Homes here mostly date from the 1990s. 1 planning file on this house, the latest from 2014. Home extensions nearby almost always get approved (94%). 2 applications nearby open for comments.

See on the mapWatch this area

How planning works, with this area's numbers

steps can overlap · medians for home extensions within 1.5 km, 10 years
  1. 1ApplySite notice up, plans online
  2. 2Comments5 weeks, €20. Comment to keep your right to appeal
  3. 3Decision8 weeks by law. Here 53 days
  4. 4Appeal window4 weeks after the decision
  5. 5AppealHere about 5 months
  6. 6PermissionLasts 5 years
  7. 7StartStart notice to the council. Here about 5 months after
  8. 8Sign-offCompletion cert, or the owner opts out
Question 1

What's the planning story of this house?

Figure 1

When it was built, and the rules since

Most homes here were built 1991–2000, under planning permission and building regulations. 1 planning file on this house, the latest from 2014.

Timeline from 1955: planning permission needed from October 1964, building regulations from June 1992, building records online from March 2014, sign-off opt-out from September 2015. Most homes here were built 1991–2000. 1 planning file on this house.1960197019801990200020102020Oct 1964permission neededJun 1992building regulationsMar 2014building records onlineSep 2015owners may opt out of sign-offThis houseAll of FosterbrookBuilt: most homes in this small area date from 1991–2000 (census estimate)most built2014: D14B/0096 · demolition, approved2002: 1 file on Fosterbrook2004: 1 file on Fosterbrook2005: 5 files on Fosterbrook2006: 2 files on Fosterbrook2007: 2 files on Fosterbrook2008: 4 files on Fosterbrook2009: 1 file on Fosterbrook2010: 3 files on Fosterbrook2011: 2 files on Fosterbrook2012: 2 files on Fosterbrook2013: 1 file on Fosterbrook2014: 2 files on Fosterbrook2017: 1 file on Fosterbrook2020: 1 file on Fosterbrook2021: 1 file on Fosterbrook2022: 3 files on Fosterbrook2025: 1 file on Fosterbrook2026: 1 file on Fosterbrook34 files

Each line is a rule that applies to work done after it.

MeasuredEstimatecouncil register via NPAD · build years: CSO Census 2022, small area

  1. 2014
    D14B/0096 · demolition · approved 2014 · ran out unbuilt
    approvedstartedsigned off
On this site
R2
Zoning · Existing residential
No
Protected or listed · on the council's list
No
Vacant land tax · lived-in homes don't pay it
1 in 20
Radon (EPA) · homes with high radon
Zoning, protection, tax and flood: the detail
ZoningR2 · Existing residential
What it says

Objective A: A To provide residential development and improve residential amenity while protecting the existing residential amenities

An established residential area. The objective is to protect existing residential amenity as well as to provide housing — which is the objective a neighbour's objection to an overbearing extension is usually argued under.

county development plan 2022 2028 · 1 Apr 2022 – 1 Apr 2028

ZoningR2 · Existing residential
What it says

Objective A: A To provide residential development and improve residential amenity while protecting the existing residential amenities

An established residential area. The objective is to protect existing residential amenity as well as to provide housing — which is the objective a neighbour's objection to an overbearing extension is usually argued under.

d n laoghaire rathdown county development plan 2022 2028 variation no 1 · 21 Apr 2022 – 20 Apr 2028

Radon1 in 20 homes have high radon (EPA)

Not on this site: protected building, heritage inventory, monument zone, conservation area, EU nature site, EU bird site, natural heritage area, tree order, landslide risk, derelict list.

Licensed industrial sites within 1.0 km: Sytheses Limited (436 m)

Vacant land taxNo lived-in homes don't pay it
Flood riskNone mapped within 500 m
Within 500 mCountFor example
Licensed industrial sites1Sytheses Limited
Radon grid squares2
Protected buildings6Dornden House; Bellevue House
Monuments2House - 18th/19th century; R149464
How we work this out
'On this site' means the record's own map outline touches the registered parcel (or a 12 m circle round the point where there is no parcel). Only the council's own list confirms a protected building; ask the council if in doubt. The council's map for the vacant land tax shows this spot inside an area of existing homes. Homes people live in, and their gardens, don't pay the tax. The OPW flood map's licence lets us show a yes/no only.
Sources: Development plan zoning (councils), EPA radon map, EPA licensed facilities (LEAP), Residential Zoned Land Tax maps, Constraint layers (bundle), EPA licensed sites, Records of Protected Structures, Sites and Monuments Record · fetched 19 Oct 2026, 23:51
SourceLicenceFetchedLink
Development plan zoning (councils)CC BY 4.018 Oct 2026, 23:24open
EPA radon mapCC BY 4.027 Sept 2026, 19:36open
EPA licensed facilities (LEAP)CC BY 4.019 Oct 2026, 23:51open
Residential Zoned Land Tax mapsCC BY 4.019 Oct 2026, 00:29open
Constraint layers (bundle)CC BY 4.0, CC BY-NC-ND 4.027 Sept 2026, 19:37open
EPA licensed sitesCC BY 4.027 Sept 2026, 19:36open
Records of Protected StructuresCC BY 4.027 Sept 2026, 19:36open
Sites and Monuments RecordCC BY 4.027 Sept 2026, 19:29open
How we work this out
Applications whose site outline (or map point) falls on this property. 'No sign building has started' means we found no notice to the council's building control office; small jobs don't always file one, so ask. A missing completion certificate is not proof of a problem: an owner can opt out of official sign-off for a house or extension built for themselves.
Sources: Building Control Management System (commencement notices), National Planning Application Database · fetched 20 Oct 2026, 02:09
SourceLicenceFetchedLink
Building Control Management System (commencement notices)CC BY 4.020 Oct 2026, 01:45open
National Planning Application DatabaseCC BY 4.020 Oct 2026, 02:09open
Question 2

Could you extend?

Nothing on this site restricts it: not protected, not in a conservation area.

Figure 2

What happened to applications like yours

Extensions here: 82–100% by type. A new house in a garden is harder: 57% approved, and 1 in 3 is asked for more information.

Single-storey rear95 decided · more info asked 14%
99% · council 96%
Two-storey rear72 decided · more info asked 17%
93% · council 90%
Two-storey side23 decided · more info asked 26%
100% · council 94%
Single-storey side17 decided · more info asked 12%
94% · council 96%
Attic or dormer213 decided · more info asked 12%
91% · council 92%
First-floor28 decided · more info asked 14%
82% · council 89%
Garage conversion22 decided · more info asked 5%
100% · council 99%
Porch or front16 decided · more info asked 6%
94% · council 98%
New house in a garden or site49 decided · more info asked 29%
57% · council 62%
Approved nearbyDún Laoghaire-Rathdown overall

Decided applications within 1.5 km, received in the last 10 years. The kind of work is read from each description.

CalculatedOur classificationcouncil register via NPAD · 535 nearby, 6,620 council-wide

Figure 3

Fosterbrook, file by file since 2002

25 of 28 decided extensions on the road were approved. New houses in side gardens or on sites: 1 of 1.

34 planning files on Fosterbrook since 2002, by kind and decision.2002200420062008201020122014201620182020202220242026Extensions, atticsNo. 99 · 2002 · two-storey side · approved · D02B/0601No. 38 · 2005 · attic conversion / dormer · approved · D05A/1163No. 41 · 2005 · single-storey rear · approved · D05B/0130No. 99 · 2005 · two-storey side · approved · D05B/0402No. 37 · 2005 · two-storey rear · approved · D05B/0497No. 117 · 2005 · attic conversion / dormer · refused · D05B/0773No. 55 · 2006 · attic conversion / dormer · approved · D06A/0936No. 68 · 2006 · single-storey rear · refused · D06A/1154No. 68 · 2007 · single-storey rear · approved · D07B/0641No. 120 · 2008 · attic conversion / dormer · approved · D08B/0234No. 120 · 2008 · first-floor · refused · D08B/0641No. 36 · 2009 · two-storey side · approved · D09B/0488No. 35 · 2010 · two-storey rear · approved · D10B/0167No. 36 · 2010 · porch / front · approved · D10B/0219No. 89 · 2010 · attic conversion / dormer · approved · D10B/0275No. 54 · 2011 · attic conversion / dormer · approved · D11B/0092No. 107 · 2011 · first-floor · approved · D11B/0126No. 73 · 2012 · single-storey rear · approved · D12B/0057No. 86 · 2012 · attic conversion / dormer · approved · D12B/0238No. 44 · 2014 · single-storey rear · approved · D14B/0096No. 16 · 2014 · attic conversion / dormer · approved · D14B/0449No. 79 · 2017 · attic conversion / dormer · approved · D17B/0145No. 63 · 2020 · single-storey rear · approved · D20B/0269No. 1 · 2021 · attic conversion / dormer · approved · D21B/0591No. 104 · 2022 · attic conversion / dormer · approved · D22A/0307No. 34 · 2022 · attic conversion / dormer · approved · D22B/0515No. 33 · 2022 · attic conversion / dormer · approved · D22B/0520No. 37 · 2026 · attic conversion / dormer · approved · D26B/0450/WEBPorches, roofs, otherNo. 73A · 2007 · other work · refused · D07B/0905No. 55 · 2008 · single-storey rear · approved · D08A/0693No. 68 · 2008 · single-storey rear · approved · D08B/0630No. 117 · 2013 · other work · approved · D13B/0066No. 1 · 2025 · other work · approved · D25B/0371/WEBNew house in a side gardenNo. 73 · 2004 · new house · approved · D04A/043573
ApprovedRefusedWithdrawn or invalid

34 files with "Fosterbrook" in the address within 600 m, other roads of the same name left out. Hover a dot for the house number and reference.

MeasuredOur classificationcouncil register via NPAD · 2002–2026

Extensions and refusals right beside you 9 within 250 m · 0 refused within 100 m

Extensions and refusals near you 9 extensions within 250 m · the last 12 months

7 of 7 approved (100%) · most common: dormer or attic

7 approved2 no decision or withdrawn
KindAppliedApprovedRefused
Dormer or attic53—
First-floor11—
Other11—
Single-storey rear11—
Two-storey rear11—

On Fosterbrook: 10 extensions in 10 years, 92% of all applications approved; most common dormer or attic.

Refused within 100 m 0 in the last 12 months

Nothing refused this close in the last 12 months.

    How we work this out
    Home extensions are read from the application's description (extension, attic or dormer, porch, garage conversion, garden room), so a few may be missed or mislabelled. The kind is the first that fits: a dormer with a rear extension counts as a dormer. Refusal reasons come from An Coimisiún Pleanála's inspector reports, so they exist only where the refusal was appealed (Dún Laoghaire-Rathdown so far). The council's own reasons are on its planning file.
    Sources: National Planning Application Database, An Coimisiún Pleanála cases (ArcGIS feed) · fetched 20 Oct 2026, 02:09
    SourceLicenceFetchedLink
    National Planning Application DatabaseCC BY 4.020 Oct 2026, 02:09open
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.016 Oct 2026, 23:06open
    Sources: An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices), National Planning Application Database · fetched 20 Oct 2026, 02:09
    SourceLicenceFetchedLink
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.016 Oct 2026, 23:06open
    Building Control Management System (commencement notices)CC BY 4.020 Oct 2026, 01:45open
    National Planning Application DatabaseCC BY 4.020 Oct 2026, 02:09open
    Question 3

    How long, and what if someone objects?

    Figure 4

    A home extension's journey here

    A decision takes 53 days. 1 in 6 is asked for more information, which adds about 64 days. Building starts about 5 months after permission.

    Comments open: 5 weeks · €20; Council decision: 53 days; If more info asked (1 in 6): 125 days; Appeal window: 4 weeks; If appealed: +138 days; Building starts: 152 days after permission0 mo3 mo6 mo9 mo12 mo15 moComments openComments close 5 weeks after the application is lodged5 weeks · €20Council decisionDecision: median 53 days, middle half 50–55 (n=494)53 daysIf more info asked (1 in 6)With further information: median 125 days (n=91)125 daysAppeal windowAnyone who commented can appeal within 4 weeks of the decision4 weeksIf appealedAt An Coimisiún Pleanála: median 138 days (n=152, all appeals within 1.5 km)+138 daysBuilding startsStart notice: median 152 days after permission (n=300)152 days after permissionSigned off402 days after the start, for the few who file. 66% of owners opt out of sign-off

    Bars are medians; whiskers show the middle half. Medians of separate steps don't add up exactly.

    Calculated585 decided home extensions, 300 start notices, 152 decided appeals · within 1.5 km, 10 years · NPAD, BCMS, An Coimisiún Pleanála

    Figure 5

    What appeals changed

    28 of 57 appealed refusals became permissions. 8 of 97 appealed approvals were reversed.

    Refusals appealed57 decided
    28 became permissions
    Approvals appealed97 decided
    8 reversed
    Ended approvedEnded refusedWithdrawn, invalid or other

    Every appeal decided within 1.5 km in 10 years, any kind of development.

    CalculatedAn Coimisiún Pleanála cases linked to the council file

    Appeals nearby 2 in the last 12 months

    None of 2 changed the council's decision

    • 501590 Granted · 19 Trimleston Avenue, Blackrock, Co. Dublin, A94XD42 · 409 m
    • 500441 Refused · 54, Woodbine Road, Booterstown, Dublin, A94WF22 · 236 m report
    Sources: An Coimisiún Pleanála cases (ArcGIS feed), Courts Service legal diary (judicial reviews), National Planning Application Database · fetched 20 Oct 2026, 02:09
    SourceLicenceFetchedLink
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.016 Oct 2026, 23:06open
    Courts Service legal diary (judicial reviews)© the publisher20 Oct 2026, 01:39open
    National Planning Application DatabaseCC BY 4.020 Oct 2026, 02:09open
    Question 4

    What's changing around you?

    Street map around Fosterbrook with 15 numbered planning items
    ⌖ the houseOpen for commentsBuilding startedApprovedNo decision yetOther
    1. 130, Seafield Road D26A/0697/WEBNo decision yet · 117 m
    2. 225, Woodbine Park D26B/0513/WEBNo decision yet · 127 m
    3. 314 Seafield Road, Blackrock D26A/0254/WEBBuilding started · 181 m
    4. 437 Fosterbrook, Booterstown D26B/0450/WEBApproved · 15 m
    5. 529 Seafield Road, Booterstown D26B/0494/WEBNo decision yet · 51 m
    6. 655 Trimleston Gardens, Booterstown REF8626Section 5: exempt · 155 m
    7. 789, Trimleston Gardens D26A/0472/WEBApproved · 195 m
    8. 834, Woodbine Park D26B/0103/WEBApproved · 203 m
    9. 95, Seafield D25B/0601/WEBApproved · 204 m
    10. 1046, Glenomena Park D26B/0211/WEBApproved · 219 m
    11. 1154, Woodbine Road D26B/0396/WEBApproved · 236 m
    12. 127, Seafield Close D26B/0303/WEBApproved · 250 m
    13. 1316, Trimleston Gardens D26A/0074/WEBApproved · 266 m
    14. 1459, Glenomena Park D26B/0424/WEBApproved · 292 m
    15. 152, Seafield Close D25B/0724/WEBApproved · 292 m
    Figure 6

    What happens to applications within 500 m

    Permission isn't building. Of 214 permissions since 2016, 114 show a start notice and 10 have a completion certificate. Most owners opt out of sign-off.

    252 applications lodged within 500 m. Council: 214 approved, 11 refused. After appeals: 214 approved. Of those: 10 signed off, 74 built with the owner's opt-out, 30 started, 100 with no start notice found, 0 ran out.LODGEDCOUNCIL DECISIONAFTER APPEALSWHAT HAPPENED NEXT214: lodged → approved11: lodged → refused22: lodged → withdrawn or invalid5: lodged → undecided212: approved → approved9: refused → refused22: withdrawn or invalid → withdrawn5: undecided → undecided2 approved by the council, withdrawn or invalid after an appeal2 refused by the council, approved after an appeal100: approved → no start notice found74: approved → built, owner opted out30: approved → started, not signed off10: approved → signed off252 lodged252 lodged214 approved214 approved11 refused11 refused22 withdrawn or invalid22 withdrawn or invalid5 undecided5 undecided214 approved214 approved9 refused9 refused24 withdrawn24 withdrawn5 undecided5 undecided100 no start notice found100 no start notice found74 built, owner opted out74 built, owner opted out30 started, not signed off30 started, not signed off10 signed off10 signed off

    Purple bands are refusals turned into permissions on appeal. "No start notice found" includes small jobs that never needed one and notices we couldn't match.

    Measured252 applications in 10 years · NPAD, An Coimisiún Pleanála, BCMS start notices and completion certificates

    Figure 7

    The next 30 days

    3 deadlines within 500 m; the first closes 22 Oct 2026.

    3 deadlines in the next 30 days: 2026-10-22 D26A/0697/WEB: application received — Permission is sought for new vehicular entrance and parking area (including ass; 2026-10-28 D26B/0513/WEB: application received — 1. Demolition of part of the existing two-storey structure and chimney stack to; 2026-11-10 ACP 501590: Grant permissiontoday25 Oct30 Oct4 Nov9 Nov14 Nov19 NovD26A/0697/WEB: application received — Permission is sought for new vehicular entrance and parking area (including ass · 117 m away · 2026-10-22D26B/0513/WEB: application received — 1. Demolition of part of the existing two-storey structure and chimney stack to · 127 m away · 2026-10-28ACP 501590: Grant permission · 409 m away · 2026-11-10
    Comments closeHigh Court window ends
    • Comments close 22 Oct 20262 days left
      1D26A/0697/WEB · application received — Permission is sought for new vehicular entrance and parking area (including ass
      €20 to the council · 117 m away
    • Comments close 28 Oct 20268 days left
      2D26B/0513/WEB · application received — 1. Demolition of part of the existing two-storey structure and chimney stack to
      €20 to the council · 127 m away
    • Time to ask the High Court for a review ends 10 Nov 202621 days left
      Grant permission
      409 m away

    Measuredcouncil registers and An Coimisiún Pleanála · deadlines worked out from the dates on file

    Figure 8

    Approved, stalled or planned, not built yet

    BusConnects Core Bus Corridors is planned 411 m away.

    BusConnects Core Bus…: core bus corridor (DLR County Development Plan 2022-2028)20242025202620272028BusConnects Core Bus…411 m · plannedcore bus corridor (DLR County Development Plan 2022-2028)today

    Each row is a dated fact from a public register: no score and no forecast.

    Measuredcouncil registers, BCMS, derelict sites registers, development plan layers (CC BY 4.0)

    Figure 9

    Applications within 500 m, by year

    Between 21 and 33 a year; busiest 2025. 95% of decisions were approvals.

    2016: 3, 2017: 22, 2018: 23, 2019: 23, 2020: 21, 2021: 25, 2022: 26, 2023: 27, 2024: 31, 2025: 33, 2026: 180102030402016: 3 approved3’16*2017: 20 approved2017: 2 refused22’172018: 19 approved2018: 1 refused2018: 3 withdrawn or invalid23’182019: 19 approved2019: 3 refused2019: 1 withdrawn or invalid23’192020: 19 approved2020: 2 refused21’202021: 23 approved2021: 2 withdrawn or invalid25’212022: 25 approved2022: 1 refused26’222023: 24 approved2023: 1 refused2023: 2 withdrawn or invalid27’232024: 27 approved2024: 4 withdrawn or invalid31’242025: 23 approved2025: 1 refused2025: 9 withdrawn or invalid33’252026: 12 approved2026: 1 withdrawn or invalid2026: 5 undecided18’26*
    ApprovedRefusedWithdrawn or invalidUndecided

    2016 and 2026 are part years (*). Exemption requests and time extensions are left out.

    Measuredcouncil register via NPAD

    Open for comments €20 to comment

    Every application within 500 m 25 in the last 12 months

    See every application on the map

    How we work this out
    Descriptions are shortened by the national planning database (to 80 characters in Dún Laoghaire-Rathdown, 70 in Fingal), and it does not publish applicants' names.
    Sources: National Planning Application Database, An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices) · fetched 20 Oct 2026, 02:09
    SourceLicenceFetchedLink
    National Planning Application DatabaseCC BY 4.020 Oct 2026, 02:09open
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.016 Oct 2026, 23:06open
    Building Control Management System (commencement notices)CC BY 4.020 Oct 2026, 01:45open
    Building work nearby 12 in the last 12 months
    1 signed off as finished2 not signed off9 no sign-off needed
    • 314 Seafield Road, Blackrock, Dublin, A94 RY73 · 2 Nov 2026 · 1 homes · start notice, opted out no sign-off needed · D26A/0254/WEB · 181 m
    • 13 McCabe Villas, Blackrock, Dublin, A94 XW29 · 30 Sept 2026 · 1 homes · start notice, opted out no sign-off needed · D25B/0395/WEB · 489 m
    • Booterstown Avenue, Booterstown, Dublin, A94XN72 · 13 Jul 2026 · start notice not signed off · D25A/0087/WEB · 455 m
    • Booterstown Avenue, Booterstown, Dublin, A94XN72 · 29 Jun 2026 · start notice signed off · 476 m
    • 34 Woodbine Park, Blackrock, Dublin, A94 A997 · 4 Jun 2026 · 1 homes · start notice, opted out no sign-off needed · D26B/0103/WEB · 223 m
    • 9 Seafield Crescent, Blackrock, Dún Laoghaire-Rathdown, A94 R762 · 28 May 2026 · 1 homes · start notice, opted out no sign-off needed · D25B/0325/WEB · 282 m
    • 23 Woodbine Avenue, Blackrock, Dún Laoghaire-Rathdown, A94 CR97 · 26 May 2026 · 1 homes · start notice, opted out no sign-off needed · D25B/0527/WEB · 338 m
    • 5 Seafield Road, Blackrock, Dún Laoghaire-Rathdown, A94 Y033 · 15 Apr 2026 · 1 homes · start notice, opted out no sign-off needed · D25B/0601/WEB · 220 m
    • 34 Seafield Road, Blackrock, Dún Laoghaire-Rathdown, A94 AP89 · 9 Mar 2026 · 1 homes · start notice, opted out no sign-off needed · D24A/0692/WEB · 127 m
    • 34 Seafield Road, Blackrock, Dún Laoghaire-Rathdown, A94 AP89 · 9 Mar 2026 · 1 homes · short notice no sign-off needed · D24A/0703/WEB · 127 m
    • 5 Bellevue Park, Booterstown, Dún Laoghaire-Rathdown, A94 RD45 · 1 Dec 2025 · 1 homes · start notice not signed off · D24A/0873/WEB · 353 m
    • 73 Trimleston Gardens, Booterstown, Dún Laoghaire-Rathdown, A94 N529 · 18 Nov 2025 · 1 homes · short notice no sign-off needed · D25B/0075 · 262 m
    How we work this out
    Each row is a notice the builder sent to the council's building control office before work started. One notice can cover many homes. 'Signed off as finished' means a completion certificate is on file; work done under an opt-out or a short notice doesn't need one.
    Source: Building Control Management System (commencement notices) · fetched 20 Oct 2026, 01:45
    SourceLicenceFetchedLink
    Building Control Management System (commencement notices)CC BY 4.020 Oct 2026, 01:45open
    0
    Named places nearby: estate, schemes, crèches, schools

    Named places estate, developments, inspections

    Estate: Fosterbrook · 14 applications in 10 years · 92% approved · most common: attic conversion / dormer

    Developments within 1.0 km

    SchemeHomesProgressDistance
    Elmpark Green79—453 m
    24-28 Fosters Avenue6969 being built (2026-Q2)716 m
    26 & 28 Foster's Avenue——727 m
    Part Ground Floor of Permitted Block A——735 m
    3.4 ha at Chesterfield——745 m
    Merrion——747 m
    Merrion at——747 m
    Chesterfield——747 m

    Crèches and schools inspected

    NameLatest inspectionDistance
    Willow House Childcare Woodbine · Crèche26 Nov 2025 · report · Tusla Early Years Inspectorate601 m
    Booterstown Montessori School · Crèche3 Mar 2025 · report · Tusla Early Years Inspectorate628 m
    St. Nicholas Montessori Merrion · Crèche13 May 2026 · report · Tusla Early Years Inspectorate890 m
    The Park Academy Childcare Thornwood · Crèche8 Sept 2025 · report · Tusla Early Years Inspectorate946 m
    How we work this out
    Organisations only: a person named on an application is never listed. Inspection dates and links are the publisher's; read their report for the findings.
    Sources: Dublin housing delivery pipeline, Housing estates, National Planning Application Database, Department of Education school list, Tusla early years register · fetched 20 Oct 2026, 02:09
    SourceLicenceFetchedLink
    Dublin housing delivery pipelineCC BY 4.019 Oct 2026, 23:03open
    Housing estatesODbL 1.0, CC BY-SA 4.0, CC BY 4.027 Sept 2026, 20:18open
    National Planning Application DatabaseCC BY 4.020 Oct 2026, 02:09open
    Department of Education school listCC BY 4.027 Sept 2026, 23:32open
    Tusla early years registerPublic register14 Oct 2026, 23:20open
    How busy is this area Busier than most of Dún Laoghaire-Rathdown County Council.
    Homes approved
    Here68
    Council middle44
    Homes started
    Here196
    Council middle92
    How we work this out
    Homes approved counts schemes of 10 or more homes (one-off houses are not included). Homes started counts every home in a notice that building work was starting. The council figure is the middle value across the council's built-up squares of the same area (3.1 km², about a 1 km circle), so half of them saw more and half fewer.
    Sources: An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices), National Planning Application Database · fetched 20 Oct 2026, 02:09
    SourceLicenceFetchedLink
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.016 Oct 2026, 23:06open
    Building Control Management System (commencement notices)CC BY 4.020 Oct 2026, 01:45open
    National Planning Application DatabaseCC BY 4.020 Oct 2026, 02:09open
    Question 5

    What's the area like?

    Figure 10

    This street block against the council

    1% of homes built before 1971 (council 38%). 82% owner-occupied (council 68%).

    Homes built before 1971
    1% · council 38%
    Homes built since 2001
    3% · council 25%
    Owner-occupied
    82% · council 68%
    Rented
    17% · council 29%
    Children under 15
    20% · council 18%
    Aged 65 and over
    7% · council 17%
    Households with 2+ cars
    58% · council 39%
    Work mainly from home
    24% · council 19%
    This small area (355 people)Dún Laoghaire-Rathdown

    MeasuredCSO Census 2022, Small Area Population Statistics (CC BY 4.0) · small area 267022005

    Bus
    407 m
    Seafield Road · 116, 46n, 47 · busiest stop within 500 m: 27 an hour at peak
    Planned
    411 m
    BusConnects Core Bus Corridors, Bray to City
    Radon
    1 in 20
    homes here likely high (EPA). Test it
    Nearest school
    473 m
    St Andrews College, 1011 pupils
    Homes sold nearby
    57
    in 3 years, 1 new (Property Price Register)
    Schools, stops and the council

    Schools

    • St Andrews College · postprimary · 1011 pupils · 473 m
    • Booterstown Boys · primary · 188 pupils · 546 m
    • Our Lady Of Mercy Convent School · primary · 247 pupils · 556 m
    • Coláiste Eoin · postprimary · 517 pupils · 650 m
    • Coláiste Íosagáin · postprimary · 488 pupils · 689 m
    • Willow Park School · postprimary · 206 pupils · 820 m

    Stops 32

    • Seafield Road · 116, 46n, 47, 7B, 7D, E1 · 20/hour at peak · 407 m
    • Seafield Road · 116, 118, 47, 7B, 7D, E1 · 27/hour at peak · 435 m
    • St Helen's Road · 4, 7, 7A, 7E · 9/hour at peak · 541 m
    • Radisson Hotel · 116, 46n, 47, 700, 7B, 7D · 21/hour at peak · 558 m
    • Rock Road · 4, 7, 7A, 7n, 84n · 9/hour at peak · 564 m
    • Stillorgan Road · 47 · 581 m
    • Merrion Road · 4, 7, 702, 7A, 7n, 84n · 9/hour at peak · 595 m
    • Bellevue Avenue · 4, 7, 702, 7A, 7E · 10/hour at peak · 596 m

    Schools growing or shrinking planning in 3 years · pupils last year

    • St Andrews College · 473 m+0.3% pupils (1,011) · an extension 2025, approved
    • Booterstown Boys · 546 m-9.6% pupils (188)
    • Our Lady Of Mercy Convent School · 556 m-2% pupils (247)
    • Coláiste Eoin · 650 m+1.4% pupils (517)
    • Coláiste Íosagáin · 689 m0% pupils (488)
    • Willow Park School · 820 m-1% pupils (206) · an extension 2024, approved

    Open consultations

    Council meetings 3 items

    Public land

    • Dublin City Council · 1.21 ha · 422 m
    Sources: Public transport stops and routes (NTA GTFS), Department of Education school list, National Planning Application Database, Council consultation portals, Council meetings (ModernGov), Land Development Agency public land register, cso_saps_2022, National Transport Authority, Fingal County Council and Dún Laoghaire-Rathdown County Council development plan layers (CC BY 4.0), dartplus.ie project extents over NTA GTFS rail shapes (CC BY 4.0), EPA strategic noise maps, Fingal County Council · fetched 20 Oct 2026, 02:32
    SourceLicenceFetchedLink
    Public transport stops and routes (NTA GTFS)CC BY 4.018 Oct 2026, 23:44open
    Department of Education school listCC BY 4.027 Sept 2026, 23:32open
    National Planning Application DatabaseCC BY 4.020 Oct 2026, 02:09open
    Council consultation portalsPublic20 Oct 2026, 01:41open
    Council meetings (ModernGov)Public20 Oct 2026, 02:32open
    Land Development Agency public land registerCC BY 4.011 Sept 2026, 16:43open
    cso_saps_2022CC BY 4.0—open
    National Transport AuthorityCC BY 4.0——
    Fingal County Council and Dún Laoghaire-Rathdown County Council development plan layers (CC BY 4.0)CC BY 4.0——
    dartplus.ie project extents over NTA GTFS rail shapes (CC BY 4.0)CC BY 4.0——
    EPA strategic noise mapsCC BY 4.0——
    Fingal County CouncilCC BY 4.0——
    Question 6

    What to ask, and who

    1. Demolition (D14B/0096) ran out unbuilt in 2019: built anyway?
      Ask for: If built: proof it started in time, and an opinion of compliance.
      Seller · solicitor
    2. Application 117 m away open for comments until 22 Oct 2026: comment?
      Ask for: The plans on the council's website (€20 to comment).
      Council
    3. Any work done without planning permission?
      Ask for: An opinion of compliance for the whole house.
      Seller · solicitor
    Reference

    Where this is, the terms, the sources

    Townland
    Trimleston or Owenstown
    Electoral division
    Blackrock-Glenomena
    Electoral area
    Blackrock
    Council
    Dun Laoghaire-Rathdown County Council
    Everything we found, as a list 8 lines
    • 1 application on this site; latest D14B/0096, approved 2014, ran out unbuilt.
    • Zoned R2 (existing residential); not protected; no vacant land tax.
    • Nothing nearby looks set to change.
    • 2 applications open for comments nearby; nearest closes 22 Oct 2026.
    • Seafield Road (bus 116, 118) 435 m away: 27 an hour at morning peak; 47 from all stops within 500 m. Planned: BusConnects Core Bus Corridors 410 m away, core bus corridor (DLR County Development Plan 2022-2028).
    • Here (2022 census): 82% owner-occupied (council 68%); 6% of homes empty (council 6%); most built 1991–2000; 45% drive to work (council 43%); population down 4% since 2016.
    • 9 home extensions within 250 m since 2025: 7 approved (100%). Most were dormers or attic conversions. On Fosterbrook: 10 in 10 years, 92% approved.
    • The council decides in a median 52 days (about 7 weeks); 1 in 8 is asked for more information.
    What the terms mean 8 terms
    • Vacant land tax (Residential Zoned Land Tax (RZLT)): A yearly tax of 3% of the land's value on land that is zoned for homes and serviced but left unbuilt.
    • Building started (Commencement notice (BCMS)): The builder must tell the council's building control office 14 to 28 days before work starts.
    • Signed off as finished (Certificate of Compliance on Completion): A certificate filed when a building is finished, confirming it meets the building regulations.
    • Approved (Grant of permission): The council said yes, usually with conditions.
    • Approval ran out without being built (Permission lapsed / expired): Most permissions last five years.
    • Comment on an application (Observation / submission): Anyone can comment on a planning application within five weeks of it being lodged, for a €20 fee.
    • Appeal (Appeal to An Coimisiún Pleanála): The applicant, or anyone who commented in time, can appeal the council's decision within four weeks.
    • What the land is zoned for (Zoning objective): The council's development plan sets what each area is for: homes, shops, open space and so on.
    Sources and licences 32
    SourcePublisherLicenceFetched
    EPA strategic noise maps—CC BY 4.0—
    Fingal County Council—CC BY 4.0—
    Fingal County Council and Dún Laoghaire-Rathdown County Council development plan layers (CC BY 4.0)—CC BY 4.0—
    National Transport Authority—CC BY 4.0—
    services-eu1.arcgis.comAn Coimisiún PleanálaCC BY 4.016 Oct 2026
    data.nbco.gov.ieNational Building Control Office (BCMS)CC BY 4.020 Oct 2026
    data.gov.ieVarious (see each layer)CC BY 4.0, CC BY-NC-ND 4.027 Sept 2026
    gis.epa.ieEnvironmental Protection AgencyCC BY 4.027 Sept 2026
    gis.epa.ieEnvironmental Protection AgencyCC BY 4.027 Sept 2026
    services.arcgis.comLocal authorities (Record of Protected Structures)CC BY 4.027 Sept 2026
    services-eu1.arcgis.comNational Monuments Service (SMR)CC BY 4.027 Sept 2026
    dlrcoco.citizenspace.comLocal authorities (consultation portals)Public20 Oct 2026
    www2.courts.ie—© the publisher20 Oct 2026
    cso.ie—CC BY 4.0—
    dartplus.ie project extents over NTA GTFS rail shapes (CC BY 4.0)—CC BY 4.0—
    services-eu1.arcgis.comLocal authorities (derelict sites registers)CC BY 4.019 Oct 2026
    services.arcgis.comDublin local authorities (housing delivery pipeline)CC BY 4.019 Oct 2026
    data.epa.ieEnvironmental Protection Agency (LEAP licence register)CC BY 4.019 Oct 2026
    esbnetworks.ie—© the publisher · flag only11 Sept 2026
    overpass-api.deOpenStreetMap contributors, NHDS, Kildare County CouncilODbL 1.0, CC BY-SA 4.0, CC BY 4.027 Sept 2026
    transportforireland.ieNational Transport AuthorityCC BY 4.018 Oct 2026
    lda.ieLand Development AgencyCC BY 4.011 Sept 2026
    meetings.fingal.ieLocal authorities (council meetings)Public20 Oct 2026
    services.arcgis.comDepartment of Housing (National Planning Application Database)CC BY 4.020 Oct 2026
    services-eu1.arcgis.comTailte ÉireannCC BY 4.011 Sept 2026
    services-eu1.arcgis.comCSO, Tailte Éireann, OpenStreetMap contributorsCC BY 4.04 Oct 2026
    propertypriceregister.ieProperty Services Regulatory Authority (PPR)© PSRA, PSI licence20 Oct 2026
    services.arcgis.comLocal authorities (RZLT maps)CC BY 4.018 Oct 2026
    gov.ieDepartment of EducationCC BY 4.027 Sept 2026
    gov.ieDepartment of HousingCC BY-SA 4.09 Oct 2026
    tusla.ieTusla (Early Years Inspectorate)Public register14 Oct 2026
    services.arcgis.comLocal authorities via the Department of Housing (GZT / MyPlan)CC BY 4.018 Oct 2026
    Measured
    counted from a public register
    Calculated
    a rate or median we worked out from those counts
    Our classification
    we sorted it by reading each description
    Estimate
    inferred from another source (census, map data)
    Rule summary
    the law, simplified: check before relying on it
    How we work this out
    Generated 20 Oct 2026, 15:57 from the Planning Register store; nothing was fetched live. Not a legal search: the council's planning file is the record. Deadlines come from published dates under the Planning and Development Act 2000: confirm with the council before relying on them. Street map © OpenStreetMap contributors; building outlines © Overture Maps Foundation. The text version carries every figure with its source, for an AI assistant.