- SDCC Lands @28 Locations Unregistered application
Proposed Outdoor advertising project comprising of digital advertising display units
PT8SD422received 1 Jul 2026422 m away
- West of the Ninth Lock Road and east of the R113, Fonthill Road, Clonburris, Dublin 22 Grant permission
The proposed development consists of the construction of 233 no. dwellings which are comprised of: 78 no. 2 & 3 bed, 2 storey, detached, semi-detached and terraced houses, 56 no. 2 & 3 bed duplex units in 8 no. 3 storey buildings and 99 no. 1, 2 & 3 bed apartments in 2 no. 3-5 and 4-6 storey buildings. Access to the development will be from two new vehicular accesses from the Ninth Lock Road to the east and via the permitted road network i.e. the Clonburris Northern Link Street, (under Ref. SDZ24A/0033W) which provides access from the Ninth Lock Road to the east and the R113, Fonthill Road to the west. The proposed development will connect into the permitted infrastructural works as approved under the Clonburris Strategic Development Zone Planning Scheme (2019) and permitted under Ref. SDZ24A/0033W. The proposed development also provides for all associated site development works and infrastructure to facilitate the development (above and below ground), public & communal open spaces, hard & soft landscaping and boundary treatments, surface car parking (192 no. spaces), bicycle parking (351 no. spaces), bin & bicycle storage, public lighting, plant (M&E) etc.
SDZ25A/0019Wreceived 24 Feb 2026decided 23 Mar 2026233 units0 m away
- 34, Foxdene Green, Lucan, Dublin, K78 AK15 Grant retention & refuse retention
The development will consist of works comprising of Retention of Permission for a second floor - 27.6msq attic conversion with bedroom, comprising of internal stairs, dormer structure and dormer window to the East and West side and rear South facing elevations and associated works. Internal and external -8.5msq front porch to front facing North elevation with overhead hipped roof structure External roofed storage area 12.9msq with polycarbonate roof to side facing West elevation Single storey flat roof Rear Garden shed - 10.6msq And all associated site works.
SD26B/0021Wreceived 21 Jan 2026decided 11 Mar 2026426 m away
- Keepers Lock, Clonburris, Dublin 22 Grant permission
Kelland Homes Ltd. seeks permission for development, consisting of amendments to street design, and in compliance with condition no. 16(e) attached to planning permission Ref. SDZ22A/0010. The proposed development consists of the creation of an intimate local street/home zone and includes for all associated site development works, car parking, landscaping and public lighting etc., all on a site measuring c.0.15Ha, located at "Keepers Lock", Clonburris, Dublin 22, within the Clonburris Strategic Development Zone (SDZ). This application is being made in accordance with the Clonburris Strategic Development Zone Planning Scheme 2019 and relates to a proposed development within the Clonburris Strategic Development Planning Scheme Area, as defined by Statutory Instrument No. 604 of 2015.
SDZ25A/0006Wreceived 17 Sept 2025decided 14 Oct 2025450 m away
- Neilstown Lodge, Clondalkin, Dublin 22 Grant permission & grant retention
We, Phoenix Tower Ireland III Limited are applying for 1) Retention Permission to retain the existing 20m telecommunications support structure carrying antenna and dishes, communications cabinets and associated site works within a palisade fenced compound previously granted under planning permission File Ref No. SD10A/0291 AND, 2) Permission to install additional antenna, dish equipment to the support structure including ground equipment cabinets and associated site works at Neilston Lodge, Clondalkin, Dublin 22. The site is within the curtilage of Neilston Lodge a Protected Structure under RPS no. 113 in the South Dublin County Development Plan 2022-2028
SD25A/0204Wreceived 29 Aug 2025decided 23 Oct 2025268 m away
- Within the townlands of Neilstown, Clonburris, Dublin 22, all on wider lands bounded by, D22 E2KA Grant permission
The proposed development will consist of the temporary storage of inert soil and stone generated by construction and development activity and imported as waste under licence or as by-product (in accordance with Article 27 of the European Communities (Waste Directive) Regulations 2011 (as amended)) as a non-waste by-product on a 3.87-hectare site within the Clonburris North-West Development Area of the Clonburris Strategic Development Zone (SDZ) Planning Scheme 2019. The proposed development will include for: i. The provision of temporary soil and stone storage for later re-distribution and use within the Clonburris SDZ; ii. The proposed fill material will be stored in 2 no. stockpiles of c.90,000m3 and 18,000m3. iii. The proposed 2 no. stockpiles will provide for a combined c.108,000m3 of material to be stored on site and will be c.6m in height; iv. Vehicular and pedestrian access will be provided via approved access off the Fonthill Road (R113), which will also serve the Logistics Facility as approved under Reg. Ref. SDZ23A/0016. The proposed inert soil and stone stockpiles will be temporary in nature and will be operational for an anticipated 7-year time period. It will then be decommissioned, and the subject lands will be restored and developed in line with the Clonburris Strategic Development Zone Planning Scheme 2019.
SDZ24A/0023Wreceived 20 Dec 2024decided 27 Jan 2025105 m away
- 4 No. sites A) Along Griffeen Road Griffeen Glen Drive, Balgaddy Road and, B) Grange Castle Road Junction Lucan Co. Dublin, C) Thomas Omer Way/Ninth Lock Road, & D) Ninth Lock Road/Neilstown Road, Clondalkin, Dublin 22. Grant permission
The development will consist of works located outside the Clonburris SDZ relating to the "Stage 2" roads, public parks/open space areas and services infrastructure works (as part of a separate concurrent application) in respect of the northern part of the overall Clonburris SDZ lands comprising: A) The construction/upgrade of an underground surface water pipe from Griffeen Avenue along Griffeen Road to connect to the existing surface water pipe along with the upgrade of existing surface water pipe along Griffeen Glen Drive and adjoining open space area (for c. 450m), which will connect ultimately to the Griffeen River. B) Junction upgrade and junction tie in works to existing road layout at Balgaddy Road and Grange Castle Road, C) Junction upgrade and junction tie in works to existing road layout at Thomas Omer Way/Ninth Lock Road, Fonthill Road (R113), including slip road to the north; D) Junction upgrade and junction tie in works to existing road layout at Ninth Lock Road/Neilstown Road. E) The proposals will also entail the restoration of the open space areas and road surfaces and all associated site development and associated landscape works.
SD24A/0266Wreceived 6 Dec 2024decided 10 Feb 2025247 m away
- Within the townlands of Kishoge, Balgaddy, Neillstown and Cappagh, Clondalkin & Lucan, Dublin 22 Grant permission
The development will consist of works located inside the Clonburris SDZ relating to the Stage 2 roads, public parks/open space areas and services infrastructure works (as part of a separate concurrent application) as per the Clonburris SDZ Planning Scheme (2019) to facilitate the future development of the northern part of the overall SDZ comprising: A) The construction of c. 2.3km of a new Link Street Clonburris Northern Link Street (CNLS) and approximately 800m of side streets including ancillary cycle facilities, pedestrian crossings, traffic signals, footpaths, car parking (79 no. spaces) public lighting as well as services infrastructure (including ESB, Comms, gas main, trunk surface water sewer, and watermain) and ancillary works. B) Provision/upgrade of 12 signalised junctions (5 new and 7 upgraded) as follows: Junction 1: R136 & Adamstown Avenue/Thomas Omer Way, Junction 3: R113 & Thomas Omer Way / Ninth Lock Road, Junction 4: CNLS & R136, Junction 6: CNLS, Junction 8: CNLS & R113, Junction 9: CNLS/Neilstown Road & Ninth Lock, Junction 24: CNLS/Neilstown Road & Ninth Lock, Junction 28: R136 & Adamstown Avenue/Thomas Omer Way, Junction 2: CNLS & Thomas Omer Way, Junction 5: CNLS, Junction 7: CNLS, Junction 27: R136 & Adamstown Avenue/Thomas Omer Way along with minor priority-controlled junctions are proposed along the street alignment to provide access to existing development and future development cells within the Clonburris SDZ. C) Approximately 2 km of upgrade of existing streets, including minor priority-controlled junctions are proposed along the street alignment to provide access to existing development and future development cells within the Clonburris SDZ, including pedestrian crossings. D) Provision of 2 main public parks centrally (Na Cluainte Park North) c. 2.78 ha and in the eastern part of the subject lands (c. 0.77 ha) both to include open water attenuation areas. E) Drainage infrastructure works to include surface water attenuation areas, Sustainable Urban Drainage Systems (SUDs) as well as landscaped areas including attenuation ponds and the provision of underground attenuation. Provision of surface water drainage and waste supply trunk infrastructure within the proposed road corridors; wastewater infrastructure including a foul pumping station (known as pumping station no.3) and foul pipe network within proposed road corridors to facilitate drainage connections to future development within the SDZ lands. The easterly section of the development will collect surface water and discharge into an existing outfall situated within Moorfield Walk whereas the western surface water catchment will connect (as part of a separate concurrent application) to an existing surface water outfall on the Griffeen Road (and ultimately to an existing Griffeen River outfall). F) Provision of trunk watermain infrastructure within the CNLS as well as connections to the permitted watermain infrastructure as part of SDZ20A/0021. G) Permission is also sought for all ancillary site development and landscape works associated with the development, including hard and soft landscaping, (tree pits, boundary treatments, road marking, signage, enabling works and temporary construction works, (including site accommodation, site compounds, and temporary construction boundary fencing) as well as temporary project signage (at 6 no. locations) and provision of underground utility connections under the Dublin - Cork Railway line (at 3 no. locations) and Irish water diversions. This application is being made in accordance with the Clonburris Strategic Development Zone Planning Scheme 2019 and relates to a proposed development within the Clonburris Strategic Development Planning Scheme Area, as defined by Statutory Instrument No. 604 of 2015.
SDZ24A/0033Wreceived 6 Dec 2024decided 10 Feb 202540 m away
- Keepers Lock, Clonburris, Dublin 22 Grant permission
Kelland Homes Ltd. seeks permission for development, consisting of elevational changes and alterations to an apartment building (known as Block A) permitted under Ref. SDZ22A/0010. Permission is sought to (I) replace previously approved recessed balconies on the east and west facades with proposed cantilevered balconies and associated elevational and internal amendments, (ii) incorporation of ESB substation & meter room into the ground floor plan of the building and associated internal modifications, (iii) revisions to external materiality, and (iv) all associated site development works, car parking, open spaces & landscaping etc., all on a site measuring c.0.27Ha, located at "Keepers Lock", Clon Burris, Dublin 22, within the Clon Burris Strategic Development Zone (SDZ). This application is being made in accordance with the Clon Burris Strategic Development Zone Planning Scheme 2019 and relates to a proposed development within the Clon Burris Strategic Development Planning Scheme Area, as defined by Statutory Instrument No. 604 of 2015.
SDZ24A/0030Wreceived 6 Nov 2024decided 20 Dec 2024386 m away
- Within the townland of Cappagh, Clonburris, Dublin 22 Grant permission
The development will consist of amendments to the permitted development as approved by South Dublin County Council under Planning Reg. Ref. SDZ22A0018 comprising in the Clonburris Development Areas CUCS3 & CSWS3 of the Clonburris SDZ Planning Scheme 2019 as follows:
A) Reconfiguration of internal arrangement in Block E to allow for the replacement of 5 no. permitted 1 bedroom apartments with 5 no. 2 bedroom apartments at first floor to fifth floor levels within Block E (facing internal courtyard), and the replacement of 2 no. 1 bedroom apartments with 2 no. 2 bedroom apartments at ground floor level of Block G and H to result in an overall mix of 257 no. 1 bedroom apartments, 318 no. 2 bedroom apartments and 32 no. 3 bedroom apartments (no change to overall no. of permitted apartments) and all associated elevation changes;
B) Reconfiguration and amendment to floor areas of retail/café/retail service units and associated alterations to internal podium level to result in an overall increase of c. 51 sq. m of Gross Floor Area (an overall increase from 1,150 sq. m to 1,201 sq. m), and all internal reconfigurations;
C) Inclusion of green roof in place of pitched roof along portion of Block A (eastern block - no change to internal arrangements or profile fronting onto external street);
D) Amendments to undercroft car parking arrangements to now provide 378 no. car parking spaces (compared to 385 no. car parking spaces permitted) and alterations to cycle parking in bike stores and surface spaces to now provide 1,620 no. cycle spaces (compared to 1,548 no. cycle spaces permitted) and all internal/external reconfigurations.
SDZ24A/0019Wreceived 9 Jul 2024decided 2 Sept 2024330 m away
`description` is truncated at source (80 chars for DLR, 70 for Fingal) and `applicant` is null nationally — NPAD publishes neither in full.