- Lockhouse Gate, Seven Mills, Clonburris, Dublin 22, Co. Dublin Grant permission
The installation of 24no. telecommunications antennas enclosed in pairs within 12no. antenna shrouds together with 6no. dishes, 3no. equipment cabinets and all associated equipment at rooftop level. The development will provide high-speed voice and broadband services for all 3 of irelands mobile operators, namely eircom (t/a eir), three ireland and vodafone ireland.
SDZ26A/0018Wreceived 22 Jul 2026decided 17 Aug 2026293 m away
- 34, Foxdene Green, Lucan, Dublin, K78 AK15 Grant retention & refuse retention
The development will consist of works comprising of Retention of Permission for a second floor - 27.6msq attic conversion with bedroom, comprising of internal stairs, dormer structure and dormer window to the East and West side and rear South facing elevations and associated works. Internal and external -8.5msq front porch to front facing North elevation with overhead hipped roof structure External roofed storage area 12.9msq with polycarbonate roof to side facing West elevation Single storey flat roof Rear Garden shed - 10.6msq And all associated site works.
SD26B/0021Wreceived 21 Jan 2026decided 11 Mar 2026461 m away
- Development Area 9 Kishoge South East, Sub Sectors KSE-S1 and KSE-S2, Clonburris SDZ, within the townland of Kishoge, Clonburris, Dublin 22. Grant permission
Cairn Homes Properties Limited intend to apply for a 7 year planning permission for development at a site of c.15.6 hectares (on two land parcels) known as 'Development Area 9' Kishoge South East, Sub Sectors KSE-S1 and KSE-S2, Clonburris SDZ, within the townland of Kishoge, Clonburris, Dublin 22. The site is principally bounded by the Dublin-Cork railway line to the north, the Grand Canal to the south, the Grange Castle Road (R136) to the south-west and undeveloped lands to the north-west and east. The development will consist of the construction of a mixed-use development, which includes 660 no. residential units comprising: • 264 no. semi-detached and terraced houses (7 No. 2 bed 4 person houses, 238 No. 3 bed houses and 19 No. 4 bed houses), ranging in height from 2 to 3 storeys. • 68 No. duplex apartment units (34 no. 2 bed 4 person units and 34 no. 3 bed units), arranged across 6 No. duplex blocks, ranging
in height from 2 to 3 storeys; • 328 no. apartments (165 no. 1 bed units, 30 no. 2 bed 3 person units, 133 no. 2 bed 4 person units), arranged across 7 No. apartment blocks (Blocks 1, 2, 3, 4, 5a, 5b and 5c), ranging in height from 4 to 6 storeys; and • A creche (c. 615 sq m) at ground floor level within Block 4. The development will also include a Local Node at 'Clonburris Little' which includes the provision of a double-height Park Hub building (c. 8m in height) comprising c. 1,558 sq m of community floorspace, including a sports hall/place of
assembly, multi-purpose spaces, changing rooms, a café, storage areas, staff and visitor amenity areas and other ancillary spaces. Vehicular access to the site will be from the Clonburris Southern Link Street (as permitted by Reg. Ref. SDZ20A/0021) located centrally between Sub-Sectors KSE-S1 and KSE-S2. The development will also consist of the provision of c.11,049 sq m of public open spaces and associated
landscaping (including a section of Grand Canal Park, a local park and pockets parks); communal open spaces; private open
space (rear gardens, terraces and balconies); hard and soft landscaping (including internal roads, pedestrian and cyclist routes, pathways, hedgerows, boundary treatments and street furniture); play spaces with natural play elements; surface car parking (653 no. surface spaces in total, including accessible spaces); electric vehicle charging points; bicycle parking (long and short stay spaces including stands) and electric bicycle charging points; motorcycle parking; pedestrian and cyclist connections; routes ESB substations, piped infrastructural services and connections; ducting; plant; waste management provision; SuDS measures (including brown roofs/biodiverse
roofs, ponds and wetland areas); solar panels; advertising signage; pedestrian crossings, public lighting; changes in levels and all site development and excavation works above and below ground.
SDZ24A/0029Wreceived 9 Jun 2025decided 5 Aug 2025660 units415 m away
- Lands comprising 3 sites Sites 3, 4 and 5, within Kishoge Development Area of Clonburris SDZ in the townlands of, Kishoge, Esker South Grange & Balgaddy, Clonburris, Co. Dublin. pending
SOUTH DUBLIN COUNTY COUNCIL NOTICE PURSUANT TO SECTION 175 OF THE PLANNING AND DEVELOPMENT ACT, 2000 (AS AMENDED) APPLICATION TO AN BORD PLEANÁLA In accordance with Section 175 of the Planning and Development Act, 2000 (as amended) South Dublin County Council gives notice of its intention to make an application for approval to An Bord Pleanála under Section 175(3) of the Planning and Development Act, 2000 (as amended), to carry out development at lands cumulatively measuring c. 29.39 hectares, comprising three sites referred to as Site 3, Site 4, and Site 5, located predominantly within the Kishoge Development Area of Clonburris Strategic Development Zone (SDZ), in the townlands of Kishoge, Esker South, Grange, and Balgaddy, Clonburris, County Dublin. The proposed development at Sites 3, 4 and 5 broadly comprises the development of 1,252no. residential units in a mix of houses, duplexes, triplexes and apartments; 2no. childcare facilities; 1no. community building; retail uses; refurbishment works to Grange House for future reuse: -
Site 3: Located within ‘Development Area 7- Kishoge North West’ and ‘Development Area 6- Kishoge Urban Centre’ of the Clonburris SDZ Planning Scheme and bounded generally by Lucan East Educate Together National School and Oldbridge housing estate to the north; Tullyhall residential housing estate to the west; Adamstown Avenue and Kishoge train station and Dublin-Cork rail line to the south; and, Grange Castle Road (R136) to the east. The proposed development at Site 3 comprises the construction of 580no. dwellings, including 130no. 2-storey 3-bedroom houses; 15no. 3-storey 3-bedroom houses; 76no. apartment units (32no. 1-bedroom, 36no. 2-bedroom and 8no. 3-bedroom) accommodated in 2no. 5-storey apartment buildings with balconies on all elevations; 356no. duplex units (108no. 1-bedroom, 115no. 2-bedroom, and 133no. 3-bedroom) and 3no. 3-bedroom triplex units accommodated in 24no. 3-storey duplex blocks, with balconies on rear and/or front elevations. 1no. 2-storey childcare facility (c.553 sq. m). And all associated and ancillary site development, landscape and boundary works, including public open space (c. 7,015 sq. m) and communal open space (c. 3,079sqm); 456no. surface car parking spaces (total); 1,116no. bicycle parking spaces (total); 7no. ESB substations; and the diversion and rerouting of ESB 10KV and 38KV cabling; public lighting. New vehicular site, pedestrian and cycle access to Site 3 is proposed from existing Adamstown Avenue, the consented Northern Link Street (SDZ24A/0033W) and from the existing site entrance at Tullyhall Rise. New pedestrian access is proposed via the permitted green link (SDZ24A/0033W) adjacent to Lucan East Educate Together National School to the north and via the existing public open space at Rossberry Park to the north east.
Site 4: Located within ‘Development Area 8- Kishoge South West’ of the Clonburris SDZ Planning Scheme and bounded to the north by the Dublin-Cork rail line, to the west by Griffeen Valley Park extension, by a linear park permitted under SDCC Reg. Ref. SD228/0003 to the east and the Grand Canal corridor to the south. The proposed development at Site 4 comprises the construction of 436no. dwellings, including 141no. houses (133no. 3-bedroom and 8no. 4-bedroom) ranging from 2 to 3-storeys in height; 124no. apartment units (62no. 1-bedroom and 62no. 2-bedroom) accommodated in 3no. apartment buildings ranging from 4 to 6-storeys in height, with balconies/terraces on all elevations; 106no. duplex units (53no. 2-bedroom and 53no. 3-bedroom) and 57no. 2-bedroom triplex units accommodated in 19no. 3-storey duplex blocks, with a combination of rear gardens, and balconies/ terraces on all elevations; 3no. 1-bedroom age-friendly apartments accommodated in a 1-storey apartment building, with a rear courtyard garden; 5no. 2-bedroom garden apartments accommodated in a 1 to 2-storey apartment building with a front and rear courtyard garden. 1no. childcare facility (c. 544 sqm) and 1no. retail unit (c. 150 sqm) at ground floor of apartment Block F and 1no. community building/ pavilion (c. 683 sq m), all fronting Griffeen Valley Park; and, proposed refurbishment of existing Grange House for employment reuse (c. 173 sq m). And all associated and ancillary site development, landscape and boundary works, including public open space (c. 778 sqm) and communal open space (c. 1,621 sqm); 408no. surface car parking spaces (total); 793no. bicycle parking spaces (total); 3no. ESB substations and 5no. ESB substation kiosks; public lighting; bin stores; demolition of existing outbuildings associated with Grange House (c. 118.0sqm) and isolated buildings (c. 98.0sqm). New vehicular, pedestrian and cycle access to the site is proposed from the permitted Southern Link Road (SDZ20A/0021).
Site 5: Primarily located within Development Area 6- Kishoge Urban Centre and Development Area 10- Kishoge North East of the Clonburris SDZ Planning Scheme. Site 5 consists of two parcels (5a & 5b) located to the north of Kishoge Train Station and east of the R136 roundabout, intersected by Thomas Omer Way. One parcel is bounded by the Foxborough and Omer Walk housing estates to the north, Griffeen Community College and Thomas Omer Way to the south, and the second parcel is bounded by Thomas Omer Way to the north, Lynch’s Lane to the east and Grange Castle Road (R136) to the west. The eastern portion of Site 5b lies outside of the Clonburris SDZ Planning Scheme area. The proposed development at Site 5 will consist of: the construction of 236 no. residential units comprising 35 no. 2-storey 3-bedroom houses; 110 no. 3-storey duplex units (53 no. 2-bedroom and 57 no. 3-bedroom); 33 no. 3-storey 2-bedroom triplex units; and 58 no. apartments (37 no. 1-bedroom and 21 no. 2-bedroom) in a 6-storey over basement apartment block. And all associated and ancillary site development, landscape and infrastructural works, including: public open space (3,101 sq.m); communal open space (332 sq.m) to serve the apartment building; balconies/terraces for the apartments and duplex/triplex units; 219 no. car parking spaces (total); 628 no. bicycle parking spaces (527 no. resident spaces and 101 no. visitor spaces); ESB substation, public lighting, boundary treatments, waste storage areas, drainage and open attenuation ponds. To facilitate development, it is proposed to remove a section of the concrete noise barrier along Thomas Omer Way (within the Site 5 boundary only) and remnants of derelict structures and hardstand on lands to the south of Thomas Omer Way. Vehicular, pedestrian and cycle access to the parcel in the south will be from Thomas Omer Way via a new left-in-left-out junction at Lynch’s Lane and from the R136 via the permitted Northern Link Street (granted under Reg. Ref. SDZ24A/0033W). Vehicular, pedestrian and cycle access to the north parcel will be from Thomas Omer Way via a new signalised junction. New pedestrian connections are facilitated to the Foxborough and Omer Walk residential estates.
This application is being made in accordance with the Clonburris Strategic Development Zone (SDZ) Planning Scheme, as defined by Statutory Instrument No. 604 of 2015. An Environmental Impact Assessment Report has been prepared in respect of the proposed development. The application documentation including the Environmental Impact Assessment Report may be inspected free of charge or purchased on payment of a specified fee (which fee shall not exceed the reasonable cost of making such copy) during public opening hours from Tuesday 03 June 2025 to Monday 14 July 2025 at the following locations: The Office of An Bord Pleanála, 64 Marlborough Street, Dublin 1, D01 V902 (between 9.15am and 5.30 pm Monday to Friday); South Dublin County Council, County Hall, Town Centre, Tallaght, Dublin 24 (between 9:00am to 4:00pm., Monday to Friday); The application (including EIAR) may also be viewed/downloaded on the following website: www.kishoge-part10.com. Submissions or observations may be made in writing to An Bord Pleanála, 64 Marlborough Street, Dublin 1, D01 V902 on payment of the prescribed fee of €50 within 6-weeks of receipt of the application by An Bord Pleanála (submissions or observations may also be made through the Board’s website at the following address https://www.pleanala.ie/en-IE/Observation-on-a-strategic-Infrastructure-devel) to be received on or before 5.30 p.m. Monday 14 July 2025 relating to: (i) The implications of the proposed development for proper planning and sustainable development of the area in which the proposed development is concerned; and (ii) The likely effects on the environment of the proposed development, if carried out. An Bord Pleanála may give approval to the application for development with or without conditions or may refuse the application for development. A person may question the validity of any such decision by An Bord Pleanála by way of an application for judicial review under Order 84 of the Rules of the Superior Courts (S.I. No. 15 of 1986, as amended), in accordance with section 50 of the Planning and Development Act, 2000 (as amended). Practical information on the judicial review mechanism can be accessed under the heading Legal Notices – Judicial Review Notice on the An Bord Pleanála website www.pleanala.ie or on the Citizens Information website www.citizensinformation.ie
SDZ25X/0001received 26 May 2025421 m away
- Within the townland of Cappagh and Clonburris, Clonburris, Dublin 22 Grant permission
The development will consist of amendments to the permitted development as approved by South Dublin County Council under Planning Reg. Ref. SDZ23A/0018 comprising the Clonburris Development Areas CSW-S1 and CSW-S2 of the Clonburris SDZ Planning Scheme 2019 as follows:
Site A (to the north of the permitted CSLS) the proposed amendments to the permitted layout and external elevations of Apartment Block B1 to include:
i. A change to the location of window / terrace door at ground floor level;
ii. The swapping of a terrace door / window at ground and upper floor levels;
iii. Amendment to the stair core and omission of a step-out of the external wall at ground and upper floor levels;
iv. Proposed relocation of a plant room door at ground floor level on the western elevation;
v. Proposed change of doorway to bicycle store at ground floor level on the western elevation;
vi. Provision of 1 no. Cleaner's Store at ground floor level (c.12.4 sq.m);
vii. Proposed increase in area for PV panels from c.15 sq.m to c.175 sq.m and provision of 7 no. additional Automatic Opening Vents (AOVs) at roof level;
viii. Provision of 2 no. additional internal fire doors at ground floor level;
ix. Amendment to 6 no. units at ground floor level to provide for Universal Access;
x. The amalgamation of 2 no. Plant Rooms, as approved under the parent permission, to provide for 1 no. single Plant Room (c.86.32sq.m) and a Meter Room (c.14.19 sq.m) located to the north of the Plant Room;
xi. A proposed change from green roof, as approved under the parent permission, to brown roof;
xii. The lowering of the higher roof parapet level from 74.47 AOD to 73.42 AOD on the western elevation;
xiii. Proposed change of finish from render to buff brick on western elevation and provision of protruded buff brick detail on upper floor levels of northern, southern, eastern and western elevations;
xiv. Provision of wall mounted feature panel (3.45 sq.m) at ground floor level on the western elevation;
xv. Proposed change from brick finish to render at ground and upper floor level of the western elevation; and,
xvi. The omission of dark render detail at upper floor levels on the western elevation.
Site B (to the south of the permitted CSLS) the proposed amendments to the permitted layout and external elevations of Apartment Block B2 to include:
i. A change in window location at ground and upper floors on western elevation due to a change in apartment layout;
ii. Relocation of plant room door on ground floor level on eastern elevation;
iii. the provision of a new window ope at ground and upper floor levels on the northern elevation;
iv. Provision of Cleaner's Store (4.79 sq.m) at ground floor level;
v. Proposed change to fenestration arrangement on northern, southern, eastern and western elevations due to change in apartment layout;
vi. Amendment to arrangement of stairway;
vii. Provision of 2 no. additional Automatic Opening Vents and increase in area for PV panels from 30 sq.m to 132 sq.m at roof level;
viii. The lowering of the higher roof parapet level from 75.32 AOD to 74.47 AOD on the western elevation;
ix. The amalgamation of 2 no. Plant Rooms, as approved under the parent permission, to provide for 1 no. single Plant Room (c.59.55 sq.m) and a Meter Panel Room (c.13.82 sq.m) located to the south of the Plant Room;
x. Proposed change from green roof to brown roof;
xi. The omission of dark render detail on the upper floors of the eastern elevation;
xii. The provision of a wall-mounted feature panel (3.91 sq.m) at ground floor level on the western elevation;
xiii The lowering of brick finish to window head height on the northern, southern and eastern elevations;
xiv. The omission of a canopy above the permitted entrance on the eastern elevation;
xv. The provision of protruded brick details at upper floor levels on the western elevation; and,
xvi. The provision of alternative render panels on upper floor levels of the northern and eastern elevations.
The proposed amendments will result in an overall increase in Gross Floor Area by 35.4 sq.m to 7,722.2 sqm and will also include the relocation of an ESB substation and associated switch room to the gable end of Apartment Block 2, the reconfiguration of the existing bin, bicycle and ESB room to provide for bin and bicycle storage only and a minor amendment to car parking spaces to provide for access to the relocated ESB substation and all associated/ancillary amendments.
SDZ25A/0007Wreceived 6 May 2025decided 3 Jun 2025150 m away
- 14, Parkleigh View, Seven Mills, Dublin 22, D22 NCW2 Declared exempt
Shed used for home office only
ED25/0033received 2 May 2025decided 15 May 2025298 m away
- Thomas Omer Way,, (east of Kishoge Community College), Balgaddy, Lucan, CO DUBLIN Grant permission & grant retention
The development consists of the retention and completion of revisions to a section of the northern site boundary comprising the omission of the pedestrian/cycle access (consisting of ramp and stairs) off Thomas Omer Way and the repositioning of the pedestrian access c. 6 m in an easterly direction to co-join with the permitted vehicular access. The amendments do not involve any changes to the position of the permitted vehicular access itself and the access road remains in accordance with the Clonburris Strategic Development Zone (SDZ) Planning Scheme. Permission is also sought for the relocation of bicycle parking areas within the site; revisions to the permitted boundary treatment along a section of the eastern site boundary; the installation of 3 no. flagpoles in the south-eastern part of the site; and revisions to the site compound including repositioning of bin store area and replacement of previously permitted bio-mass heating with new heat pump and gas storage tank.
SDZ24A/0032Wreceived 13 Feb 2025decided 11 Mar 2025382 m away
- Within the townlands of Neilstown, Clonburris, Dublin 22, all on wider lands bounded by, D22 E2KA Grant permission
The proposed development will consist of the temporary storage of inert soil and stone generated by construction and development activity and imported as waste under licence or as by-product (in accordance with Article 27 of the European Communities (Waste Directive) Regulations 2011 (as amended)) as a non-waste by-product on a 3.87-hectare site within the Clonburris North-West Development Area of the Clonburris Strategic Development Zone (SDZ) Planning Scheme 2019. The proposed development will include for: i. The provision of temporary soil and stone storage for later re-distribution and use within the Clonburris SDZ; ii. The proposed fill material will be stored in 2 no. stockpiles of c.90,000m3 and 18,000m3. iii. The proposed 2 no. stockpiles will provide for a combined c.108,000m3 of material to be stored on site and will be c.6m in height; iv. Vehicular and pedestrian access will be provided via approved access off the Fonthill Road (R113), which will also serve the Logistics Facility as approved under Reg. Ref. SDZ23A/0016. The proposed inert soil and stone stockpiles will be temporary in nature and will be operational for an anticipated 7-year time period. It will then be decommissioned, and the subject lands will be restored and developed in line with the Clonburris Strategic Development Zone Planning Scheme 2019.
SDZ24A/0023Wreceived 20 Dec 2024decided 27 Jan 2025203 m away
- Within the townlands of Kishoge, Balgaddy, Neillstown and Cappagh, Clondalkin & Lucan, Dublin 22 Grant permission
The development will consist of works located inside the Clonburris SDZ relating to the Stage 2 roads, public parks/open space areas and services infrastructure works (as part of a separate concurrent application) as per the Clonburris SDZ Planning Scheme (2019) to facilitate the future development of the northern part of the overall SDZ comprising: A) The construction of c. 2.3km of a new Link Street Clonburris Northern Link Street (CNLS) and approximately 800m of side streets including ancillary cycle facilities, pedestrian crossings, traffic signals, footpaths, car parking (79 no. spaces) public lighting as well as services infrastructure (including ESB, Comms, gas main, trunk surface water sewer, and watermain) and ancillary works. B) Provision/upgrade of 12 signalised junctions (5 new and 7 upgraded) as follows: Junction 1: R136 & Adamstown Avenue/Thomas Omer Way, Junction 3: R113 & Thomas Omer Way / Ninth Lock Road, Junction 4: CNLS & R136, Junction 6: CNLS, Junction 8: CNLS & R113, Junction 9: CNLS/Neilstown Road & Ninth Lock, Junction 24: CNLS/Neilstown Road & Ninth Lock, Junction 28: R136 & Adamstown Avenue/Thomas Omer Way, Junction 2: CNLS & Thomas Omer Way, Junction 5: CNLS, Junction 7: CNLS, Junction 27: R136 & Adamstown Avenue/Thomas Omer Way along with minor priority-controlled junctions are proposed along the street alignment to provide access to existing development and future development cells within the Clonburris SDZ. C) Approximately 2 km of upgrade of existing streets, including minor priority-controlled junctions are proposed along the street alignment to provide access to existing development and future development cells within the Clonburris SDZ, including pedestrian crossings. D) Provision of 2 main public parks centrally (Na Cluainte Park North) c. 2.78 ha and in the eastern part of the subject lands (c. 0.77 ha) both to include open water attenuation areas. E) Drainage infrastructure works to include surface water attenuation areas, Sustainable Urban Drainage Systems (SUDs) as well as landscaped areas including attenuation ponds and the provision of underground attenuation. Provision of surface water drainage and waste supply trunk infrastructure within the proposed road corridors; wastewater infrastructure including a foul pumping station (known as pumping station no.3) and foul pipe network within proposed road corridors to facilitate drainage connections to future development within the SDZ lands. The easterly section of the development will collect surface water and discharge into an existing outfall situated within Moorfield Walk whereas the western surface water catchment will connect (as part of a separate concurrent application) to an existing surface water outfall on the Griffeen Road (and ultimately to an existing Griffeen River outfall). F) Provision of trunk watermain infrastructure within the CNLS as well as connections to the permitted watermain infrastructure as part of SDZ20A/0021. G) Permission is also sought for all ancillary site development and landscape works associated with the development, including hard and soft landscaping, (tree pits, boundary treatments, road marking, signage, enabling works and temporary construction works, (including site accommodation, site compounds, and temporary construction boundary fencing) as well as temporary project signage (at 6 no. locations) and provision of underground utility connections under the Dublin - Cork Railway line (at 3 no. locations) and Irish water diversions. This application is being made in accordance with the Clonburris Strategic Development Zone Planning Scheme 2019 and relates to a proposed development within the Clonburris Strategic Development Planning Scheme Area, as defined by Statutory Instrument No. 604 of 2015.
SDZ24A/0033Wreceived 6 Dec 2024decided 10 Feb 20250 m away
- Clonburris, Parkleigh Drive, Dublin 22 Grant permission
The development will consist of amendments to the permitted development as approved by South Dublin County Council under Planning Reg. Ref. SDZ21A/0022, and as amended under South Dublin County Council Reg. Ref.: SDZ23A/0029, relating to the local node building (Block CR) comprising of the temporary change of use of the permitted flexible community space (c.73.7 sq.) located at ground floor level within Block CR to convenience retail use, including the provision of an external bin store (8.4 sq.) and all associated site development works. The proposed change of use will exist for a temporary period of up to 5 years to facilitate retail provision in the local area. The unit will then return to its permitted community space use as approved under SDZ23A/0022.
SDZ24A/0028Wreceived 1 Nov 2024decided 16 Dec 2024446 m away