PlanningRegister.ie
Planning report · Dublin City Council · 500 m around the house · the last 12 months · 13 Oct 2026, 00:08

Rathdrum Road, Dolphin's Barn

53.32905, -6.29003

Homes here mostly date from the 1950s. Home extensions nearby almost always get approved (94%). 21 homes approved 402 m away haven't started.

See on the mapWatch this area

How planning works, with this area's numbers

steps can overlap · medians for home extensions within 1.5 km, 10 years
  1. 1ApplySite notice up, plans online
  2. 2Comments5 weeks, €20. Comment to keep your right to appeal
  3. 3Decision8 weeks by law. Here 55 days
  4. 4Appeal window4 weeks after the decision
  5. 5AppealHere about 4 months
  6. 6PermissionLasts 5 years
  7. 7StartStart notice to the council. Here about 4 months after
  8. 8Sign-offCompletion cert, or the owner opts out
Question 1

What's the planning story of this house?

Figure 1

When it was built, and the rules since

Most homes here were built 1946–60, before planning permission was needed.

Timeline from 1942: planning permission needed from October 1964, building regulations from June 1992, building records online from March 2014, sign-off opt-out from September 2015. Most homes here were built 1946–1960.19501960197019801990200020102020Oct 1964permission neededJun 1992building regulationsMar 2014building records onlineSep 2015owners may opt out of sign-offThis houseAll of Rathdrum RoadBuilt: most homes in this small area date from 1946–1960 (census estimate)most built2019: 2 files on Rathdrum Road2022: 1 file on Rathdrum Road2023: 3 files on Rathdrum Road2025: 1 file on Rathdrum Road7 files

Each line is a rule that applies to work done after it.

MeasuredEstimatecouncil register via NPAD · build years: CSO Census 2022, small area

On this site
R2
Zoning · Existing residential
No
Protected or listed · on the council's list
No
Vacant land tax · lived-in homes don't pay it
1 in 20
Radon (EPA) · homes with high radon
Zoning, protection, tax and flood: the detail
Zoning
What it says

Zone Z1 - DEV PLAN 2022-2028

DCC_DP_OWN · — – —

ZoningR2 · Existing residential
What it says

Z1: Sustainable Residential Neighbourhoods: To protect, provide and improve residential amenities.

An established residential area. The objective is to protect existing residential amenity as well as to provide housing — which is the objective a neighbour's objection to an overbearing extension is usually argued under.

development plan 2022 2028 · 14 Dec 2022 – 31 Dec 2028

ZoningR2 · Existing residential
What it says

Z1: Sustainable Residential Neighbourhoods: To protect, provide and improve residential amenities.

An established residential area. The objective is to protect existing residential amenity as well as to provide housing — which is the objective a neighbour's objection to an overbearing extension is usually argued under.

development plan 2022 2028 variation no 11 · 14 Dec 2022 – 31 Dec 2028

Radon1 in 20 homes have high radon (EPA)

Not on this site: protected building, heritage inventory, monument zone, conservation area, EU nature site, EU bird site, natural heritage area, tree order, landslide risk, derelict list.

Licensed industrial sites within 1.0 km: B.G. Flexible Packaging Limited. (493 m)

Vacant land taxNo lived-in homes don't pay it
Flood riskWithin 100 m OPW map area within 100 m · floodinfo.ie
Within 500 mCountFor example
Licensed industrial sites1B.G. Flexible Packaging Limited.
Natural heritage areas1Grand Canal
Heritage inventory buildings10Camac Bridge; Parnell Bridge
Radon grid squares6
Monuments6Windmill; Watercourse
How we work this out
'On this site' means the record's own map outline touches the registered parcel (or a 12 m circle round the point where there is no parcel). Only the council's own list confirms a protected building; ask the council if in doubt. The council's map for the vacant land tax shows this spot inside an area of existing homes. Homes people live in, and their gardens, don't pay the tax. The OPW flood map's licence lets us show a yes/no only. Land on the vacant land tax map nearby: 2 on the draft 2027 map; 2 on the final 2026 map.
Sources: zoning, constraints.radon, epa_leap, rzlt, constraints, constraints.epa_licence, constraints.flood_cfram, constraints.nha, constraints.niah, constraints.smr · fetched 11 Oct 2026, 23:18
SourceLicenceFetchedLink
zoningCC-BY-4.011 Oct 2026, 23:18open
constraints.radonCC-BY-4.027 Sept 2026, 19:36open
epa_leapCC-BY-4.012 Oct 2026, 23:31open
rzltCC-BY-4.012 Oct 2026, 00:14open
constraintsmixed — CC-BY-4.0 except OPW flood (CC-BY-NC-ND-4.0, publishable=false)27 Sept 2026, 19:37open
constraints.epa_licenceCC-BY-4.027 Sept 2026, 19:36open
constraints.flood_cframCC-BY-NC-ND-4.0 · not redistributable — shown as a flag only11 Sept 2026, 19:11open
constraints.nhaCC-BY-4.027 Sept 2026, 19:27open
constraints.niahCC-BY-4.027 Sept 2026, 19:35open
constraints.smrCC-BY-4.027 Sept 2026, 19:29open
How we work this out
Applications whose site outline (or map point) falls on this property. 'No sign building has started' means we found no notice to the council's building control office; small jobs don't always file one, so ask. A missing completion certificate is not proof of a problem: an owner can opt out of official sign-off for a house or extension built for themselves.
Sources: bcms, npad · fetched 12 Oct 2026, 00:09
SourceLicenceFetchedLink
bcmsCC-BY-4.012 Oct 2026, 00:09open
npadCC-BY-4.012 Oct 2026, 01:44open
Question 2

Could you extend?

Nothing on this site restricts it: not protected, not in a conservation area.

Figure 2

What happened to applications like yours

Extensions are almost always approved here: 92–96% by type. A new house in a garden is harder: 69% approved, and 1 in 5 is asked for more information.

Single-storey rear154 decided · more info asked 9%
95% · council 97%
Two-storey rear126 decided · more info asked 10%
96% · council 96%
Two-storey side35 decided · more info asked 17%
94% · council 98%
Single-storey side18 decided · more info asked 17%
94% · council 99%
Attic or dormer224 decided · more info asked 7%
93% · council 96%
First-floor50 decided · more info asked 2%
92% · council 93%
Porch or front16 decided · more info asked 0%
94% · council 97%
New house in a garden or site72 decided · more info asked 22%
69% · council 72%
Approved nearbyDublin overall

Decided applications within 1.5 km, received in the last 10 years. The kind of work is read from each description.

CalculatedOur classificationcouncil register via NPAD · 695 nearby, 7,642 council-wide

Figure 3

Rathdrum Road, file by file since 2019

3 of 5 decided extensions on the road were approved.

7 planning files on Rathdrum Road since 2019, by kind and decision.20192020202120222023202420252026Extensions, atticsNo. 52 · 2019 · two-storey rear · approved · 3045/19No. 100 · 2022 · single-storey rear · refused · 3425/22No. 100 · 2023 · single-storey rear · refused · 3198/23No. 17 · 2023 · two-storey rear · approved · WEB1899/23No. 17 · 2023 · two-storey rear · approved · WEB2135/23No. 13 · 2025 · single-storey rear · withdrawn or invalid · WEB1866/25Porches, roofs, otherNo. 76 · 2019 · other work · approved · 2138/19New house in a side garden
ApprovedRefusedWithdrawn or invalid

7 files with "Rathdrum Road" in the address within 600 m, other roads of the same name left out. Hover a dot for the house number and reference.

MeasuredOur classificationcouncil register via NPAD · 2019–2026

Extensions and refusals right beside you 0 within 250 m · 0 refused within 100 m

Extensions and refusals near you 0 extensions within 250 m · the last 12 months

No home extensions within 250 m in the last 12 months.

Refused within 100 m 0 in the last 12 months

Nothing refused this close in the last 12 months.

    How we work this out
    Home extensions are read from the application's description (extension, attic or dormer, porch, garage conversion, garden room), so a few may be missed or mislabelled. The kind is the first that fits: a dormer with a rear extension counts as a dormer. Refusal reasons come from An Coimisiún Pleanála's inspector reports, so they exist only where the refusal was appealed (Dún Laoghaire-Rathdown so far). The council's own reasons are on its planning file.
    Sources: npad, acp · fetched 12 Oct 2026, 01:44
    SourceLicenceFetchedLink
    npadCC-BY-4.012 Oct 2026, 01:44open
    acpCC-BY-4.09 Oct 2026, 23:03open
    Sources: acp, bcms, npad · fetched 9 Oct 2026, 23:03
    SourceLicenceFetchedLink
    acpCC-BY-4.09 Oct 2026, 23:03open
    bcmsCC-BY-4.012 Oct 2026, 00:09open
    npadCC-BY-4.012 Oct 2026, 01:44open
    Question 3

    How long, and what if someone objects?

    Figure 4

    A home extension's journey here

    A decision takes 55 days. 1 in 11 is asked for more information, which adds about 82 days. Building starts about 4 months after permission.

    Comments open: 5 weeks · €20; Council decision: 55 days; If more info asked (1 in 11): 138 days; Appeal window: 4 weeks; If appealed: +126 days; Building starts: 134 days after permission0 mo3 mo6 mo9 mo12 mo15 moComments openComments close 5 weeks after the application is lodged5 weeks · €20Council decisionDecision: median 55 days, middle half 52–55 (n=681)55 daysIf more info asked (1 in 11)With further information: median 138 days (n=69)138 daysAppeal windowAnyone who commented can appeal within 4 weeks of the decision4 weeksIf appealedAt An Coimisiún Pleanála: median 126 days (n=189, all appeals within 1.5 km)+126 daysBuilding startsStart notice: median 134 days after permission (n=321)134 days after permissionSigned off267 days after the start, for the few who file. 39% of owners opt out of sign-off

    Bars are medians; whiskers show the middle half. Medians of separate steps don't add up exactly.

    Calculated750 decided home extensions, 326 start notices, 189 decided appeals · within 1.5 km, 10 years · NPAD, BCMS, An Coimisiún Pleanála

    Figure 5

    What appeals changed

    26 of 82 appealed refusals became permissions. 8 of 110 appealed approvals were reversed.

    Refusals appealed82 decided
    26 became permissions
    Approvals appealed110 decided
    8 reversed
    Ended approvedEnded refusedWithdrawn, invalid or other

    Every appeal decided within 1.5 km in 10 years, any kind of development.

    CalculatedAn Coimisiún Pleanála cases linked to the council file

    Appeals nearby 4 in the last 12 months

    None of 1 changed the council's decision

    • 501650 Open · 265, South Circular Road, Dublin 8, D08 VW6N · 368 m
    • 324123 Refused · Lands at White Heather Industrial Estate, South Circular Road and… · 292 m report
    • 500436 Granted · Land to the Rear of 207 South Circular Road, Dublin 8 · 452 m report
    • 500245 Refused · 337, Clogher Road, Crumlin, Dublin 12 · 248 m report
    Sources: acp, courts, npad · fetched 9 Oct 2026, 23:03
    SourceLicenceFetchedLink
    acpCC-BY-4.09 Oct 2026, 23:03open
    courtsall-rights-reserved12 Oct 2026, 01:27open
    npadCC-BY-4.012 Oct 2026, 01:44open
    Question 4

    What's changing around you?

    Street map around Rathdrum Road, Dolphin's Barn with 8 numbered planning items
    ⌖ the houseApproved, not startedDerelict buildingEmpty land zoned for homesNo decision yetApproved
    1. 144/45 Dolphin's Barn WEB2869/25Approved, no sign building has started · 402 m
    2. 2231 South Circular Road Dublin 8 D08E6HH DS1753Derelict building · 424 m
    3. 31.4 ha zoned for homesEmpty land zoned for homes · 389 m
    4. 44.7 ha zoned for homesEmpty land zoned for homes · 431 m
    5. 5337, Clogher Road WEB2152/26No decision yet · 248 m
    6. 6349, Clogher Road WEB1636/26Approved · 271 m
    7. 7265 South Circular Road, Dublin 8 WEB5820/25Approved · 370 m
    8. 861, Crumlin Road WEB2527/26No decision yet · 409 m
    Figure 6

    What happens to applications within 500 m

    Permission isn't building. Of 72 permissions since 2016, 28 show a start notice and 2 have a completion certificate.

    95 applications lodged within 500 m. Council: 72 approved, 13 refused. After appeals: 72 approved. Of those: 2 signed off, 10 built with the owner's opt-out, 16 started, 44 with no start notice found, 0 ran out.LODGEDCOUNCIL DECISIONAFTER APPEALSWHAT HAPPENED NEXT72: lodged → approved13: lodged → refused9: lodged → withdrawn or invalid1: lodged → undecided70: approved → approved11: refused → refused9: withdrawn or invalid → withdrawn1: undecided → undecided1 approved by the council, refused after an appeal1 approved by the council, withdrawn or invalid after an appeal2 refused by the council, approved after an appeal44: approved → no start notice found10: approved → built, owner opted out16: approved → started, not signed off2: approved → signed off95 lodged95 lodged72 approved72 approved13 refused13 refused9 withdrawn or invalid9 withdrawn or invalid1 undecided1 undecided72 approved72 approved12 refused12 refused10 withdrawn10 withdrawn1 undecided1 undecided44 no start notice found44 no start notice found10 built, owner opted out10 built, owner opted out16 started, not signed off16 started, not signed off2 signed off2 signed off

    Purple bands are refusals turned into permissions on appeal. "No start notice found" includes small jobs that never needed one and notices we couldn't match.

    Measured95 applications in 10 years · NPAD, An Coimisiún Pleanála, BCMS start notices and completion certificates

    Figure 7

    The next 30 days

    Nothing closes within 500 m in the next 30 days.

      Measuredcouncil registers and An Coimisiún Pleanála · deadlines worked out from the dates on file

      Figure 8

      Approved, stalled or planned, not built yet

      21 homes 402 m away were approved Feb 2026 with no start notice yet; the permission runs to Feb 2031.

      44/45 Dolphin's Barn · 21 homes: 21 homes approved Feb 2026, not started20242025202620272028202920302031203244/45 Dolphin's Barn · 21 homes402 m · WEB2869/2521 homes approved Feb 2026, not started21 homes approved Feb 2026, not startedtoday

      Each row is a dated fact from a public register: no score and no forecast.

      Measuredcouncil registers, BCMS, derelict sites registers, development plan layers (CC BY 4.0)

      Sites that could change 4 within 500 m

      Derelict building 1

      • 2231 South Circular Road Dublin 8 D08E6HH · derelict since Jul 2025 · 424 m

      Approved, not started 1

      Empty land zoned for homes 2

      • 31.4 ha zoned for homes · no homes built on it yet · 389 m
      • 44.7 ha zoned for homes · no homes built on it yet · 431 m
      Sources: acp, bcms, derelict, moderngov, npad, rzlt · fetched 9 Oct 2026, 23:03
      SourceLicenceFetchedLink
      acpCC-BY-4.09 Oct 2026, 23:03open
      bcmsCC-BY-4.012 Oct 2026, 00:09open
      derelictCC-BY-4.012 Oct 2026, 23:08open
      moderngovpublic12 Oct 2026, 01:27open
      npadCC-BY-4.012 Oct 2026, 01:44open
      rzltCC-BY-4.012 Oct 2026, 00:14open
      Figure 9

      Applications within 500 m, by year

      Between 10 and 19 a year; busiest 2021. 85% of decisions were approvals.

      2019: 9, 2020: 12, 2021: 19, 2022: 10, 2023: 12, 2024: 11, 2025: 19, 2026: 3051015202019: 8 approved2019: 1 refused9’19*2020: 11 approved2020: 1 refused12’202021: 16 approved2021: 2 refused2021: 1 withdrawn or invalid19’212022: 8 approved2022: 2 refused10’222023: 11 approved2023: 1 refused12’232024: 8 approved2024: 3 refused11’242025: 9 approved2025: 3 refused2025: 7 withdrawn or invalid19’252026: 1 approved2026: 1 withdrawn or invalid2026: 1 undecided3’26*
      ApprovedRefusedWithdrawn or invalidUndecided

      2019 and 2026 are part years (*). Exemption requests and time extensions are left out.

      Measuredcouncil register via NPAD

      Every application within 500 m 5 in the last 12 months

      See every application on the map

      • 44, Parnell Road, Dublin 12 Withdrawn or not valid
        RETENTION: permission to retain the as constructed building at the rear of 44 Parnell Road, Dublin 12. The…
        5228/262 Oct 2026335 m
      • 861, Crumlin Road, Dublin 12 No decision yet
        Demolition of existing extensions at ground floor to rear (39.5 sqm in total) and construction of a 36 sqm…
        WEB2527/2618 Jun 2026409 m
      • 5337, Clogher Road, Dublin 12 No decision yet
        RETENTION: Planning permission is sought at 337 Clogher Road, Crumlin, Dublin 12, D12WD30 for retention of…
        WEB2152/263 Jul 2026248 m
      • 6349, Clogher Road, Dublin 12 Approved
        RETENTION PERMISSION : For development at this site; 349 Clogher Road Dublin 12, D12 AH26 The development…
        WEB1636/2611 May 2026271 m
      • 7265 South Circular Road, Dublin 8, D08 VW6N Approved
        (1) the widening of previously granted dormer window under Planning Reg. Ref. WEB2697/25, (2) three new roof…
        WEB5820/2529 Jan 2026370 m
      How we work this out
      Descriptions are shortened by the national planning database (to 80 characters in Dún Laoghaire-Rathdown, 70 in Fingal), and it does not publish applicants' names.
      Sources: npad, acp, bcms · fetched 12 Oct 2026, 01:44
      SourceLicenceFetchedLink
      npadCC-BY-4.012 Oct 2026, 01:44open
      acpCC-BY-4.09 Oct 2026, 23:03open
      bcmsCC-BY-4.012 Oct 2026, 00:09open
      Building work nearby 9 in the last 12 months
      4 not signed off5 no sign-off needed
      • 265 South Circular Road, Dublin 8, D08 VW6N · 10 Sept 2026 · start notice, opted out no sign-off needed · 5820/25 · 392 m
      • 65B Crumlin Road, Dublin 12 · 8 Sept 2026 · 7-day notice not signed off · 4900/23 · 378 m
      • Site to rear of 404, 406, 408, 410 Clogher Road Crumlin, Dublin 12 Dublin 12, Dublin 12 · 8 Jun 2026 · 2 homes · start notice not signed off · 3099/25 · 414 m
      • Site to rear of 404, 406, 408, 410 Clogher Road, Crumlin, Dublin 12, Dublin 12, D12 KP38 · 23 Feb 2026 · short notice no sign-off needed · 3099/25 · 392 m
      • 63 Parnell Road, Harolds Cross, Dublin 12, D12 DX39 · 16 Feb 2026 · short notice no sign-off needed · WEB1912/25 · 384 m
      • 276 South Circular Road, Dublin 8, Dublin, D08T6DC · 27 Jan 2026 · 732 homes · start notice not signed off · SHD0031/20 & ABP-308917-20 · 434 m
      • Clogher Road, Dublin, Dublin 12, D12 YP98 · 5 Jan 2026 · start notice not signed off · 3590/22 · 376 m
      • 6 South Circular Road, Dublin 8, D08T6DC · 28 Oct 2025 · short notice no sign-off needed · SHD0031/20 & ABP-308917-20 · 483 m
      • 65 Parnell Road, Dublin, Dublin 12, D12 E224 · 27 Oct 2025 · start notice, opted out no sign-off needed · WEB2771/24 · 376 m
      How we work this out
      Each row is a notice the builder sent to the council's building control office before work started. One notice can cover many homes. 'Signed off as finished' means a completion certificate is on file; work done under an opt-out or a short notice doesn't need one.
      Source: bcms · fetched 12 Oct 2026, 00:09
      SourceLicenceFetchedLink
      bcmsCC-BY-4.012 Oct 2026, 00:09open
      Homes coming 21 not started
      How we work this out
      Schemes of 10 or more homes approved since 2019, from the council and An Coimisiún Pleanála registers. 'Building started' means the builder told the council's building control office that work was starting (a commencement notice).
      Sources: acp, bcms, npad, social_housing · fetched 9 Oct 2026, 23:03
      SourceLicenceFetchedLink
      acpCC-BY-4.09 Oct 2026, 23:03open
      bcmsCC-BY-4.012 Oct 2026, 00:09open
      npadCC-BY-4.012 Oct 2026, 01:44open
      social_housingCC-BY-SA-4.09 Oct 2026, 23:01open
      Named places nearby: estate, schemes, crèches, schools

      Named places estate, developments, inspections

      Developments within 1.0 km

      SchemeHomesProgressDistance
      Dolphin Park161—122 m
      White Heather Industrial Estate250no activity on site reported (2026-Q2)285 m
      Former Baily Gibson Site416416 being built (2026-Q2)365 m
      Former Player Wills Site492462 being built · 30 not started (2026-Q2)418 m
      Dolphin House Estate3030 not started (2026-Q2)431 m
      Former St. Teresa's Gardens543543 being built (2026-Q2)522 m
      ESB Depot, Parnell Avenue55—547 m
      69D Donore Avenue68—591 m

      Crèches and schools inspected

      NameLatest inspectionDistance
      Eco Kidz Clogher · Crèche17 Feb 2026 · report · Tusla Early Years Inspectorate210 m
      The Marist Creche · Crèche27 Sept 2024 · report · Tusla Early Years Inspectorate379 m
      Loreto Preschool and Afterschool · Crèche19 Mar 2026 · report · Tusla Early Years Inspectorate405 m
      Pearse College Nursery · Crèche17 Feb 2025 · report · Tusla Early Years Inspectorate413 m
      Kkcreche Ltd · Crèche1 Jul 2025 · report · Tusla Early Years Inspectorate559 m
      St Joseph's ECDS · Crèche14 Nov 2024 · report · Tusla Early Years Inspectorate842 m
      St. Clare's Pre- School Limited · Crèche23 Jan 2025 · report · Tusla Early Years Inspectorate932 m
      Fatima Groups United Children's Day Care Centre · Crèche20 Nov 2025 · report · Tusla Early Years Inspectorate942 m
      How we work this out
      Organisations only: a person named on an application is never listed. Inspection dates and links are the publisher's; read their report for the findings.
      Sources: dublin_pipeline, npad, schools, tusla_ey · fetched 12 Oct 2026, 23:02
      SourceLicenceFetchedLink
      dublin_pipelineCC-BY-4.012 Oct 2026, 23:02open
      npadCC-BY-4.012 Oct 2026, 01:44open
      schoolsCC-BY-4.027 Sept 2026, 23:32open
      tusla_eypublic (Tusla statutory register; acknowledgement required, no open licence stated)5 Oct 2026, 23:33open
      How busy is this area Busier than most of Dublin City Council.
      Homes approved
      Here184
      Council middle53
      Homes started
      Here2,622
      Council middle141
      How we work this out
      Homes approved counts schemes of 10 or more homes (one-off houses are not included). Homes started counts every home in a notice that building work was starting. The council figure is the middle value across the council's built-up squares of the same area (3.1 km², about a 1 km circle), so half of them saw more and half fewer.
      Sources: acp, bcms, npad · fetched 9 Oct 2026, 23:03
      SourceLicenceFetchedLink
      acpCC-BY-4.09 Oct 2026, 23:03open
      bcmsCC-BY-4.012 Oct 2026, 00:09open
      npadCC-BY-4.012 Oct 2026, 01:44open
      Question 5

      What's the area like?

      Figure 10

      This street block against the council

      100% of homes built before 1971 (council 52%). 71% owner-occupied (council 47%).

      Homes built before 1971
      100% · council 52%
      Homes built since 2001
      0% · council 19%
      Owner-occupied
      71% · council 47%
      Rented
      24% · council 45%
      Children under 15
      18% · council 15%
      Aged 65 and over
      21% · council 13%
      Households with 2+ cars
      27% · council 19%
      Work mainly from home
      4% · council 12%
      This small area (216 people)Dublin

      MeasuredCSO Census 2022, Small Area Population Statistics (CC BY 4.0) · small area 268053005

      Bus
      214 m
      Clogher Road · 150 · busiest stop within 500 m: 16 an hour at peak
      Radon
      1 in 20
      homes here likely high (EPA). Test it
      Flood
      Yes
      OPW flood map area within 100 m
      Nearest school
      210 m
      Scoil Iosagain Boys Senior, 83 pupils
      Homes sold nearby
      41
      in 3 years (Property Price Register)
      Schools, stops and the council

      Schools

      • Scoil Iosagain Boys Senior · primary · 83 pupils · 210 m
      • Clogher Road Community College · postprimary · 297 pupils · 361 m
      • Marist National School · primary · 210 pupils · 396 m
      • Scoil Mhuire Ogh 1 · primary · 212 pupils · 451 m
      • Muire Og 2 Loreto Con · primary · 191 pupils · 451 m
      • Loreto College · postprimary · 320 pupils · 518 m
      • St Catherines West NS · primary · 193 pupils · 639 m
      • Griffith Barracks Multi D School · primary · 403 pupils · 730 m

      Stops 76

      • Clogher Road · 150 · 4/hour at peak · 214 m
      • Aughavannagh Rd · 150 · 4/hour at peak · 242 m
      • Aughavannagh Rd · 150 · 3/hour at peak · 247 m
      • Clogher Road · 150 · 3/hour at peak · 269 m
      • Parnell Road · 150 · 3/hour at peak · 376 m
      • Parnell Road · 150 · 4/hour at peak · 384 m
      • Dolphin Avenue · 122, 68, 68A · 5/hour at peak · 390 m
      • Rutland Avenue · 151, 27, 56A, 74, 77A, 77n · 15/hour at peak · 404 m

      Schools growing or shrinking planning in 3 years · pupils last year

      • Scoil Iosagain Boys Senior · 210 m+2.5% pupils (83)
      • Clogher Road Community College · 360 m+10.4% pupils (297)
      • Marist National School · 396 m-0.9% pupils (210)
      • Muire Og 2 Loreto Con · 450 m-8.2% pupils (191)
      • Scoil Mhuire Ogh 1 · 450 m-0.9% pupils (212)
      • Loreto College · 518 m-12.3% pupils (320)

      Open consultations

      Council meetings 30 items

      Public land

      • Dublin City Council · 0.42 ha · 253 m
      • Waterways Ireland · 0.39 ha · 258 m
      • Waterways Ireland · 0.26 ha · 258 m
      • City of Dublin Education and Training Board · 4.8 ha · 259 m
      • Dublin City Council · 0.26 ha · 266 m
      • Dublin City Council · 0.13 ha · 266 m
      Sources: gtfs, schools, npad, consult, moderngov, lda_lands, cso_saps_2022, National Transport Authority, Fingal County Council and Dún Laoghaire-Rathdown County Council development plan layers (CC BY 4.0), dartplus.ie project extents over NTA GTFS rail shapes (CC BY 4.0), EPA strategic noise maps, Fingal County Council · fetched 11 Oct 2026, 23:43
      SourceLicenceFetchedLink
      gtfsCC-BY-4.011 Oct 2026, 23:43open
      schoolsCC-BY-4.027 Sept 2026, 23:32open
      npadCC-BY-4.012 Oct 2026, 01:44open
      consultpublic12 Oct 2026, 01:26open
      moderngovpublic12 Oct 2026, 01:27open
      lda_landsCC-BY-4.011 Sept 2026, 16:43open
      cso_saps_2022CC BY 4.0—open
      National Transport AuthorityCC BY 4.0——
      Fingal County Council and Dún Laoghaire-Rathdown County Council development plan layers (CC BY 4.0)CC BY 4.0——
      dartplus.ie project extents over NTA GTFS rail shapes (CC BY 4.0)CC BY 4.0——
      EPA strategic noise mapsCC BY 4.0——
      Fingal County CouncilCC BY 4.0——
      Question 6

      What to ask, and who

      1. Flood risk area within 100 m: can you insure it?
        Ask for: A flood-cover quote before sale agreed.
        Insurer
      2. Any work done without planning permission?
        Ask for: An opinion of compliance for the whole house.
        Seller · solicitor
      Reference

      Where this is, the terms, the sources

      Electoral division
      Crumlin C
      Electoral area
      Kimmage-Rathmines
      Council
      Dublin City Council
      Everything we found, as a list 8 lines
      • Zoned R2 (existing residential); not protected; no vacant land tax; flood risk area within 100 m.
      • 4 sites nearby could change: 1 derelict, 1 approved scheme, 2 empty zoned plots.
      • 21 homes approved nearby, not started; largest 21 at 44/45 Dolphin's Barn.
      • Rutland Avenue (bus 151, 27) 421 m away: 16 an hour at morning peak; 128 from all stops within 500 m.
      • Here (2022 census): 71% owner-occupied (council 47%); 11% of homes empty (council 8%); most built 1946–1960; 45% drive to work (council 28%); population up 1% since 2016.
      • The council decides in a median 55 days (about 8 weeks); 1 in 4 is asked for more information.
      • Homes started within 1 km: 1,472 in the last year, 322 three years before.
      • 5 applications nearby in the last 12 months.
      What the terms mean 7 terms
      • Vacant land tax (Residential Zoned Land Tax (RZLT)): A yearly tax of 3% of the land's value on land that is zoned for homes and serviced but left unbuilt.
      • Building started (Commencement notice (BCMS)): The builder must tell the council's building control office 14 to 28 days before work starts.
      • Signed off as finished (Certificate of Compliance on Completion): A certificate filed when a building is finished, confirming it meets the building regulations.
      • Approved (Grant of permission): The council said yes, usually with conditions.
      • Listed by the council as derelict (Derelict Sites Register): Councils keep a public list of land and buildings in a ruinous or dangerous state.
      • Appeal (Appeal to An Coimisiún Pleanála): The applicant, or anyone who commented in time, can appeal the council's decision within four weeks.
      • What the land is zoned for (Zoning objective): The council's development plan sets what each area is for: homes, shops, open space and so on.
      Sources and licences 33
      SourcePublisherLicenceFetched
      EPA strategic noise maps—CC BY 4.0—
      Fingal County Council—CC BY 4.0—
      Fingal County Council and Dún Laoghaire-Rathdown County Council development plan layers (CC BY 4.0)—CC BY 4.0—
      National Transport Authority—CC BY 4.0—
      services-eu1.arcgis.comAn Coimisiún PleanálaCC-BY-4.09 Oct 2026
      data.nbco.gov.ieNational Building Control Office (BCMS)CC-BY-4.011 Oct 2026
      data.gov.ieVarious (see each layer)mixed — CC-BY-4.0 except OPW flood (CC…27 Sept 2026
      gis.epa.ieEnvironmental Protection AgencyCC-BY-4.027 Sept 2026
      s3.eu-west-1.amazonaws.comOffice of Public WorksCC-BY-NC-ND-4.0 · flag only11 Sept 2026
      services-eu1.arcgis.comNational Parks and Wildlife ServiceCC-BY-4.027 Sept 2026
      services-eu1.arcgis.comNational Inventory of Architectural HeritageCC-BY-4.027 Sept 2026
      gis.epa.ieEnvironmental Protection AgencyCC-BY-4.027 Sept 2026
      services-eu1.arcgis.comNational Monuments Service (SMR)CC-BY-4.027 Sept 2026
      dlrcoco.citizenspace.com | https:Local authorities (consultation portals)public12 Oct 2026
      www2.courts.ie—all-rights-reserved12 Oct 2026
      cso.ie—CC BY 4.0—
      dartplus.ie project extents over NTA GTFS rail shapes (CC BY 4.0)—CC BY 4.0—
      services-eu1.arcgis.comLocal authorities (derelict sites registers)CC-BY-4.012 Oct 2026
      services.arcgis.comDublin local authorities (housing delivery pipeline)CC-BY-4.012 Oct 2026
      data.epa.ieEnvironmental Protection Agency (LEAP licence register)CC-BY-4.012 Oct 2026
      esbnetworks.ie—all-rights-reserved (esbnetworks.ie di… · flag only11 Sept 2026
      transportforireland.ieNational Transport AuthorityCC-BY-4.011 Oct 2026
      lda.ieLand Development AgencyCC-BY-4.011 Sept 2026
      meetings.fingal.ieLocal authorities (council meetings)public12 Oct 2026
      services.arcgis.comDepartment of Housing (National Planning Application Database)CC-BY-4.012 Oct 2026
      services-eu1.arcgis.comTailte ÉireannCC-BY-4.011 Sept 2026
      services-eu1.arcgis.comCSO, Tailte Éireann, OpenStreetMap contributorsCC-BY-4.04 Oct 2026
      propertypriceregister.ieProperty Services Regulatory Authority (PPR)PSI — PSRA re-use terms (psr.ie/re-use…12 Oct 2026
      services.arcgis.comLocal authorities (RZLT maps)CC-BY-4.011 Oct 2026
      gov.ieDepartment of EducationCC-BY-4.027 Sept 2026
      gov.ieDepartment of HousingCC-BY-SA-4.09 Oct 2026
      tusla.ieTusla (Early Years Inspectorate)public (Tusla statutory register; ackn…5 Oct 2026
      services.arcgis.comLocal authorities via the Department of Housing (GZT / MyPlan)CC-BY-4.011 Oct 2026
      Measured
      counted from a public register
      Calculated
      a rate or median we worked out from those counts
      Our classification
      we sorted it by reading each description
      Estimate
      inferred from another source (census, map data)
      Rule summary
      the law, simplified: check before relying on it
      How we work this out
      Generated 13 Oct 2026, 00:08 from the Planning Register store; nothing was fetched live. Not a legal search: the council's planning file is the record. Deadlines come from published dates under the Planning and Development Act 2000: confirm with the council before relying on them. Street map © OpenStreetMap contributors; building outlines © Overture Maps Foundation. The text version carries every figure with its source, for an AI assistant.