R2 — Existing residentialdevelopment plan 2022 2028 · 14 Dec 2022 – 31 Dec 2028
Z2: Residential Neighbourhoods (Conservation Areas): To protect and/or improve the amenities of residential conservation areas.
What that means: An established residential area. The objective is to protect existing residential amenity as well as to provide housing — which is the objective a neighbour's objection to an overbearing extension is usually argued under.
This site is on an RZLT map — the draft map 2027 and the final map 2026 (0.85 ha). The owner is liable for an annual 3% tax on market value while it stays there. Submissions on the draft map closed 1 Apr 2026.
CHANGE OF USE: The development will consist of the change of use of the ground floor and first floor only of the existing office premises to provide up to 7 no. appointment-based medical consultation suites, including ancillary reception/waiting area, staff welfare facilities, WC facilities, storage, associated internal alterations and all ancillary works necessary to facilitate the proposed use. The second floor of the building is to remain in its existing office use and does not form part of the proposed change of use.
RETENTION: Reinstatement of boundary wall to rear of site, bordering Camac River, including new foundation to support masonry wall with concrete capping built up to garden level in place of original collapsed stone wall.
RETENTION: Reinstatement of boundary wall to rear of site, bordering Camac River, including new foundation to support masonry wall with concrete capping built up to garden level in place of original collapsed stone wall.
WEB2523/26received 18 Jun 2026decided 18 Jun 2026243 m away
The development will consist of:
(i) the removal of an existing single-storey rear extension and construction of a new single-storey rear extension maintaining existing size of private open-space/courtyard with modified layout;
(ii) attic conversion to habitable room with rear dormer roof constructed below existing ridge line and reduction in ground floor level;
(iii) renovation and alterations to the existing building including all associated ancillary site works.
We, St. James’s National School, intend to apply for planning permission for development St. James’s National School, Basin View, Dublin 8. The site is located immediately to the south of the school, north of James’s Walk and west of The Hops, Basin View, Dublin 8.
The proposed development comprises of the following:
• Removal of the existing structures, including a shed and storage container and all associated site clearance works;
• Relocation of the play frame within the inner courtyard of the school;
• Upgrade of the existing school playground to provide a synthetic all-weather sports pitch with a total area of approx. 2,400 sq.m, incorporating 2 no. overlapping sports playing field measuring approx. 40m X 30m each;
• Provision of 12 no. Sheffield stands accommodating 24 no. bicycle parking spaces and associated pedestrian pathways;
• Revisions to the existing boundary wall onto James’s Walk to facilitate maintenance vehicle access;
• Provision of perimeter mesh fencing with ball stop netting above, floodlighting on 4 no. columns measuring 10.5m in height, drainage infrastructure, retaining walls, hard and soft landscaping works and all associated site development works.
(i) change of use of first-floor level office space to provide limited-term staff accommodation, related to the operation of the new National Children’s Hospital with associated internal alterations to facilitate revised layout providing for 8 no. ensuite bedrooms each with access to shared facilities including kitchen/dining area, living area, storage/service area, linen store and existing roof terrace all at first floor level; (ii) partial change of use of basement-floor level storage area to provide shared laundry/storage room in association with limited-term staff accommodation use and re-designation of the separate entrance foyer at ground floor level to serve the limited-term staff accommodation use; and, (iii) all associated works, including drainage works, engineering works and installation of new boiler cabinet, as necessary to facilitate the development.
(i) change of use of first-floor level office space to provide limited-term staff accommodation, related to the operation of the new National Children’s Hospital with associated internal alterations to facilitate revised layout providing for 8 no. ensuite bedrooms each with access to shared facilities including kitchen/dining area, living area, storage/service area, linen store and existing roof terrace all at first floor level;
(ii) partial change of use of basement-floor level storage area to provide shared laundry/storage room in association with limited-term staff accommodation use and re-designation of the separate entrance foyer at ground floor level to serve the limited-term staff accommodation use; and,
(iii) all associated works, including drainage works, engineering works and installation of new boiler cabinet, as necessary to facilitate the development.
WEB2408/26received 9 Jun 2026decided 10 Jun 2026207 m away
(i) change of use of first-floor level office space to provide limited-term staff accommodation, related to the operation of the new National Children’s Hospital with associated internal alterations to facilitate revised layout providing for 8 no. ensuite bedrooms each with access to shared facilities including kitchen/dining area, living area, storage/service area, linen store and existing roof terrace all at first floor level; (ii) partial change of use of basement-floor level storage area to provide shared laundry/storage room in association with limited-term staff accommodation use and re-designation of the separate entrance foyer at ground floor level to serve the limited-term staff accommodation use; and, (iii) all associated works, including drainage works, engineering works and installation of new boiler cabinet, as necessary to facilitate the development.
WEB2379/26received 5 Jun 2026decided 8 Jun 2026207 m away
The development will consist of: (i) the removal of an existing single-storey rear extension and construction of a new single-storey rear extension maintaining existing size of private open-space/courtyard with modified layout; (ii) attic conversion to habitable room with rear dormer roof constructed below existing ridge line and reduction in ground floor level; (iii) renovation and alterations to the existing building including all associated ancillary site works.
WEB2339/26received 3 Jun 2026decided 4 Jun 2026405 m away
PPR addresses are geocoded, not surveyed — a sale's position is as good as its address match (`rooftop_n` says how many are address-accurate). Beds, floor area, BER and asking price come from the matched daft.ie advertisement, not from the Register, and only where a match was found (`enriched_n`).
Third-party advertisement data captured by Cara from daft.ie. Not open data: internal analysis only, no redistribution of listing content. Business-contact details (licensed PSP name and branch) are retained per Cara DECISIONS 2026-08-19; agent phone numbers and all vendor/buyer identities are dropped.
No publishable utility-capacity record within the radius. 27 records from Esb substation withheld: source licence forbids redistribution; see the operator's own register.
Public land (LDA register of relevant lands)
Health Service Executive — Dublin city and suburbs
18.16 ha10 m awayas of 1 Apr 2023
Health Service Executive — Dublin city and suburbs
0.36 hafolio DN21088F121 m awayas of 1 Apr 2023
Health Service Executive — Dublin city and suburbs
0.28 hafolio DN64397F124 m awayas of 1 Apr 2023
Irish Museum of Modern Art — Dublin city and suburbs
16.97 ha209 m awayas of 1 Apr 2023
Dublin City Council — Dublin city and suburbs
0.64 hafolio DN205124F264 m awayas of 1 Apr 2023
Dublin City Council — Dublin city and suburbs
0.27 hafolio DN205124F312 m awayas of 1 Apr 2023
Railway Procurement Agency — Dublin city and suburbs
all-rights-reserved (esbnetworks.ie disclaimer: personal/non-commercial, no modification or republication without written ESB permission) — permission NOT sought · not redistributable — shown as a flag only
Third-party advertisement data captured by Cara from daft.ie. Not open data: internal analysis only, no redistribution of listing content. Business-contact details (licensed PSP name and branch) are retained per Cara DECISIONS 2026-08-19; agent phone numbers and all vendor/buyer identities are dropped.
all-rights-reserved (esbnetworks.ie disclaimer: personal/non-commercial, no modification or republication without written ESB permission) — permission NOT sought · not redistributable, flag only
Generated 12 Sept 2026, 20:20 from the Planning Register store. Nothing on this page was fetched live: every figure was already in the store with the fetch time shown. Deadlines are derived from published receipt and decision dates under the Planning and Development Act 2000; confirm with the planning authority before relying on them.