PlanningRegister.ie
Planning report · South Dublin County Council · 500 m around the house · the last 12 months · 28 Oct 2026, 10:20

Saint Patrick's Road, Greenhills

53.31273, -6.32982

Homes here mostly date from the 1950s. Home extensions nearby almost always get approved (98%). 1 application nearby open for comments.

See on the mapWatch this area

How planning works, with this area's numbers

steps can overlap · medians for home extensions within 1.5 km, 10 years
  1. 1ApplySite notice up, plans online
  2. 2Comments5 weeks, €20. Comment to keep your right to appeal
  3. 3Decision8 weeks by law. Here 54 days
  4. 4Appeal window4 weeks after the decision
  5. 5AppealHere about 4 months
  6. 6PermissionLasts 5 years
  7. 7StartStart notice to the council. Here about 4 months after
  8. 8Sign-offCompletion cert, or the owner opts out
Question 1

What's the planning story of this house?

Figure 1

When it was built, and the rules since

Most homes here were built 1946–60, before planning permission was needed.

Timeline from 1942: planning permission needed from October 1964, building regulations from June 1992, building records online from March 2014, sign-off opt-out from September 2015. Most homes here were built 1946–1960.19501960197019801990200020102020Oct 1964permission neededJun 1992building regulationsMar 2014building records onlineSep 2015owners may opt out of sign-offThis houseBuilt: most homes in this small area date from 1946–1960 (census estimate)most built

Each line is a rule that applies to work done after it.

MeasuredEstimatecouncil register via NPAD · build years: CSO Census 2022, small area

On this site
R2
Zoning · Existing residential
No
Protected or listed · on the council's list
No
Vacant land tax · lived-in homes don't pay it
1 in 20
Radon (EPA) · homes with high radon
Zoning, protection, tax and flood: the detail
ZoningR2 · Existing residential
What it says

RES: To protect and/or improve residential amenity

An established residential area. The objective is to protect existing residential amenity as well as to provide housing — which is the objective a neighbour's objection to an overbearing extension is usually argued under.

south dublin county development plan 2022 2028 · 8 Mar 2022 – 8 Mar 2028

Radon1 in 20 homes have high radon (EPA)

Not on this site: protected building, heritage inventory, monument zone, conservation area, EU nature site, EU bird site, natural heritage area, tree order, landslide risk, derelict list.

Licensed industrial sites within 1.0 km: Plateco ZN Limited (300 m); Circle Paints Manufacturing Ireland Limited (443 m); CCM Limited T/A Kenn Truss (612 m)

Vacant land taxNo lived-in homes don't pay it
Flood riskNone mapped within 500 m
Within 500 mCountFor example
Licensed industrial sites2Circle Paints Manufacturing Ireland Limited; Just The Plating Company Limited
Heritage inventory buildings1Catholic Church of the Holy Spirit
Radon grid squares6
Monuments2Flat cemetery; R149469
How we work this out
'On this site' means the record's own map outline touches the registered parcel (or a 12 m circle round the point where there is no parcel). Only the council's own list confirms a protected building; ask the council if in doubt. The council's map for the vacant land tax shows this spot inside an area of existing homes. Homes people live in, and their gardens, don't pay the tax. The OPW flood map's licence lets us show a yes/no only. Land on the vacant land tax map nearby: 3 on the draft 2027 map; 3 on the final 2026 map.
Sources: Development plan zoning (councils), EPA licensed sites, EPA radon map, EPA licensed facilities (LEAP), Residential Zoned Land Tax maps, Constraint layers (bundle), National Inventory of Architectural Heritage, Sites and Monuments Record · fetched 26 Oct 2026, 23:21
SourceLicenceFetchedLink
Development plan zoning (councils)CC BY 4.025 Oct 2026, 23:06open
EPA licensed sitesCC BY 4.027 Sept 2026, 19:36open
EPA radon mapCC BY 4.027 Sept 2026, 19:36open
EPA licensed facilities (LEAP)CC BY 4.026 Oct 2026, 23:21open
Residential Zoned Land Tax mapsCC BY 4.025 Oct 2026, 23:43open
Constraint layers (bundle)CC BY 4.0, CC BY-NC-ND 4.027 Sept 2026, 19:37open
National Inventory of Architectural HeritageCC BY 4.027 Sept 2026, 19:35open
Sites and Monuments RecordCC BY 4.027 Sept 2026, 19:29open
How we work this out
Applications whose site outline (or map point) falls on this property. 'No sign building has started' means we found no notice to the council's building control office; small jobs don't always file one, so ask. A missing completion certificate is not proof of a problem: an owner can opt out of official sign-off for a house or extension built for themselves.
Sources: Building Control Management System (commencement notices), National Planning Application Database · fetched 28 Oct 2026, 04:50
SourceLicenceFetchedLink
Building Control Management System (commencement notices)CC BY 4.028 Oct 2026, 02:21open
National Planning Application DatabaseCC BY 4.028 Oct 2026, 04:50open
Question 2

Could you extend?

Nothing on this site restricts it: not protected, not in a conservation area.

Figure 2

What happened to applications like yours

Extensions are almost always approved here: 86–100% by type. A new house in a garden is harder: 81% approved, and 1 in 3 is asked for more information.

Single-storey rear68 decided · more info asked 21%
100% · council 96%
Two-storey rear21 decided · more info asked 29%
100% · council 99%
Two-storey side14 decided · more info asked 43%
86% · council 94%
Attic or dormer265 decided · more info asked 12%
98% · council 98%
First-floor22 decided · more info asked 14%
100% · council 92%
Garage conversion28 decided · more info asked 14%
100% · council 99%
Porch or front12 decided · more info asked 17%
100% · council 96%
New house in a garden or site27 decided · more info asked 37%
81% · council 62%
Approved nearbySouth Dublin overall

Decided applications within 1.5 km, received in the last 10 years. The kind of work is read from each description.

CalculatedOur classificationcouncil register via NPAD · 457 nearby, 2,803 council-wide

Extensions and refusals right beside you 4 within 250 m · 0 refused within 100 m

Extensions and refusals near you 4 extensions within 250 m · the last 12 months

3 approved1 no decision or withdrawn
KindAppliedApprovedRefused
Dormer or attic43—

Refused within 100 m 0 in the last 12 months

Nothing refused this close in the last 12 months.

    How we work this out
    Home extensions are read from the application's description (extension, attic or dormer, porch, garage conversion, garden room), so a few may be missed or mislabelled. The kind is the first that fits: a dormer with a rear extension counts as a dormer. Refusal reasons come from An Coimisiún Pleanála's inspector reports, so they exist only where the refusal was appealed (Dún Laoghaire-Rathdown so far). The council's own reasons are on its planning file.
    Sources: National Planning Application Database, An Coimisiún Pleanála cases (ArcGIS feed) · fetched 28 Oct 2026, 04:50
    SourceLicenceFetchedLink
    National Planning Application DatabaseCC BY 4.028 Oct 2026, 04:50open
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.023 Oct 2026, 23:08open
    Sources: An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices), National Planning Application Database · fetched 28 Oct 2026, 04:50
    SourceLicenceFetchedLink
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.023 Oct 2026, 23:08open
    Building Control Management System (commencement notices)CC BY 4.028 Oct 2026, 02:21open
    National Planning Application DatabaseCC BY 4.028 Oct 2026, 04:50open
    Question 3

    How long, and what if someone objects?

    Figure 3

    A home extension's journey here

    A decision takes 54 days. 1 in 6 is asked for more information, which adds about 78 days. Building starts about 4 months after permission.

    Comments open: 5 weeks · €20; Council decision: 54 days; If more info asked (1 in 6): 131 days; Appeal window: 4 weeks; If appealed: +126 days; Building starts: 110 days after permission0 mo3 mo6 mo9 mo12 mo15 moComments openComments close 5 weeks after the application is lodged5 weeks · €20Council decisionDecision: median 54 days, middle half 50–55 (n=407)54 daysIf more info asked (1 in 6)With further information: median 131 days (n=77)131 daysAppeal windowAnyone who commented can appeal within 4 weeks of the decision4 weeksIf appealedAt An Coimisiún Pleanála: median 126 days (n=55, all appeals within 1.5 km)+126 daysBuilding startsStart notice: median 110 days after permission (n=203)110 days after permissionSigned off54% of owners opt out of sign-off

    Bars are medians; whiskers show the middle half. Medians of separate steps don't add up exactly.

    Calculated484 decided home extensions, 211 start notices, 55 decided appeals · within 1.5 km, 10 years · NPAD, BCMS, An Coimisiún Pleanála

    Figure 4

    What appeals changed

    8 of 17 appealed refusals became permissions. 4 of 39 appealed approvals were reversed.

    Refusals appealed17 decided
    8 became permissions
    Approvals appealed39 decided
    4 reversed
    Ended approvedEnded refusedWithdrawn, invalid or other

    Every appeal decided within 1.5 km in 10 years, any kind of development.

    CalculatedAn Coimisiún Pleanála cases linked to the council file

    Appeals nearby 1 in the last 12 months

    None of 1 changed the council's decision

    • 324035 Granted with conditions · Lands located at the former Chadwicks Builders Merchant site, South… · 373 m report
    Sources: An Coimisiún Pleanála cases (ArcGIS feed), Courts Service legal diary (judicial reviews), National Planning Application Database · fetched 28 Oct 2026, 04:50
    SourceLicenceFetchedLink
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.023 Oct 2026, 23:08open
    Courts Service legal diary (judicial reviews)© the publisher27 Oct 2026, 23:11open
    National Planning Application DatabaseCC BY 4.028 Oct 2026, 04:50open
    Question 4

    What's changing around you?

    Street map around Saint Patrick's Road, Greenhills with 15 numbered planning items
    ⌖ the houseOpen for commentsWindow closingDerelict buildingBuilding startedEmpty land zoned for homesApprovedNo decision yet
    1. 188 Saint Peter's Road, Walkinstown SD26B/0455WNo decision yet · 123 m
    2. 271, St Conleth's Road SD26B/0370WApproved · 203 m
    3. 362, Backland site to rear of SD26A/0031WRefused · 446 m
    4. 464 Cromwellsfort Road, Walkinstown SD26B/0369WApproved · 448 m
    5. 51 St Brendan's Crescent, Greenhills 2046Derelict building · 420 m
    6. 699 Saint Peter's Road, Dublin 12 SD26B/0177WBuilding started · 149 m
    7. 72.8 ha zoned for homesEmpty land zoned for homes · 436 m
    8. 80.2 ha zoned for homesEmpty land zoned for homes · 473 m
    9. 999, St Peter's Rd SD26B/0177WApproved · 166 m
    10. 1085, Cherryfield Road SD26B/0244WApproved · 182 m
    11. 11Yard to rear of 131 Saint Peters Road, Walkinstown SD26A/0186WNo decision yet · 192 m
    12. 1277, Cherryfield Road SD26B/0221WApproved · 204 m
    13. 13Unit 10, Greenhills Industrial Estate SD25A/0299WApproved · 239 m
    14. 1457, St Peters Road SD26B/0164WApproved · 253 m
    15. 15183 St Peter's Rd, Walkinstown SD26B/0210WNo decision yet · 313 m
    Figure 5

    What happens to applications within 500 m

    Permission isn't building. Of 88 permissions since 2016, 27 show a start notice and 0 have a completion certificate.

    111 applications lodged within 500 m. Council: 90 approved, 5 refused. After appeals: 88 approved. Of those: 0 signed off, 13 built with the owner's opt-out, 14 started, 60 with no start notice found, 1 ran out.LODGEDCOUNCIL DECISIONAFTER APPEALSWHAT HAPPENED NEXT90: lodged → approved5: lodged → refused12: lodged → withdrawn or invalid4: lodged → undecided88: approved → approved5: refused → refused12: withdrawn or invalid → withdrawn4: undecided → undecided1 approved by the council, refused after an appeal1 approved by the council, withdrawn or invalid after an appeal60: approved → no start notice found13: approved → built, owner opted out14: approved → started, not signed off1: approved → ran out111 lodged111 lodged90 approved90 approved5 refused5 refused12 withdrawn or invalid12 withdrawn or invalid4 undecided4 undecided88 approved88 approved6 refused6 refused13 withdrawn13 withdrawn4 undecided4 undecided60 no start notice found60 no start notice found13 built, owner opted out13 built, owner opted out14 started, not signed off14 started, not signed off1 ran out1 ran out

    Purple bands are refusals turned into permissions on appeal. "No start notice found" includes small jobs that never needed one and notices we couldn't match.

    Measured111 applications in 10 years · NPAD, An Coimisiún Pleanála, BCMS start notices and completion certificates

    Figure 6

    The next 30 days

    4 deadlines within 500 m; the first closes 28 Oct 2026.

    4 deadlines in the next 30 days: 2026-10-28 SD26B/0369W: Grant Permission — Remove the bay window and the existing pitched roof to the existing single storey extension to the rear and replace with; 2026-11-03 SD26B/0370W: Grant Permission — Conversion of existing attic space comprising of modification of existing roof structure; new access stairs; two roof wi; 2026-11-12 SD26B/0455W: application received — The construction of a single-storey rear extension with rooflights, single-storey front extension, two-storey side exten; 2026-11-16 SD26A/0031W: Refuse Permission — Construction of a new single storey dwelling with pitched roof; works to existing boundary wall; new vehicle entrance witoday2 Nov7 Nov12 Nov17 Nov22 Nov27 NovSD26B/0369W: Grant Permission — Remove the bay window and the existing pitched roof to the existing single storey extension to the rear and replace with · 448 m away · 2026-10-28SD26B/0370W: Grant Permission — Conversion of existing attic space comprising of modification of existing roof structure; new access stairs; two roof wi · 203 m away · 2026-11-03SD26B/0455W: application received — The construction of a single-storey rear extension with rooflights, single-storey front extension, two-storey side exten · 123 m away · 2026-11-12SD26A/0031W: Refuse Permission — Construction of a new single storey dwelling with pitched roof; works to existing boundary wall; new vehicle entrance wi · 446 m away · 2026-11-16
    Comments closeTime to appeal ends
    • Time to appeal ends 28 Oct 2026closes today
      4SD26B/0369W · Grant Permission — Remove the bay window and the existing pitched roof to the existing single storey extension to the…
      €220 to An Coimisiún Pleanála (€110 observer) · 448 m away
    • Time to appeal ends 3 Nov 20266 days left
      2SD26B/0370W · Grant Permission — Conversion of existing attic space comprising of modification of existing roof structure; new access…
      €220 to An Coimisiún Pleanála (€110 observer) · 203 m away
    • Comments close 12 Nov 202615 days left
      1SD26B/0455W · application received — The construction of a single-storey rear extension with rooflights, single-storey front…
      €20 to the council · 123 m away
    • Time to appeal ends 16 Nov 202619 days left
      3SD26A/0031W · Refuse Permission — Construction of a new single storey dwelling with pitched roof; works to existing boundary wall;…
      €220 to An Coimisiún Pleanála (€110 observer) · 446 m away

    Measuredcouncil registers and An Coimisiún Pleanála · deadlines worked out from the dates on file

    Sites that could change 3 within 500 m

    Derelict building 1

    • 51 St Brendan's Crescent, Greenhills · derelict since Oct 2025 · 420 m

    Empty land zoned for homes 2

    • 72.8 ha zoned for homes · no homes built on it yet · 436 m
    • 80.2 ha zoned for homes · no homes built on it yet · 473 m
    Sources: An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices), Derelict sites registers, Council meetings (ModernGov), National Planning Application Database, Residential Zoned Land Tax maps · fetched 28 Oct 2026, 04:50
    SourceLicenceFetchedLink
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.023 Oct 2026, 23:08open
    Building Control Management System (commencement notices)CC BY 4.028 Oct 2026, 02:21open
    Derelict sites registersCC BY 4.026 Oct 2026, 23:09open
    Council meetings (ModernGov)Public28 Oct 2026, 02:10open
    National Planning Application DatabaseCC BY 4.028 Oct 2026, 04:50open
    Residential Zoned Land Tax mapsCC BY 4.025 Oct 2026, 23:43open
    Figure 7

    Applications within 500 m, by year

    Between 15 and 25 a year; busiest 2025. 95% of decisions were approvals.

    2021: 15, 2022: 15, 2023: 19, 2024: 22, 2025: 25, 2026: 1501020302021: 13 approved2021: 1 refused2021: 1 withdrawn or invalid15’21*2022: 14 approved2022: 1 refused15’222023: 17 approved2023: 2 withdrawn or invalid19’232024: 16 approved2024: 2 refused2024: 4 withdrawn or invalid22’242025: 20 approved2025: 5 withdrawn or invalid25’252026: 10 approved2026: 1 refused2026: 4 undecided15’26*
    ApprovedRefusedWithdrawn or invalidUndecided

    2021 and 2026 are part years (*). Exemption requests and time extensions are left out.

    Measuredcouncil register via NPAD

    Open for comments €20 to comment

    Every application within 500 m 21 in the last 12 months

    See every application on the map

    How we work this out
    Descriptions are shortened by the national planning database (to 80 characters in Dún Laoghaire-Rathdown, 70 in Fingal), and it does not publish applicants' names.
    Sources: National Planning Application Database, An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices) · fetched 28 Oct 2026, 04:50
    SourceLicenceFetchedLink
    National Planning Application DatabaseCC BY 4.028 Oct 2026, 04:50open
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.023 Oct 2026, 23:08open
    Building Control Management System (commencement notices)CC BY 4.028 Oct 2026, 02:21open
    Building work nearby 7 in the last 12 months
    1 not signed off6 no sign-off needed
    • 699 Saint Peter's Road, Dublin 12, Dublin, D12 C6K1 · 8 Sept 2026 · start notice, opted out no sign-off needed · SD26B/0177W · 149 m
    • 77 Cherryfield Road, Dublin, D12 NW27 · 24 Aug 2026 · short notice no sign-off needed · SD26B/0221W · 227 m
    • 17 Greentrees Park, Dublin 12, Dublin, D12 WF29 · 22 Jun 2026 · start notice, opted out no sign-off needed · SD25B/0481 · 489 m
    • Greenhills Road, Dublin 12, Dublin, D12 XR92 · 16 Jun 2026 · start notice not signed off · SD25A/0139W & PL-500594-SD-26 · 370 m
    • 40 Cherryfield Avenue, Dublin 12, Dublin, D12 Y0P0 · 10 Jun 2026 · short notice no sign-off needed · SD25B/0622W · 452 m
    • 8 Cromwellsfort Road, Dublin, South Dublin, D12 T3C6 · 9 Feb 2026 · short notice no sign-off needed · SD25B/0609W · 485 m
    • 27 Wilkin's Court, South Dublin, D12 E44N · 3 Feb 2026 · short notice no sign-off needed · SD25B/0153W · 499 m
    How we work this out
    Each row is a notice the builder sent to the council's building control office before work started. One notice can cover many homes. 'Signed off as finished' means a completion certificate is on file; work done under an opt-out or a short notice doesn't need one.
    Source: Building Control Management System (commencement notices) · fetched 28 Oct 2026, 02:21
    SourceLicenceFetchedLink
    Building Control Management System (commencement notices)CC BY 4.028 Oct 2026, 02:21open
    0
    Named places nearby: estate, schemes, crèches, schools

    Named places estate, developments, inspections

    Developments within 1.0 km

    SchemeHomesProgressDistance
    Former Chadwicks Builders Merchant588—373 m
    Former Chadwicks Site633—436 m
    Former Chadwicks Builders Merchant Site588—436 m
    Kestrel House4242 being built (2026-Q2)529 m
    Concrete Pumping Ltd Site99—558 m
    Greenhills Park——571 m
    Little John Centre2020 built (2025-Q1)658 m
    CHM Premises171—703 m

    Crèches and schools inspected

    NameLatest inspectionDistance
    Small Wonders Montessori & Afterschool Centre · Crèche24 Feb 2026 · report · Tusla Early Years Inspectorate329 m
    Wonder Years · Crèche8 May 2023 · report · Tusla Early Years Inspectorate625 m
    Evergreen Montessori · Crèche17 Sept 2025 · report · Tusla Early Years Inspectorate751 m
    How we work this out
    Organisations only: a person named on an application is never listed. Inspection dates and links are the publisher's; read their report for the findings.
    Sources: Dublin housing delivery pipeline, National Planning Application Database, Department of Education school list, Tusla early years register · fetched 28 Oct 2026, 04:50
    SourceLicenceFetchedLink
    Dublin housing delivery pipelineCC BY 4.026 Oct 2026, 23:00open
    National Planning Application DatabaseCC BY 4.028 Oct 2026, 04:50open
    Department of Education school listCC BY 4.027 Oct 2026, 23:04open
    Tusla early years registerPublic register21 Oct 2026, 23:37open
    How busy is this area Busier than most of South Dublin County Council.
    Homes approved
    Here844
    Council middle0
    Homes started
    Here91
    Council middle5
    How we work this out
    Homes approved counts schemes of 10 or more homes (one-off houses are not included). Homes started counts every home in a notice that building work was starting. The council figure is the middle value across the council's built-up squares of the same area (3.1 km², about a 1 km circle), so half of them saw more and half fewer.
    Sources: An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices), National Planning Application Database · fetched 28 Oct 2026, 04:50
    SourceLicenceFetchedLink
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.023 Oct 2026, 23:08open
    Building Control Management System (commencement notices)CC BY 4.028 Oct 2026, 02:21open
    National Planning Application DatabaseCC BY 4.028 Oct 2026, 04:50open
    Question 5

    What's the area like?

    Figure 8

    This street block against the council

    92% of homes built before 1971 (council 18%). 92% owner-occupied (council 67%).

    Homes built before 1971
    92% · council 18%
    Homes built since 2001
    1% · council 27%
    Owner-occupied
    92% · council 67%
    Rented
    5% · council 29%
    Children under 15
    13% · council 21%
    Aged 65 and over
    23% · council 13%
    Households with 2+ cars
    33% · council 40%
    Work mainly from home
    14% · council 10%
    This small area (288 people)South Dublin

    MeasuredCSO Census 2022, Small Area Population Statistics (CC BY 4.0) · small area 267157001

    Bus
    129 m
    Saint James's Road · F3 · busiest stop within 500 m: 10 an hour at peak
    Radon
    1 in 20
    homes here likely high (EPA). Test it
    Nearest school
    441 m
    Holy Spirit Junior Primary School, 270 pupils
    Homes sold nearby
    51
    in 3 years (Property Price Register)
    Schools, stops and the council

    Schools

    • Holy Spirit Junior Primary School · primary · 270 pupils · 441 m
    • Holy Spirit Senior Primary School · primary · 269 pupils · 461 m
    • St Pauls Secondary School · postprimary · 466 pupils · 562 m
    • St Damiens Ns · primary · 231 pupils · 593 m
    • Greenhills College · postprimary · 186 pupils · 710 m
    • Riverview Educate Together National School · primary · 242 pupils · 859 m

    Stops 62

    • Saint James's Road · F3 · 4/hour at peak · 129 m
    • Saint Joseph's Road · F3 · 4/hour at peak · 146 m
    • Saint Joseph's Road · F3 · 4/hour at peak · 185 m
    • Saint James's Road · F3 · 4/hour at peak · 238 m
    • St Peter's Rd North · F3 · 4/hour at peak · 304 m
    • St Peter's Rd North · F3 · 4/hour at peak · 406 m
    • St Brendan's Cres · F3 · 4/hour at peak · 451 m
    • M Keane IE · 27, 77A, 77n · 8/hour at peak · 453 m

    Schools growing or shrinking planning in 3 years · pupils last year

    • Holy Spirit Junior Primary School · 441 m-2.5% pupils (270) · temporary classrooms 2024, approved
    • Holy Spirit Senior Primary School · 461 m+1.1% pupils (269) · temporary classrooms 2024, approved
    • St Pauls Secondary School · 562 m+0.4% pupils (466)
    • St Damiens Ns · 593 m-0.4% pupils (231)
    • Greenhills College · 710 m+5.1% pupils (186) · temporary classrooms 2024, approved
    • Riverview Educate Together National School · 859 m+3.4% pupils (242)

    Open consultations

    Council meetings 25 items

    Public land

    • Dublin City Council · 0.18 ha · 265 m
    • Dublin City Council · 2.56 ha · 266 m
    • Dublin City Council · 0.72 ha · 275 m
    • Dublin City Council · 0.17 ha · 312 m
    • Dublin City Council · 0.56 ha · 321 m
    • Dublin City Council · 0.16 ha · 358 m
    Sources: Public transport stops and routes (NTA GTFS), Department of Education school list, National Planning Application Database, Council consultation portals, Council meetings (ModernGov), Land Development Agency public land register, cso_saps_2022, National Transport Authority, Fingal County Council and Dún Laoghaire-Rathdown County Council development plan layers (CC BY 4.0), dartplus.ie project extents over NTA GTFS rail shapes (CC BY 4.0), EPA strategic noise maps, Fingal County Council · fetched 28 Oct 2026, 04:50
    SourceLicenceFetchedLink
    Public transport stops and routes (NTA GTFS)CC BY 4.025 Oct 2026, 23:02open
    Department of Education school listCC BY 4.027 Oct 2026, 23:04open
    National Planning Application DatabaseCC BY 4.028 Oct 2026, 04:50open
    Council consultation portalsPublic28 Oct 2026, 00:59open
    Council meetings (ModernGov)Public28 Oct 2026, 02:10open
    Land Development Agency public land registerCC BY 4.011 Sept 2026, 16:43open
    cso_saps_2022CC BY 4.0—open
    National Transport AuthorityCC BY 4.0——
    Fingal County Council and Dún Laoghaire-Rathdown County Council development plan layers (CC BY 4.0)CC BY 4.0——
    dartplus.ie project extents over NTA GTFS rail shapes (CC BY 4.0)CC BY 4.0——
    EPA strategic noise mapsCC BY 4.0——
    Fingal County CouncilCC BY 4.0——
    Question 6

    What to ask, and who

    1. Application 123 m away open for comments until 12 Nov 2026: comment?
      Ask for: The plans on the council's website (€20 to comment).
      Council
    2. Decision 203 m away can be appealed until 3 Nov 2026: appeal?
      Ask for: The decision on the council's website (€220 to appeal).
      Council
    3. Any work done without planning permission?
      Ask for: An opinion of compliance for the whole house.
      Seller · solicitor
    Reference

    Where this is, the terms, the sources

    Townland
    Greenhills
    Electoral division
    Terenure-St. James
    Electoral area
    Rathfarnham-Templeogue
    Council
    South Dublin County Council
    Everything we found, as a list 8 lines
    • Zoned R2 (existing residential); not protected; no vacant land tax.
    • 3 sites nearby could change: 1 derelict, 2 empty zoned plots.
    • 1 application open for comments nearby; nearest closes 12 Nov 2026.
    • M Keane IE (bus 27, 77A) 469 m away: 10 an hour at morning peak; 50 from all stops within 500 m.
    • Here (2022 census): 92% owner-occupied (council 66%); 8% of homes empty (council 4%); most built 1946–1960; 45% drive to work (council 54%); population down 6% since 2016.
    • 4 home extensions within 250 m since 2026. Most were dormers or attic conversions.
    • The council decides in a median 55 days (about 8 weeks); 1 in 5 is asked for more information.
    • Homes started within 1 km: 54 in the last year, 183 three years before.
    What the terms mean 8 terms
    • Vacant land tax (Residential Zoned Land Tax (RZLT)): A yearly tax of 3% of the land's value on land that is zoned for homes and serviced but left unbuilt.
    • Building started (Commencement notice (BCMS)): The builder must tell the council's building control office 14 to 28 days before work starts.
    • Signed off as finished (Certificate of Compliance on Completion): A certificate filed when a building is finished, confirming it meets the building regulations.
    • Approved (Grant of permission): The council said yes, usually with conditions.
    • Listed by the council as derelict (Derelict Sites Register): Councils keep a public list of land and buildings in a ruinous or dangerous state.
    • Comment on an application (Observation / submission): Anyone can comment on a planning application within five weeks of it being lodged, for a €20 fee.
    • Appeal (Appeal to An Coimisiún Pleanála): The applicant, or anyone who commented in time, can appeal the council's decision within four weeks.
    • What the land is zoned for (Zoning objective): The council's development plan sets what each area is for: homes, shops, open space and so on.
    Sources and licences 31
    SourcePublisherLicenceFetched
    EPA strategic noise maps—CC BY 4.0—
    Fingal County Council—CC BY 4.0—
    Fingal County Council and Dún Laoghaire-Rathdown County Council development plan layers (CC BY 4.0)—CC BY 4.0—
    National Transport Authority—CC BY 4.0—
    services-eu1.arcgis.comAn Coimisiún PleanálaCC BY 4.023 Oct 2026
    data.nbco.gov.ieNational Building Control Office (BCMS)CC BY 4.028 Oct 2026
    data.gov.ieVarious (see each layer)CC BY 4.0, CC BY-NC-ND 4.027 Sept 2026
    gis.epa.ieEnvironmental Protection AgencyCC BY 4.027 Sept 2026
    services-eu1.arcgis.comNational Inventory of Architectural HeritageCC BY 4.027 Sept 2026
    gis.epa.ieEnvironmental Protection AgencyCC BY 4.027 Sept 2026
    services-eu1.arcgis.comNational Monuments Service (SMR)CC BY 4.027 Sept 2026
    dlrcoco.citizenspace.comLocal authorities (consultation portals)Public28 Oct 2026
    www2.courts.ie—© the publisher27 Oct 2026
    cso.ie—CC BY 4.0—
    dartplus.ie project extents over NTA GTFS rail shapes (CC BY 4.0)—CC BY 4.0—
    services-eu1.arcgis.comLocal authorities (derelict sites registers)CC BY 4.026 Oct 2026
    services.arcgis.comDublin local authorities (housing delivery pipeline)CC BY 4.026 Oct 2026
    data.epa.ieEnvironmental Protection Agency (LEAP licence register)CC BY 4.026 Oct 2026
    esbnetworks.ie—© the publisher · flag only11 Sept 2026
    transportforireland.ieNational Transport AuthorityCC BY 4.025 Oct 2026
    lda.ieLand Development AgencyCC BY 4.011 Sept 2026
    meetings.fingal.ieLocal authorities (council meetings)Public28 Oct 2026
    services.arcgis.comDepartment of Housing (National Planning Application Database)CC BY 4.028 Oct 2026
    services-eu1.arcgis.comTailte ÉireannCC BY 4.011 Sept 2026
    services-eu1.arcgis.comCSO, Tailte Éireann, OpenStreetMap contributorsCC BY 4.04 Oct 2026
    propertypriceregister.ieProperty Services Regulatory Authority (PPR)© PSRA, PSI licence28 Oct 2026
    services.arcgis.comLocal authorities (RZLT maps)CC BY 4.025 Oct 2026
    gov.ieDepartment of EducationCC BY 4.027 Oct 2026
    gov.ieDepartment of HousingCC BY-SA 4.023 Oct 2026
    tusla.ieTusla (Early Years Inspectorate)Public register21 Oct 2026
    services.arcgis.comLocal authorities via the Department of Housing (GZT / MyPlan)CC BY 4.025 Oct 2026
    Measured
    counted from a public register
    Calculated
    a rate or median we worked out from those counts
    Our classification
    we sorted it by reading each description
    Estimate
    inferred from another source (census, map data)
    Rule summary
    the law, simplified: check before relying on it
    How we work this out
    Generated 28 Oct 2026, 10:20 from the Planning Register store; nothing was fetched live. Not a legal search: the council's planning file is the record. Deadlines come from published dates under the Planning and Development Act 2000: confirm with the council before relying on them. Street map © OpenStreetMap contributors; building outlines © Overture Maps Foundation. The text version carries every figure with its source, for an AI assistant.