Zoned for employment uses. Housing is not the intended use here.
galway city development plan 2023 2029 variations 1 2 3 · 4 Jan 2023 – 4 Jan 2029
Not on this site: protected building, heritage inventory, monument zone, conservation area, EU nature site, EU bird site, natural heritage area, tree order, landslide risk, derelict list.
Licensed industrial sites within 1.0 km: Thermo King Ireland Limited (666 m); Trane Technologies International Limited (670 m); Heiton Buckley Limited (Galway) (831 m)
| Within 500 m | Count | For example |
|---|---|---|
| Monuments | 1 | Quarry |
How we work this out
Sources: Development plan zoning (councils), EPA licensed facilities (LEAP), Residential Zoned Land Tax maps, Constraint layers (bundle), Sites and Monuments Record · fetched 2 Nov 2026, 23:44
| Source | Licence | Fetched | Link |
|---|---|---|---|
| Development plan zoning (councils) | CC BY 4.0 | 1 Nov 2026, 23:13 | open |
| EPA licensed facilities (LEAP) | CC BY 4.0 | 2 Nov 2026, 23:44 | open |
| Residential Zoned Land Tax maps | CC BY 4.0 | 1 Nov 2026, 23:58 | open |
| Constraint layers (bundle) | CC BY 4.0, CC BY-NC-ND 4.0 | 27 Sept 2026, 19:37 | open |
| Sites and Monuments Record | CC BY 4.0 | 27 Sept 2026, 19:29 | open |
How we work this out
Sources: Building Control Management System (commencement notices), National Planning Application Database · fetched 5 Nov 2026, 05:03
| Source | Licence | Fetched | Link |
|---|---|---|---|
| Building Control Management System (commencement notices) | CC BY 4.0 | 5 Nov 2026, 03:55 | open |
| National Planning Application Database | CC BY 4.0 | 5 Nov 2026, 05:03 | open |
Could you extend?
Nothing on this site restricts it: not protected, not in a conservation area.
What happened to applications like yours
Extensions are almost always approved here: 90–91% by type. A new house in a garden is harder: 91% approved, and 1 in 2 are asked for more information.
Decided applications within 1.5 km, received in the last 10 years. The kind of work is read from each description.
CalculatedOur classificationcouncil register via NPAD · 32 nearby, 355 council-wide
Extensions and refusals right beside you 0 within 250 m · 0 refused within 100 m
Extensions and refusals near you 0 extensions within 250 m · the last 12 months
No home extensions within 250 m in the last 12 months.
Refused within 100 m 0 in the last 12 months
Nothing refused this close in the last 12 months.
How we work this out
Sources: An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices), National Planning Application Database · fetched 5 Nov 2026, 05:03
| Source | Licence | Fetched | Link |
|---|---|---|---|
| An Coimisiún Pleanála cases (ArcGIS feed) | CC BY 4.0 | 30 Oct 2026, 23:01 | open |
| Building Control Management System (commencement notices) | CC BY 4.0 | 5 Nov 2026, 03:55 | open |
| National Planning Application Database | CC BY 4.0 | 5 Nov 2026, 05:03 | open |
How long, and what if someone objects?
A home extension's journey here
A decision takes 52 days. 1 in 8 is asked for more information, which adds about 71 days. Building starts about 4 months after permission.
Bars are medians; whiskers show the middle half. Medians of separate steps don't add up exactly.
Calculated75 decided home extensions, 26 start notices · within 1.5 km, 10 years · NPAD, BCMS, An Coimisiún Pleanála
What appeals changed
3 of 7 appealed refusals became permissions. 1 of 7 appealed approvals were reversed.
Every appeal decided within 1.5 km in 10 years, any kind of development.
CalculatedAn Coimisiún Pleanála cases linked to the council file
Appeals nearby 1 in the last 12 months
- 500690 Granted with conditions · Lands known as Glasshouse Commercial Site , Radharc na Gr?ine ,… · 494 m
Sources: An Coimisiún Pleanála cases (ArcGIS feed), Courts Service legal diary (judicial reviews), National Planning Application Database · fetched 5 Nov 2026, 05:03
| Source | Licence | Fetched | Link |
|---|---|---|---|
| An Coimisiún Pleanála cases (ArcGIS feed) | CC BY 4.0 | 30 Oct 2026, 23:01 | open |
| Courts Service legal diary (judicial reviews) | © the publisher | 4 Nov 2026, 23:17 | open |
| National Planning Application Database | CC BY 4.0 | 5 Nov 2026, 05:03 | open |
What's changing around you?
- 1Estelle, Tuam Road 2660364
- 2Block J Crown Square, located at the junction of Monivea Road and Joyces Road 2660358
- 3Crown Square, Monivea Road 2626
- 4Crown Square 2660287
- 50.7 ha zoned for homes
- 60.3 ha zoned for homes
- 70.3 ha zoned for homes
- 80.3 ha zoned for homes
- 90.2 ha zoned for homes
- 100.2 ha zoned for homes
- 11Riverside Industrial Estate, Tuam Road 2620
- 12Harris House, IDA Small Business Centre 2660202
- 13Crown Square, Monivea Road 267
- 1422 Seaman Drive, Riverside 2660173
- 1512 Seaman Drive, Riverside Estate 2614
What happens to applications within 500 m
Permission isn't building. Of 26 permissions since 2016, 6 show a start notice and 3 have a completion certificate.
Purple bands are refusals turned into permissions on appeal. "No start notice found" includes small jobs that never needed one and notices we couldn't match.
Measured31 applications in 10 years · NPAD, An Coimisiún Pleanála, BCMS start notices and completion certificates
The next 30 days
4 deadlines within 500 m; the first closes 6 Nov 2026.
- Comments close 6 Nov 20261 day left22660358 · application received — Permission for development which consists of: permission for a Proposed Development within Block…€20 to the council · 436 m away
- Comments close 13 Nov 20268 days left12660364 · application received — Permission for development which consists of: • Demolition of existing Chiropractic Clinic &…€20 to the council · 353 m away
- Time to appeal ends 26 Nov 202621 days left32626 · UNCONDITIONAL — Permission for development which consists of: Extension of Duration - 288 no. Build-to-Rent apartments…€220 to An Coimisiún Pleanála (€110 observer) · 272 m away
- Time to appeal ends 26 Nov 202621 days left2627 · UNCONDITIONAL — Permission for development which consists of: Extension of Duration - 345 no. Build-to-Rent apartments…€220 to An Coimisiún Pleanála (€110 observer) · 272 m away
Measuredcouncil registers and An Coimisiún Pleanála · deadlines worked out from the dates on file
Approved, stalled or planned, not built yet
129 homes 330 m away were approved Oct 2026 with no start notice yet; the permission runs to Oct 2031.
Each row is a dated fact from a public register: no score and no forecast.
Measuredcouncil registers, BCMS, derelict sites registers, development plan layers (CC BY 4.0)
Sites that could change 11 within 500 m
Approved, not started 1
- Crown Square · 129 homes approved Oct 2026, not started · 330 m
Empty land zoned for homes 10
- 50.7 ha zoned for homes · no homes built on it yet · 175 m
- 60.3 ha zoned for homes · no homes built on it yet · 190 m
- 70.3 ha zoned for homes · no homes built on it yet · 195 m
- 80.3 ha zoned for homes · no homes built on it yet · 213 m
- 90.2 ha zoned for homes · no homes built on it yet · 224 m
- 100.2 ha zoned for homes · no homes built on it yet · 238 m
- 0.3 ha zoned for homes · no homes built on it yet · 249 m
- 0.7 ha zoned for homes · no homes built on it yet · 252 m
- 0.4 ha zoned for homes · no homes built on it yet · 268 m
- 0.4 ha zoned for homes · no homes built on it yet · 271 m
Not covered here: council land to be sold (Dublin only).
Sources: An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices), Derelict sites registers, National Planning Application Database, Residential Zoned Land Tax maps · fetched 5 Nov 2026, 05:03
| Source | Licence | Fetched | Link |
|---|---|---|---|
| An Coimisiún Pleanála cases (ArcGIS feed) | CC BY 4.0 | 30 Oct 2026, 23:01 | open |
| Building Control Management System (commencement notices) | CC BY 4.0 | 5 Nov 2026, 03:55 | open |
| Derelict sites registers | CC BY 4.0 | 2 Nov 2026, 23:17 | open |
| National Planning Application Database | CC BY 4.0 | 5 Nov 2026, 05:03 | open |
| Residential Zoned Land Tax maps | CC BY 4.0 | 1 Nov 2026, 23:58 | open |
Applications within 500 m, by year
Between 1 and 9 a year; busiest 2025. 77% of decisions were approvals.
2021 and 2026 are part years (*). Exemption requests and time extensions are left out.
Measuredcouncil register via NPAD
Open for comments €20 to comment
- 2Block J Crown Square , located at the junction of Monivea Road and Joyces Road , Galway Co. Galway comments close 6 Nov 2026Permission for development which consists of: permission for a Proposed Development within Block J (c. 480…
- 1Estelle , Tuam Road , Galway comments close 13 Nov 2026Permission for development which consists of: • Demolition of existing Chiropractic Clinic & Garage. •…
Every application within 500 m 14 in the last 12 months
See every application on the map
- 3Crown Square , Monivea Road , Galway ApprovedPermission for development which consists of: Extension of Duration - 288 no. Build-to-Rent apartments and…
- Crown Square , Monivea Road , Galway ApprovedPermission for development which consists of: Extension of Duration - 345 no. Build-to-Rent apartments and…
- 4Crown Square , Located at the junction of Monivea Road and Joyces Road , Galway Co. Galway Approved with conditionsPermission for development which consists of: We, Crown Square Developments Ltd., intend to apply to Galway…
- 11Riverside Industrial Estate , Tuam Road , Galway Approved with conditionsPermission for development which consists of: retention is sought on behalf of Kevin Burke to retain an…
- 12Harris House , IDA Small Business Centre , Tuam Road Galway No decision yetPermission for development which consists of: Permission is being sought by Brian Higgins Medical Limited for…
- 1422 Seaman Drive , Riverside , Galway Approved with conditionsPermission for development which consists of: 1. demolition and reconstruction of single storey granny flat,…
- 1512 Seaman Drive , Riverside Estate , Tuam Road Approved with conditionsPermission for development which consists of: Permission to construct first floor side extension over…
- 13Crown Square , Monivea Road , Galway RefusedPermission for development which consists of: Extension Of Duration - the development comprises 4 no.…
- 22 Seaman Drive , Riverside , Galway RefusedPermission for development which consists of: 1. demolition and reconstruction of single storey granny flat…
- 19 Monivea Road , Mervue , Galway Approved with conditionsPermission for development which consists of: to demolish existing rear single storey annex and existing…
- Four and Five Crown Square , Monivea Road , Galway Approved with conditionsPermission for development which consists of: Two commercial office use buildings located at Crown Square,…
- Galway Crystal Murrough Drive , Dublin Road , Galway Approved with conditionsPermission for development which consists of: we, HeatGrid Ireland Limited, intend to apply for a 10-year…
How we work this out
Sources: National Planning Application Database, An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices) · fetched 5 Nov 2026, 05:03
| Source | Licence | Fetched | Link |
|---|---|---|---|
| National Planning Application Database | CC BY 4.0 | 5 Nov 2026, 05:03 | open |
| An Coimisiún Pleanála cases (ArcGIS feed) | CC BY 4.0 | 30 Oct 2026, 23:01 | open |
| Building Control Management System (commencement notices) | CC BY 4.0 | 5 Nov 2026, 03:55 | open |
Building work nearby 3 in the last 12 months
- Three Crown Square, Monivea Road, Galway, 00000 · 16 Apr 2026 · 7-day notice not signed off · PT8GY295 · 396 m
- Tuam Road, Galway · 12 Mar 2026 · 7-day notice not signed off · 2460118 · 23 m
- Tuam Road, Galway, H91E9T1 · 11 Nov 2025 · 7-day notice not signed off · 23/60060 · 112 m
How we work this out
Source: Building Control Management System (commencement notices) · fetched 5 Nov 2026, 03:55
| Source | Licence | Fetched | Link |
|---|---|---|---|
| Building Control Management System (commencement notices) | CC BY 4.0 | 5 Nov 2026, 03:55 | open |
Homes coming 129 not started
- 4Crown Square · 129 homes · not started · runs out 2 Oct 2031 · 331 m
- Glenanail · 26 homes · building started · 24 m
How we work this out
Sources: An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices), National Planning Application Database, Social housing construction status report · fetched 5 Nov 2026, 05:03
| Source | Licence | Fetched | Link |
|---|---|---|---|
| An Coimisiún Pleanála cases (ArcGIS feed) | CC BY 4.0 | 30 Oct 2026, 23:01 | open |
| Building Control Management System (commencement notices) | CC BY 4.0 | 5 Nov 2026, 03:55 | open |
| National Planning Application Database | CC BY 4.0 | 5 Nov 2026, 05:03 | open |
| Social housing construction status report | CC BY-SA 4.0 | 23 Oct 2026, 23:02 | open |
Named places nearby: estate, schemes, crèches, schools
Named places estate, developments, inspections
Crèches and schools inspected
| Name | Latest inspection | Distance |
|---|---|---|
| Sunny Meadow Pre- School CLG · Crèche | 13 Mar 2024 · report · Tusla Early Years Inspectorate | 879 m |
| Acorn Pre-School · Crèche | 23 Feb 2026 · report · Tusla Early Years Inspectorate | 970 m |
How we work this out
How busy is this area Busier than most of Galway City Council.
How we work this out
Sources: An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices), National Planning Application Database · fetched 5 Nov 2026, 05:03
| Source | Licence | Fetched | Link |
|---|---|---|---|
| An Coimisiún Pleanála cases (ArcGIS feed) | CC BY 4.0 | 30 Oct 2026, 23:01 | open |
| Building Control Management System (commencement notices) | CC BY 4.0 | 5 Nov 2026, 03:55 | open |
| National Planning Application Database | CC BY 4.0 | 5 Nov 2026, 05:03 | open |
What's the area like?
This street block against the council
1% of homes built before 1971 (council 17%). 16% owner-occupied (council 46%).
MeasuredCSO Census 2022, Small Area Population Statistics (CC BY 4.0) · small area 068004002
Schools, stops and the council
Schools
- Galway Community College · postprimary · 395 pupils · 986 m
Stops 37
- Trappers Inn · 427 · 1/hour at peak · 181 m
- Riverside IE · 405, 425, 427 · 5/hour at peak · 202 m
- Riverside IE · 405, 425 · 3/hour at peak · 215 m
- Mervue Ind Estate · 405, 425, 427 · 5/hour at peak · 366 m
- Mervue Ind Estate · 405, 425 · 3/hour at peak · 368 m
- Ballybane Industrial Estate · 427 · 3/hour at peak · 429 m
- Monivea Road · 401, 425A · 3/hour at peak · 445 m
- Monivea Road · 401, 425A · 3/hour at peak · 453 m
Schools growing or shrinking planning in 3 years · pupils last year
- Galway Community College · 986 m-13% pupils (395)
Sources: Public transport stops and routes (NTA GTFS), Department of Education school list, National Planning Application Database, Council consultation portals, Council meetings (ModernGov), Land Development Agency public land register, cso_saps_2022, National Transport Authority, Fingal County Council and Dún Laoghaire-Rathdown County Council development plan layers (CC BY 4.0), dartplus.ie project extents over NTA GTFS rail shapes (CC BY 4.0), EPA strategic noise maps, Fingal County Council · fetched 5 Nov 2026, 05:03
| Source | Licence | Fetched | Link |
|---|---|---|---|
| Public transport stops and routes (NTA GTFS) | CC BY 4.0 | 1 Nov 2026, 23:05 | open |
| Department of Education school list | CC BY 4.0 | 27 Oct 2026, 23:04 | open |
| National Planning Application Database | CC BY 4.0 | 5 Nov 2026, 05:03 | open |
| Council consultation portals | Public | 5 Nov 2026, 01:15 | open |
| Council meetings (ModernGov) | Public | 5 Nov 2026, 02:33 | open |
| Land Development Agency public land register | CC BY 4.0 | 11 Sept 2026, 16:43 | open |
| cso_saps_2022 | CC BY 4.0 | — | open |
| National Transport Authority | CC BY 4.0 | — | — |
| Fingal County Council and Dún Laoghaire-Rathdown County Council development plan layers (CC BY 4.0) | CC BY 4.0 | — | — |
| dartplus.ie project extents over NTA GTFS rail shapes (CC BY 4.0) | CC BY 4.0 | — | — |
| EPA strategic noise maps | CC BY 4.0 | — | — |
| Fingal County Council | CC BY 4.0 | — | — |
What to ask, and who
- Zoned C2.1 (economic development and employment), not for homes: could you extend?Solicitor · plannerAsk for: A solicitor's or planner's view.
- Application 353 m away open for comments until 13 Nov 2026: comment?CouncilAsk for: The plans on the council's website (€20 to comment).
- Any work done without planning permission?Seller · solicitorAsk for: An opinion of compliance for the whole house.
Where this is, the terms, the sources
- Electoral division
- Castlegar
- Electoral area
- Galway City East
- Council
- Galway City Council
Everything we found, as a list 8 lines
- Zoned C2.1 (economic development and employment); not protected; no vacant land tax.
- 11 sites nearby could change: 1 approved scheme, 10 empty zoned plots.
- 2 applications open for comments nearby; nearest closes 13 Nov 2026.
- 129 homes approved nearby, not started; largest 129 at Crown Square.
- Riverside IE (bus 405, 425) 202 m away: 5 an hour at morning peak; 26 from all stops within 500 m.
- Noise from road traffic mapped at 55–59 dB (day-evening-night average, EPA 2022).
- Here (2022 census): 76% rent (council 47%); 9% of homes empty (council 10%); most built 2001–2010; 49% drive to work (council 47%); population up 6% since 2016.
- The council decides in a median 55 days (about 8 weeks); 1 in 4 is asked for more information.
What the terms mean 7 terms
- Vacant land tax (Residential Zoned Land Tax (RZLT)): A yearly tax of 3% of the land's value on land that is zoned for homes and serviced but left unbuilt.
- Building started (Commencement notice (BCMS)): The builder must tell the council's building control office 14 to 28 days before work starts.
- Signed off as finished (Certificate of Compliance on Completion): A certificate filed when a building is finished, confirming it meets the building regulations.
- Approved (Grant of permission): The council said yes, usually with conditions.
- Comment on an application (Observation / submission): Anyone can comment on a planning application within five weeks of it being lodged, for a €20 fee.
- Appeal (Appeal to An Coimisiún Pleanála): The applicant, or anyone who commented in time, can appeal the council's decision within four weeks.
- What the land is zoned for (Zoning objective): The council's development plan sets what each area is for: homes, shops, open space and so on.
Sources and licences 26
| Source | Publisher | Licence | Fetched |
|---|---|---|---|
| EPA strategic noise maps | — | CC BY 4.0 | — |
| Fingal County Council | — | CC BY 4.0 | — |
| Fingal County Council and Dún Laoghaire-Rathdown County Council development plan layers (CC BY 4.0) | — | CC BY 4.0 | — |
| National Transport Authority | — | CC BY 4.0 | — |
| services-eu1.arcgis.com | An Coimisiún Pleanála | CC BY 4.0 | 30 Oct 2026 |
| data.nbco.gov.ie | National Building Control Office (BCMS) | CC BY 4.0 | 5 Nov 2026 |
| data.gov.ie | Various (see each layer) | CC BY 4.0, CC BY-NC-ND 4.0 | 27 Sept 2026 |
| services-eu1.arcgis.com | National Monuments Service (SMR) | CC BY 4.0 | 27 Sept 2026 |
| dlrcoco.citizenspace.com | Local authorities (consultation portals) | Public | 5 Nov 2026 |
| www2.courts.ie | — | © the publisher | 4 Nov 2026 |
| cso.ie | — | CC BY 4.0 | — |
| dartplus.ie project extents over NTA GTFS rail shapes (CC BY 4.0) | — | CC BY 4.0 | — |
| services-eu1.arcgis.com | Local authorities (derelict sites registers) | CC BY 4.0 | 2 Nov 2026 |
| data.epa.ie | Environmental Protection Agency (LEAP licence register) | CC BY 4.0 | 2 Nov 2026 |
| transportforireland.ie | National Transport Authority | CC BY 4.0 | 1 Nov 2026 |
| lda.ie | Land Development Agency | CC BY 4.0 | 11 Sept 2026 |
| meetings.fingal.ie | Local authorities (council meetings) | Public | 5 Nov 2026 |
| services.arcgis.com | Department of Housing (National Planning Application Database) | CC BY 4.0 | 5 Nov 2026 |
| services-eu1.arcgis.com | Tailte Éireann | CC BY 4.0 | 11 Sept 2026 |
| services-eu1.arcgis.com | CSO, Tailte Éireann, OpenStreetMap contributors | CC BY 4.0 | 4 Oct 2026 |
| propertypriceregister.ie | Property Services Regulatory Authority (PPR) | © PSRA, PSI licence | 5 Nov 2026 |
| services.arcgis.com | Local authorities (RZLT maps) | CC BY 4.0 | 1 Nov 2026 |
| gov.ie | Department of Education | CC BY 4.0 | 27 Oct 2026 |
| gov.ie | Department of Housing | CC BY-SA 4.0 | 23 Oct 2026 |
| tusla.ie | Tusla (Early Years Inspectorate) | Public register | 4 Nov 2026 |
| services.arcgis.com | Local authorities via the Department of Housing (GZT / MyPlan) | CC BY 4.0 | 1 Nov 2026 |