Applications only for this county. Appeals, zoning, RZLT and consultations: Dún Laoghaire-Rathdown and Fingal only for now.
What closes soonest 1 open window
Appeal window closes 15 Sept 20262 days left
SD26A/0153W — Request Additional Information — Retention of church use within the northern single-storey section of building (Unit 12).
4 weeks from the council's decision (18 Aug 2026) · s.37 Planning and Development Act 2000 · €220 to An Coimisiún Pleanála (€110 observer) · 313 m away
About 1 in 10 homes in this area is likely to have high radon levels; About 1 in 10 homes in this area is likely to have high radon levels; About 1 in 20 homes in this area is likely to have high radon levels
MV electrical upgrade to serve the existing facility. Construction of two separate electrical building structures: 1) Low Voltage Switch room consisting of the Clients Transfor1ner room and a new LV Switch room measuring 8.095m x 4.380m x 3.120m high single storey, located to the east of and adjoining the existing facility. 2) ESB Electrical substation consisting of the ESB Substation and the Clients Medium Voltage Switch room measuring 8.095m x 4.380m x 3.120m high single storey, located to the east of the existing facility. Both structures will be standalone and constructed with 415mm cavity blockwork. The external finish will be rendered or otherwise suitably finished masonry in a neutral colour. The roofs will be constructed in reinforced concrete. The ESB Electrical substation will accommodate their MV switchgear and equipment necessary to upgrade and reinforce the existing electricity supply to facilitate the operation of a proposed extension and the second room will house the Clients MV switchgear and MV meter. The LV room will house associated low voltage distribution equipment, and the transformer room will house the Clients MV/LV 630 KVA transformer. The development is ancillary to and required to support the proposed extension to the existing facility. All associated works, including cabling and connections, will be contained within the site boundary.
SD26A/0092Wreceived 12 Apr 2026decided 8 Jun 2026487 m away
Alterations to the building to facilitate the conversion of the existing Test Centre into a ''Drive - Through'' Test Centre in line with incoming RSA/CVRT regulatory policy. The alterations are mostly internal, including the re-positioning of partitions and the vehicular test equipment to facilitate the proposed 'drive - through' circulation route. Externally, there are alterations to the front facade including the removal of the glazed screen of the existing disused showroom and the insertion in that area of two new vehicular openings that will be similar to the one existing vehicular opening.
SD25A/0283received 19 Nov 2025decided 21 Jan 2026386 m away
Construction of external free standing dock leveller for 2 trucks and associated ramp within rear yard , The dock leveller is open on 2 sides and clad with Insulated metal cladding on the other 2 sides. Works include a sunken pit appx 650mm below yard level .
SD25A/0258Wreceived 21 Oct 2025decided 4 Dec 2025293 m away
Placement of 1 (Minimum) to 6 (Maximum) shipping containers each at (Length 40FT X 10FT X Height 8FT) to back of building. Containers will not be visible from street.
ED25/0070received 8 Aug 2025decided 4 Sept 20250 m away
Permission for Retention for an Existing Single Storey Temporary Warehouse Structure, Located to the Rear of the Existing Warehouse Building, together with all associated site works and connection into existing services
SD25A/0171Wreceived 18 Jul 2025decided 2 Sept 202564 m away
Single storey rear extension an attic conversion with dormer roof to rear plus changing of existing roof profile from hipped to new gable roof plus internal alterations to existing ground floor layout and all associated site works.
SD25B/0409received 19 Jun 2025decided 11 Aug 2025487 m away
The development will comprise the following: Demolition of existing commercial/industrial buildings on site (c.6,711 sq.m in total). Provision of a mixed use, residential and commercial/employment development (c.49,275 sq.m GFA excluding undercroft) within 4 no. blocks ranging in height from 6 to 10 storeys. The development will provide 436 no. apartments (all with individual private open spaces) consisting of: 2 no. studios, 180 no. 1-beds, 158 no. 2-beds and 96 no. 3-beds. The development will also include: internal residential amenity spaces (c.375.3 sq.m in total); community library (c.352.1 sq.m); creche (c.359.1 sq.m), and 4 no. commercial/employment units (c.1,226.6 sq.m) comprising 2 office/co-working units (c.435.8 sq.m in total), medical centre (with ancillary pharmacy)(c.674.1 sq.m) and café (c.116.7 sq.m). • Block A - 9 to 10 storeys in height and will provide 81 no. residential units. • Block B - 9 to 10 storeys in height and will provide 137 no. residential units • Block C - 8 to 10 storeys in height and will provide 85 no. residential units • Block D - 6 storeys in height and will provide 133 no. residential units. Upgrades to the western side of the Parkmore Estate Road and along the Long Mile Road and Robinhood Road to provide a variety of pedestrian/ cyclist access points to the development and with vehicular access provided from the Estate Road with associated upgrades to the Estate entrance. The development will also include 173 no. car parking spaces within 2 no. undercroft car parks on site and including 12 no. parking spaces (for the commercial units) along the Long Mile Road frontage. Provision of 1,040 cycle parking spaces. Provision of public and communal open spaces, landscaping, boundary treatments, plant areas, waste management areas, and services provision (including ESB substations), and all associated works required to enable this development including connection to the Uisce Eireann network. A Natura Impact Statement (NIS) has been prepared in respect of the proposed development.
LRD25A/0002Wreceived 5 Jun 2025decided 28 Jul 2025436 units412 m away
`description` is truncated at source (80 chars for DLR, 70 for Fingal) and `applicant` is null nationally — NPAD publishes neither in full.
PPR addresses are geocoded, not surveyed — a sale's position is as good as its address match (`rooftop_n` says how many are address-accurate). Beds, floor area, BER and asking price come from the matched daft.ie advertisement, not from the Register, and only where a match was found (`enriched_n`).
Third-party advertisement data captured by Cara from daft.ie. Not open data: internal analysis only, no redistribution of listing content. Business-contact details (licensed PSP name and branch) are retained per Cara DECISIONS 2026-08-19; agent phone numbers and all vendor/buyer identities are dropped.
No publishable utility-capacity record within the radius. 22 records from Esb substation withheld: source licence forbids redistribution; see the operator's own register.
Public land (LDA register of relevant lands)
Dublin City Council — Dublin city and suburbs
0.35 hafolio DN14001N211 m awayas of 1 Apr 2023
The Industrial Development Authority — Dublin city and suburbs
1.14 hafolio DN20897F262 m awayas of 1 Apr 2023
Dublin City Council — Dublin city and suburbs
0.33 hafolio DN14001N271 m awayas of 1 Apr 2023
South Dublin County Council — Dublin city and suburbs
0.15 hafolio DN188867F272 m awayas of 1 Apr 2023
South Dublin County Council — Dublin city and suburbs
0.12 hafolio DN185050F282 m awayas of 1 Apr 2023
South Dublin County Council — Dublin city and suburbs
0.67 hafolio DN183423F290 m awayas of 1 Apr 2023
South Dublin County Council — Dublin city and suburbs
0.19 hafolio DN183423F315 m awayas of 1 Apr 2023
South Dublin County Council — Dublin city and suburbs
all-rights-reserved (esbnetworks.ie disclaimer: personal/non-commercial, no modification or republication without written ESB permission) — permission NOT sought · not redistributable — shown as a flag only
Third-party advertisement data captured by Cara from daft.ie. Not open data: internal analysis only, no redistribution of listing content. Business-contact details (licensed PSP name and branch) are retained per Cara DECISIONS 2026-08-19; agent phone numbers and all vendor/buyer identities are dropped.
all-rights-reserved (esbnetworks.ie disclaimer: personal/non-commercial, no modification or republication without written ESB permission) — permission NOT sought · not redistributable, flag only
Generated 13 Sept 2026, 16:56 from the Planning Register store. Nothing on this page was fetched live: every figure was already in the store with the fetch time shown. Deadlines are derived from published receipt and decision dates under the Planning and Development Act 2000; confirm with the planning authority before relying on them.