R2 — Existing residentialdevelopment plan 2022 2028 · 14 Dec 2022 – 31 Dec 2028
Z1: Sustainable Residential Neighbourhoods: To protect, provide and improve residential amenities.
What that means: An established residential area. The objective is to protect existing residential amenity as well as to provide housing — which is the objective a neighbour's objection to an overbearing extension is usually argued under.
An OPW flood extent intersects this area. The OPW's map is licensed CC-BY-NC-ND, so we show a flag only — see the extent at floodinfo.ie.
Designation
Count
Examples
EPA-licensed facility
1
B.G. Flexible Packaging Limited.
Natural Heritage Area (incl. proposed)
1
Grand Canal
NIAH-recorded building
54
Grand Canal; Griffith Bridge; Rialto Bridge
Radon risk area
9
About 1 in 10 homes in this area is likely to have high radon levels; About 1 in 10 homes in this area is likely to have high radon levels; About 1 in 10 homes in this area is likely to have high radon levels
This site is on an RZLT map — the draft map 2027 and the final map 2026 (1.65 ha). The owner is liable for an annual 3% tax on market value while it stays there. Submissions on the draft map closed 1 Apr 2026.
Planning permission is sought for an external, backlight illuminated signage, with the name 'The Coombe Hospital', measuring 1.73m in height by 4m in width, to be positioned approximately 13m above ground level along the front (west) elevation of the Main Building fronting onto Dolphins Barn Street. The proposed signage is to replace the existing signage in the same location. Associated repainting and replastering on the external façade of the building is also proposed.
The development will consist of changes to the previously approved development of a one off house, ref WEB2483/25, to incorporate a new dormer to the rear roof slope of the new previously approved dwelling, and a new pedestrian gate to retain access from the rear garden of 29 Church Avenue South onto Reuben Avenue.
WEB2830/26received 23 Jul 2026decided 27 Jul 2026418 m away
Planning permission is sought for an external, backlight illuminated signage, with the name ‘The Coombe Hospital’, measuring 1.73m in height by 4m in width, to be positioned approximately 13m above ground level along the front (west) elevation of the Main Building fronting onto Dolphins Barn Street. The proposed signage is to replace the existing signage in the same location. Associated repainting and replastering on the external façade of the building is also proposed.
WEB2822/26received 23 Jul 2026decided 27 Jul 2026482 m away
CHANGE OF USE: The development will consist of the change of use of the ground floor and first floor only of the existing office premises to provide up to 7 no. appointment-based medical consultation suites, including ancillary reception/waiting area, staff welfare facilities, WC facilities, storage, associated internal alterations and all ancillary works necessary to facilitate the proposed use. The second floor of the building is to remain in its existing office use and does not form part of the proposed change of use.
Demolition of existing extensions at ground floor to rear (39.5 sqm in total) and construction of a 36 sqm single storey extension to rear at ground floor. Removal of existing chimney and end wall of return at first floor level and construction of a 7.1 sqm pitched roof extension to rear at first floor and all associated internal and external alterations.
Permission is sought for demolishing existing single story side extension, and construction of new 2 storey detached 3 bedroom dwelling, with associated site works.
The development will consist of:
(i) the removal of an existing single-storey rear extension and construction of a new single-storey rear extension maintaining existing size of private open-space/courtyard with modified layout;
(ii) attic conversion to habitable room with rear dormer roof constructed below existing ridge line and reduction in ground floor level;
(iii) renovation and alterations to the existing building including all associated ancillary site works.
We, St. James’s National School, intend to apply for planning permission for development St. James’s National School, Basin View, Dublin 8. The site is located immediately to the south of the school, north of James’s Walk and west of The Hops, Basin View, Dublin 8.
The proposed development comprises of the following:
• Removal of the existing structures, including a shed and storage container and all associated site clearance works;
• Relocation of the play frame within the inner courtyard of the school;
• Upgrade of the existing school playground to provide a synthetic all-weather sports pitch with a total area of approx. 2,400 sq.m, incorporating 2 no. overlapping sports playing field measuring approx. 40m X 30m each;
• Provision of 12 no. Sheffield stands accommodating 24 no. bicycle parking spaces and associated pedestrian pathways;
• Revisions to the existing boundary wall onto James’s Walk to facilitate maintenance vehicle access;
• Provision of perimeter mesh fencing with ball stop netting above, floodlighting on 4 no. columns measuring 10.5m in height, drainage infrastructure, retaining walls, hard and soft landscaping works and all associated site development works.
WEB2437/26received 11 Jun 2026804 m away
`description` is truncated at source (80 chars for DLR, 70 for Fingal) and `applicant` is null nationally — NPAD publishes neither in full.
PPR addresses are geocoded, not surveyed — a sale's position is as good as its address match (`rooftop_n` says how many are address-accurate). Beds, floor area, BER and asking price come from the matched daft.ie advertisement, not from the Register, and only where a match was found (`enriched_n`).
Third-party advertisement data captured by Cara from daft.ie. Not open data: internal analysis only, no redistribution of listing content. Business-contact details (licensed PSP name and branch) are retained per Cara DECISIONS 2026-08-19; agent phone numbers and all vendor/buyer identities are dropped.
No publishable utility-capacity record within the radius. 67 records from Esb substation withheld: source licence forbids redistribution; see the operator's own register.
all-rights-reserved (esbnetworks.ie disclaimer: personal/non-commercial, no modification or republication without written ESB permission) — permission NOT sought · not redistributable — shown as a flag only
Third-party advertisement data captured by Cara from daft.ie. Not open data: internal analysis only, no redistribution of listing content. Business-contact details (licensed PSP name and branch) are retained per Cara DECISIONS 2026-08-19; agent phone numbers and all vendor/buyer identities are dropped.
all-rights-reserved (esbnetworks.ie disclaimer: personal/non-commercial, no modification or republication without written ESB permission) — permission NOT sought · not redistributable, flag only
Generated 14 Sept 2026, 02:46 from the Planning Register store. Nothing on this page was fetched live: every figure was already in the store with the fetch time shown. Deadlines are derived from published receipt and decision dates under the Planning and Development Act 2000; confirm with the planning authority before relying on them.