What closes soonest 4 open windows
Appeal window closes 15 Sept 20261 day left
SD26A/0153W — Request Additional Information — Retention of church use within the northern single-storey section of building (Unit 12).
4 weeks from the council's decision (18 Aug 2026) · s.37 Planning and Development Act 2000 · €220 to An Coimisiún Pleanála (€110 observer) · 726 m away
Observations close 16 Sept 20262 days left
SD26B/0369W — application received — Remove the bay window and the existing pitched roof to the existing single storey extension to the rear and replace with
5 weeks from receipt (12 Aug 2026) · s.34 Planning and Development Act 2000 · art. 29 Regulations 2001 · €20 to the council · 798 m away
Appeal window closes 17 Sept 20263 days left
SD26B/0378W — Invalidate Application — Planning permission for attic conversion with dormer to rear roof and to front roof to accommodate stairs to allow acces
4 weeks from the council's decision (20 Aug 2026) · s.37 Planning and Development Act 2000 · €220 to An Coimisiún Pleanála (€110 observer) · 513 m away
Observations close 23 Sept 20269 days left
SD26B/0378W — application received — Planning permission for attic conversion with dormer to rear roof and to front roof to accommodate stairs to allow acces
5 weeks from receipt (19 Aug 2026) · s.34 Planning and Development Act 2000 · art. 29 Regulations 2001 · €20 to the council · 513 m away
R2 — Existing residentialdevelopment plan 2022 2028 · 14 Dec 2022 – 31 Dec 2028
Z1: Sustainable Residential Neighbourhoods: To protect, provide and improve residential amenities.
What that means: An established residential area. The objective is to protect existing residential amenity as well as to provide housing — which is the objective a neighbour's objection to an overbearing extension is usually argued under.
Bluebell Cemetery; Our Lady of the Wayside; Lansdowne House
Radon risk area
7
About 1 in 10 homes in this area is likely to have high radon levels; About 1 in 10 homes in this area is likely to have high radon levels; About 1 in 10 homes in this area is likely to have high radon levels
This site is on an RZLT map — the draft map 2027 and the final map 2026 (2.85 ha). The owner is liable for an annual 3% tax on market value while it stays there. Submissions on the draft map closed 1 Apr 2026.
Remove the bay window and the existing pitched roof to the existing single storey extension to the rear and replace with a new flat roof; installation of a dormer window in the attic; alterations to the front and rear elevations; internal alterations to the existing house and the construction of a garden room / gym and a garden shed in the rear garden with relocated access from the laneway at the rear.
Planning permission for attic conversion with dormer to rear roof and to front roof to accommodate stairs to allow access to attic conversion as non-habitable storage space with roof windows to front all with associated ancillary works
SD26B/0378Wreceived 19 Aug 2026decided 20 Aug 2026513 m away
Attic conversion with dormer to rear roof and to front roof to accommodate stairs to allow access to attic conversion as non-habitable storage space with roof windows to front all with associated ancillary works
SD26B/0366Wreceived 7 Aug 2026decided 10 Aug 2026513 m away
(1) Demolition of all existing industrial and warehouse structures on site (579.1 sq.m) and associated site clearance works; (2) Construction of part 6, part 7, part 10 storey over basement mixed use block providing 99 no. apartments, comprising 49 no. one-bed units and 50 no. two-bed units, with balconies on all elevations; (3) Provision of a commercial unit (148.2sqm) fronting onto Greenhills Road at ground floor level along with a designated set down area/loading bay; (4) Provision of 87.2 sq.m of designated indoor residential amenity space at the ground floor level; (5) Provision of 1,127 sq.m of Communal Open Space to the rear of the site; (6) An access ramp to facilitate vehicular access to the basement car park which will provide 38 no. car parking spaces; A further 2 no. accessible car parking spaces are provided at ground level, resulting in a total of 40 no car parking spaces; (7) A total of 204 no. bicycle parking spaces (comprising 150 no. long stay and 54 no. short stay) at ground and basement level; (8) Provision of 68m of footpath along the Greenhills Road frontage, and a pedestrian crossing across the Greenhills Road; (9) All enabling and associated site development and works including landscaping, footpaths, boundary treatments, lighting, water and utility services and connections, bin stores, plant and all ancillary development and works above and below ground.
1) demolition of the existing rear single storey return to the existing house and to replace with a two storey, flat roof extension, 2) the construction of two number detached 2 storey, 3 bedroom houses to the side garden onto Bunting Road and rear garden facing Balfe Road, both with a mix of pitched and flat roofs, 3) 2 new on site driveways with dished kerbing to both new houses, new boundary wall treatment and all ancillary site works a
WEB2835/26received 23 Jul 2026decided 28 Jul 2026755 m away
We, InstaVolt Europe Limited, intend to apply for planning permission for development at the site: McDonald’s, Kylemore Rd, Naas Rd, Inchicore, Dublin, D12 P6R6. The development will consist of the installation of 2 no. electric vehicle (EV) chargers, ancillary equipment and all associated site development works.
We, InstaVolt Europe Limited, intend to apply for planning permission for development at the site: McDonald’s, Kylemore Rd, Naas Rd, Inchicore, Dublin, D12 P6R6. The development will consist of the installation of 2 no. electric vehicle (EV) chargers, ancillary equipment and all associated site development works.
WEB2664/26received 6 Jul 2026decided 7 Jul 2026724 m away
We, O’Flynn Construction Co. Unlimited Company intend to apply to Dublin City Council for permission for development at this c. 1.86-hectare site, part of the ‘Nissan Site’, to the east of Walkinstown Avenue at the junction of Walkinstown Avenue and Naas Road. The development will consist of amendments to a previously permitted (Reg. Ref. 3228/20, as amended by Reg. Refs. 3792/23 and WEB5179/25) mixed-use development.The development will consist of: I. Amendments to the basement with subsequent reduction of 47 sq.m. gross floor area. The amendments include combining bin storage areas, removal of a water storage tank, changes to vent sizes and locations, changes to and consolidation of plant room layouts, and revised lift/stair core and lobby layouts. II. Amendments at roof-level, including: a. Removal of previously permitted plant structures on Blocks F, G & K. b. Provision of safety railings, approximately 1.8 m above roof level, to accessible roof terraces on Blocks F, J, K, and L. c. Reduction in the extent of roof-mounted photovoltaic (PV) solar panels across Blocks I, J, and L due to the use of more efficient panels. III. Amendments to individual blocks, including: a. Block F: Increase in the overall building height by 0.76m. Building setback by 0.35m and central balconies recessed along the western façade to avoid encroachment into the ESB exclusion zone. Balconies on the apartments at the northwest corner on the western façade will be relocated to the northern façade to avoid extending into the ESB exclusion zone. Overall decrease of 100 sq.m. in the gross floor area. Minor changes will be made to fenestration and access arrangements. b. Block G: Reduction in the overall building height by 0.8m and reduction of 59 sq.m. gross floor area. To facilitate access to the ESB substation, the formation level will be -1.5m below the current level. Reduction in the number of lifts to 1 no., service risers will be amended, and the roof layout will be revised due to the removal of technical areas. Minor changes will be made to fenestration and access arrangements. c. Block H2: Increase of 181 sq.m. in gross floor area to accommodate ESB substation requirements. Reduction in the overall building height by 0.38m. Changes to roof level plant/structures. Removal of one window on the western façade to improve internal apartment layout. Rearrangement of the main entrance and service area, rearrangement of solar panels, and minor changes to fenestration and access arrangements. d. Block I: Minor reduction in the formation level of the nearby ESB substation to accommodate ESB requirements. Change to the materiality of the ESB substation cladding and minor changes to fenestration and access arrangements. e. Block K: Increase of 14 sq.m. in gross floor area to meet ESB substation requirements. Balcony sizes have been reduced at the southwest, northwest, and northeast corners of the block. Removal of railing on the eighth storey. The overall building height will be reduced by by 2.4m. Minor changes will be made to fenestration and access arrangements, roof layout, plant room layouts, refuse store room, and the loading bay will be relocated from the north side to the east side of the block. f. Block L: Relocation of the block approximately 0.9m eastwards to avoid balconies extending into the ESB exclusion zone, together with minor changes to fenestration and access arrangements. IV. Revision to electric vehicle (EV) charging provision, reducing the proportion of car parking spaces with charging points to 10%. All car parking spaces will be fitted out with electric ducting to allow for future expansion of EV charging points. V. Reconfiguration of bicycle parking spaces associated with Blocks K, H2, I and the playground, including: a. Block K: Two covered spaces north of the block will be relocated to the west side of the block as uncovered spaces. b. Blocks H2 and I: Covered visitor bicycle spaces will be relocated from near Block H2 to under the canopy of Block I. c. Playground: Bicycle parking spaces at the entrance to the playground will be rearranged. VI. Communal open space will be increased by 10 sq.m. and allocated to Block H1, due to the removal of the previously permitted water tank enclosure. VII. All other associated ancillary site works to facilitate the above amendments.
WEB2618/26received 30 Jun 2026393 m away
`description` is truncated at source (80 chars for DLR, 70 for Fingal) and `applicant` is null nationally — NPAD publishes neither in full.
PPR addresses are geocoded, not surveyed — a sale's position is as good as its address match (`rooftop_n` says how many are address-accurate). Beds, floor area, BER and asking price come from the matched daft.ie advertisement, not from the Register, and only where a match was found (`enriched_n`).
Third-party advertisement data captured by Cara from daft.ie. Not open data: internal analysis only, no redistribution of listing content. Business-contact details (licensed PSP name and branch) are retained per Cara DECISIONS 2026-08-19; agent phone numbers and all vendor/buyer identities are dropped.
No publishable utility-capacity record within the radius. 74 records from Esb substation withheld: source licence forbids redistribution; see the operator's own register.
all-rights-reserved (esbnetworks.ie disclaimer: personal/non-commercial, no modification or republication without written ESB permission) — permission NOT sought · not redistributable — shown as a flag only
Third-party advertisement data captured by Cara from daft.ie. Not open data: internal analysis only, no redistribution of listing content. Business-contact details (licensed PSP name and branch) are retained per Cara DECISIONS 2026-08-19; agent phone numbers and all vendor/buyer identities are dropped.
all-rights-reserved (esbnetworks.ie disclaimer: personal/non-commercial, no modification or republication without written ESB permission) — permission NOT sought · not redistributable, flag only
Generated 14 Sept 2026, 04:17 from the Planning Register store. Nothing on this page was fetched live: every figure was already in the store with the fetch time shown. Deadlines are derived from published receipt and decision dates under the Planning and Development Act 2000; confirm with the planning authority before relying on them.