R2 — Existing residentialdevelopment plan 2022 2028 · 14 Dec 2022 – 31 Dec 2028
Z1: Sustainable Residential Neighbourhoods: To protect, provide and improve residential amenities.
What that means: An established residential area. The objective is to protect existing residential amenity as well as to provide housing — which is the objective a neighbour's objection to an overbearing extension is usually argued under.
This site is on an RZLT map — the draft map 2027 and the final map 2026 (3.84 ha). The owner is liable for an annual 3% tax on market value while it stays there. Submissions on the draft map closed 1 Apr 2026.
Conversion of existing garage to habitable room plus a single storey rear extension; Internal and external alterations plus the widening of the existing vehicular entrance plus new pedestrian gate in rear boundary wall and all associated site works.
The proposed development will consist of; 1) Conversion of existing hipped roof to half hip roof, 2) Conversion of existing attic to habitable space with dormer extension to the rear, 3) Proposed rooflight and PV panel array to the front of the dwelling, 4) 150mm external wall insulation to existing dwelling with acrylic render finish, 5) Widening of existing vehicular entrance to 3.8m and all associated site works.
Widening the existing vehicular entrance to 3.5m wide, converting the existing garage to the side of the house; Construction of dormer window in main roof to the rear of the house, two rooflights in the main roof to the front of the house, first-floor side extension (including extending main roof hip) over converted garage; Minor modification to the front and rear fenestration; Single-storey ground floor extension to the rear; Proposed canopy to the front of the house, integrating the existing porch and all associated site works.
Demolition of existing garage structure and construction of a new single storey bungalow with pitched roof and all associated site, drainage and ancillary works.
CHANGE OF USE: Planning permission is being sought by Dr. Nick Flynn for a development comprising the change of use of 93-95 Terenure Road East , Terenure, Dublin, D06 V3F4 , from its authorised use as a bank to use as a medical centre and all the related internal and external alterations to the unit at 93-95 Terenure Road East, Terenure, Dublin, D06 V3F4.
Change of use from Bank to Medical Centre consisting of 5 consultation rooms and all associated internal works. Additional upgrading to the front façade is proposed as well.
WEB2702/26received 9 Jul 2026decided 14 Jul 2026815 m away
A) The removal of the existing part two-storey side extension, part single-storey rear extension and the existing single-storey conservatory. B) Construction of a part two-storey, part singlestorey side and rear extension, incorporating a canopy and associated rooflights and a bay window to the front to match the existing bay window. C) Amendment of the existing roof to align with the proposed extension. D) Internal reconfiguration and refurbishment work, together with all associated site development, drainage, landscaping, and ancillary works including the widening of the existing vehicular access. E) Construction of a bike shed to the front.
We , Brendan and Carol Quinn, seek to apply for Planning Permission at No. 3 Lakelands park, Terenure, Dublin 6W, D6W RH94.
The development will consist of:
Removal of the existing rear conservatory and the construction of a new single-storey rear extension with minor internal alterations and reconfiguration of the existing ground and first-floor layouts.
Enhancements to the front façade, including new window surrounds, string course and an entrance canopy over the front entrance door.
The provision of a new pedestrian entrance gate and the widening of the existing vehicular entrances, including an increase in the height of the boundary wall with new railings proposed.
All with associated site works, landscaping, and other services to facilitate the proposed development at No. 3 Lakelands park, Terenure, Dublin 6w, D6W RH94.
PPR addresses are geocoded, not surveyed — a sale's position is as good as its address match (`rooftop_n` says how many are address-accurate). Beds, floor area, BER and asking price come from the matched daft.ie advertisement, not from the Register, and only where a match was found (`enriched_n`).
Third-party advertisement data captured by Cara from daft.ie. Not open data: internal analysis only, no redistribution of listing content. Business-contact details (licensed PSP name and branch) are retained per Cara DECISIONS 2026-08-19; agent phone numbers and all vendor/buyer identities are dropped.
No publishable utility-capacity record within the radius. 34 records from Esb substation withheld: source licence forbids redistribution; see the operator's own register.
Public land (LDA register of relevant lands)
Dublin City Council — Dublin city and suburbs
9.66 hafolio DN208448F159 m awayas of 1 Apr 2023
Dublin City Council — Dublin city and suburbs
13.75 hafolio DN208448F182 m awayas of 1 Apr 2023
Dublin City Council — Dublin city and suburbs
0.15 hafolio DN208448F231 m awayas of 1 Apr 2023
City of Dublin Education and Training Board — Dublin city and suburbs
2.17 hafolio DN86916F254 m awayas of 1 Apr 2023
Dublin City Council — Dublin city and suburbs
2.38 hafolio DN113355F280 m awayas of 1 Apr 2023
City of Dublin Education and Training Board — Dublin city and suburbs
all-rights-reserved (esbnetworks.ie disclaimer: personal/non-commercial, no modification or republication without written ESB permission) — permission NOT sought · not redistributable — shown as a flag only
Third-party advertisement data captured by Cara from daft.ie. Not open data: internal analysis only, no redistribution of listing content. Business-contact details (licensed PSP name and branch) are retained per Cara DECISIONS 2026-08-19; agent phone numbers and all vendor/buyer identities are dropped.
all-rights-reserved (esbnetworks.ie disclaimer: personal/non-commercial, no modification or republication without written ESB permission) — permission NOT sought · not redistributable, flag only
Generated 13 Sept 2026, 12:53 from the Planning Register store. Nothing on this page was fetched live: every figure was already in the store with the fetch time shown. Deadlines are derived from published receipt and decision dates under the Planning and Development Act 2000; confirm with the planning authority before relying on them.