Planning report · South Dublin County Council · 500 m around the house · the last 12 months · 17 Oct 2026, 12:59

Palmer's Copse

53.34844, -6.38403

Homes here mostly date from the 1990s. Home extensions nearby almost always get approved (95%).

See on the mapWatch this area

How planning works, with this area's numbers

steps can overlap · medians for home extensions within 1.5 km, 10 years
  1. 1ApplySite notice up, plans online
  2. 2Comments5 weeks, €20. Comment to keep your right to appeal
  3. 3Decision8 weeks by law. Here 55 days
  4. 4Appeal window4 weeks after the decision
  5. 5AppealHere about 4 months
  6. 6PermissionLasts 5 years
  7. 7StartStart notice to the council. Here about 4 months after
  8. 8Sign-offCompletion cert, or the owner opts out
Question 1

What's the planning story of this house?

Figure 1

When it was built, and the rules since

Most homes here were built 1991–2000, under planning permission and building regulations.

Timeline from 1955: planning permission needed from October 1964, building regulations from June 1992, building records online from March 2014, sign-off opt-out from September 2015. Most homes here were built 1991–2000.1960197019801990200020102020Oct 1964permission neededJun 1992building regulationsMar 2014building records onlineSep 2015owners may opt out of sign-offThis houseBuilt: most homes in this small area date from 1991–2000 (census estimate)most built

Each line is a rule that applies to work done after it.

MeasuredEstimatecouncil register via NPAD · build years: CSO Census 2022, small area

On this site
R2
Zoning · Existing residential
No
Protected or listed · on the council's list
No
Vacant land tax · lived-in homes don't pay it
1 in 20
Radon (EPA) · homes with high radon
Zoning, protection, tax and flood: the detail
ZoningR2 · Existing residential
What it says

RES: To protect and/or improve residential amenity

An established residential area. The objective is to protect existing residential amenity as well as to provide housing — which is the objective a neighbour's objection to an overbearing extension is usually argued under.

south dublin county development plan 2022 2028 · 8 Mar 2022 – 8 Mar 2028

Radon1 in 20 homes have high radon (EPA)

Not on this site: protected building, heritage inventory, monument zone, conservation area, EU nature site, EU bird site, natural heritage area, tree order, landslide risk, derelict list.

Vacant land taxNo lived-in homes don't pay it
Flood riskNone mapped within 500 m
Within 500 mCountFor example
Radon grid squares3
How we work this out
'On this site' means the record's own map outline touches the registered parcel (or a 12 m circle round the point where there is no parcel). Only the council's own list confirms a protected building; ask the council if in doubt. The council's map for the vacant land tax shows this spot inside an area of existing homes. Homes people live in, and their gardens, don't pay the tax. The OPW flood map's licence lets us show a yes/no only. Land on the vacant land tax map nearby: 1 on the draft 2027 map; 1 on the final 2026 map.
Sources: Development plan zoning (councils), EPA radon map, Residential Zoned Land Tax maps, Constraint layers (bundle) · fetched 12 Oct 2026, 00:14
SourceLicenceFetchedLink
Development plan zoning (councils)CC BY 4.011 Oct 2026, 23:18open
EPA radon mapCC BY 4.027 Sept 2026, 19:36open
Residential Zoned Land Tax mapsCC BY 4.012 Oct 2026, 00:14open
Constraint layers (bundle)CC BY 4.0, CC BY-NC-ND 4.027 Sept 2026, 19:37open
How we work this out
Applications whose site outline (or map point) falls on this property. 'No sign building has started' means we found no notice to the council's building control office; small jobs don't always file one, so ask. A missing completion certificate is not proof of a problem: an owner can opt out of official sign-off for a house or extension built for themselves.
Sources: Building Control Management System (commencement notices), National Planning Application Database · fetched 17 Oct 2026, 02:05
SourceLicenceFetchedLink
Building Control Management System (commencement notices)CC BY 4.017 Oct 2026, 01:09open
National Planning Application DatabaseCC BY 4.017 Oct 2026, 02:05open
Question 2

Could you extend?

Nothing on this site restricts it: not protected, not in a conservation area.

Figure 2

What happened to applications like yours

Extensions are almost always approved here: 86–100% by type. A new house in a garden is harder: 63% approved, and 1 in 3 is asked for more information.

Single-storey rear35 decided · more info asked 29%
89% · council 94%
Two-storey rear16 decided · more info asked 38%
94% · council 94%
Two-storey side17 decided · more info asked 12%
100% · council 94%
Single-storey side20 decided · more info asked 20%
95% · council 95%
Attic or dormer72 decided · more info asked 25%
97% · council 95%
First-floor14 decided · more info asked 21%
86% · council 92%
Porch or front12 decided · more info asked 25%
92% · council 95%
New house in a garden or site35 decided · more info asked 37%
63% · council 62%
Approved nearbySouth Dublin overall

Decided applications within 1.5 km, received in the last 10 years. The kind of work is read from each description.

CalculatedOur classificationcouncil register via NPAD · 221 nearby, 4,628 council-wide

Extensions and refusals right beside you 1 within 250 m · 0 refused within 100 m

Extensions and refusals near you 1 extensions within 250 m · the last 12 months

1 no decision or withdrawn
KindAppliedApprovedRefused
Single-storey rear10—

On Palmerstown Manor: 8 extensions in 10 years, 91% of all applications approved; most common single-storey rear.

Refused within 100 m 0 in the last 12 months

Nothing refused this close in the last 12 months.

    How we work this out
    Home extensions are read from the application's description (extension, attic or dormer, porch, garage conversion, garden room), so a few may be missed or mislabelled. The kind is the first that fits: a dormer with a rear extension counts as a dormer. Refusal reasons come from An Coimisiún Pleanála's inspector reports, so they exist only where the refusal was appealed (Dún Laoghaire-Rathdown so far). The council's own reasons are on its planning file.
    Sources: National Planning Application Database, An Coimisiún Pleanála cases (ArcGIS feed) · fetched 17 Oct 2026, 02:05
    SourceLicenceFetchedLink
    National Planning Application DatabaseCC BY 4.017 Oct 2026, 02:05open
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.016 Oct 2026, 23:06open
    Sources: An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices), National Planning Application Database · fetched 17 Oct 2026, 02:05
    SourceLicenceFetchedLink
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.016 Oct 2026, 23:06open
    Building Control Management System (commencement notices)CC BY 4.017 Oct 2026, 01:09open
    National Planning Application DatabaseCC BY 4.017 Oct 2026, 02:05open
    Question 3

    How long, and what if someone objects?

    Figure 3

    A home extension's journey here

    A decision takes 55 days. 1 in 4 is asked for more information, which adds about 91 days. Building starts about 4 months after permission.

    Comments open: 5 weeks · €20; Council decision: 55 days; If more info asked (1 in 4): 146 days; Appeal window: 4 weeks; If appealed: +130 days; Building starts: 133 days after permission0 mo3 mo6 mo9 mo12 moComments openComments close 5 weeks after the application is lodged5 weeks · €20Council decisionDecision: median 55 days, middle half 52–55 (n=183)55 daysIf more info asked (1 in 4)With further information: median 146 days (n=57)146 daysAppeal windowAnyone who commented can appeal within 4 weeks of the decision4 weeksIf appealedAt An Coimisiún Pleanála: median 130 days (n=42, all appeals within 1.5 km)+130 daysBuilding startsStart notice: median 133 days after permission (n=83)133 days after permissionSigned off308 days after the start, for the few who file. 54% of owners opt out of sign-off

    Bars are medians; whiskers show the middle half. Medians of separate steps don't add up exactly.

    Calculated240 decided home extensions, 84 start notices, 42 decided appeals · within 1.5 km, 10 years · NPAD, BCMS, An Coimisiún Pleanála

    Figure 4

    What appeals changed

    6 of 20 appealed refusals became permissions. 3 of 24 appealed approvals were reversed.

    Refusals appealed20 decided
    6 became permissions
    Approvals appealed24 decided
    3 reversed
    Ended approvedEnded refusedWithdrawn, invalid or other

    Every appeal decided within 1.5 km in 10 years, any kind of development.

    CalculatedAn Coimisiún Pleanála cases linked to the council file

    Question 4

    What's changing around you?

    Street map around Palmer's Copse with 6 numbered planning items
    ⌖ the houseBuilding startedEmpty land zoned for homesOtherApproved
    1. 11 Palmers Copse, Palmerstown SD25B/0485Building started · 38 m
    2. 20.8 ha zoned for homesEmpty land zoned for homes · 362 m
    3. 338 Palmerstown Lawn, Dublin 20 ED26/0005Section 5: exempt · 87 m
    4. 437, Whitethorn Crescent SD26B/0253WApproved · 353 m
    5. 514, Palmerstown Park SD25A/0281WApproved · 439 m
    6. 6Unit 14b, The Retail Park Liffey Valley SD26A/0089WApproved · 497 m
    Figure 5

    What happens to applications within 500 m

    Permission isn't building. Of 64 permissions since 2016, 27 show a start notice and 13 have a completion certificate.

    82 applications lodged within 500 m. Council: 66 approved, 9 refused. After appeals: 64 approved. Of those: 13 signed off, 4 built with the owner's opt-out, 10 started, 33 with no start notice found, 4 ran out.LODGEDCOUNCIL DECISIONAFTER APPEALSWHAT HAPPENED NEXT66: lodged → approved9: lodged → refused7: lodged → withdrawn or invalid62: approved → approved7: refused → refused7: withdrawn or invalid → withdrawn1 approved by the council, undecided after an appeal2 approved by the council, refused after an appeal1 approved by the council, withdrawn or invalid after an appeal2 refused by the council, approved after an appeal33: approved → no start notice found4: approved → built, owner opted out10: approved → started, not signed off13: approved → signed off4: approved → ran out82 lodged82 lodged66 approved66 approved9 refused9 refused7 withdrawn or invalid7 withdrawn or invalid64 approved64 approved9 refused9 refused8 withdrawn8 withdrawn1 undecided1 undecided33 no start notice found33 no start notice found4 built, owner opted out4 built, owner opted out10 started, not signed off10 started, not signed off13 signed off13 signed off4 ran out4 ran out

    Purple bands are refusals turned into permissions on appeal. "No start notice found" includes small jobs that never needed one and notices we couldn't match.

    Measured82 applications in 10 years · NPAD, An Coimisiún Pleanála, BCMS start notices and completion certificates

    Figure 6

    The next 30 days

    Nothing closes within 500 m in the next 30 days.

      Measuredcouncil registers and An Coimisiún Pleanála · deadlines worked out from the dates on file

      Sites that could change 1 within 500 m

      Empty land zoned for homes 1

      • 20.8 ha zoned for homes · no homes built on it yet · 362 m
      Sources: An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices), Derelict sites registers, Council meetings (ModernGov), National Planning Application Database, Residential Zoned Land Tax maps · fetched 17 Oct 2026, 02:12
      SourceLicenceFetchedLink
      An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.016 Oct 2026, 23:06open
      Building Control Management System (commencement notices)CC BY 4.017 Oct 2026, 01:09open
      Derelict sites registersCC BY 4.012 Oct 2026, 23:08open
      Council meetings (ModernGov)Public17 Oct 2026, 02:12open
      National Planning Application DatabaseCC BY 4.017 Oct 2026, 02:05open
      Residential Zoned Land Tax mapsCC BY 4.012 Oct 2026, 00:14open
      Figure 7

      Applications within 500 m, by year

      Between 5 and 11 a year; busiest 2017. 88% of decisions were approvals.

      2016: 3, 2017: 11, 2018: 9, 2019: 7, 2020: 11, 2021: 10, 2022: 10, 2023: 5, 2024: 6, 2025: 8, 2026: 2051015202016: 2 approved2016: 1 withdrawn or invalid3’16*2017: 5 approved2017: 3 refused2017: 3 withdrawn or invalid11’172018: 9 approved9’182019: 6 approved2019: 1 withdrawn or invalid7’192020: 7 approved2020: 4 refused11’202021: 9 approved2021: 1 withdrawn or invalid10’212022: 8 approved2022: 1 refused2022: 1 withdrawn or invalid10’222023: 5 approved5’232024: 5 approved2024: 1 refused6’242025: 8 approved8’252026: 2 approved2’26*
      ApprovedRefusedWithdrawn or invalidUndecided

      2016 and 2026 are part years (*). Exemption requests and time extensions are left out.

      Measuredcouncil register via NPAD

      Every application within 500 m 4 in the last 12 months

      See every application on the map

      How we work this out
      Descriptions are shortened by the national planning database (to 80 characters in Dún Laoghaire-Rathdown, 70 in Fingal), and it does not publish applicants' names.
      Sources: National Planning Application Database, An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices) · fetched 17 Oct 2026, 02:05
      SourceLicenceFetchedLink
      National Planning Application DatabaseCC BY 4.017 Oct 2026, 02:05open
      An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.016 Oct 2026, 23:06open
      Building Control Management System (commencement notices)CC BY 4.017 Oct 2026, 01:09open
      Building work nearby 5 in the last 12 months
      2 not signed off3 no sign-off needed
      • Snap Fitness, Unit 14B, Liffey Valley Retail Park, Coldcut Road, Dublin 22, Dublin · 17 Aug 2026 · 7-day notice not signed off · SD26A/0089W · 475 m
      • Ballyfermot Road, Dublin, D10 P381 · 9 Jul 2026 · 7-day notice not signed off · 490 m
      • Unit 2 Liffey valley retail park, Dublin, D22 N6F4 · 6 Jul 2026 · short notice no sign-off needed · 408 m
      • 11 Palmers Copse, Palmerstown, South Dublin, D20 CT95 · 5 May 2026 · short notice no sign-off needed · SD25B/0485 · 38 m
      • 89 Whitethorn Drive, Palmerstown, South Dublin, D22 R6E5 · 19 Feb 2026 · short notice no sign-off needed · SD25B/0604W · 442 m
      How we work this out
      Each row is a notice the builder sent to the council's building control office before work started. One notice can cover many homes. 'Signed off as finished' means a completion certificate is on file; work done under an opt-out or a short notice doesn't need one.
      Source: Building Control Management System (commencement notices) · fetched 17 Oct 2026, 01:09
      SourceLicenceFetchedLink
      Building Control Management System (commencement notices)CC BY 4.017 Oct 2026, 01:09open
      Homes coming 0 not started
      How we work this out
      Schemes of 10 or more homes approved since 2019, from the council and An Coimisiún Pleanála registers. 'Building started' means the builder told the council's building control office that work was starting (a commencement notice).
      Sources: An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices), National Planning Application Database, Social housing construction status report · fetched 17 Oct 2026, 02:05
      SourceLicenceFetchedLink
      An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.016 Oct 2026, 23:06open
      Building Control Management System (commencement notices)CC BY 4.017 Oct 2026, 01:09open
      National Planning Application DatabaseCC BY 4.017 Oct 2026, 02:05open
      Social housing construction status reportCC BY-SA 4.09 Oct 2026, 23:01open
      Named places nearby: estate, schemes, crèches, schools

      Named places estate, developments, inspections

      Estate: Palmerstown Manor · 11 applications in 10 years · 91% approved · most common: single-storey rear

      Developments within 1.0 km

      SchemeHomesProgressDistance
      Cherry Orchard Industrial Estate144—344 m
      The Silver Granite4343 not started (2026-Q2)428 m
      Silver Granite pub50—428 m
      Quarryvale Park——886 m
      The Finches Public House2626 not started (2026-Q2)989 m

      Crèches and schools inspected

      NameLatest inspectionDistance
      Naionra Tír na nÓg · Crèche9 Dec 2025 · report · Tusla Early Years Inspectorateapprox. 511 m
      Maureen's Playgroup · Crèche4 Jun 2026 · report · Tusla Early Years Inspectorate848 m
      First Steps · Crèche20 Jan 2026 · report · Tusla Early Years Inspectorateapprox. 982 m
      St. Vincents ECDS Daughters of Charity · Crèche8 Oct 2025 · report · Tusla Early Years Inspectorate1.0 km
      How we work this out
      Organisations only: a person named on an application is never listed. Inspection dates and links are the publisher's; read their report for the findings.
      Sources: Dublin housing delivery pipeline, Housing estates, National Planning Application Database, Department of Education school list, Tusla early years register · fetched 17 Oct 2026, 02:05
      SourceLicenceFetchedLink
      Dublin housing delivery pipelineCC BY 4.012 Oct 2026, 23:02open
      Housing estatesODbL 1.0, CC BY-SA 4.0, CC BY 4.027 Sept 2026, 20:18open
      National Planning Application DatabaseCC BY 4.017 Oct 2026, 02:05open
      Department of Education school listCC BY 4.027 Sept 2026, 23:32open
      Tusla early years registerPublic register14 Oct 2026, 23:20open
      How busy is this area About as busy as most of South Dublin County Council.
      Homes approved
      Here170
      Council middle0
      Homes started
      Here2
      Council middle4
      How we work this out
      Homes approved counts schemes of 10 or more homes (one-off houses are not included). Homes started counts every home in a notice that building work was starting. The council figure is the middle value across the council's built-up squares of the same area (3.1 km², about a 1 km circle), so half of them saw more and half fewer.
      Sources: An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices), National Planning Application Database · fetched 17 Oct 2026, 02:05
      SourceLicenceFetchedLink
      An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.016 Oct 2026, 23:06open
      Building Control Management System (commencement notices)CC BY 4.017 Oct 2026, 01:09open
      National Planning Application DatabaseCC BY 4.017 Oct 2026, 02:05open
      Question 5

      What's the area like?

      Figure 8

      This street block against the council

      0% of homes built before 1971 (council 18%). 84% owner-occupied (council 67%).

      Homes built before 1971
      0% · council 18%
      Homes built since 2001
      2% · council 27%
      Owner-occupied
      84% · council 67%
      Rented
      12% · council 29%
      Children under 15
      16% · council 21%
      Aged 65 and over
      10% · council 13%
      Households with 2+ cars
      52% · council 40%
      Work mainly from home
      7% · council 10%
      This small area (419 people)South Dublin

      MeasuredCSO Census 2022, Small Area Population Statistics (CC BY 4.0) · small area 267109010

      Road noise
      55–59 dB
      day–night average (EPA 2022)
      Bus
      142 m
      Coldcut Cres · 80, G2, S4 · busiest stop within 500 m: 16 an hour at peak
      Radon
      1 in 20
      homes here likely high (EPA). Test it
      Nearest school
      473 m
      Phobailscoil Iosolde, 764 pupils
      Homes sold nearby
      19
      in 3 years (Property Price Register)
      Schools, stops and the council

      Schools

      • Phobailscoil Iosolde · postprimary · 764 pupils · 473 m
      • Linn Dara Schools · primary · 51 pupils · 563 m
      • St Bernadettes Senior NS · primary · 194 pupils · 912 m
      • St Marys Junior NS · primary · 183 pupils · 931 m
      • St Bernadettes Junior NS · primary · 173 pupils · 933 m

      Stops 34

      • Coldcut Cres · 80, G2, S4 · 16/hour at peak · 142 m
      • Coldcut Rd · 80, G2, S4 · 16/hour at peak · 324 m
      • Palmers Crescent · 80, L55 · 6/hour at peak · 346 m
      • Coldcut Rd · G2, S4 · 10/hour at peak · 354 m
      • Palmers Crescent · 80, L55 · 6/hour at peak · 358 m
      • Whitethorn Cres · 80, G2, S4 · 15/hour at peak · 377 m
      • Palmerstown SC · 80, L55 · 6/hour at peak · 447 m
      • Palmerstown SC · 80, L55 · 6/hour at peak · 459 m

      Schools growing or shrinking planning in 3 years · pupils last year

      • Phobailscoil Iosolde · 473 m-1.2% pupils (764)
      • Linn Dara Schools · 563 m-1.9% pupils (51)
      • St Bernadettes Senior NS · 911 m-2.5% pupils (194) · an extension 2025, approved
      • St Marys Junior NS · 931 m-2.1% pupils (183)
      • St Bernadettes Junior NS · 933 m+0.6% pupils (173) · an extension 2025, approved

      Open consultations

      Council meetings 23 items

      Public land

      • South Dublin County Council · 0.95 ha · 55 m
      • South Dublin County Council · 0.32 ha · 66 m
      • Dublin City Council · 0.38 ha · 100 m
      • Dublin City Council · 1.56 ha · 105 m
      • Dublin City Council · 2.08 ha · 135 m
      • South Dublin County Council · 1.61 ha · 143 m
      Sources: Public transport stops and routes (NTA GTFS), Department of Education school list, National Planning Application Database, Council consultation portals, Council meetings (ModernGov), Land Development Agency public land register, cso_saps_2022, National Transport Authority, Fingal County Council and Dún Laoghaire-Rathdown County Council development plan layers (CC BY 4.0), dartplus.ie project extents over NTA GTFS rail shapes (CC BY 4.0), EPA strategic noise maps, Fingal County Council · fetched 17 Oct 2026, 02:12
      SourceLicenceFetchedLink
      Public transport stops and routes (NTA GTFS)CC BY 4.011 Oct 2026, 23:43open
      Department of Education school listCC BY 4.027 Sept 2026, 23:32open
      National Planning Application DatabaseCC BY 4.017 Oct 2026, 02:05open
      Council consultation portalsPublic17 Oct 2026, 01:36open
      Council meetings (ModernGov)Public17 Oct 2026, 02:12open
      Land Development Agency public land registerCC BY 4.011 Sept 2026, 16:43open
      cso_saps_2022CC BY 4.0—open
      National Transport AuthorityCC BY 4.0——
      Fingal County Council and Dún Laoghaire-Rathdown County Council development plan layers (CC BY 4.0)CC BY 4.0——
      dartplus.ie project extents over NTA GTFS rail shapes (CC BY 4.0)CC BY 4.0——
      EPA strategic noise mapsCC BY 4.0——
      Fingal County CouncilCC BY 4.0——
      Question 6

      What to ask, and who

      1. Building work started 38 m away: for how long?
        Ask for: The planning conditions for SD25B/0485.
        Agent · council
      2. Any work done without planning permission?
        Ask for: An opinion of compliance for the whole house.
        Seller · solicitor
      Reference

      Where this is, the terms, the sources

      Townland
      Coldcut
      Electoral division
      Palmerston West
      Electoral area
      Palmerstown-Fonthill
      Council
      South Dublin County Council
      Everything we found, as a list 8 lines
      • Zoned R2 (existing residential); not protected; no vacant land tax.
      • 1 site nearby could change: 1 empty zoned plot.
      • Coldcut Cres (bus 80, G2) 142 m away: 16 an hour at morning peak; 109 from all stops within 500 m.
      • Noise from road traffic mapped at 55–59 dB (day-evening-night average, EPA 2022).
      • Here (2022 census): 84% owner-occupied (council 66%); 1% of homes empty (council 4%); most built 1991–2000; 62% drive to work (council 54%); population down 3% since 2016.
      • 1 home extension within 250 m since 2026. On Palmerstown Manor: 8 in 10 years, 91% approved.
      • The council decides in a median 55 days (about 8 weeks); 1 in 5 is asked for more information.
      • 4 applications nearby in the last 12 months.
      What the terms mean 6 terms
      • Vacant land tax (Residential Zoned Land Tax (RZLT)): A yearly tax of 3% of the land's value on land that is zoned for homes and serviced but left unbuilt.
      • Building started (Commencement notice (BCMS)): The builder must tell the council's building control office 14 to 28 days before work starts.
      • Signed off as finished (Certificate of Compliance on Completion): A certificate filed when a building is finished, confirming it meets the building regulations.
      • Approved (Grant of permission): The council said yes, usually with conditions.
      • Approval ran out without being built (Permission lapsed / expired): Most permissions last five years.
      • What the land is zoned for (Zoning objective): The council's development plan sets what each area is for: homes, shops, open space and so on.
      Sources and licences 28
      SourcePublisherLicenceFetched
      EPA strategic noise maps—CC BY 4.0—
      Fingal County Council—CC BY 4.0—
      Fingal County Council and Dún Laoghaire-Rathdown County Council development plan layers (CC BY 4.0)—CC BY 4.0—
      National Transport Authority—CC BY 4.0—
      services-eu1.arcgis.comAn Coimisiún PleanálaCC BY 4.016 Oct 2026
      data.nbco.gov.ieNational Building Control Office (BCMS)CC BY 4.017 Oct 2026
      data.gov.ieVarious (see each layer)CC BY 4.0, CC BY-NC-ND 4.027 Sept 2026
      gis.epa.ieEnvironmental Protection AgencyCC BY 4.027 Sept 2026
      dlrcoco.citizenspace.comLocal authorities (consultation portals)Public17 Oct 2026
      www2.courts.ie—© the publisher17 Oct 2026
      cso.ie—CC BY 4.0—
      dartplus.ie project extents over NTA GTFS rail shapes (CC BY 4.0)—CC BY 4.0—
      services-eu1.arcgis.comLocal authorities (derelict sites registers)CC BY 4.012 Oct 2026
      services.arcgis.comDublin local authorities (housing delivery pipeline)CC BY 4.012 Oct 2026
      esbnetworks.ie—© the publisher · flag only11 Sept 2026
      overpass-api.deOpenStreetMap contributors, NHDS, Kildare County CouncilODbL 1.0, CC BY-SA 4.0, CC BY 4.027 Sept 2026
      transportforireland.ieNational Transport AuthorityCC BY 4.011 Oct 2026
      lda.ieLand Development AgencyCC BY 4.011 Sept 2026
      meetings.fingal.ieLocal authorities (council meetings)Public17 Oct 2026
      services.arcgis.comDepartment of Housing (National Planning Application Database)CC BY 4.017 Oct 2026
      services-eu1.arcgis.comTailte ÉireannCC BY 4.011 Sept 2026
      services-eu1.arcgis.comCSO, Tailte Éireann, OpenStreetMap contributorsCC BY 4.04 Oct 2026
      propertypriceregister.ieProperty Services Regulatory Authority (PPR)© PSRA, PSI licence17 Oct 2026
      services.arcgis.comLocal authorities (RZLT maps)CC BY 4.011 Oct 2026
      gov.ieDepartment of EducationCC BY 4.027 Sept 2026
      gov.ieDepartment of HousingCC BY-SA 4.09 Oct 2026
      tusla.ieTusla (Early Years Inspectorate)Public register14 Oct 2026
      services.arcgis.comLocal authorities via the Department of Housing (GZT / MyPlan)CC BY 4.011 Oct 2026
      Measured
      counted from a public register
      Calculated
      a rate or median we worked out from those counts
      Our classification
      we sorted it by reading each description
      Estimate
      inferred from another source (census, map data)
      Rule summary
      the law, simplified: check before relying on it
      How we work this out
      Generated 17 Oct 2026, 12:59 from the Planning Register store; nothing was fetched live. Not a legal search: the council's planning file is the record. Deadlines come from published dates under the Planning and Development Act 2000: confirm with the council before relying on them. Street map © OpenStreetMap contributors; building outlines © Overture Maps Foundation. The text version carries every figure with its source, for an AI assistant.