Homes here mostly date from the 1950s. Home extensions nearby almost always get approved (93%). 1 application nearby open for comments.

See on the mapWatch this area

How planning works, with this area's numbers

steps can overlap · medians for home extensions within 1.5 km, 10 years
  1. 1ApplySite notice up, plans online
  2. 2Comments5 weeks, €20. Comment to keep your right to appeal
  3. 3Decision8 weeks by law. Here 55 days
  4. 4Appeal window4 weeks after the decision
  5. 5AppealHere about 5 months
  6. 6PermissionLasts 5 years
  7. 7StartStart notice to the council. Here about 5 months after
  8. 8Sign-offCompletion cert, or the owner opts out
Question 1

What's the planning story of this house?

Figure 1

When it was built, and the rules since

Most homes here were built 1946–60, before planning permission was needed.

Timeline from 1942: planning permission needed from October 1964, building regulations from June 1992, building records online from March 2014, sign-off opt-out from September 2015. Most homes here were built 1946–1960.19501960197019801990200020102020Oct 1964permission neededJun 1992building regulationsMar 2014building records onlineSep 2015owners may opt out of sign-offThis houseAll of Clogher RoadBuilt: most homes in this small area date from 1946–1960 (census estimate)most built2021: 5 files on Clogher Road2022: 2 files on Clogher Road2024: 2 files on Clogher Road2025: 5 files on Clogher Road2026: 1 file on Clogher Road15 files

Each line is a rule that applies to work done after it.

MeasuredEstimatecouncil register via NPAD · build years: CSO Census 2022, small area

On this site
R2
Zoning · Existing residential
No
Protected or listed · on the council's list
No
Vacant land tax · lived-in homes don't pay it
1 in 20
Radon (EPA) · homes with high radon
Zoning, protection, tax and flood: the detail
Zoning
What it says

Zone Z1 - DEV PLAN 2022-2028

ZoningR2 · Existing residential
What it says

Z1: Sustainable Residential Neighbourhoods: To protect, provide and improve residential amenities.

An established residential area. The objective is to protect existing residential amenity as well as to provide housing — which is the objective a neighbour's objection to an overbearing extension is usually argued under.

development plan 2022 2028 · 14 Dec 2022 – 31 Dec 2028

ZoningR2 · Existing residential
What it says

Z1: Sustainable Residential Neighbourhoods: To protect, provide and improve residential amenities.

An established residential area. The objective is to protect existing residential amenity as well as to provide housing — which is the objective a neighbour's objection to an overbearing extension is usually argued under.

development plan 2022 2028 variation no 11 · 14 Dec 2022 – 31 Dec 2028

Radon1 in 20 homes have high radon (EPA)

Not on this site: protected building, heritage inventory, monument zone, conservation area, EU nature site, EU bird site, natural heritage area, tree order, landslide risk, derelict list.

Licensed industrial sites within 1.0 km: B.G. Flexible Packaging Limited. (663 m)

Vacant land taxNo lived-in homes don't pay it
Flood riskWithin 100 m OPW map area within 100 m · floodinfo.ie
Within 500 mCountFor example
Natural heritage areas1Grand Canal
Heritage inventory buildings24Parnell Bridge; Jewish Cemetery
Radon grid squares4
Monuments11Watercourse; Water mill - unclassified
How we work this out
'On this site' means the record's own map outline touches the registered parcel (or a 12 m circle round the point where there is no parcel). Only the council's own list confirms a protected building; ask the council if in doubt. The council's map for the vacant land tax shows this spot inside an area of existing homes. Homes people live in, and their gardens, don't pay the tax. The OPW flood map's licence lets us show a yes/no only. Land on the vacant land tax map nearby: 3 on the draft 2027 map; 3 on the final 2026 map.
Sources: Development plan zoning (councils), EPA radon map, EPA licensed facilities (LEAP), Residential Zoned Land Tax maps, Constraint layers (bundle), OPW flood maps (CFRAM), Natural Heritage Areas (NPWS), National Inventory of Architectural Heritage, Sites and Monuments Record · fetched 26 Oct 2026, 23:21
SourceLicenceFetchedLink
Development plan zoning (councils)CC BY 4.025 Oct 2026, 23:06open
EPA radon mapCC BY 4.027 Sept 2026, 19:36open
EPA licensed facilities (LEAP)CC BY 4.026 Oct 2026, 23:21open
Residential Zoned Land Tax mapsCC BY 4.025 Oct 2026, 23:43open
Constraint layers (bundle)CC BY 4.0, CC BY-NC-ND 4.027 Sept 2026, 19:37open
OPW flood maps (CFRAM)CC BY-NC-ND 4.0 · shown as a yes/no only11 Sept 2026, 19:11open
Natural Heritage Areas (NPWS)CC BY 4.027 Sept 2026, 19:27open
National Inventory of Architectural HeritageCC BY 4.027 Sept 2026, 19:35open
Sites and Monuments RecordCC BY 4.027 Sept 2026, 19:29open
How we work this out
Applications whose site outline (or map point) falls on this property. 'No sign building has started' means we found no notice to the council's building control office; small jobs don't always file one, so ask. A missing completion certificate is not proof of a problem: an owner can opt out of official sign-off for a house or extension built for themselves.
Sources: Building Control Management System (commencement notices), National Planning Application Database · fetched 31 Oct 2026, 05:04
SourceLicenceFetchedLink
Building Control Management System (commencement notices)CC BY 4.031 Oct 2026, 02:56open
National Planning Application DatabaseCC BY 4.031 Oct 2026, 05:04open
Question 2

Could you extend?

Nothing on this site restricts it: not protected, not in a conservation area.

Figure 2

What happened to applications like yours

Extensions are almost always approved here: 86–100% by type. A new house in a garden is harder: 58% approved, and 1 in 4 is asked for more information.

Single-storey rear116 decided · more info asked 9%
94% · council 97%
Two-storey rear99 decided · more info asked 11%
97% · council 96%
Two-storey side25 decided · more info asked 24%
92% · council 98%
Single-storey side14 decided · more info asked 21%
86% · council 99%
Attic or dormer181 decided · more info asked 8%
93% · council 96%
First-floor41 decided · more info asked 10%
93% · council 94%
Porch or front10 decided · more info asked 0%
100% · council 97%
New house in a garden or site62 decided · more info asked 27%
58% · council 71%
Approved nearbyDublin overall

Decided applications within 1.5 km, received in the last 10 years. The kind of work is read from each description.

CalculatedOur classificationcouncil register via NPAD · 548 nearby, 5,543 council-wide

Figure 3

Clogher Road, file by file since 2021

7 of 7 decided extensions on the road were approved. New houses in side gardens or on sites: 1 of 1.

15 planning files on Clogher Road since 2021, by kind and decision.202120222023202420252026Extensions, atticsNo. 229 · 2021 · two-storey rear · approved · 2759/21No. 373 · 2021 · attic conversion / dormer · approved · WEB1136/21No. 279 · 2021 · two-storey rear · approved · WEB1518/21No number · 2022 · other extension · approved · 3590/22No. 337 · 2024 · attic conversion / dormer · approved · WEB2039/24No. 229 · 2025 · first-floor · approved · WEB1152/25No. 349 · 2026 · single-storey rear · approved · WEB1636/26Porches, roofs, otherNo. 1 · 2021 · other work · approved · 2273/21No. 245 · 2022 · other work · approved · 3088/22No. 335 · 2024 · other work · refused · 3708/24No. 410 · 2025 · other work · approved · 3099/25No. 337 · 2025 · other work · withdrawn or invalid · WEB2681/25No. 337 · 2025 · other work · withdrawn or invalid · WEB2914/25No. 337 · 2025 · other work · refused · WEB2921/25New house in a side gardenNo. 266 · 2021 · new house · approved · WEB1625/21266
ApprovedRefusedWithdrawn or invalid

15 files with "Clogher Road" in the address within 600 m, other roads of the same name left out. Hover a dot for the house number and reference.

MeasuredOur classificationcouncil register via NPAD · 2021–2026

Extensions and refusals right beside you 1 within 250 m · 0 refused within 100 m

Extensions and refusals near you 1 extensions within 250 m · the last 12 months

1 approved
KindAppliedApprovedRefused
Single-storey rear11—

Refused within 100 m 0 in the last 12 months

Nothing refused this close in the last 12 months.

    How we work this out
    Home extensions are read from the application's description (extension, attic or dormer, porch, garage conversion, garden room), so a few may be missed or mislabelled. The kind is the first that fits: a dormer with a rear extension counts as a dormer. Refusal reasons come from An Coimisiún Pleanála's inspector reports, so they exist only where the refusal was appealed (Dún Laoghaire-Rathdown so far). The council's own reasons are on its planning file.
    Sources: National Planning Application Database, An Coimisiún Pleanála cases (ArcGIS feed) · fetched 31 Oct 2026, 05:04
    SourceLicenceFetchedLink
    National Planning Application DatabaseCC BY 4.031 Oct 2026, 05:04open
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.030 Oct 2026, 23:01open
    Sources: An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices), National Planning Application Database · fetched 31 Oct 2026, 05:04
    SourceLicenceFetchedLink
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.030 Oct 2026, 23:01open
    Building Control Management System (commencement notices)CC BY 4.031 Oct 2026, 02:56open
    National Planning Application DatabaseCC BY 4.031 Oct 2026, 05:04open
    Question 3

    How long, and what if someone objects?

    Figure 4

    A home extension's journey here

    A decision takes 55 days. 1 in 9 is asked for more information, which adds about 76 days. Building starts about 5 months after permission.

    Comments open: 5 weeks · €20; Council decision: 55 days; If more info asked (1 in 9): 135 days; Appeal window: 4 weeks; If appealed: +164 days; Building starts: 138 days after permission0 mo3 mo6 mo9 mo12 mo15 moComments openComments close 5 weeks after the application is lodged5 weeks · €20Council decisionDecision: median 55 days, middle half 53–55 (n=524)55 daysIf more info asked (1 in 9)With further information: median 135 days (n=68)135 daysAppeal windowAnyone who commented can appeal within 4 weeks of the decision4 weeksIf appealedAt An Coimisiún Pleanála: median 164 days (n=168, all appeals within 1.5 km)+164 daysBuilding startsStart notice: median 138 days after permission (n=256)138 days after permissionSigned off458 days after the start, for the few who file. 41% of owners opt out of sign-off

    Bars are medians; whiskers show the middle half. Medians of separate steps don't add up exactly.

    Calculated592 decided home extensions, 263 start notices, 168 decided appeals · within 1.5 km, 10 years · NPAD, BCMS, An Coimisiún Pleanála

    Figure 5

    What appeals changed

    25 of 83 appealed refusals became permissions. 9 of 90 appealed approvals were reversed.

    Refusals appealed83 decided
    25 became permissions
    Approvals appealed90 decided
    9 reversed
    Ended approvedEnded refusedWithdrawn, invalid or other

    Every appeal decided within 1.5 km in 10 years, any kind of development.

    CalculatedAn Coimisiún Pleanála cases linked to the council file

    Appeals nearby 6 in the last 12 months

    None of 1 changed the council's decision

    • 501650 Refused · 265, South Circular Road, Dublin 8, D08 VW6N · 380 m
    • 502105 Pending · 69D Donore Avenue, Dublin 8. The site is situated to the south and… · 406 m
    • 324123 Refused · Lands at White Heather Industrial Estate, South Circular Road and… · 451 m report
    • 500986 Withdrawn · 92a Harold's Cross Road, St. Clares Avenue, Dublin 6W · 489 m
    • 500436 Granted · Land to the Rear of 207 South Circular Road, Dublin 8 · 281 m report
    • 500245 Refused · 337, Clogher Road, Crumlin, Dublin 12 · 53 m report
    Sources: An Coimisiún Pleanála cases (ArcGIS feed), Courts Service legal diary (judicial reviews), National Planning Application Database · fetched 31 Oct 2026, 05:04
    SourceLicenceFetchedLink
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.030 Oct 2026, 23:01open
    Courts Service legal diary (judicial reviews)© the publisher30 Oct 2026, 23:12open
    National Planning Application DatabaseCC BY 4.031 Oct 2026, 05:04open
    Question 4

    What's changing around you?

    Street map around Clogher Road, Dublin with 15 numbered planning items
    ⌖ the houseOpen for commentsDerelict buildingLarge schemeAppealBuilding startedEmpty land zoned for homesApprovedNo decision yet
    1. 11, Parnell Avenue WEB3522/26No decision yet · 311 m
    2. 2231 South Circular Road Dublin 8 D08E6HH DS1753Derelict building · 334 m
    3. 3UNIT 4 GREENMOUNT INDUSTRIAL ESTATE GREENMOUNT AVENUE DUBLIN 12 D12K883 DS884Derelict building · 336 m
    4. 469D Donore Avenue, Dublin 8. The site is situated to the south and west of White Swan Business Centre WEB1951/26No decision yet · 406 m
    5. 5337, Clogher Road 500245Appeal: refused · 53 m
    6. 6Site to rear of 404, 406 3099/25Building started · 119 m
    7. 74.7 ha zoned for homesEmpty land zoned for homes · 366 m
    8. 81.4 ha zoned for homesEmpty land zoned for homes · 475 m
    9. 9349, Clogher Road WEB1636/26Approved · 32 m
    10. 10265 South Circular Road, Dublin 8 WEB5820/25Approved · 382 m
    11. 111 Greenmount Business Park, Greenmount Industrial Estate WEB2150/26No decision yet · 390 m
    12. 12Griffith College, South Circular Road WEB1036/26No decision yet · 391 m
    13. 1316, Parnell Road WEB2353/26No decision yet · 398 m
    14. 1410, Greenmount Court WEB3317/26No decision yet · 430 m
    15. 1592a Harold's Cross Road / St. Clare's Avenue, Dublin 6W WEB2793/26No decision yet · 489 m
    Figure 6

    What happens to applications within 500 m

    Permission isn't building. Of 57 permissions since 2016, 27 show a start notice and 2 have a completion certificate.

    83 applications lodged within 500 m. Council: 56 approved, 12 refused. After appeals: 57 approved. Of those: 2 signed off, 11 built with the owner's opt-out, 14 started, 30 with no start notice found, 0 ran out.LODGEDCOUNCIL DECISIONAFTER APPEALSWHAT HAPPENED NEXT56: lodged → approved12: lodged → refused11: lodged → withdrawn or invalid4: lodged → undecided55: approved → approved10: refused → refused11: withdrawn or invalid → withdrawn4: undecided → undecided1 approved by the council, refused after an appeal2 refused by the council, approved after an appeal30: approved → no start notice found11: approved → built, owner opted out14: approved → started, not signed off2: approved → signed off83 lodged83 lodged56 approved56 approved12 refused12 refused11 withdrawn or invalid11 withdrawn or invalid4 undecided4 undecided57 approved57 approved11 refused11 refused11 withdrawn11 withdrawn4 undecided4 undecided30 no start notice found30 no start notice found11 built, owner opted out11 built, owner opted out14 started, not signed off14 started, not signed off2 signed off2 signed off

    Purple bands are refusals turned into permissions on appeal. "No start notice found" includes small jobs that never needed one and notices we couldn't match.

    Measured83 applications in 10 years · NPAD, An Coimisiún Pleanála, BCMS start notices and completion certificates

    Figure 7

    The next 30 days

    2 deadlines within 500 m; the first closes 18 Nov 2026.

    1 deadlines in the next 30 days: 2026-11-18 WEB3522/26: application received — The development will consist of an attic conversion including a change of roof profile from hipped roof to a gable-endedtoday5 Nov10 Nov15 Nov20 Nov25 Nov30 NovWEB3522/26: application received — The development will consist of an attic conversion including a change of roof profile from hipped roof to a gable-ended · 311 m away · 2026-11-18
    Comments closeHigh Court window ends
    • Comments close 18 Nov 202618 days left
      1WEB3522/26 · application received — The development will consist of an attic conversion including a change of roof profile from…
      €20 to the council · 311 m away
    • Time to ask the High Court for a review ends 3 Dec 202633 days left
      Refuse permission
      380 m away

    Measuredcouncil registers and An Coimisiún Pleanála · deadlines worked out from the dates on file

    Sites that could change 5 within 500 m

    Derelict building 2

    • 2231 South Circular Road Dublin 8 D08E6HH · derelict since Jul 2025 · 334 m
    • 3UNIT 4 GREENMOUNT INDUSTRIAL ESTATE GREENMOUNT AVENUE DUBLIN 12 D12K883 · derelict since Apr 2015 · 336 m

    Empty land zoned for homes 3

    • 74.7 ha zoned for homes · no homes built on it yet · 366 m
    • 0.3 ha zoned for homes · no homes built on it yet · 406 m
    • 81.4 ha zoned for homes · no homes built on it yet · 475 m
    Sources: An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices), Derelict sites registers, Council meetings (ModernGov), National Planning Application Database, Residential Zoned Land Tax maps · fetched 31 Oct 2026, 05:04
    SourceLicenceFetchedLink
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.030 Oct 2026, 23:01open
    Building Control Management System (commencement notices)CC BY 4.031 Oct 2026, 02:56open
    Derelict sites registersCC BY 4.026 Oct 2026, 23:09open
    Council meetings (ModernGov)Public31 Oct 2026, 02:21open
    National Planning Application DatabaseCC BY 4.031 Oct 2026, 05:04open
    Residential Zoned Land Tax mapsCC BY 4.025 Oct 2026, 23:43open
    Figure 8

    Applications within 500 m, by year

    Between 9 and 21 a year; busiest 2025. 82% of decisions were approvals.

    2021: 21, 2022: 9, 2023: 13, 2024: 11, 2025: 21, 2026: 801020302021: 18 approved2021: 2 refused2021: 1 withdrawn or invalid21’21*2022: 7 approved2022: 2 refused9’222023: 10 approved2023: 3 refused13’232024: 8 approved2024: 3 refused11’242025: 12 approved2025: 2 refused2025: 7 withdrawn or invalid21’252026: 1 approved2026: 3 withdrawn or invalid2026: 4 undecided8’26*
    ApprovedRefusedWithdrawn or invalidUndecided

    2021 and 2026 are part years (*). Exemption requests and time extensions are left out.

    Measuredcouncil register via NPAD

    Open for comments €20 to comment

    • 11, Parnell Avenue, Dublin 12, D12 TX03 comments close 18 Nov 2026
      The development will consist of an attic conversion including a change of roof profile from hipped roof to a…
      WEB3522/2614 Oct 2026311 m
    Every application within 500 m 14 in the last 12 months

    See every application on the map

    How we work this out
    Descriptions are shortened by the national planning database (to 80 characters in Dún Laoghaire-Rathdown, 70 in Fingal), and it does not publish applicants' names.
    Sources: National Planning Application Database, An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices) · fetched 31 Oct 2026, 05:04
    SourceLicenceFetchedLink
    National Planning Application DatabaseCC BY 4.031 Oct 2026, 05:04open
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.030 Oct 2026, 23:01open
    Building Control Management System (commencement notices)CC BY 4.031 Oct 2026, 02:56open
    Building work nearby 7 in the last 12 months
    2 not signed off5 no sign-off needed
    • 265 South Circular Road, Dublin 8, D08 VW6N · 10 Sept 2026 · start notice, opted out no sign-off needed · 5820/25 · 403 m
    • 22 Parnell Road, Dublin, Dublin 12, D12 YXE6 · 17 Aug 2026 · start notice, opted out no sign-off needed · WEB5398/25 · 384 m
    • 10 Greenmount Court, Dublin 12, D12 E002 · 10 Jun 2026 · start notice, opted out no sign-off needed · WEB2913/25 · 451 m
    • 6Site to rear of 404, 406, 408, 410 Clogher Road Crumlin, Dublin 12 Dublin 12, Dublin 12 · 8 Jun 2026 · 2 homes · start notice not signed off · 3099/25 · 119 m
    • Site to rear of 404, 406, 408, 410 Clogher Road, Crumlin, Dublin 12, Dublin 12, D12 KP38 · 23 Feb 2026 · short notice no sign-off needed · 3099/25 · 113 m
    • 63 Parnell Road, Harolds Cross, Dublin 12, D12 DX39 · 16 Feb 2026 · short notice no sign-off needed · WEB1912/25 · 194 m
    • 276 South Circular Road, Dublin 8, Dublin, D08T6DC · 27 Jan 2026 · 732 homes · start notice not signed off · SHD0031/20 & ABP-308917-20 · 366 m
    How we work this out
    Each row is a notice the builder sent to the council's building control office before work started. One notice can cover many homes. 'Signed off as finished' means a completion certificate is on file; work done under an opt-out or a short notice doesn't need one.
    Source: Building Control Management System (commencement notices) · fetched 31 Oct 2026, 02:56
    SourceLicenceFetchedLink
    Building Control Management System (commencement notices)CC BY 4.031 Oct 2026, 02:56open
    Homes coming 0 not started
    How we work this out
    Schemes of 10 or more homes approved since 2021, from the council and An Coimisiún Pleanála registers. 'Building started' means the builder told the council's building control office that work was starting (a commencement notice).
    Sources: An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices), National Planning Application Database, Social housing construction status report · fetched 31 Oct 2026, 05:04
    SourceLicenceFetchedLink
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.030 Oct 2026, 23:01open
    Building Control Management System (commencement notices)CC BY 4.031 Oct 2026, 02:56open
    National Planning Application DatabaseCC BY 4.031 Oct 2026, 05:04open
    Social housing construction status reportCC BY-SA 4.023 Oct 2026, 23:02open
    Named places nearby: estate, schemes, crèches, schools

    Named places estate, developments, inspections

    Developments within 1.0 km

    SchemeHomesProgressDistance
    Former Player Wills Site492462 being built · 30 not started (2026-Q2)351 m
    69D Donore Avenue86—406 m
    White Heather Industrial Estate250no activity on site reported (2026-Q2)412 m
    Former Baily Gibson Site416416 being built (2026-Q2)432 m
    Harold's Bridge Court181181 not started (2026-Q2)449 m
    Former St. Teresa's Gardens543543 being built (2026-Q2)481 m
    126-128 Harold's Cross Road4040 built (2025-Q3)516 m
    2186/15220220 built (2025-Q1)562 m

    Crèches and schools inspected

    NameLatest inspectionDistance
    Eco Kidz Clogher · Crèche17 Feb 2026 · report · Tusla Early Years Inspectorate201 m
    The Marist Creche · Crèche27 Sept 2024 · report · Tusla Early Years Inspectorate586 m
    St. Clare's Pre- School Limited · Crèche23 Jan 2025 · report · Tusla Early Years Inspectorate616 m
    Eden Montessori · Crèche18 May 2026 · report · Tusla Early Years Inspectorate639 m
    Pearse College Nursery · Crèche17 Feb 2025 · report · Tusla Early Years Inspectorate698 m
    Loreto Preschool and Afterschool · Crèche19 Mar 2026 · report · Tusla Early Years Inspectorate725 m
    Kkcreche Ltd · Crèche1 Jul 2025 · report · Tusla Early Years Inspectorate878 m
    St Joseph's ECDS · Crèche14 Nov 2024 · report · Tusla Early Years Inspectorate947 m
    How we work this out
    Organisations only: a person named on an application is never listed. Inspection dates and links are the publisher's; read their report for the findings.
    Sources: Dublin housing delivery pipeline, National Planning Application Database, Department of Education school list, Tusla early years register · fetched 31 Oct 2026, 05:04
    SourceLicenceFetchedLink
    Dublin housing delivery pipelineCC BY 4.026 Oct 2026, 23:00open
    National Planning Application DatabaseCC BY 4.031 Oct 2026, 05:04open
    Department of Education school listCC BY 4.027 Oct 2026, 23:04open
    Tusla early years registerPublic register28 Oct 2026, 23:19open
    How busy is this area Busier than most of Dublin City Council.
    Homes approved
    Here146
    Council middle50
    Homes started
    Here2,602
    Council middle105
    How we work this out
    Homes approved counts schemes of 10 or more homes (one-off houses are not included). Homes started counts every home in a notice that building work was starting. The council figure is the middle value across the council's built-up squares of the same area (3.1 km², about a 1 km circle), so half of them saw more and half fewer.
    Sources: An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices), National Planning Application Database · fetched 31 Oct 2026, 05:04
    SourceLicenceFetchedLink
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.030 Oct 2026, 23:01open
    Building Control Management System (commencement notices)CC BY 4.031 Oct 2026, 02:56open
    National Planning Application DatabaseCC BY 4.031 Oct 2026, 05:04open
    Question 5

    What's the area like?

    Figure 9

    This street block against the council

    75% owner-occupied (council 47%).

    Homes built before 1971
    55% · council 52%
    Homes built since 2001
    3% · council 19%
    Owner-occupied
    75% · council 47%
    Rented
    21% · council 45%
    Children under 15
    11% · council 15%
    Aged 65 and over
    27% · council 13%
    Households with 2+ cars
    21% · council 19%
    Work mainly from home
    14% · council 12%
    This small area (312 people)Dublin

    MeasuredCSO Census 2022, Small Area Population Statistics (CC BY 4.0) · small area 268092003

    Bus
    107 m
    Parnell Road · 150 · busiest stop within 500 m: 7 an hour at peak
    Radon
    1 in 20
    homes here likely high (EPA). Test it
    Flood
    Yes
    OPW flood map area within 100 m
    Nearest school
    201 m
    Scoil Iosagain Boys Senior, 83 pupils
    Homes sold nearby
    58
    in 3 years (Property Price Register)
    Schools, stops and the council

    Schools

    • Scoil Iosagain Boys Senior · primary · 83 pupils · 201 m
    • Griffith Barracks Multi D School · primary · 403 pupils · 449 m
    • St Catherines West NS · primary · 193 pupils · 505 m
    • Marist National School · primary · 210 pupils · 610 m
    • Clogher Road Community College · postprimary · 297 pupils · 642 m
    • St Clares Convent NS · primary · 163 pupils · 681 m
    • Scoil Treasa Naofa · primary · 175 pupils · 750 m
    • Harolds Cross Educate Together Secondary School · postprimary · 437 pupils · 758 m

    Stops 73

    • Parnell Road · 150 · 3/hour at peak · 107 m
    • Aughavannagh Rd · 150 · 4/hour at peak · 111 m
    • Aughavannagh Rd · 150 · 3/hour at peak · 124 m
    • Parnell Road · 150 · 4/hour at peak · 135 m
    • Clogher Road · 150 · 4/hour at peak · 335 m
    • Saint Anne's Rd S · 122, 68, 68A · 5/hour at peak · 348 m
    • National Stadium · 122, 68, 68A · 7/hour at peak · 351 m
    • Donore Ave · 150 · 4/hour at peak · 379 m

    Schools growing or shrinking planning in 3 years · pupils last year

    • Scoil Iosagain Boys Senior · 201 m+2.5% pupils (83)
    • Griffith Barracks Multi D School · 449 m+4.1% pupils (403) · an extension 2026, no decision yet
    • St Catherines West NS · 505 m+3.2% pupils (193)
    • Marist National School · 610 m-0.9% pupils (210)
    • Clogher Road Community College · 642 m+10.4% pupils (297)
    • St Clares Convent NS · 681 m-9.9% pupils (163)

    Open consultations

    Council meetings 30 items

    Public land

    • Dublin City Council · 0.26 ha · 13 m
    • Waterways Ireland · 0.27 ha · 218 m
    • Waterways Ireland · 1 ha · 223 m
    • Waterways Ireland · 0.36 ha · 229 m
    • Waterways Ireland · 0.11 ha · 289 m
    • Waterways Ireland · 0.26 ha · 313 m
    Sources: Public transport stops and routes (NTA GTFS), Department of Education school list, National Planning Application Database, Council consultation portals, Council meetings (ModernGov), Land Development Agency public land register, cso_saps_2022, National Transport Authority, Fingal County Council and Dún Laoghaire-Rathdown County Council development plan layers (CC BY 4.0), dartplus.ie project extents over NTA GTFS rail shapes (CC BY 4.0), EPA strategic noise maps, Fingal County Council · fetched 31 Oct 2026, 05:04
    SourceLicenceFetchedLink
    Public transport stops and routes (NTA GTFS)CC BY 4.025 Oct 2026, 23:02open
    Department of Education school listCC BY 4.027 Oct 2026, 23:04open
    National Planning Application DatabaseCC BY 4.031 Oct 2026, 05:04open
    Council consultation portalsPublic31 Oct 2026, 01:06open
    Council meetings (ModernGov)Public31 Oct 2026, 02:21open
    Land Development Agency public land registerCC BY 4.011 Sept 2026, 16:43open
    cso_saps_2022CC BY 4.0—open
    National Transport AuthorityCC BY 4.0——
    Fingal County Council and Dún Laoghaire-Rathdown County Council development plan layers (CC BY 4.0)CC BY 4.0——
    dartplus.ie project extents over NTA GTFS rail shapes (CC BY 4.0)CC BY 4.0——
    EPA strategic noise mapsCC BY 4.0——
    Fingal County CouncilCC BY 4.0——
    Question 6

    What to ask, and who

    1. Flood risk area within 100 m: can you insure it?
      Ask for: A flood-cover quote before sale agreed.
      Insurer
    2. Application 311 m away open for comments until 18 Nov 2026: comment?
      Ask for: The plans on the council's website (€20 to comment).
      Council
    3. Any work done without planning permission?
      Ask for: An opinion of compliance for the whole house.
      Seller · solicitor
    Reference

    Where this is, the terms, the sources

    Electoral division
    Kimmage C
    Electoral area
    Kimmage-Rathmines
    Council
    Dublin City Council
    Everything we found, as a list 8 lines
    • Zoned R2 (existing residential); not protected; no vacant land tax; flood risk area within 100 m.
    • 5 sites nearby could change: 2 derelict, 3 empty zoned plots.
    • 1 application open for comments nearby; nearest closes 18 Nov 2026.
    • National Stadium (bus 122, 68) 351 m away: 7 an hour at morning peak; 58 from all stops within 500 m.
    • Here (2022 census): 75% owner-occupied (council 47%); 1% of homes empty (council 8%); most built 1946–1960; 40% drive to work (council 28%); population up 23% since 2016.
    • 1 home extension within 250 m since 2026.
    • The council decides in a median 55 days (about 8 weeks); 1 in 4 is asked for more information.
    • Homes started within 1 km: 1,470 in the last year, 146 three years before.
    What the terms mean 8 terms
    • Vacant land tax (Residential Zoned Land Tax (RZLT)): A yearly tax of 3% of the land's value on land that is zoned for homes and serviced but left unbuilt.
    • Building started (Commencement notice (BCMS)): The builder must tell the council's building control office 14 to 28 days before work starts.
    • Signed off as finished (Certificate of Compliance on Completion): A certificate filed when a building is finished, confirming it meets the building regulations.
    • Approved (Grant of permission): The council said yes, usually with conditions.
    • Listed by the council as derelict (Derelict Sites Register): Councils keep a public list of land and buildings in a ruinous or dangerous state.
    • Comment on an application (Observation / submission): Anyone can comment on a planning application within five weeks of it being lodged, for a €20 fee.
    • Appeal (Appeal to An Coimisiún Pleanála): The applicant, or anyone who commented in time, can appeal the council's decision within four weeks.
    • What the land is zoned for (Zoning objective): The council's development plan sets what each area is for: homes, shops, open space and so on.
    Sources and licences 32
    SourcePublisherLicenceFetched
    EPA strategic noise maps—CC BY 4.0—
    Fingal County Council—CC BY 4.0—
    Fingal County Council and Dún Laoghaire-Rathdown County Council development plan layers (CC BY 4.0)—CC BY 4.0—
    National Transport Authority—CC BY 4.0—
    services-eu1.arcgis.comAn Coimisiún PleanálaCC BY 4.030 Oct 2026
    data.nbco.gov.ieNational Building Control Office (BCMS)CC BY 4.031 Oct 2026
    data.gov.ieVarious (see each layer)CC BY 4.0, CC BY-NC-ND 4.027 Sept 2026
    s3.eu-west-1.amazonaws.comOffice of Public WorksCC BY-NC-ND 4.0 · flag only11 Sept 2026
    services-eu1.arcgis.comNational Parks and Wildlife ServiceCC BY 4.027 Sept 2026
    services-eu1.arcgis.comNational Inventory of Architectural HeritageCC BY 4.027 Sept 2026
    gis.epa.ieEnvironmental Protection AgencyCC BY 4.027 Sept 2026
    services-eu1.arcgis.comNational Monuments Service (SMR)CC BY 4.027 Sept 2026
    dlrcoco.citizenspace.comLocal authorities (consultation portals)Public31 Oct 2026
    www2.courts.ie—© the publisher30 Oct 2026
    cso.ie—CC BY 4.0—
    dartplus.ie project extents over NTA GTFS rail shapes (CC BY 4.0)—CC BY 4.0—
    services-eu1.arcgis.comLocal authorities (derelict sites registers)CC BY 4.026 Oct 2026
    services.arcgis.comDublin local authorities (housing delivery pipeline)CC BY 4.026 Oct 2026
    data.epa.ieEnvironmental Protection Agency (LEAP licence register)CC BY 4.026 Oct 2026
    esbnetworks.ie—© the publisher · flag only11 Sept 2026
    transportforireland.ieNational Transport AuthorityCC BY 4.025 Oct 2026
    lda.ieLand Development AgencyCC BY 4.011 Sept 2026
    meetings.fingal.ieLocal authorities (council meetings)Public31 Oct 2026
    services.arcgis.comDepartment of Housing (National Planning Application Database)CC BY 4.031 Oct 2026
    services-eu1.arcgis.comTailte ÉireannCC BY 4.011 Sept 2026
    services-eu1.arcgis.comCSO, Tailte Éireann, OpenStreetMap contributorsCC BY 4.04 Oct 2026
    propertypriceregister.ieProperty Services Regulatory Authority (PPR)© PSRA, PSI licence31 Oct 2026
    services.arcgis.comLocal authorities (RZLT maps)CC BY 4.025 Oct 2026
    gov.ieDepartment of EducationCC BY 4.027 Oct 2026
    gov.ieDepartment of HousingCC BY-SA 4.023 Oct 2026
    tusla.ieTusla (Early Years Inspectorate)Public register28 Oct 2026
    services.arcgis.comLocal authorities via the Department of Housing (GZT / MyPlan)CC BY 4.025 Oct 2026
    Measured
    counted from a public register
    Calculated
    a rate or median we worked out from those counts
    Our classification
    we sorted it by reading each description
    Estimate
    inferred from another source (census, map data)
    Rule summary
    the law, simplified: check before relying on it
    How we work this out
    Generated 31 Oct 2026, 20:35 from the Planning Register store; nothing was fetched live. Not a legal search: the council's planning file is the record. Deadlines come from published dates under the Planning and Development Act 2000: confirm with the council before relying on them. Street map © OpenStreetMap contributors; building outlines © Overture Maps Foundation. The text version carries every figure with its source, for an AI assistant.