Applications only for this county. Appeals, zoning, RZLT and consultations: Dún Laoghaire-Rathdown and Fingal only for now.
What closes soonest 3 open windows
Appeal window closes 14 Sept 20261 day left
SD26A/0121W — Grant Permission — Installation of a new culvert to convey the Baldonnell Stream. The proposed culvert will be an approximately 90m long c
4 weeks from the council's decision (17 Aug 2026) · s.37 Planning and Development Act 2000 · €220 to An Coimisiún Pleanála (€110 observer) · 795 m away
Observations close 17 Sept 20264 days left
SD26A/0195W — application received — Physical extension of c. 1260sq.m. to the existing electricity substation compound and will comprise of an extension of
5 weeks from receipt (13 Aug 2026) · s.34 Planning and Development Act 2000 · art. 29 Regulations 2001 · €20 to the council · 956 m away
Observations close 28 Sept 202615 days left
SDZ25A/0044W — application received — Development at this site (c. 3.74Ha) at the Kishoge Southwest Development Area, including lands located within developme
5 weeks from receipt (24 Aug 2026) · s.34 Planning and Development Act 2000 · art. 29 Regulations 2001 · €20 to the council · 937 m away
About 1 in 10 homes in this area is likely to have high radon levels; About 1 in 20 homes in this area is likely to have high radon levels; About 1 in 5 homes in this area is likely to have high radon levels
Recorded monument
12
Castle - tower house; Castle - unclassified; Moated site
Physical extension of c. 1260sq.m. to the existing electricity substation compound and will comprise of an extension of the existing 110kV busbar from bay H18 to create a new 110kV line bay H20, including the installation of new electrical equipment; fencing and all other ancillary development works to facilitate the proposed development.
Development at this site (c. 3.74Ha) at the Kishoge Southwest Development Area, including lands located within development sub-sector KSW-S2 and development sub-sector KSW-S4, in the Clonburris Strategic Development Zone (SDZ) within the townland of Grange, Dublin 22. The proposed development will consist of the removal of existing hard standing and associated sub-structures and the construction of 84no. dwelling units consisting of 42no. 2-bed 3p apartments and 42no. 3-bed 5p duplexes arranged across 6no. 3-storey Blocks A-F (9,255sqm GFA) with associated communal amenity space (3,444sqm total) and all ancillary accommodation including bicycle and refuse stores. Vehicular access to development sub-sector KSW-S2 is proposed from the Clonburris Southern Link Street (as permitted under Reg. Ref. SDZ20A/0021) via local roads (as proposed under Pl. Ref. SDZ25X/0001; ACP Ref. 322638) within adjoining development sectors KSW-S1 and KSW-S3 to the north of the subject site. Vehicular access to development sub-sector KSW-S4 is proposed from the Clonburris Southern Link Street (as permitted under Reg. Ref. SDZ20A/0021) via Lynch's Lane. Within development sub-sector KSW-S4, provision is also made for a future vehicular access to directly adjoining lands in development sub-sector KSW-S4 to the east of the subject site. The development will also consist of the provision of public open space including the southern part of Kishoge Linear Park, hard and soft landscaping including internal roads, shared paths and pedestrian pathways and associated connections to adjoining lands, boundary treatments and street furniture; surface car parking (95no. spaces in total, including 5no. accessible spaces and 19no. electric vehicle charging spaces); bicycle parking (252no. spaces in total, including 210no. long-stay resident spaces and 42no. short-stay visitor spaces); 2no. ESB substations; piped infrastructural services and connections; ducting; plant; SuDS measures; attenuation basins; water crossings; water, surface water, and foul drainage infrastructure; public lighting; and all site development and excavation works above and below ground. This application is being made in accordance with the Clonburris Strategic Development Zone Planning Scheme 2019 and relates to a proposed development within the Clonburris Strategic Development Planning Scheme Area, as defined by Statutory Instrument No. 604 of 2015.
SDZ25A/0044Wreceived 24 Aug 202684 units937 m away
Provision of a boiler house, boiler, heat exchangers and ancillary equipment; The application relates to a development which comprises or is for the purposes of an activity requiring an Industrial Emissions Licence; The use of the site is an establishment to which the European Communities (Major Accident Hazards Involving Dangerous Substances) Regulations 2006 as amended by the Chemicals Act (Control of Major Accident Hazards Involving Dangerous Substances) Regulations 2015 apply.
Installation of a new culvert to convey the Baldonnell Stream. The proposed culvert will be an approximately 90m long concrete box culvert with overall internal dimensions of 1.1m wide by 1.7m high. And all associated works.
SD26A/0121Wreceived 21 Jul 2026decided 17 Aug 2026795 m away
Construction of a new two storey three bedroom house adjacent and attached to the front and side and rear of existing house with pitched roof over same height as existing house roof together with all associated site development works and including vehicular access, off-street parking, boundary treatments, and connection to all public services.
Demolition of existing single storey vacant house, garage and outhouse (total gross floor area (GFA) c.291.2sq.m) and removal of existing temporary construction car park; Construction of a single 1-4 storey Central Administration Building and 2 2-storey (with mezzanine) data centres (DUB14 & DUB15) all to be located west of data centres DUB9, DUB10, DUB12 & DUB13 within the MS campus; The Central Administration Building (c.6.03m to c.19.85m high) will comprise central office administration, with staff cafeteria, staff gym and reception (GFA c.3,520sq.m), with provision of PV panels on the roof; each data centre (c.15.6m high to parapet height and c.18.65m to top of roof plant) will include data halls, admin blocks (comprising offices, canteen, loading dock, storage and ancillary areas) and a variety of mechanical and electrical plant areas/structures including Modular Electrical Rooms (MERs), battery rooms and transformer areas. GFA of DUB14 is c.28,072sq.m and GFA of DUB15 is c.28,173sq.m (c.56,246sq.m in total); DUB14 will also include 21 diesel generators and associated sub-stations (E-houses) and 11 mechanical flues (each c.30.75m high); Provision of a gas generator compound (to serve DUB15) containing 20 generators, 5 E-houses and 5 flues (c.25m max height); Provision of a Gas Networks Ireland gas skid including 3 kiosk buildings; Expansion of existing electrical sub-station compound (originally granted under SD07A/0632) to provide 3 additional transformer bays. 3 E-houses and 1 control room, 2 auxiliary transformers; 2 sprinkler tank and pump house areas, 1 additional rainwater harvesting plant; Provision of 168 permanent car parking spaces and 40 cycle parking spaces; Provision of additional western access to the MS campus (to serves the Central Administration Building) from the Business Park estate road (including bridge over the Griffeen River) with existing temporary access to be extinguished; Physical integration with the remainder of the existing MS campus (including internal access roads and landscaping) with associated modifications to the western boundary of the DUB09/DUB10/DUB12/DUB13 data centre development as permitted under SD16A/0088; Provision of a new temporary construction car park (with 802 car spaces, shuttle bus stop and shelter) on site north of the main entrance to the business park; Total gross floor area of the development will be c.59,766sq.m; All associated site development works, drainage and services provision, landscaping, boundary treatments (including security fencing) and associated works; An Environmental Impact Assessment Report (EIAR) has been submitted with this application; The application relates to a development which comprises an activity requiring an integrated pollution prevention and control (IE) licence.
SD20A/0283/EPreceived 27 May 2026decided 21 Jul 2026675 m away
The development will consist of: 1. Demolition of existing front porch. 2. Demolition of existing timber shed connected to the rear existing house. 3. Construction of a single-storey flat roof front extension consisting of an entrance porch, a disability bedroom and a living area. 4. General remodel, upgrade and adaptations for disability access of the existing dwelling at ground floor level and general remodel and upgrade of the first-floor level to suit the new proposed layouts including new external insulation at the front, side and back of the house. 5. All drainage, structural and associated site works to be implemented.
SD25B/0631Wreceived 20 May 2026decided 16 Jun 2026574 m away
The development consists of permission for retention of a single storey, masonry constructed, detached outbuilding with a flat roof to the rear of the existing dwelling house.
SD26A/0094Wreceived 13 Apr 2026decided 8 Jun 2026929 m away
The development consists of permission for retention of a single storey, masonry constructed, detached outbuilding with a flat roof to the rear of the existing dwelling house.
SD26A/0039Wreceived 16 Feb 2026decided 16 Mar 2026929 m away
PPR addresses are geocoded, not surveyed — a sale's position is as good as its address match (`rooftop_n` says how many are address-accurate). Beds, floor area, BER and asking price come from the matched daft.ie advertisement, not from the Register, and only where a match was found (`enriched_n`).
Third-party advertisement data captured by Cara from daft.ie. Not open data: internal analysis only, no redistribution of listing content. Business-contact details (licensed PSP name and branch) are retained per Cara DECISIONS 2026-08-19; agent phone numbers and all vendor/buyer identities are dropped.
No publishable utility-capacity record within the radius. 28 records from Esb substation withheld: source licence forbids redistribution; see the operator's own register.
Public land (LDA register of relevant lands)
Dublin City Council — Dublin city and suburbs
15.96 hafolio DN1169F168 m awayas of 1 Jul 2023
Dublin City Council — Dublin city and suburbs
3.64 hafolio DN3784N177 m awayas of 1 Apr 2023
Dublin City Council — Dublin city and suburbs
19.28 hafolio DN19764F292 m awayas of 1 Jul 2023
Dublin City Council — Dublin city and suburbs
23.84 hafolio DN1168F363 m awayas of 1 Jul 2023
Dublin City Council — Dublin city and suburbs
0.04 hafolio DN72834F474 m awayas of 1 Jul 2023
Dublin City Council — Dublin city and suburbs
0.11 hafolio DN15208N476 m awayas of 1 Jul 2023
Dublin City Council — Dublin city and suburbs
0.3 hafolio DN14598N480 m awayas of 1 Jul 2023
South Dublin County Council — Dublin city and suburbs
all-rights-reserved (esbnetworks.ie disclaimer: personal/non-commercial, no modification or republication without written ESB permission) — permission NOT sought · not redistributable — shown as a flag only
Third-party advertisement data captured by Cara from daft.ie. Not open data: internal analysis only, no redistribution of listing content. Business-contact details (licensed PSP name and branch) are retained per Cara DECISIONS 2026-08-19; agent phone numbers and all vendor/buyer identities are dropped.
all-rights-reserved (esbnetworks.ie disclaimer: personal/non-commercial, no modification or republication without written ESB permission) — permission NOT sought · not redistributable, flag only
Generated 13 Sept 2026, 18:41 from the Planning Register store. Nothing on this page was fetched live: every figure was already in the store with the fetch time shown. Deadlines are derived from published receipt and decision dates under the Planning and Development Act 2000; confirm with the planning authority before relying on them.