Olaf Road

53.35109, -6.28445

Homes here mostly date from before 1919. 1 planning file on this house, the latest from 2025. Home extensions nearby almost always get approved (92%). 2 applications nearby open for comments.

See on the mapWatch this area

How planning works, with this area's numbers

steps can overlap · medians for home extensions within 1.5 km, 10 years
  1. 1ApplySite notice up, plans online
  2. 2Comments5 weeks, €20. Comment to keep your right to appeal
  3. 3Decision8 weeks by law. Here 55 days
  4. 4Appeal window4 weeks after the decision
  5. 5AppealHere about 7 months
  6. 6PermissionLasts 5 years
  7. 7StartStart notice to the council. Here about 5 months after
  8. 8Sign-offCompletion cert, or the owner opts out
Question 1

What's the planning story of this house?

Figure 1

When it was built, and the rules since

Most homes here were built before 1919, before planning permission was needed. 1 planning file on this house, the latest from 2025.

Timeline from 1896: planning permission needed from October 1964, building regulations from June 1992, building records online from March 2014, sign-off opt-out from September 2015. Most homes here were built 1900–1918. 1 planning file on this house.1900191019201930194019501960197019801990200020102020Oct 1964permission neededJun 1992building regulationsMar 2014building records onlineSep 2015owners may opt out of sign-offThis houseBuilt: most homes in this small area date from 1900–1918 (census estimate)most built2025: WEB1443/25 · extension, approved

Each line is a rule that applies to work done after it.

MeasuredEstimatecouncil register via NPAD · build years: CSO Census 2022, small area

  1. 2025
    WEB1443/25 · extension · approved 2025 · not started, runs out 2030
    approvedstartedsigned off
On this site
R2
Zoning · Existing residential
No
Protected or listed · on the council's list
No
Vacant land tax · lived-in homes don't pay it
1 in 20
Radon (EPA) · homes with high radon
Zoning, protection, tax and flood: the detail
Zoning
What it says

Zone Z2 - DEV PLAN 2022-2028

ZoningR2 · Existing residential
What it says

Z2: Residential Neighbourhoods (Conservation Areas): To protect and/or improve the amenities of residential conservation areas.

An established residential area. The objective is to protect existing residential amenity as well as to provide housing — which is the objective a neighbour's objection to an overbearing extension is usually argued under.

development plan 2022 2028 · 14 Dec 2022 – 31 Dec 2028

ZoningR2 · Existing residential
What it says

Z2: Residential Neighbourhoods (Conservation Areas): To protect and/or improve the amenities of residential conservation areas.

An established residential area. The objective is to protect existing residential amenity as well as to provide housing — which is the objective a neighbour's objection to an overbearing extension is usually argued under.

development plan 2022 2028 variation no 11 · 14 Dec 2022 – 31 Dec 2028

Protected building4 within 100 m Terraced house; Terraced house
Heritage inventory4 within 100 m house; The Lilliput Press
Radon1 in 20 homes have high radon (EPA)

Not on this site: monument zone, conservation area, EU nature site, EU bird site, natural heritage area, tree order, landslide risk, derelict list.

Licensed industrial sites within 1.0 km: Diageo Ireland Unlimited Company (518 m)

Vacant land taxNo lived-in homes don't pay it
Flood riskNearby OPW map area within 500 m · floodinfo.ie
Within 500 mCountFor example
Heritage inventory buildings141quay/wharf; Rory O'More Bridge
Radon grid squares1
Monuments29School; Building
How we work this out
'On this site' means the record's own map outline touches the registered parcel (or a 12 m circle round the point where there is no parcel). Only the council's own list confirms a protected building; ask the council if in doubt. The council's map for the vacant land tax shows this spot inside an area of existing homes. Homes people live in, and their gardens, don't pay the tax. The OPW flood map's licence lets us show a yes/no only. Land on the vacant land tax map nearby: 6 on the draft 2027 map; 5 on the final 2026 map.
Sources: Development plan zoning (councils), National Inventory of Architectural Heritage, EPA radon map, EPA licensed facilities (LEAP), Records of Protected Structures, Residential Zoned Land Tax maps, Constraint layers (bundle), OPW flood maps (CFRAM), Sites and Monuments Record · fetched 26 Oct 2026, 23:21
SourceLicenceFetchedLink
Development plan zoning (councils)CC BY 4.025 Oct 2026, 23:06open
National Inventory of Architectural HeritageCC BY 4.027 Sept 2026, 19:35open
EPA radon mapCC BY 4.027 Sept 2026, 19:36open
EPA licensed facilities (LEAP)CC BY 4.026 Oct 2026, 23:21open
Records of Protected StructuresCC BY 4.0—open
Residential Zoned Land Tax mapsCC BY 4.025 Oct 2026, 23:43open
Constraint layers (bundle)CC BY 4.0, CC BY-NC-ND 4.027 Sept 2026, 19:37open
OPW flood maps (CFRAM)CC BY-NC-ND 4.0 · shown as a yes/no only11 Sept 2026, 19:11open
Sites and Monuments RecordCC BY 4.027 Sept 2026, 19:29open
How we work this out
Applications whose site outline (or map point) falls on this property. 'No sign building has started' means we found no notice to the council's building control office; small jobs don't always file one, so ask. A missing completion certificate is not proof of a problem: an owner can opt out of official sign-off for a house or extension built for themselves.
Sources: Building Control Management System (commencement notices), National Planning Application Database · fetched 1 Nov 2026, 05:02
SourceLicenceFetchedLink
Building Control Management System (commencement notices)CC BY 4.01 Nov 2026, 03:07open
National Planning Application DatabaseCC BY 4.01 Nov 2026, 05:02open
Question 2

Could you extend?

Nothing on this site restricts it: not protected, not in a conservation area.

Figure 2

What happened to applications like yours

Extensions are almost always approved here: 89–100% by type. A new house in a garden is harder: 70% approved, and 1 in 2 is asked for more information.

Single-storey rear78 decided · more info asked 13%
97% · council 97%
Two-storey rear46 decided · more info asked 15%
100% · council 96%
Single-storey side11 decided · more info asked 18%
100% · council 99%
Attic or dormer72 decided · more info asked 7%
89% · council 96%
First-floor27 decided · more info asked 26%
96% · council 94%
New house in a garden or site43 decided · more info asked 47%
70% · council 71%
Approved nearbyDublin overall

Decided applications within 1.5 km, received in the last 10 years. The kind of work is read from each description.

CalculatedOur classificationcouncil register via NPAD · 277 nearby, 5,202 council-wide

Extensions and refusals right beside you 7 within 250 m · 0 refused within 100 m

Extensions and refusals near you 7 extensions within 250 m · the last 12 months

1 approved6 no decision or withdrawn
KindAppliedApprovedRefused
Single-storey rear30—
Rear20—
First-floor10—
Two-storey rear11—

Refused within 100 m 0 in the last 12 months

Nothing refused this close in the last 12 months.

    How we work this out
    Home extensions are read from the application's description (extension, attic or dormer, porch, garage conversion, garden room), so a few may be missed or mislabelled. The kind is the first that fits: a dormer with a rear extension counts as a dormer. Refusal reasons come from An Coimisiún Pleanála's inspector reports, so they exist only where the refusal was appealed (Dún Laoghaire-Rathdown so far). The council's own reasons are on its planning file.
    Sources: National Planning Application Database, An Coimisiún Pleanála cases (ArcGIS feed) · fetched 1 Nov 2026, 05:02
    SourceLicenceFetchedLink
    National Planning Application DatabaseCC BY 4.01 Nov 2026, 05:02open
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.030 Oct 2026, 23:01open
    Sources: An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices), National Planning Application Database · fetched 1 Nov 2026, 05:02
    SourceLicenceFetchedLink
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.030 Oct 2026, 23:01open
    Building Control Management System (commencement notices)CC BY 4.01 Nov 2026, 03:07open
    National Planning Application DatabaseCC BY 4.01 Nov 2026, 05:02open
    Question 3

    How long, and what if someone objects?

    Figure 3

    A home extension's journey here

    A decision takes 55 days. 1 in 6 is asked for more information, which adds about 90 days. Building starts about 5 months after permission.

    Comments open: 5 weeks · €20; Council decision: 55 days; If more info asked (1 in 6): 149 days; Appeal window: 4 weeks; If appealed: +207 days; Building starts: 166 days after permission0 mo3 mo6 mo9 mo12 mo15 moComments openComments close 5 weeks after the application is lodged5 weeks · €20Council decisionDecision: median 55 days, middle half 53–55 (n=267)55 daysIf more info asked (1 in 6)With further information: median 149 days (n=53)149 daysAppeal windowAnyone who commented can appeal within 4 weeks of the decision4 weeksIf appealedAt An Coimisiún Pleanála: median 207 days (n=131, all appeals within 1.5 km)+207 daysBuilding startsStart notice: median 166 days after permission (n=121)166 days after permissionSigned off440 days after the start, for the few who file. 38% of owners opt out of sign-off

    Bars are medians; whiskers show the middle half. Medians of separate steps don't add up exactly.

    Calculated320 decided home extensions, 125 start notices, 131 decided appeals · within 1.5 km, 10 years · NPAD, BCMS, An Coimisiún Pleanála

    Figure 4

    What appeals changed

    20 of 68 appealed refusals became permissions. 5 of 65 appealed approvals were reversed.

    Refusals appealed68 decided
    20 became permissions
    Approvals appealed65 decided
    5 reversed
    Ended approvedEnded refusedWithdrawn, invalid or other

    Every appeal decided within 1.5 km in 10 years, any kind of development.

    CalculatedAn Coimisiún Pleanála cases linked to the council file

    Appeals nearby 7 in the last 12 months

    None of 1 changed the council's decision

    • 324665 Pending · Stanley Court 62/63, Sr?id Na Pr?ise, Stoneybatter, Dublin 7, Ireland · 420 m
    • 502053 Pending · 13, Kirwan Street, Stoneybatter, Dublin 7 D07C9Y2 · 215 m
    • 501783 Pending · 50 Blackhall Place, 13/14 Hendrick Street, Oxmantown Lane, Dublin 7,… · 362 m
    • 500755 Granted · 2 Temple Villas, Arbour Hill, Dublin 7, D07 N2F4 · 429 m report
    • 501335 Pending · 14 Arbour Place, a site situated between Arbour Hill and Viking Place… · 60 m
    • 501302 Invalid · 20 Murtagh Road, Stoneybatter, Dublin 7, D07 W6Y4 · 256 m
    • 500599 Refused · 13 Kirwan Street, Stoneybatter, Dublin 7, D07 C9Y2. · 215 m report
    Sources: An Coimisiún Pleanála cases (ArcGIS feed), Courts Service legal diary (judicial reviews), National Planning Application Database · fetched 1 Nov 2026, 05:02
    SourceLicenceFetchedLink
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.030 Oct 2026, 23:01open
    Courts Service legal diary (judicial reviews)© the publisher31 Oct 2026, 23:12open
    National Planning Application DatabaseCC BY 4.01 Nov 2026, 05:02open
    Question 4

    What's changing around you?

    Street map around Olaf Road with 15 numbered planning items
    ⌖ the houseOpen for commentsWindow closingDerelict buildingAppealBuilding startedEmpty land zoned for homesApprovedNo decision yet
    1. 173, Kirwan Street Cottages WEB3444/26No decision yet · 160 m
    2. 212, Manor Street WEB3435/26No decision yet · 269 m
    3. 3Site of c.210 sq m at 3 Wood Lane, Dublin 7 WEB3085/26No decision yet · 390 m
    4. 486 King Street North Dublin 7 DS580Derelict building · 397 m
    5. 568 Prussia Street Dublin 7; 68A Prussia Street Dublin 7 DS691Derelict building · 475 m
    6. 614 Arbour Place, a site situated between Arbour Hill and Viking Place to the north and the rear of 17-19 Arbour Hill to the east and rear of 59-63 Sitric Road to the south and rear of 3-5 Sitric Place and to the west and side of 12 Arbour Place 501335Appeal: no decision yet · 60 m
    7. 711 Viking Road, Dublin 1118/26Building started · 73 m
    8. 822 Ard Righ Road, Dublin 7 WEB5555/25Building started · 100 m
    9. 99 Viking Place, Stonybatter 5613/25Building started · 114 m
    10. 100.2 ha zoned for homesEmpty land zoned for homes · 343 m
    11. 110.2 ha zoned for homesEmpty land zoned for homes · 379 m
    12. 121 Manor Place, Stoneybatter WEB1474/26Approved · 102 m
    13. 139, Viking Place WEB5613/25Approved · 110 m
    14. 14Bus Stop 1713 Manor Street, outside St Joseph's WEB2680/26No decision yet · 120 m
    15. 1519 Arbour Place, Stoneybatter WEB6025/25Approved · 123 m
    Figure 5

    What happens to applications within 500 m

    Permission isn't building. Of 99 permissions since 2016, 37 show a start notice and 9 have a completion certificate.

    140 applications lodged within 500 m. Council: 99 approved, 12 refused. After appeals: 99 approved. Of those: 9 signed off, 6 built with the owner's opt-out, 22 started, 62 with no start notice found, 0 ran out.LODGEDCOUNCIL DECISIONAFTER APPEALSWHAT HAPPENED NEXT99: lodged → approved12: lodged → refused19: lodged → withdrawn or invalid10: lodged → undecided98: approved → approved10: refused → refused19: withdrawn or invalid → withdrawn10: undecided → undecided1 approved by the council, withdrawn or invalid after an appeal1 refused by the council, approved after an appeal1 refused by the council, withdrawn or invalid after an appeal62: approved → no start notice found6: approved → built, owner opted out22: approved → started, not signed off9: approved → signed off140 lodged140 lodged99 approved99 approved12 refused12 refused19 withdrawn or invalid19 withdrawn or invalid10 undecided10 undecided99 approved99 approved10 refused10 refused21 withdrawn21 withdrawn10 undecided10 undecided62 no start notice found62 no start notice found6 built, owner opted out6 built, owner opted out22 started, not signed off22 started, not signed off9 signed off9 signed off

    Purple bands are refusals turned into permissions on appeal. "No start notice found" includes small jobs that never needed one and notices we couldn't match.

    Measured140 applications in 10 years · NPAD, An Coimisiún Pleanála, BCMS start notices and completion certificates

    Figure 6

    The next 30 days

    3 deadlines within 500 m; the first closes 6 Nov 2026.

    3 deadlines in the next 30 days: 2026-11-06 WEB3435/26: application received — PROTECTED STRUCTURE: We Robert Quinn and Gary Falconer wish to apply for planning permission for modification to previou; 2026-11-09 WEB3444/26: application received — The development will consist of renovation and energy upgrade of the existing single-storey terraced cottage, including ; 2026-11-10 WEB3085/26: ADDITIONAL INFORMATION — Your Home from Home Limited intend to apply for planning permission for development at this site of c. 210 sq m at 3 Wootoday6 Nov11 Nov16 Nov21 Nov26 Nov1 DecWEB3435/26: application received — PROTECTED STRUCTURE: We Robert Quinn and Gary Falconer wish to apply for planning permission for modification to previou · 269 m away · 2026-11-06WEB3444/26: application received — The development will consist of renovation and energy upgrade of the existing single-storey terraced cottage, including · 160 m away · 2026-11-09WEB3085/26: ADDITIONAL INFORMATION — Your Home from Home Limited intend to apply for planning permission for development at this site of c. 210 sq m at 3 Woo · 390 m away · 2026-11-10
    Comments closeTime to appeal ends
    • Comments close 6 Nov 20265 days left
      2WEB3435/26 · application received — PROTECTED STRUCTURE: We Robert Quinn and Gary Falconer wish to apply for planning permission for…
      €20 to the council · 269 m away
    • Comments close 9 Nov 20268 days left
      1WEB3444/26 · application received — The development will consist of renovation and energy upgrade of the existing single-storey…
      €20 to the council · 160 m away
    • Time to appeal ends 10 Nov 20269 days left
      3WEB3085/26 · ADDITIONAL INFORMATION — Your Home from Home Limited intend to apply for planning permission for development at this…
      €220 to An Coimisiún Pleanála (€110 observer) · 390 m away

    Measuredcouncil registers and An Coimisiún Pleanála · deadlines worked out from the dates on file

    Figure 7

    Approved, stalled or planned, not built yet

    DART+ South West is planned 796 m away.

    DART+ South West, Dublin…: railway order granted (13 November 2024); DART+ South West, DART+ South…: railway order granted (13 November 2024)20242025202620272028DART+ South West, Dublin…796 m · plannedrailway order granted (13 November 2024)DART+ South West, DART+ South…798 m · plannedrailway order granted (13 November 2024)today

    Each row is a dated fact from a public register: no score and no forecast.

    Measuredcouncil registers, BCMS, derelict sites registers, development plan layers (CC BY 4.0)

    Sites that could change 4 within 500 m

    Derelict building 2

    • 486 King Street North Dublin 7 · derelict since Jul 2020 · 397 m
    • 568 Prussia Street Dublin 7; 68A Prussia Street Dublin 7 · derelict since Apr 2023 · 475 m

    Empty land zoned for homes 2

    • 100.2 ha zoned for homes · no homes built on it yet · 343 m
    • 110.2 ha zoned for homes · no homes built on it yet · 379 m
    Sources: An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices), Derelict sites registers, Council meetings (ModernGov), National Planning Application Database, Residential Zoned Land Tax maps · fetched 1 Nov 2026, 05:02
    SourceLicenceFetchedLink
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.030 Oct 2026, 23:01open
    Building Control Management System (commencement notices)CC BY 4.01 Nov 2026, 03:07open
    Derelict sites registersCC BY 4.026 Oct 2026, 23:09open
    Council meetings (ModernGov)Public1 Nov 2026, 02:24open
    National Planning Application DatabaseCC BY 4.01 Nov 2026, 05:02open
    Residential Zoned Land Tax mapsCC BY 4.025 Oct 2026, 23:43open
    Figure 8

    Applications within 500 m, by year

    Between 20 and 29 a year; busiest 2025. 89% of decisions were approvals.

    2021: 19, 2022: 20, 2023: 24, 2024: 25, 2025: 29, 2026: 2301020302021: 14 approved2021: 4 refused2021: 1 undecided19’21*2022: 17 approved2022: 3 refused20’222023: 22 approved2023: 2 refused24’232024: 22 approved2024: 2 refused2024: 1 withdrawn or invalid25’242025: 19 approved2025: 1 refused2025: 9 withdrawn or invalid29’252026: 5 approved2026: 9 withdrawn or invalid2026: 9 undecided23’26*
    ApprovedRefusedWithdrawn or invalidUndecided

    2021 and 2026 are part years (*). Exemption requests and time extensions are left out.

    Measuredcouncil register via NPAD

    Open for comments €20 to comment

    Every application within 500 m 29 in the last 12 months

    See every application on the map

    How we work this out
    Descriptions are shortened by the national planning database (to 80 characters in Dún Laoghaire-Rathdown, 70 in Fingal), and it does not publish applicants' names.
    Sources: National Planning Application Database, An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices) · fetched 1 Nov 2026, 05:02
    SourceLicenceFetchedLink
    National Planning Application DatabaseCC BY 4.01 Nov 2026, 05:02open
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.030 Oct 2026, 23:01open
    Building Control Management System (commencement notices)CC BY 4.01 Nov 2026, 03:07open
    Building work nearby 16 in the last 12 months
    2 signed off as finished5 not signed off9 no sign-off needed
    • 99 Viking Place, Stonybatter, Dublin 7, Dublin 7, D07 E9K6 · 28 Sept 2026 · short notice no sign-off needed · 5613/25 · 114 m
    • 36 Murtagh Road, Dublin, Dublin 7, D07 R6V4 · 25 Sept 2026 · short notice no sign-off needed · WEB1802/26 · 287 m
    • 26 Aughrim Street, Dublin 7, D07 DA39 · 7 Sept 2026 · short notice no sign-off needed · WEB1713/26 · 419 m
    • 35 Murtagh Road, Dublin 7, D07 YRR0 · 24 Aug 2026 · short notice no sign-off needed · WEB1801/26 · 292 m
    • 822 Ard Righ Road, Dublin 7, D07 A9R2 · 20 Jul 2026 · start notice, opted out no sign-off needed · WEB5555/25 · 100 m
    • 25 Prussia Street, Dublin 7 · 1 Jul 2026 · 7-day notice not signed off · LRD6057/24-S3A · 461 m
    • 23 Prussia Street, Dublin · 18 May 2026 · 110 homes · 7-day notice not signed off · WEBLRD6103/26-S3 · 451 m
    • 711 Viking Road, Dublin, Dublin 7, D07 R3P9 · 6 May 2026 · short notice no sign-off needed · 1118/26 · 73 m
    • 23 Prussia Street, Dublin, Dublin 7 · 30 Mar 2026 · 102 homes · 7-day notice not signed off · LRD6057/24-S3A · 451 m
    • 37 Manor Street, Dublin 7, D07 E371 · 13 Mar 2026 · start notice, opted out no sign-off needed · WEB2233/24 · 242 m
    • 38 Stoneybatter, dublin, Dublin 7, D07 X652 · 13 Feb 2026 · 7-day notice signed off · 186 m
    • 23 Prussia Street, Knockatee, Dublin 7 · 6 Feb 2026 · 102 homes · 7-day notice not signed off · LRD6057/24-S3A · 448 m
    • 90 King Street North, Dublin, Dublin 7, D07 N7CV · 5 Feb 2026 · short notice no sign-off needed · 370 m
    • 70 Aughrim Street, Dublin, Dublin 7, D07 E0P4 · 12 Jan 2026 · short notice no sign-off needed · WEB1695/25 · 464 m
    • Stanhope Street, Dublin, Dublin 7 · 11 Dec 2025 · 7-day notice not signed off · WEB2802/24 · 291 m
    • 6-11 Hendrick Street, Smithfield D7, Dublin 7, D07 A8N1 · 3 Nov 2025 · start notice signed off · 424 m
    How we work this out
    Each row is a notice the builder sent to the council's building control office before work started. One notice can cover many homes. 'Signed off as finished' means a completion certificate is on file; work done under an opt-out or a short notice doesn't need one.
    Source: Building Control Management System (commencement notices) · fetched 1 Nov 2026, 03:07
    SourceLicenceFetchedLink
    Building Control Management System (commencement notices)CC BY 4.01 Nov 2026, 03:07open
    Homes coming 0 not started
    How we work this out
    Schemes of 10 or more homes approved since 2021, from the council and An Coimisiún Pleanála registers. 'Building started' means the builder told the council's building control office that work was starting (a commencement notice).
    Sources: An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices), National Planning Application Database, Social housing construction status report · fetched 1 Nov 2026, 05:02
    SourceLicenceFetchedLink
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.030 Oct 2026, 23:01open
    Building Control Management System (commencement notices)CC BY 4.01 Nov 2026, 03:07open
    National Planning Application DatabaseCC BY 4.01 Nov 2026, 05:02open
    Social housing construction status reportCC BY-SA 4.023 Oct 2026, 23:02open
    Named places nearby: estate, schemes, crèches, schools

    Named places estate, developments, inspections

    Developments within 1.0 km

    SchemeHomesProgressDistance
    9-13 Blackhall Place200—169 m
    No. 272020 not started (2026-Q2)210 m
    23-28 Prussia Street110107 being built · 3 not started (2026-Q2)420 m
    O'Devaney Gardens and St. Bricin's Military Hospital1046379 built · 667 being built (2026-Q2)518 m
    Park Shopping Centre and Prussia Street3232 not started (2026-Q2)541 m
    Former Westbrook Motors Property2323 not started (2026-Q2)609 m
    Brunswick Street North and Church Street Upper3333 not started (2026-Q2)615 m
    42A Parkgate Street578578 not started (2026-Q2)627 m

    Who applies most nearby

    • Your Home from Home Limited — 2 applications, latest 20 Aug 2026

    Crèches and schools inspected

    NameLatest inspectionDistance
    Rainbow Community Playgroup · Crèche25 Mar 2025 · report · Tusla Early Years Inspectorate131 m
    Rainbow Community Playgroup · Crèche12 Feb 2026 · report · Tusla Early Years Inspectorate131 m
    The Diverseminds Academy · Crèche20 Mar 2026 · report · Tusla Early Years Inspectorate201 m
    Tiny Toes Community Creche · Crèche4 Sept 2025 · report · Tusla Early Years Inspectorate269 m
    Seven Dwarfs Playgroup · Crèche16 Oct 2024 · report · Tusla Early Years Inspectorate505 m
    Little Stars Creche · Crèche27 Feb 2026 · report · Tusla Early Years Inspectorate514 m
    Constitution Hill Playgroup · Crèche15 Sept 2025 · report · Tusla Early Years Inspectorate832 m
    Pitter Patter Community Play Group · Crèche17 Feb 2026 · report · Tusla Early Years Inspectorate953 m
    How we work this out
    Organisations only: a person named on an application is never listed. Inspection dates and links are the publisher's; read their report for the findings.
    Sources: Dublin housing delivery pipeline, National Planning Application Database, Applicant organisations (from the CRO), Department of Education school list, Tusla early years register · fetched 1 Nov 2026, 05:02
    SourceLicenceFetchedLink
    Dublin housing delivery pipelineCC BY 4.026 Oct 2026, 23:00open
    National Planning Application DatabaseCC BY 4.01 Nov 2026, 05:02open
    Applicant organisations (from the CRO)Derived by Planning Register25 Oct 2026, 23:01—
    Department of Education school listCC BY 4.027 Oct 2026, 23:04open
    Tusla early years registerPublic register28 Oct 2026, 23:19open
    How busy is this area Busier than most of Dublin City Council.
    Homes approved
    Here426
    Council middle62
    Homes started
    Here3,404
    Council middle132
    How we work this out
    Homes approved counts schemes of 10 or more homes (one-off houses are not included). Homes started counts every home in a notice that building work was starting. The council figure is the middle value across the council's built-up squares of the same area (3.1 km², about a 1 km circle), so half of them saw more and half fewer.
    Sources: An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices), National Planning Application Database · fetched 1 Nov 2026, 05:02
    SourceLicenceFetchedLink
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.030 Oct 2026, 23:01open
    Building Control Management System (commencement notices)CC BY 4.01 Nov 2026, 03:07open
    National Planning Application DatabaseCC BY 4.01 Nov 2026, 05:02open
    Question 5

    What's the area like?

    Figure 9

    This street block against the council

    81% of homes built before 1971 (council 52%). 54% owner-occupied (council 47%).

    Homes built before 1971
    81% · council 52%
    Homes built since 2001
    4% · council 19%
    Owner-occupied
    54% · council 47%
    Rented
    45% · council 45%
    Children under 15
    10% · council 15%
    Aged 65 and over
    11% · council 13%
    Households with 2+ cars
    10% · council 19%
    Work mainly from home
    13% · council 12%
    This small area (244 people)Dublin

    MeasuredCSO Census 2022, Small Area Population Statistics (CC BY 4.0) · small area 268005004

    Bus
    110 m
    Stoneybatter · 37, 39, 39A · busiest stop within 500 m: 44 an hour at peak
    Planned
    796 m
    DART+ South West, Dublin Heuston
    Radon
    1 in 20
    homes here likely high (EPA). Test it
    Flood
    Within 500 m
    OPW flood map area, not beside the house
    Nearest school
    187 m
    Stanhope Street Primary School, 384 pupils
    Homes sold nearby
    138
    in 3 years, 1 new (Property Price Register)
    Schools, stops and the council

    Schools

    • Stanhope Street Primary School · primary · 384 pupils · 187 m
    • St Josephs Secondary School · postprimary · 283 pupils · 250 m
    • An Cosan CSS · primary · 56 pupils · 424 m
    • St Gabriels NS · primary · 168 pupils · 516 m
    • Scoil Na Mbrathar Boys Senior School · primary · 120 pupils · 516 m
    • St Pauls C.B.S. · postprimary · 244 pupils · 585 m
    • Dublin 7 Educate Together NS · primary · 515 pupils · 699 m
    • Presentation Primary School · primary · 165 pupils · 899 m

    Stops 91

    • Stoneybatter · 37, 39, 39A, 70, N2 · 14/hour at peak · 110 m
    • Manor Street · 37, 39, 39A, 39X, 70, N2 · 24/hour at peak · 118 m
    • Manor Street · 37, 39, 39A, 39X, 70, N2 · 14/hour at peak · 164 m
    • Stoneybatter · 37, 39, 39A, 70, N2 · 24/hour at peak · 178 m
    • Aughrim Court · 37, N2 · 9/hour at peak · 277 m
    • Blackhall Place · 37, 39, 39A, 39X, 70, N2 · 14/hour at peak · 347 m
    • Museum · Red · 20/hour at peak · 391 m
    • Museum · Red · 18/hour at peak · 398 m

    Schools growing or shrinking planning in 3 years · pupils last year

    • Stanhope Street Primary School · 187 m-4% pupils (384)
    • St Josephs Secondary School · 250 m+18.9% pupils (283)
    • An Cosan CSS · 424 m+93.1% pupils (56) · 14 classrooms 2024, approved
    • Scoil Na Mbrathar Boys Senior School · 516 m-7% pupils (120) · an extension 2025, approved
    • St Gabriels NS · 516 m-4.5% pupils (168)
    • St Pauls C.B.S. · 585 m+11.4% pupils (244) · an extension 2025, approved

    Open consultations

    Council meetings 30 items

    Public land

    • National Museum of Ireland · 5.6 ha · 157 m
    • Dublin City Council · 0.12 ha · 180 m
    • Dublin City Council · 1.16 ha · 184 m
    • Irish Prison Service · 1.4 ha · 184 m
    • The Minister for Justice and Equality · 0.13 ha · 291 m
    • Grangegorman Development Agency · 2.9 ha · 299 m
    Sources: Public transport stops and routes (NTA GTFS), Department of Education school list, National Planning Application Database, Council consultation portals, Council meetings (ModernGov), Land Development Agency public land register, cso_saps_2022, National Transport Authority, Fingal County Council and Dún Laoghaire-Rathdown County Council development plan layers (CC BY 4.0), dartplus.ie project extents over NTA GTFS rail shapes (CC BY 4.0), EPA strategic noise maps, Fingal County Council · fetched 1 Nov 2026, 05:02
    SourceLicenceFetchedLink
    Public transport stops and routes (NTA GTFS)CC BY 4.025 Oct 2026, 23:02open
    Department of Education school listCC BY 4.027 Oct 2026, 23:04open
    National Planning Application DatabaseCC BY 4.01 Nov 2026, 05:02open
    Council consultation portalsPublic1 Nov 2026, 01:08open
    Council meetings (ModernGov)Public1 Nov 2026, 02:24open
    Land Development Agency public land registerCC BY 4.011 Sept 2026, 16:43open
    cso_saps_2022CC BY 4.0—open
    National Transport AuthorityCC BY 4.0——
    Fingal County Council and Dún Laoghaire-Rathdown County Council development plan layers (CC BY 4.0)CC BY 4.0——
    dartplus.ie project extents over NTA GTFS rail shapes (CC BY 4.0)CC BY 4.0——
    EPA strategic noise mapsCC BY 4.0——
    Fingal County CouncilCC BY 4.0——
    Question 6

    What to ask, and who

    1. Extension (WEB1443/25) approved 2025, not started: still planned?
      Ask for: The grant, and whether it stays with the house.
      Seller · solicitor
    2. Application 160 m away open for comments until 9 Nov 2026: comment?
      Ask for: The plans on the council's website (€20 to comment).
      Council
    3. Building work started 73 m away: for how long?
      Ask for: The planning conditions for 1118/26.
      Agent · council
    4. Any work done without planning permission?
      Ask for: An opinion of compliance for the whole house.
      Seller · solicitor
    Reference

    Where this is, the terms, the sources

    Electoral division
    Arran Quay E
    Electoral area
    North Inner City
    Council
    Dublin City Council
    Everything we found, as a list 8 lines
    • 1 application on this site; latest WEB1443/25, approved 2025, not started, runs out 2030.
    • Zoned R2 (existing residential); not protected; no vacant land tax.
    • 4 sites nearby could change: 2 derelict, 2 empty zoned plots.
    • 2 applications open for comments nearby; nearest closes 9 Nov 2026.
    • Sarsfield Quay (bus 4, 51D) 447 m away: 44 an hour at morning peak; 207 from all stops within 500 m. Planned: DART+ South West Dublin Heuston 796 m away, railway order granted (13 November 2024).
    • Here (2022 census): 54% owner-occupied (council 47%); 9% of homes empty (council 8%); most built before 1919; 18% drive to work (council 28%); population up 3% since 2016.
    • 7 home extensions within 250 m since 2025. Most were single-storey rear extensions.
    • The council decides in a median 55 days (about 8 weeks); 1 in 4 is asked for more information.
    What the terms mean 9 terms
    • Vacant land tax (Residential Zoned Land Tax (RZLT)): A yearly tax of 3% of the land's value on land that is zoned for homes and serviced but left unbuilt.
    • Building started (Commencement notice (BCMS)): The builder must tell the council's building control office 14 to 28 days before work starts.
    • Signed off as finished (Certificate of Compliance on Completion): A certificate filed when a building is finished, confirming it meets the building regulations.
    • Approved (Grant of permission): The council said yes, usually with conditions.
    • Listed by the council as derelict (Derelict Sites Register): Councils keep a public list of land and buildings in a ruinous or dangerous state.
    • Protected building (Protected structure (Record of Protected Structures)): A building the council has listed for its heritage value.
    • Comment on an application (Observation / submission): Anyone can comment on a planning application within five weeks of it being lodged, for a €20 fee.
    • Appeal (Appeal to An Coimisiún Pleanála): The applicant, or anyone who commented in time, can appeal the council's decision within four weeks.
    • What the land is zoned for (Zoning objective): The council's development plan sets what each area is for: homes, shops, open space and so on.
    Sources and licences 33
    SourcePublisherLicenceFetched
    EPA strategic noise maps—CC BY 4.0—
    Fingal County Council—CC BY 4.0—
    Fingal County Council and Dún Laoghaire-Rathdown County Council development plan layers (CC BY 4.0)—CC BY 4.0—
    National Transport Authority—CC BY 4.0—
    services-eu1.arcgis.comAn Coimisiún PleanálaCC BY 4.030 Oct 2026
    data.nbco.gov.ieNational Building Control Office (BCMS)CC BY 4.01 Nov 2026
    data.gov.ieVarious (see each layer)CC BY 4.0, CC BY-NC-ND 4.027 Sept 2026
    s3.eu-west-1.amazonaws.comOffice of Public WorksCC BY-NC-ND 4.0 · flag only11 Sept 2026
    services-eu1.arcgis.comNational Inventory of Architectural HeritageCC BY 4.027 Sept 2026
    gis.epa.ieEnvironmental Protection AgencyCC BY 4.027 Sept 2026
    services-eu1.arcgis.comNational Monuments Service (SMR)CC BY 4.027 Sept 2026
    dlrcoco.citizenspace.comLocal authorities (consultation portals)Public1 Nov 2026
    www2.courts.ie—© the publisher31 Oct 2026
    cso.ie—CC BY 4.0—
    dartplus.ie project extents over NTA GTFS rail shapes (CC BY 4.0)—CC BY 4.0—
    services-eu1.arcgis.comLocal authorities (derelict sites registers)CC BY 4.026 Oct 2026
    services.arcgis.comDublin local authorities (housing delivery pipeline)CC BY 4.026 Oct 2026
    data.epa.ieEnvironmental Protection Agency (LEAP licence register)CC BY 4.026 Oct 2026
    esbnetworks.ie—© the publisher · flag only11 Sept 2026
    transportforireland.ieNational Transport AuthorityCC BY 4.025 Oct 2026
    lda.ieLand Development AgencyCC BY 4.011 Sept 2026
    meetings.fingal.ieLocal authorities (council meetings)Public1 Nov 2026
    services.arcgis.comDepartment of Housing (National Planning Application Database)CC BY 4.01 Nov 2026
    organisationsPlanning Register (derived from applications and the CRO register)Derived by Planning Register25 Oct 2026
    services-eu1.arcgis.comTailte ÉireannCC BY 4.011 Sept 2026
    services-eu1.arcgis.comCSO, Tailte Éireann, OpenStreetMap contributorsCC BY 4.04 Oct 2026
    propertypriceregister.ieProperty Services Regulatory Authority (PPR)© PSRA, PSI licence1 Nov 2026
    data.gov.ieLocal authorities (Record of Protected Structures)CC BY 4.0—
    services.arcgis.comLocal authorities (RZLT maps)CC BY 4.025 Oct 2026
    gov.ieDepartment of EducationCC BY 4.027 Oct 2026
    gov.ieDepartment of HousingCC BY-SA 4.023 Oct 2026
    tusla.ieTusla (Early Years Inspectorate)Public register28 Oct 2026
    services.arcgis.comLocal authorities via the Department of Housing (GZT / MyPlan)CC BY 4.025 Oct 2026
    Measured
    counted from a public register
    Calculated
    a rate or median we worked out from those counts
    Our classification
    we sorted it by reading each description
    Estimate
    inferred from another source (census, map data)
    Rule summary
    the law, simplified: check before relying on it
    How we work this out
    Generated 1 Nov 2026, 09:35 from the Planning Register store; nothing was fetched live. Not a legal search: the council's planning file is the record. Deadlines come from published dates under the Planning and Development Act 2000: confirm with the council before relying on them. Street map © OpenStreetMap contributors; building outlines © Overture Maps Foundation. The text version carries every figure with its source, for an AI assistant.