Dublin City Council · 3193/22 · Permission

Kestrel House

Building: all 42 apartments are under construction (Q2 2026).

6 storeysDouble E Investments LtdDublin 12, Dublin City Council

Email me when the next phase is lodged

Status
Building started
Council decision
Approved · 21 Jun 2022
Height
up to 6 storeys
Uses
apartments, retail, mixed
Applicant
Double E Investments Ltd · 3 planning applications, 33% granted
Site
1,552 m²
Appeal
ACP 314103 · Approved with conditions · 27 Mar 2024

Building progress councils’ figures, Q2 2026

42
homes permitted
42
homes started on site

completed · under construction · not started · 0 houses and 42 apartments permitted

Quarter by quarter
QuarterPermittedUnder constructionCompletedCompleted share
Q2 202542420
Q3 202542420
Q4 202542420
Q1 202642420
Q2 202642420
Source and licence

The scheme

Double E Investments Ltd proposes the demolition of the existing Kestrel House public house at 157 Walkinstown Road. The development consists of a part 4, 5 and 6 storey mixed-use building containing 42 apartments, three retail units and a new public house. The scheme includes basement car parking, bicycle storage and telecommunications infrastructure at roof level.

What the register says

Planning permission is sought for the development comprising: (i) demolition of the existing two storey building (licensed public house and ancillary off-licence); (ii) construction of a part 4, 5 and 6 storey (over basement) mixed use development consisting of the following: (a) 42 no. apartments, comprising of 19 no. one-bed apartments and 23 no. two-bed apartments (accessed from Bunting Road). Each unit will have access to private amenity space in the form of a balcony/terrace and 381.6 sqm of external communal amenity space provided at 4th and 5th floor levels; (b) 3 no. retail units at ground floor level totally 146sqm (accessed from Walkinstown Road and Bunting Road); (c) a 384sqm public house at ground floor level (accessed from Walkinstown Road, Cromwellsfort Road and Bunting Road). The development is served by refuse storage; a plant room; an ESB substation; 99 no. bicycle parking spaces, including 1 no. accessible space and 2 no. cargo bicycle spaces located internally at ground floor level and 39 no. visitor bicycle parking spaces located externally; (iii) extended excavation of existing basement to provide for 16 no. car parking spaces (including 1 no. limited mobility parking space). Vehicular access to the basement will be provided via a vehicle lift accessible via Bunting Road; (iv) provision of telecommunications infrastructure at roof level comprising (a) 6 no. 5G antennas and 6 no. hexaband antennas. Each antenna will be enclosed within shrouds (2.8m in height above parapet). A total of 6 no. shrouds will be provided, each containing 1 no. 5G antenna, 1 no hexaband (2G/3G/4G) antenna; (b) 6 no. 0.3m microwave link dishes on 3 no. steel support poles (2m in height above the lift shaft overrun); (c) all associated equipment. (v) landscaping and all associated site development works necessary to facilitate the development

Summary from the register record.

Planning timeline 7 steps
  • 1 Feb 2022
    Application lodged — Standard
  • 21 Jun 2022
    Council decision — Grant
  • 19 Jul 2022
    Appealed to An Coimisiún Pleanála — ABP-314103-22
  • 27 Mar 2024
    Commission decision — Granted
  • 27 Mar 2024
    Final approval
  • Q2 2024
    Building started
  • 10 May 2029
    Approval runs out (estimate)

The site 1,552 m²

Boundary of Kestrel House as the Dublin councils map it in the housing pipeline.

Planning applications inside the site 4 applications in the last 10 years

Appeals inside the site 4 with An Coimisiún Pleanála

Other big developments nearby within 2 km

Start notices are matched from the national building control register; a start on site can be missed.