Bath Avenue

53.33763, -6.22858

Homes here mostly date from 1919–1945. 1 planning file on this house, the latest from 2019. Home extensions nearby almost always get approved (92%). 1 application nearby open for comments.

See on the mapWatch this area

How planning works, with this area's numbers

steps can overlap · medians for home extensions within 1.5 km, 10 years
  1. 1ApplySite notice up, plans online
  2. 2Comments5 weeks, €20. Comment to keep your right to appeal
  3. 3Decision8 weeks by law. Here 55 days
  4. 4Appeal window4 weeks after the decision
  5. 5AppealHere about 4 months
  6. 6PermissionLasts 5 years
  7. 7StartStart notice to the council. Here about 4 months after
  8. 8Sign-offCompletion cert, or the owner opts out
Question 1

What's the planning story of this house?

Figure 1

When it was built, and the rules since

Most homes here were built 1919–45, before planning permission was needed. 1 planning file on this house, the latest from 2019.

Timeline from 1915: planning permission needed from October 1964, building regulations from June 1992, building records online from March 2014, sign-off opt-out from September 2015. Most homes here were built 1919–1945. 1 planning file on this house.19201930194019501960197019801990200020102020Oct 1964permission neededJun 1992building regulationsMar 2014building records onlineSep 2015owners may opt out of sign-offThis houseAll of Bath AvenueBuilt: most homes in this small area date from 1919–1945 (census estimate)most built2019: 2440/19 · garden room, approved2019: 6 files on Bath Avenue2020: 4 files on Bath Avenue2021: 3 files on Bath Avenue2022: 4 files on Bath Avenue2023: 2 files on Bath Avenue2024: 3 files on Bath Avenue2025: 1 file on Bath Avenue23 files

Each line is a rule that applies to work done after it.

MeasuredEstimatecouncil register via NPAD · build years: CSO Census 2022, small area

  1. 2019
    2440/19 · garden room · approved 2019 · started, no sign-off needed
    approvedstartedsigned off?
On this site
R2
Zoning · Existing residential
No
Protected or listed · on the council's list
No
Vacant land tax · lived-in homes don't pay it
1 in 20
Radon (EPA) · homes with high radon
Zoning, protection, tax and flood: the detail
Zoning
What it says

Zone Z1 - DEV PLAN 2022-2028

ZoningR2 · Existing residential
What it says

Z1: Sustainable Residential Neighbourhoods: To protect, provide and improve residential amenities.

An established residential area. The objective is to protect existing residential amenity as well as to provide housing — which is the objective a neighbour's objection to an overbearing extension is usually argued under.

development plan 2022 2028 · 14 Dec 2022 – 31 Dec 2028

ZoningR2 · Existing residential
What it says

Z1: Sustainable Residential Neighbourhoods: To protect, provide and improve residential amenities.

An established residential area. The objective is to protect existing residential amenity as well as to provide housing — which is the objective a neighbour's objection to an overbearing extension is usually argued under.

development plan 2022 2028 variation no 11 · 14 Dec 2022 – 31 Dec 2028

Radon1 in 20 homes have high radon (EPA)

Not on this site: protected building, heritage inventory, monument zone, conservation area, EU nature site, EU bird site, natural heritage area, tree order, landslide risk, derelict list.

Licensed industrial sites within 1.0 km: Van Leer Ireland Ltd. (601 m); Dublin Port Company (733 m); Everlac Paints Limited (763 m)

Vacant land taxNo lived-in homes don't pay it
Flood riskWithin 100 m OPW map area within 100 m · floodinfo.ie
Within 500 mCountFor example
Radon grid squares1
Monuments8Settlement cluster; Church
How we work this out
'On this site' means the record's own map outline touches the registered parcel (or a 12 m circle round the point where there is no parcel). Only the council's own list confirms a protected building; ask the council if in doubt. The council's map for the vacant land tax shows this spot inside an area of existing homes. Homes people live in, and their gardens, don't pay the tax. The OPW flood map's licence lets us show a yes/no only.
Sources: Development plan zoning (councils), EPA licensed sites, EPA radon map, EPA licensed facilities (LEAP), Residential Zoned Land Tax maps, Constraint layers (bundle), OPW flood maps (CFRAM), Sites and Monuments Record · fetched 12 Oct 2026, 23:31
SourceLicenceFetchedLink
Development plan zoning (councils)CC BY 4.011 Oct 2026, 23:18open
EPA licensed sitesCC BY 4.027 Sept 2026, 19:36open
EPA radon mapCC BY 4.027 Sept 2026, 19:36open
EPA licensed facilities (LEAP)CC BY 4.012 Oct 2026, 23:31open
Residential Zoned Land Tax mapsCC BY 4.012 Oct 2026, 00:14open
Constraint layers (bundle)CC BY 4.0, CC BY-NC-ND 4.027 Sept 2026, 19:37open
OPW flood maps (CFRAM)CC BY-NC-ND 4.0 · shown as a yes/no only11 Sept 2026, 19:11open
Sites and Monuments RecordCC BY 4.027 Sept 2026, 19:29open
How we work this out
Applications whose site outline (or map point) falls on this property. 'No sign building has started' means we found no notice to the council's building control office; small jobs don't always file one, so ask. A missing completion certificate is not proof of a problem: an owner can opt out of official sign-off for a house or extension built for themselves.
Sources: Building Control Management System (commencement notices), National Planning Application Database · fetched 16 Oct 2026, 02:04
SourceLicenceFetchedLink
Building Control Management System (commencement notices)CC BY 4.016 Oct 2026, 00:56open
National Planning Application DatabaseCC BY 4.016 Oct 2026, 02:04open
Question 2

Could you extend?

Nothing on this site restricts it: not protected, not in a conservation area.

Figure 2

What happened to applications like yours

Extensions are almost always approved here: 91–100% by type. A new house in a garden is harder: 76% approved, and 1 in 3 is asked for more information.

Single-storey rear122 decided · more info asked 14%
92% · council 97%
Two-storey rear117 decided · more info asked 21%
94% · council 96%
Two-storey side16 decided · more info asked 12%
100% · council 98%
Attic or dormer172 decided · more info asked 18%
94% · council 96%
First-floor45 decided · more info asked 11%
91% · council 93%
Garage conversion15 decided · more info asked 13%
93% · council 99%
New house in a garden or site90 decided · more info asked 37%
76% · council 72%
Approved nearbyDublin overall

Decided applications within 1.5 km, received in the last 10 years. The kind of work is read from each description.

CalculatedOur classificationcouncil register via NPAD · 577 nearby, 7,530 council-wide

Figure 3

Bath Avenue, file by file since 2019

8 of 11 decided extensions on the road were approved.

23 planning files on Bath Avenue since 2019, by kind and decision.20192020202120222023202420252026Extensions, atticsNo. 4 · 2019 · two-storey rear · approved · 2440/19No. 26 · 2019 · single-storey rear · refused · 2825/19No. 51 · 2019 · two-storey rear · approved · 3304/19No number · 2019 · other extension · refused · 3489/19No. 13 · 2019 · two-storey side · approved · WEB1339/19No. 26 · 2020 · two-storey rear · approved · 2666/20No. 52 · 2021 · single-storey rear · approved · 2237/21No. 26 · 2021 · single-storey rear · withdrawn or invalid · 4064/21No. 35 · 2022 · two-storey rear · approved · 3056/22No. 24 · 2022 · single-storey rear · refused · 4966/22No. 24 · 2024 · first-floor · approved · 3152/24No. 46 · 2024 · first-floor · approved · 3976/24Porches, roofs, otherNo. 35 · 2019 · other work · approved · WEB1346/19No number · 2020 · other work · withdrawn or invalid · 2333/20No. 59 · 2020 · other work · refused · 2357/20No number · 2020 · other work · refused · 3368/20No. 25A · 2021 · other work · approved · 3528/21No. 52 · 2022 · other work · refused · 4256/22No. 15 · 2022 · other work · approved · WEB1423/22No. 59 · 2023 · other work · refused · 3153/23No. 6 · 2023 · other work · refused · 3517/23No. 15 · 2024 · other work · refused · WEB2370/24No number · 2025 · other work · approved · WEB2650/25New house in a side garden
ApprovedRefusedWithdrawn or invalid

23 files with "Bath Avenue" in the address within 600 m, other roads of the same name left out. Hover a dot for the house number and reference.

MeasuredOur classificationcouncil register via NPAD · 2019–2026

Extensions and refusals right beside you 3 within 250 m · 0 refused within 100 m

Extensions and refusals near you 3 extensions within 250 m · the last 12 months

1 approved2 no decision or withdrawn
KindAppliedApprovedRefused
First-floor20—
Single-storey rear11—

Refused within 100 m 0 in the last 12 months

Nothing refused this close in the last 12 months.

    How we work this out
    Home extensions are read from the application's description (extension, attic or dormer, porch, garage conversion, garden room), so a few may be missed or mislabelled. The kind is the first that fits: a dormer with a rear extension counts as a dormer. Refusal reasons come from An Coimisiún Pleanála's inspector reports, so they exist only where the refusal was appealed (Dún Laoghaire-Rathdown so far). The council's own reasons are on its planning file.
    Sources: National Planning Application Database, An Coimisiún Pleanála cases (ArcGIS feed) · fetched 16 Oct 2026, 23:06
    SourceLicenceFetchedLink
    National Planning Application DatabaseCC BY 4.016 Oct 2026, 02:04open
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.016 Oct 2026, 23:06open
    Sources: An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices), National Planning Application Database · fetched 16 Oct 2026, 23:06
    SourceLicenceFetchedLink
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.016 Oct 2026, 23:06open
    Building Control Management System (commencement notices)CC BY 4.016 Oct 2026, 00:56open
    National Planning Application DatabaseCC BY 4.016 Oct 2026, 02:04open
    Question 3

    How long, and what if someone objects?

    Figure 4

    A home extension's journey here

    A decision takes 55 days. 1 in 5 is asked for more information, which adds about 76 days. Building starts about 4 months after permission.

    Comments open: 5 weeks · €20; Council decision: 55 days; If more info asked (1 in 5): 134 days; Appeal window: 4 weeks; If appealed: +129 days; Building starts: 136 days after permission0 mo3 mo6 mo9 mo12 mo15 moComments openComments close 5 weeks after the application is lodged5 weeks · €20Council decisionDecision: median 55 days, middle half 53–55 (n=530)55 daysIf more info asked (1 in 5)With further information: median 134 days (n=134)134 daysAppeal windowAnyone who commented can appeal within 4 weeks of the decision4 weeksIf appealedAt An Coimisiún Pleanála: median 129 days (n=237, all appeals within 1.5 km)+129 daysBuilding startsStart notice: median 136 days after permission (n=347)136 days after permissionSigned off463 days after the start, for the few who file. 54% of owners opt out of sign-off

    Bars are medians; whiskers show the middle half. Medians of separate steps don't add up exactly.

    Calculated664 decided home extensions, 357 start notices, 237 decided appeals · within 1.5 km, 10 years · NPAD, BCMS, An Coimisiún Pleanála

    Figure 5

    What appeals changed

    29 of 92 appealed refusals became permissions. 13 of 153 appealed approvals were reversed.

    Refusals appealed92 decided
    29 became permissions
    Approvals appealed153 decided
    13 reversed
    Ended approvedEnded refusedWithdrawn, invalid or other

    Every appeal decided within 1.5 km in 10 years, any kind of development.

    CalculatedAn Coimisiún Pleanála cases linked to the council file

    Appeals nearby 6 in the last 12 months

    None of 1 changed the council's decision

    • 501362 Refused · Site rear of 4 to 16 Saint Brendan's Cottages, Irishtown, Dublin 4 · 458 m report
    • 501932 Pending · 44, Lansdowne Road, Ballsbridge, Dublin 4, D04 RY96 · 441 m
    • 501839 Pending · 69 Gordon Street, Ringsend, Dublin 4, D04AH98. · 426 m
    • 501624 Open · Site at Lansdowne Lane to the east of No. 10/10A Lansdowne Terrace… · 366 m
    • 500772 Split · Public House "The Merry Cobbler", Nos 78, 80 and 82 Irishtown Road,… · 407 m report
    • 500557 Refused · 27, Irishtown Road, Dublin 4 · 382 m report
    Sources: An Coimisiún Pleanála cases (ArcGIS feed), Courts Service legal diary (judicial reviews), National Planning Application Database · fetched 16 Oct 2026, 23:06
    SourceLicenceFetchedLink
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.016 Oct 2026, 23:06open
    Courts Service legal diary (judicial reviews)© the publisher16 Oct 2026, 01:34open
    National Planning Application DatabaseCC BY 4.016 Oct 2026, 02:04open
    Question 4

    What's changing around you?

    Street map around Bath Avenue with 15 numbered planning items
    ⌖ the houseOpen for commentsDerelict buildingBuilding startedApprovedNo decision yet
    1. 1The Church Of Saint Matthews, Irishtown Road WEB3490/26No decision yet · 393 m
    2. 258 Shelbourne Road, Dublin 4 DS1247Derelict building · 324 m
    3. 3No Address DS1744Derelict building · 388 m
    4. 47-9 Bath Street Dublin 4 D04E294 DS2006Derelict building · 433 m
    5. 567 Derrynane Gardens, Dublin 4 WEB1060/24Building started · 44 m
    6. 61 Bath Avenue Gardens, Dublin 4 WEB1057/26Building started · 138 m
    7. 711 Havelock Square, Dublin 4 WEB5874/25Building started · 177 m
    8. 81 Bath Avenue Gardens, Sandymount WEB1057/26Approved · 130 m
    9. 932, Havelock Square WEB2421/26No decision yet · 161 m
    10. 1018 Londonbridge Road, Dublin 4 WEB5452/25Approved · 224 m
    11. 1170 Saint Magdalen Terrace, Irishtown 5023/26Approved · 307 m
    12. 1234, Shelbourne Road WEB3170/26No decision yet · 364 m
    13. 13Site at Lansdowne Lane to the east of No. 10/10A Lansdowne Terrace and the west of No.1 Berkeley Mews, Shelbourne Road WEB1808/26Approved · 366 m
    14. 1462, South Lotts Road WEB1399/26Approved · 369 m
    15. 15The Watermarque Building, Ringsend Road WEB1742/26Approved · 412 m
    Figure 6

    What happens to applications within 500 m

    Permission isn't building. Of 218 permissions since 2016, 116 show a start notice and 14 have a completion certificate.

    299 applications lodged within 500 m. Council: 220 approved, 49 refused. After appeals: 218 approved. Of those: 14 signed off, 52 built with the owner's opt-out, 50 started, 102 with no start notice found, 0 ran out.LODGEDCOUNCIL DECISIONAFTER APPEALSWHAT HAPPENED NEXT220: lodged → approved49: lodged → refused23: lodged → withdrawn or invalid7: lodged → undecided212: approved → approved38: refused → refused23: withdrawn or invalid → withdrawn7: undecided → undecided2 approved by the council, undecided after an appeal3 approved by the council, refused after an appeal3 approved by the council, withdrawn or invalid after an appeal6 refused by the council, approved after an appeal5 refused by the council, withdrawn or invalid after an appeal102: approved → no start notice found52: approved → built, owner opted out50: approved → started, not signed off14: approved → signed off299 lodged299 lodged220 approved220 approved49 refused49 refused23 withdrawn or invalid23 withdrawn or invalid7 undecided7 undecided218 approved218 approved41 refused41 refused31 withdrawn31 withdrawn9 undecided9 undecided102 no start notice found102 no start notice found52 built, owner opted out52 built, owner opted out50 started, not signed off50 started, not signed off14 signed off14 signed off

    Purple bands are refusals turned into permissions on appeal. "No start notice found" includes small jobs that never needed one and notices we couldn't match.

    Measured299 applications in 10 years · NPAD, An Coimisiún Pleanála, BCMS start notices and completion certificates

    Figure 7

    The next 30 days

    4 deadlines within 500 m; the first closes 19 Oct 2026.

    4 deadlines in the next 30 days: 2026-10-19 DCC consultation opened: Proposed Front of School Works St Matthew's National School; 2026-10-19 DCC consultation closes 2026-10-19: Proposed Front of School Works St Matthew's National School; 2026-10-29 ACP 501362: Refuse permission; 2026-11-13 WEB3490/26: application received — PROTECTED STRUCTURE: The proposed development will consist of an extension to the existing columbarium wall along the eatoday21 Oct26 Oct31 Oct5 Nov10 Nov15 NovDCC consultation opened: Proposed Front of School Works St Matthew's National School · 409 m away · 2026-10-19DCC consultation closes 2026-10-19: Proposed Front of School Works St Matthew's National School · 409 m away · 2026-10-19ACP 501362: Refuse permission · 458 m away · 2026-10-29WEB3490/26: application received — PROTECTED STRUCTURE: The proposed development will consist of an extension to the existing columbarium wall along the ea · 393 m away · 2026-11-13
    Comments closeHigh Court window endsOther deadlines
    • Consultation closes 19 Oct 20262 days left
      Proposed Front of School Works St Matthew's National School
      409 m away
    • Consultation closes 19 Oct 20262 days left
      Proposed Front of School Works St Matthew's National School
      409 m away
    • Time to ask the High Court for a review ends 29 Oct 202613 days left
      Refuse permission
      458 m away
    • Comments close 13 Nov 202628 days left
      1WEB3490/26 · application received — PROTECTED STRUCTURE: The proposed development will consist of an extension to the existing…
      €20 to the council · 393 m away

    Measuredcouncil registers and An Coimisiún Pleanála · deadlines worked out from the dates on file

    Sites that could change 3 within 500 m

    Derelict building 3

    • 258 Shelbourne Road, Dublin 4 · derelict since Dec 2025 · 324 m
    • 3No Address · derelict since Jul 2025 · 388 m
    • 47-9 Bath Street Dublin 4 D04E294 · derelict since Sep 2025 · 433 m
    Sources: An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices), Derelict sites registers, Council meetings (ModernGov), National Planning Application Database, Residential Zoned Land Tax maps · fetched 16 Oct 2026, 23:06
    SourceLicenceFetchedLink
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.016 Oct 2026, 23:06open
    Building Control Management System (commencement notices)CC BY 4.016 Oct 2026, 00:56open
    Derelict sites registersCC BY 4.012 Oct 2026, 23:08open
    Council meetings (ModernGov)Public16 Oct 2026, 01:42open
    National Planning Application DatabaseCC BY 4.016 Oct 2026, 02:04open
    Residential Zoned Land Tax mapsCC BY 4.012 Oct 2026, 00:14open
    Figure 8

    Applications within 500 m, by year

    Between 36 and 44 a year; busiest 2023. 82% of decisions were approvals.

    2019: 47, 2020: 37, 2021: 40, 2022: 36, 2023: 44, 2024: 39, 2025: 36, 2026: 20010203040502019: 40 approved2019: 7 refused47’19*2020: 32 approved2020: 3 refused2020: 2 withdrawn or invalid37’202021: 32 approved2021: 7 refused2021: 1 withdrawn or invalid40’212022: 26 approved2022: 10 refused36’222023: 30 approved2023: 12 refused2023: 1 withdrawn or invalid2023: 1 undecided44’232024: 31 approved2024: 6 refused2024: 2 withdrawn or invalid39’242025: 23 approved2025: 3 refused2025: 10 withdrawn or invalid36’252026: 6 approved2026: 1 refused2026: 7 withdrawn or invalid2026: 6 undecided20’26*
    ApprovedRefusedWithdrawn or invalidUndecided

    2019 and 2026 are part years (*). Exemption requests and time extensions are left out.

    Measuredcouncil register via NPAD

    Open for comments €20 to comment

    Every application within 500 m 32 in the last 12 months

    See every application on the map

    How we work this out
    Descriptions are shortened by the national planning database (to 80 characters in Dún Laoghaire-Rathdown, 70 in Fingal), and it does not publish applicants' names.
    Sources: National Planning Application Database, An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices) · fetched 16 Oct 2026, 23:06
    SourceLicenceFetchedLink
    National Planning Application DatabaseCC BY 4.016 Oct 2026, 02:04open
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.016 Oct 2026, 23:06open
    Building Control Management System (commencement notices)CC BY 4.016 Oct 2026, 00:56open
    Building work nearby 14 in the last 12 months
    2 not signed off12 no sign-off needed
    • South Lotts Road, Dublin 4, D04 R6C2 · 23 Oct 2026 · start notice not signed off · 236 m
    • 70 Saint Magdalen Terrace, Dublin 4, D04 TC56 · 2 Oct 2026 · short notice no sign-off needed · 5023/26 · 312 m
    • 3 Londonbridge Road, Dublin 4, D04 YF96 · 7 Sept 2026 · start notice, opted out no sign-off needed · WEB1634/26 · 358 m
    • 62 South Lotts Road, Dublin 4, D04 P270 · 3 Sept 2026 · short notice no sign-off needed · WEB1399/26 · 382 m
    • 711 Havelock Square, Dublin 4, D04 W8Y7 · 10 Aug 2026 · start notice, opted out no sign-off needed · WEB5874/25 · 177 m
    • 2 Londonbridge Road, Dublin 4, D04 X084 · 3 Aug 2026 · short notice no sign-off needed · 2592/16/X1 · 331 m
    • 35 Tritonville Road, Dublin 4, D04 A436 · 31 Jul 2026 · start notice, opted out no sign-off needed · WEB5967/25 · 421 m
    • 22A & 24 South Lotts Road, and 101 Gordon Street, Ringsend Dublin 4, Dublin 4, D04 FE83 · 20 Jul 2026 · 2 homes · start notice not signed off · WEB1364/25 · 351 m
    • 567 Derrynane Gardens, Dublin 4, D04 T0H9 · 30 Jun 2026 · short notice no sign-off needed · WEB1060/24 · 44 m
    • 61 Bath Avenue Gardens, Dublin 4, D04 NR13 · 22 Jun 2026 · start notice, opted out no sign-off needed · WEB1057/26 · 138 m
    • 48 Grand Canal Street Upper, Dublin 4, D04 V990 · 8 Jun 2026 · short notice no sign-off needed · WEB1186/25 · 424 m
    • 18 Bath Avenue Gardens, Ballsbridge, Dublin 4, D04 C6H3 · 16 Dec 2025 · short notice no sign-off needed · WEB2981/25 · 106 m
    • 50 Derrynane Gardens, Dublin, Dublin 4, D04 C663 · 14 Nov 2025 · start notice, opted out no sign-off needed · WEB1543/25 · 103 m
    • 71 Derrynane Gardens, Dublin, Dublin 4, D04 NH02 · 22 Oct 2025 · start notice, opted out no sign-off needed · WEB1718/23 · 29 m
    How we work this out
    Each row is a notice the builder sent to the council's building control office before work started. One notice can cover many homes. 'Signed off as finished' means a completion certificate is on file; work done under an opt-out or a short notice doesn't need one.
    Source: Building Control Management System (commencement notices) · fetched 16 Oct 2026, 00:56
    SourceLicenceFetchedLink
    Building Control Management System (commencement notices)CC BY 4.016 Oct 2026, 00:56open
    0
    Named places nearby: estate, schemes, crèches, schools

    Named places estate, developments, inspections

    Developments within 1.0 km

    SchemeHomesProgressDistance
    Baggotrath House2222 being built (2026-Q2)437 m
    Maxol Filling Station112112 built (2025-Q2)482 m
    Former Player Wills Factory568568 built (2025-Q1)493 m
    Ballsbridge Hotel Site339—623 m
    11-12 York Road2626 built (2026-Q2)713 m
    Poolbeg West Strategic Development Zone570213 built · 357 being built (2026-Q2)806 m
    Quadrant A41510no activity on site reported (2026-Q2)806 m
    Former Irish Glass Bottle and Fabrizia Sites Phase 1B356—806 m

    Crèches and schools inspected

    NameLatest inspectionDistance
    Eco Kidz Sportsco · Crèche18 Sept 2024 · report · Tusla Early Years Inspectorate350 m
    Lansdowne Lodge Preschool Montessori · Crèche9 Apr 2026 · report · Tusla Early Years Inspectorate374 m
    St. Matthew's Primary School · Crèche5 Mar 2026 · report · Tusla Early Years Inspectorate519 m
    Tots and Co Childcare · Crèche31 Mar 2026 · report · Tusla Early Years Inspectorate588 m
    Realtoga Preschool & Afterschool · Crèche16 Sept 2025 · report · Tusla Early Years Inspectorate649 m
    Ringsend Creche Ltd · Crèche15 Jun 2026 · report · Tusla Early Years Inspectorate660 m
    The Anchorage Preschool · Crèche7 Nov 2024 · report · Tusla Early Years Inspectorate781 m
    Park Montessori · Crèche17 Jun 2026 · report · Tusla Early Years Inspectorate810 m
    How we work this out
    Organisations only: a person named on an application is never listed. Inspection dates and links are the publisher's; read their report for the findings.
    Sources: Dublin housing delivery pipeline, National Planning Application Database, Department of Education school list, Tusla early years register · fetched 16 Oct 2026, 02:04
    SourceLicenceFetchedLink
    Dublin housing delivery pipelineCC BY 4.012 Oct 2026, 23:02open
    National Planning Application DatabaseCC BY 4.016 Oct 2026, 02:04open
    Department of Education school listCC BY 4.027 Sept 2026, 23:32open
    Tusla early years registerPublic register14 Oct 2026, 23:20open
    How busy is this area Busier than most of Dublin City Council.
    Homes approved
    Here37
    Council middle50
    Homes started
    Here366
    Council middle105
    How we work this out
    Homes approved counts schemes of 10 or more homes (one-off houses are not included). Homes started counts every home in a notice that building work was starting. The council figure is the middle value across the council's built-up squares of the same area (3.1 km², about a 1 km circle), so half of them saw more and half fewer.
    Sources: An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices), National Planning Application Database · fetched 16 Oct 2026, 23:06
    SourceLicenceFetchedLink
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.016 Oct 2026, 23:06open
    Building Control Management System (commencement notices)CC BY 4.016 Oct 2026, 00:56open
    National Planning Application DatabaseCC BY 4.016 Oct 2026, 02:04open
    Question 5

    What's the area like?

    Figure 9

    This street block against the council

    89% of homes built before 1971 (council 52%). 81% owner-occupied (council 47%).

    Homes built before 1971
    89% · council 52%
    Homes built since 2001
    5% · council 19%
    Owner-occupied
    81% · council 47%
    Rented
    13% · council 45%
    Children under 15
    19% · council 15%
    Aged 65 and over
    15% · council 13%
    Households with 2+ cars
    30% · council 19%
    Work mainly from home
    11% · council 12%
    This small area (269 people)Dublin

    MeasuredCSO Census 2022, Small Area Population Statistics (CC BY 4.0) · small area 268115004

    Bus
    384 m
    Irishtown Rd · 47, 82, C1 · busiest stop within 500 m: 18 an hour at peak
    Radon
    1 in 20
    homes here likely high (EPA). Test it
    Flood
    Yes
    OPW flood map area within 100 m
    Nearest school
    496 m
    Sn Paroiste Maitiu Nfa, 212 pupils
    Homes sold nearby
    148
    in 3 years (Property Price Register)
    Schools, stops and the council

    Schools

    • Sn Paroiste Maitiu Nfa · primary · 212 pupils · 496 m
    • Marian College · postprimary · 318 pupils · 514 m
    • St Patricks Girls Ns · primary · 143 pupils · 664 m
    • St Declans Special Sch · primary · 35 pupils · 676 m
    • Naomh Padraig Boys · primary · 137 pupils · 681 m
    • John Scottus Ns · primary · 136 pupils · 683 m
    • Star of the Sea · primary · 223 pupils · 716 m
    • Ringsend College · postprimary · 191 pupils · 750 m

    Stops 39

    • Irishtown Rd · 47, 82, C1, C2 · 10/hour at peak · 384 m
    • Irishtown Rd · 47, 82, 84n, C1, C2 · 18/hour at peak · 402 m
    • Lansdowne Road · DART, Dublin - Drogheda/Dundalk, Dublin - Europort, Dublin - Maynooth · 14/hour at peak · 410 m
    • St Brendan's Ctgs · 47, 82, C1, C2 · 10/hour at peak · 412 m
    • Tritonville Road · 47, C1, C2 · 7/hour at peak · 421 m
    • Tritonville Road · 47, 84n, C1, C2 · 15/hour at peak · 422 m
    • Ringsend Village · 47, 82, C1, C2 · 10/hour at peak · 463 m
    • Ringsend Village · 47, 82, 84n, C1, C2 · 18/hour at peak · 492 m

    Schools growing or shrinking planning in 3 years · pupils last year

    • Sn Paroiste Maitiu Nfa · 496 m+1.4% pupils (212) · an extension 2024, approved
    • Marian College · 514 m+4.3% pupils (318)
    • St Patricks Girls Ns · 663 m-3.4% pupils (143) · a sports hall 2025, approved
    • St Declans Special Sch · 676 m-2.8% pupils (35)
    • Naomh Padraig Boys · 681 m+8.7% pupils (137) · a sports hall 2025, approved
    • John Scottus Ns · 683 m-18.1% pupils (136)

    Open consultations

    Council meetings 30 items

    Public land

    • Electricity Supply Board · 1.26 ha · 188 m
    • Dublin City Council · 0.2 ha · 188 m
    • Irish Greyhound Board · 3.12 ha · 221 m
    • The Office of Public Works · 0.28 ha · 339 m
    • The Minister for Finance · 0.77 ha · 351 m
    • Health Service Executive · 0.1 ha · 376 m
    Sources: Public transport stops and routes (NTA GTFS), Department of Education school list, National Planning Application Database, Council consultation portals, Council meetings (ModernGov), Land Development Agency public land register, cso_saps_2022, National Transport Authority, Fingal County Council and Dún Laoghaire-Rathdown County Council development plan layers (CC BY 4.0), dartplus.ie project extents over NTA GTFS rail shapes (CC BY 4.0), EPA strategic noise maps, Fingal County Council · fetched 16 Oct 2026, 02:04
    SourceLicenceFetchedLink
    Public transport stops and routes (NTA GTFS)CC BY 4.011 Oct 2026, 23:43open
    Department of Education school listCC BY 4.027 Sept 2026, 23:32open
    National Planning Application DatabaseCC BY 4.016 Oct 2026, 02:04open
    Council consultation portalsPublic16 Oct 2026, 01:34open
    Council meetings (ModernGov)Public16 Oct 2026, 01:42open
    Land Development Agency public land registerCC BY 4.011 Sept 2026, 16:43open
    cso_saps_2022CC BY 4.0—open
    National Transport AuthorityCC BY 4.0——
    Fingal County Council and Dún Laoghaire-Rathdown County Council development plan layers (CC BY 4.0)CC BY 4.0——
    dartplus.ie project extents over NTA GTFS rail shapes (CC BY 4.0)CC BY 4.0——
    EPA strategic noise mapsCC BY 4.0——
    Fingal County CouncilCC BY 4.0——
    Question 6

    What to ask, and who

    1. Garden room (2440/19) built without official sign-off: built properly?
      Ask for: An engineer's opinion of compliance.
      Seller · solicitor
    2. Flood risk area within 100 m: can you insure it?
      Ask for: A flood-cover quote before sale agreed.
      Insurer
    3. Application 393 m away open for comments until 13 Nov 2026: comment?
      Ask for: The plans on the council's website (€20 to comment).
      Council
    4. Building work started 44 m away: for how long?
      Ask for: The planning conditions for WEB1060/24.
      Agent · council
    5. Any work done without planning permission?
      Ask for: An opinion of compliance for the whole house.
      Seller · solicitor
    Reference

    Where this is, the terms, the sources

    Electoral division
    Pembroke West A
    Electoral area
    South East Inner City
    Council
    Dublin City Council
    Everything we found, as a list 8 lines
    • 1 application on this site; latest 2440/19, approved 2019, started, no sign-off needed.
    • Zoned R2 (existing residential); not protected; no vacant land tax; flood risk area within 100 m.
    • 3 sites nearby could change: 3 derelict.
    • 1 application open for comments nearby; nearest closes 13 Nov 2026.
    • Irishtown Rd (bus 47, 82) 402 m away: 18 an hour at morning peak; 102 from all stops within 500 m.
    • Here (2022 census): 81% owner-occupied (council 47%); 10% of homes empty (council 8%); most built 1919–1945; 29% drive to work (council 28%); population up 3% since 2016.
    • 3 home extensions within 250 m since 2026. Most were first-floor extensions.
    • Around here the council decides in a median 60 days (about 9 weeks); 35% are asked for more information.
    What the terms mean 8 terms
    • Vacant land tax (Residential Zoned Land Tax (RZLT)): A yearly tax of 3% of the land's value on land that is zoned for homes and serviced but left unbuilt.
    • Building started (Commencement notice (BCMS)): The builder must tell the council's building control office 14 to 28 days before work starts.
    • Signed off as finished (Certificate of Compliance on Completion): A certificate filed when a building is finished, confirming it meets the building regulations.
    • Approved (Grant of permission): The council said yes, usually with conditions.
    • Listed by the council as derelict (Derelict Sites Register): Councils keep a public list of land and buildings in a ruinous or dangerous state.
    • Comment on an application (Observation / submission): Anyone can comment on a planning application within five weeks of it being lodged, for a €20 fee.
    • Appeal (Appeal to An Coimisiún Pleanála): The applicant, or anyone who commented in time, can appeal the council's decision within four weeks.
    • What the land is zoned for (Zoning objective): The council's development plan sets what each area is for: homes, shops, open space and so on.
    Sources and licences 31
    SourcePublisherLicenceFetched
    EPA strategic noise maps—CC BY 4.0—
    Fingal County Council—CC BY 4.0—
    Fingal County Council and Dún Laoghaire-Rathdown County Council development plan layers (CC BY 4.0)—CC BY 4.0—
    National Transport Authority—CC BY 4.0—
    services-eu1.arcgis.comAn Coimisiún PleanálaCC BY 4.016 Oct 2026
    data.nbco.gov.ieNational Building Control Office (BCMS)CC BY 4.015 Oct 2026
    data.gov.ieVarious (see each layer)CC BY 4.0, CC BY-NC-ND 4.027 Sept 2026
    gis.epa.ieEnvironmental Protection AgencyCC BY 4.027 Sept 2026
    s3.eu-west-1.amazonaws.comOffice of Public WorksCC BY-NC-ND 4.0 · flag only11 Sept 2026
    gis.epa.ieEnvironmental Protection AgencyCC BY 4.027 Sept 2026
    services-eu1.arcgis.comNational Monuments Service (SMR)CC BY 4.027 Sept 2026
    dlrcoco.citizenspace.comLocal authorities (consultation portals)Public16 Oct 2026
    www2.courts.ie—© the publisher16 Oct 2026
    cso.ie—CC BY 4.0—
    dartplus.ie project extents over NTA GTFS rail shapes (CC BY 4.0)—CC BY 4.0—
    services-eu1.arcgis.comLocal authorities (derelict sites registers)CC BY 4.012 Oct 2026
    services.arcgis.comDublin local authorities (housing delivery pipeline)CC BY 4.012 Oct 2026
    data.epa.ieEnvironmental Protection Agency (LEAP licence register)CC BY 4.012 Oct 2026
    esbnetworks.ie—© the publisher · flag only11 Sept 2026
    transportforireland.ieNational Transport AuthorityCC BY 4.011 Oct 2026
    lda.ieLand Development AgencyCC BY 4.011 Sept 2026
    meetings.fingal.ieLocal authorities (council meetings)Public16 Oct 2026
    services.arcgis.comDepartment of Housing (National Planning Application Database)CC BY 4.016 Oct 2026
    services-eu1.arcgis.comTailte ÉireannCC BY 4.011 Sept 2026
    services-eu1.arcgis.comCSO, Tailte Éireann, OpenStreetMap contributorsCC BY 4.04 Oct 2026
    propertypriceregister.ieProperty Services Regulatory Authority (PPR)© PSRA, PSI licence16 Oct 2026
    services.arcgis.comLocal authorities (RZLT maps)CC BY 4.011 Oct 2026
    gov.ieDepartment of EducationCC BY 4.027 Sept 2026
    gov.ieDepartment of HousingCC BY-SA 4.09 Oct 2026
    tusla.ieTusla (Early Years Inspectorate)Public register14 Oct 2026
    services.arcgis.comLocal authorities via the Department of Housing (GZT / MyPlan)CC BY 4.011 Oct 2026
    Measured
    counted from a public register
    Calculated
    a rate or median we worked out from those counts
    Our classification
    we sorted it by reading each description
    Estimate
    inferred from another source (census, map data)
    Rule summary
    the law, simplified: check before relying on it
    How we work this out
    Generated 17 Oct 2026, 00:13 from the Planning Register store; nothing was fetched live. Not a legal search: the council's planning file is the record. Deadlines come from published dates under the Planning and Development Act 2000: confirm with the council before relying on them. Street map © OpenStreetMap contributors; building outlines © Overture Maps Foundation. The text version carries every figure with its source, for an AI assistant.