9-13 Blackhall Place

Approved in Jan 2023. Building started in 2023, signed off as finished in Aug 2024.

This is 9-13 Blackhall Place — 200 homes, up to 5 storeys. Read the scheme page →

  1. 14 Oct 2022Received
  2. 8 Dec 2022Approved
  3. 30 Jan 2023Final approval
  4. 28 Mar 2023Building started
  5. 29 Aug 2024Signed off

Planning details

Status
Building started
Decision
Approved · 8 Dec 2022
Reference
5041/22
Received
14 Oct 2022
Site
1,606 m²

What’s proposed

The proposed development will consist of amendments to the student accommodation granted under register references 1456/03 and 3979/19 to provide for a total of 200 no. bedspaces comprising: 1) The reconfiguration of the existing three bedroom clusters on the ground, first, second and third floors in Blocks A and B to provide seven bedroom clusters and 1 no. three bed cluster on the ground floor in Block B; 2) The…

Show all

reconfiguration of the approved six bedroom cluster in part of the ground floor of Block C to provide 2 no. one bed studio units; 3) Amendments to the internal layouts of the first, second, third, fourth and fifth floors of Block C; 4) Amendments to the design details and materials of the fifth floor extension to Block C approved under register reference 3979/19 including the provision of a green roof on the extension; 5) Amendments to the design of the rear elevation of Block C approved under register reference 3979/19 to include revised window layout and fenestration design; 6) Alterations to the fenestration design on all elevations of Block A and B and the east (front) elevation of Block C; 7) The reconfiguration of the basement car park to accommodate 6 no. spaces (including 3 no. EV charging spaces and 1 no. disabled space), 240 no. cycle parking spaces, plant rooms and bins stores; and 8) Alterations to the layout of student amenity area in the basement of Block C and below the existing adjoining courtyard approved under register reference 3979/19

27 other applications within 500 m in the last year

Open the report

Nearby 27 · 500 m · 12 months

Distance
Time
Show all 27

Explore this area on the map →

Homes nearby

Development land nearby

See all development land near here →

Building started

  • 18 Jul 2023 · Builder told the council work was starting CN0103153DC
  • 31 May 2023 · Builder told the council work was starting CN0101236DC
  • 28 Mar 2023 · Builder told the council small works were starting CN0099085DC

Zoning

Zone Z1 - DEV PLAN 2022-2028

M3 — Neighbourhood centre

A local centre: shops, services and apartments over them, serving the surrounding housing.

R2 — Existing residential

An established residential area. The objective is to protect existing residential amenity as well as to provide housing — which is the objective a neighbour's objection to an overbearing extension is usually argued under.

Protections nearby 250 m

  • NIAH-recorded building · 50
    Temple Terrace; Kinallen Terrace
  • Recorded monument · 16
    School; Building
Where this comes from

National planning feed (NPAD), fetched 11 Sept 2026, 18:51.

Source: National Planning Application Database · fetched 11 Sept 2026, 18:51
SourceLicenceFetchedLink
National Planning Application DatabaseCC BY 4.011 Sept 2026, 18:51open
Summary

5041/22 is a planning application to Dublin City Council for the proposed development will consist of amendments to the student accommodation granted, received on 14 Oct 2022; permission was granted on 8 Dec 2022.