PlanningRegister.ie
Planning report · Dublin City Council · 500 m around the house · the last 12 months · 31 Oct 2026, 20:28

Kirwan Street, Dublin

53.35289, -6.28017

Homes here mostly date from before 1919. 2 planning files on this house, the latest from 2024. Home extensions nearby almost always get approved (93%). 33 homes approved 437 m away haven't started.

See on the mapWatch this area

How planning works, with this area's numbers

steps can overlap · medians for home extensions within 1.5 km, 10 years
  1. 1ApplySite notice up, plans online
  2. 2Comments5 weeks, €20. Comment to keep your right to appeal
  3. 3Decision8 weeks by law. Here 55 days
  4. 4Appeal window4 weeks after the decision
  5. 5AppealHere about 7 months
  6. 6PermissionLasts 5 years
  7. 7StartStart notice to the council. Here about 5 months after
  8. 8Sign-offCompletion cert, or the owner opts out
Question 1

What's the planning story of this house?

Figure 1

When it was built, and the rules since

Most homes here were built before 1919, before planning permission was needed. 2 planning files on this house, the latest from 2025.

Timeline from 1896: planning permission needed from October 1964, building regulations from June 1992, building records online from March 2014, sign-off opt-out from September 2015. Most homes here were built 1900–1918. 2 planning files on this house.1900191019201930194019501960197019801990200020102020Oct 1964permission neededJun 1992building regulationsMar 2014building records onlineSep 2015owners may opt out of sign-offThis houseAll of Kirwan StreetBuilt: most homes in this small area date from 1900–1918 (census estimate)most built2025: WEB2802/24 · garden room, approved2024: WEB2724/24 · garden room, withdrawn or invalid2021: 1 file on Kirwan Street2023: 2 files on Kirwan Street2024: 1 file on Kirwan Street2025: 1 file on Kirwan Street2026: 1 file on Kirwan Street6 files

Each line is a rule that applies to work done after it.

MeasuredEstimatecouncil register via NPAD · build years: CSO Census 2022, small area

  1. 2025
    WEB2802/24 · garden room · approved 2025 · started, not signed off
    approvedstartedsigned off
  2. 2024
    WEB2724/24 · garden room · withdrawn
    approved?started?signed off?
On this site
R2
Zoning · Existing residential
No
Protected or listed · on the council's list
No
Vacant land tax · lived-in homes don't pay it
1 in 20
Radon (EPA) · homes with high radon
Zoning, protection, tax and flood: the detail
Zoning
What it says

Zone Z2 - DEV PLAN 2022-2028

ZoningR2 · Existing residential
What it says

Z2: Residential Neighbourhoods (Conservation Areas): To protect and/or improve the amenities of residential conservation areas.

An established residential area. The objective is to protect existing residential amenity as well as to provide housing — which is the objective a neighbour's objection to an overbearing extension is usually argued under.

development plan 2022 2028 · 14 Dec 2022 – 31 Dec 2028

ZoningR2 · Existing residential
What it says

Z2: Residential Neighbourhoods (Conservation Areas): To protect and/or improve the amenities of residential conservation areas.

An established residential area. The objective is to protect existing residential amenity as well as to provide housing — which is the objective a neighbour's objection to an overbearing extension is usually argued under.

development plan 2022 2028 variation no 11 · 14 Dec 2022 – 31 Dec 2028

Protected building1 within 100 m Church of Ireland chapel (former St. Brendan’s Hospital complex now Technological University Dublin, Grangegorman Campus)
Heritage inventory6 within 100 m Grangegorman Villas; Grangegorman Villas
Radon1 in 20 homes have high radon (EPA)

Not on this site: monument zone, conservation area, EU nature site, EU bird site, natural heritage area, tree order, landslide risk, derelict list.

Licensed industrial sites within 1.0 km: licence P0301 (778 m)

Vacant land taxNo lived-in homes don't pay it
Flood riskNone mapped within 500 m
Within 500 mCountFor example
Heritage inventory buildings107King's Inns; house
Radon grid squares1
Monuments22School; Building
How we work this out
'On this site' means the record's own map outline touches the registered parcel (or a 12 m circle round the point where there is no parcel). Only the council's own list confirms a protected building; ask the council if in doubt. The council's map for the vacant land tax shows this spot inside an area of existing homes. Homes people live in, and their gardens, don't pay the tax. The OPW flood map's licence lets us show a yes/no only. Land on the vacant land tax map nearby: 8 on the draft 2027 map; 7 on the final 2026 map.
Sources: Development plan zoning (councils), EPA licensed sites, National Inventory of Architectural Heritage, EPA radon map, Records of Protected Structures, Residential Zoned Land Tax maps, Constraint layers (bundle), Sites and Monuments Record · fetched 25 Oct 2026, 23:43
SourceLicenceFetchedLink
Development plan zoning (councils)CC BY 4.025 Oct 2026, 23:06open
EPA licensed sitesCC BY 4.027 Sept 2026, 19:36open
National Inventory of Architectural HeritageCC BY 4.027 Sept 2026, 19:35open
EPA radon mapCC BY 4.027 Sept 2026, 19:36open
Records of Protected StructuresCC BY 4.0—open
Residential Zoned Land Tax mapsCC BY 4.025 Oct 2026, 23:43open
Constraint layers (bundle)CC BY 4.0, CC BY-NC-ND 4.027 Sept 2026, 19:37open
Sites and Monuments RecordCC BY 4.027 Sept 2026, 19:29open
How we work this out
Applications whose site outline (or map point) falls on this property. 'No sign building has started' means we found no notice to the council's building control office; small jobs don't always file one, so ask. A missing completion certificate is not proof of a problem: an owner can opt out of official sign-off for a house or extension built for themselves.
Sources: Building Control Management System (commencement notices), National Planning Application Database · fetched 31 Oct 2026, 05:04
SourceLicenceFetchedLink
Building Control Management System (commencement notices)CC BY 4.031 Oct 2026, 02:56open
National Planning Application DatabaseCC BY 4.031 Oct 2026, 05:04open
Question 2

Could you extend?

Nothing on this site restricts it: not protected, not in a conservation area.

Figure 2

What happened to applications like yours

Extensions are almost always approved here: 91–100% by type. A new house in a garden is harder: 69% approved, and 1 in 2 is asked for more information.

Single-storey rear88 decided · more info asked 11%
98% · council 97%
Two-storey rear48 decided · more info asked 15%
100% · council 96%
Single-storey side11 decided · more info asked 18%
100% · council 99%
Attic or dormer90 decided · more info asked 4%
91% · council 96%
First-floor32 decided · more info asked 28%
94% · council 94%
New house in a garden or site45 decided · more info asked 47%
69% · council 71%
Approved nearbyDublin overall

Decided applications within 1.5 km, received in the last 10 years. The kind of work is read from each description.

CalculatedOur classificationcouncil register via NPAD · 314 nearby, 5,202 council-wide

Figure 3

Kirwan Street, file by file since 2021

3 of 3 decided extensions on the road were approved.

6 planning files on Kirwan Street since 2021, by kind and decision.202120222023202420252026Extensions, atticsNo. 6 · 2021 · two-storey rear · undecided · 2362/21No. 3 · 2023 · single-storey rear · approved · 3951/23No. 28 · 2023 · two-storey rear · approved · WEB1156/23No. 13 · 2024 · other extension · approved · WEB2734/24No. 13 · 2025 · first-floor · withdrawn or invalid · WEB5196/25No. 13 · 2026 · first-floor · undecided · WEB2505/26Porches, roofs, otherNew house in a side garden
ApprovedRefusedWithdrawn or invalid

6 files with "Kirwan Street" in the address within 600 m, other roads of the same name left out. Hover a dot for the house number and reference.

MeasuredOur classificationcouncil register via NPAD · 2021–2026

Extensions and refusals right beside you 2 within 250 m · 0 refused within 100 m

Extensions and refusals near you 2 extensions within 250 m · the last 12 months

2 no decision or withdrawn
KindAppliedApprovedRefused
First-floor10—
Other10—

Refused within 100 m 0 in the last 12 months

Nothing refused this close in the last 12 months.

    How we work this out
    Home extensions are read from the application's description (extension, attic or dormer, porch, garage conversion, garden room), so a few may be missed or mislabelled. The kind is the first that fits: a dormer with a rear extension counts as a dormer. Refusal reasons come from An Coimisiún Pleanála's inspector reports, so they exist only where the refusal was appealed (Dún Laoghaire-Rathdown so far). The council's own reasons are on its planning file.
    Sources: National Planning Application Database, An Coimisiún Pleanála cases (ArcGIS feed) · fetched 31 Oct 2026, 05:04
    SourceLicenceFetchedLink
    National Planning Application DatabaseCC BY 4.031 Oct 2026, 05:04open
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.030 Oct 2026, 23:01open
    Sources: An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices), National Planning Application Database · fetched 31 Oct 2026, 05:04
    SourceLicenceFetchedLink
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.030 Oct 2026, 23:01open
    Building Control Management System (commencement notices)CC BY 4.031 Oct 2026, 02:56open
    National Planning Application DatabaseCC BY 4.031 Oct 2026, 05:04open
    Question 3

    How long, and what if someone objects?

    Figure 4

    A home extension's journey here

    A decision takes 55 days. 1 in 6 is asked for more information, which adds about 78 days. Building starts about 5 months after permission.

    Comments open: 5 weeks · €20; Council decision: 55 days; If more info asked (1 in 6): 140 days; Appeal window: 4 weeks; If appealed: +208 days; Building starts: 164 days after permission0 mo3 mo6 mo9 mo12 mo15 moComments openComments close 5 weeks after the application is lodged5 weeks · €20Council decisionDecision: median 55 days, middle half 53–55 (n=311)55 daysIf more info asked (1 in 6)With further information: median 140 days (n=58)140 daysAppeal windowAnyone who commented can appeal within 4 weeks of the decision4 weeksIf appealedAt An Coimisiún Pleanála: median 208 days (n=145, all appeals within 1.5 km)+208 daysBuilding startsStart notice: median 164 days after permission (n=148)164 days after permissionSigned off476 days after the start, for the few who file. 38% of owners opt out of sign-off

    Bars are medians; whiskers show the middle half. Medians of separate steps don't add up exactly.

    Calculated369 decided home extensions, 152 start notices, 145 decided appeals · within 1.5 km, 10 years · NPAD, BCMS, An Coimisiún Pleanála

    Figure 5

    What appeals changed

    21 of 74 appealed refusals became permissions. 5 of 73 appealed approvals were reversed.

    Refusals appealed74 decided
    21 became permissions
    Approvals appealed73 decided
    5 reversed
    Ended approvedEnded refusedWithdrawn, invalid or other

    Every appeal decided within 1.5 km in 10 years, any kind of development.

    CalculatedAn Coimisiún Pleanála cases linked to the council file

    Appeals nearby 4 in the last 12 months
    • 324665 Pending · Stanley Court 62/63, Sr?id Na Pr?ise, Stoneybatter, Dublin 7, Ireland · 432 m
    • 502053 Pending · 13, Kirwan Street, Stoneybatter, Dublin 7 D07C9Y2 · 173 m
    • 501335 Pending · 14 Arbour Place, a site situated between Arbour Hill and Viking Place… · 353 m
    • 500599 Refused · 13 Kirwan Street, Stoneybatter, Dublin 7, D07 C9Y2. · 173 m report
    Sources: An Coimisiún Pleanála cases (ArcGIS feed), Courts Service legal diary (judicial reviews), National Planning Application Database · fetched 31 Oct 2026, 05:04
    SourceLicenceFetchedLink
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.030 Oct 2026, 23:01open
    Courts Service legal diary (judicial reviews)© the publisher30 Oct 2026, 23:12open
    National Planning Application DatabaseCC BY 4.031 Oct 2026, 05:04open
    Question 4

    What's changing around you?

    Street map around Kirwan Street, Dublin with 13 numbered planning items
    ⌖ the houseOpen for commentsDerelict buildingApproved, not startedAppealEmpty land zoned for homesNo decision yetApproved
    1. 173, Kirwan Street Cottages WEB3444/26No decision yet · 280 m
    2. 212, Manor Street WEB3435/26No decision yet · 357 m
    3. 386 King Street North Dublin 7 DS580Derelict building · 348 m
    4. 4Brunswick Street North and Church Street Upper WEB2502/24Approved, no sign building has started · 437 m
    5. 513 Kirwan Street, Stoneybatter 500599Appeal: refused · 173 m
    6. 60.2 ha zoned for homesEmpty land zoned for homes · 285 m
    7. 7A site to the south of the East Quad Building, to the north of the temporary Lower House Car Park WEBGSDZ2826/26No decision yet · 101 m
    8. 8Bus Stop 1713 Manor Street, outside St Joseph's WEB2680/26No decision yet · 234 m
    9. 91 Manor Place, Stoneybatter WEB1474/26Approved · 291 m
    10. 1019 Arbour Place, Stoneybatter WEB6025/25Approved · 377 m
    11. 119, Viking Place WEB5613/25Approved · 428 m
    12. 1256 Rathdown Road, Grangegorman WEB1875/26Approved · 446 m
    13. 131-2 Royal Canal Terrace, Phibsborough Road WEB2653/26No decision yet · 479 m
    Figure 6

    What happens to applications within 500 m

    Permission isn't building. Of 99 permissions since 2016, 38 show a start notice and 9 have a completion certificate.

    133 applications lodged within 500 m. Council: 99 approved, 10 refused. After appeals: 99 approved. Of those: 9 signed off, 8 built with the owner's opt-out, 21 started, 61 with no start notice found, 0 ran out.LODGEDCOUNCIL DECISIONAFTER APPEALSWHAT HAPPENED NEXT99: lodged → approved10: lodged → refused17: lodged → withdrawn or invalid7: lodged → undecided98: approved → approved8: refused → refused17: withdrawn or invalid → withdrawn7: undecided → undecided1 approved by the council, refused after an appeal1 refused by the council, approved after an appeal1 refused by the council, withdrawn or invalid after an appeal61: approved → no start notice found8: approved → built, owner opted out21: approved → started, not signed off9: approved → signed off133 lodged133 lodged99 approved99 approved10 refused10 refused17 withdrawn or invalid17 withdrawn or invalid7 undecided7 undecided99 approved99 approved9 refused9 refused18 withdrawn18 withdrawn7 undecided7 undecided61 no start notice found61 no start notice found8 built, owner opted out8 built, owner opted out21 started, not signed off21 started, not signed off9 signed off9 signed off

    Purple bands are refusals turned into permissions on appeal. "No start notice found" includes small jobs that never needed one and notices we couldn't match.

    Measured133 applications in 10 years · NPAD, An Coimisiún Pleanála, BCMS start notices and completion certificates

    Figure 7

    The next 30 days

    2 deadlines within 500 m; the first closes 6 Nov 2026.

    2 deadlines in the next 30 days: 2026-11-06 WEB3435/26: application received — PROTECTED STRUCTURE: We Robert Quinn and Gary Falconer wish to apply for planning permission for modification to previou; 2026-11-09 WEB3444/26: application received — The development will consist of renovation and energy upgrade of the existing single-storey terraced cottage, including today5 Nov10 Nov15 Nov20 Nov25 Nov30 NovWEB3435/26: application received — PROTECTED STRUCTURE: We Robert Quinn and Gary Falconer wish to apply for planning permission for modification to previou · 357 m away · 2026-11-06WEB3444/26: application received — The development will consist of renovation and energy upgrade of the existing single-storey terraced cottage, including · 280 m away · 2026-11-09
    Comments close
    • Comments close 6 Nov 20266 days left
      2WEB3435/26 · application received — PROTECTED STRUCTURE: We Robert Quinn and Gary Falconer wish to apply for planning permission for…
      €20 to the council · 357 m away
    • Comments close 9 Nov 20269 days left
      1WEB3444/26 · application received — The development will consist of renovation and energy upgrade of the existing single-storey…
      €20 to the council · 280 m away

    Measuredcouncil registers and An Coimisiún Pleanála · deadlines worked out from the dates on file

    Figure 8

    Approved, stalled or planned, not built yet

    33 homes 437 m away were approved Oct 2025 with no start notice yet; the permission runs to Oct 2030.

    Brunswick Street North… · 33 homes: 33 homes approved Oct 2025, not started20242025202620272028202920302031Brunswick Street North… · 33 homes437 m · WEB2502/2433 homes approved Oct 2025, not started33 homes approved Oct 2025, not startedtoday

    Each row is a dated fact from a public register: no score and no forecast.

    Measuredcouncil registers, BCMS, derelict sites registers, development plan layers (CC BY 4.0)

    Sites that could change 3 within 500 m

    Derelict building 1

    • 386 King Street North Dublin 7 · derelict since Jul 2020 · 348 m

    Approved, not started 1

    Empty land zoned for homes 1

    • 60.2 ha zoned for homes · no homes built on it yet · 285 m
    Sources: An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices), Derelict sites registers, Council meetings (ModernGov), National Planning Application Database, Residential Zoned Land Tax maps · fetched 31 Oct 2026, 05:04
    SourceLicenceFetchedLink
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.030 Oct 2026, 23:01open
    Building Control Management System (commencement notices)CC BY 4.031 Oct 2026, 02:56open
    Derelict sites registersCC BY 4.026 Oct 2026, 23:09open
    Council meetings (ModernGov)Public31 Oct 2026, 02:21open
    National Planning Application DatabaseCC BY 4.031 Oct 2026, 05:04open
    Residential Zoned Land Tax mapsCC BY 4.025 Oct 2026, 23:43open
    Figure 9

    Applications within 500 m, by year

    Between 24 and 30 a year; busiest 2024. 91% of decisions were approvals.

    2021: 15, 2022: 24, 2023: 25, 2024: 30, 2025: 25, 2026: 1401020302021: 11 approved2021: 3 refused2021: 1 undecided15’21*2022: 21 approved2022: 3 refused24’222023: 24 approved2023: 1 refused25’232024: 27 approved2024: 2 refused2024: 1 withdrawn or invalid30’242025: 14 approved2025: 1 refused2025: 10 withdrawn or invalid25’252026: 2 approved2026: 6 withdrawn or invalid2026: 6 undecided14’26*
    ApprovedRefusedWithdrawn or invalidUndecided

    2021 and 2026 are part years (*). Exemption requests and time extensions are left out.

    Measuredcouncil register via NPAD

    Open for comments €20 to comment

    Every application within 500 m 17 in the last 12 months

    See every application on the map

    How we work this out
    Descriptions are shortened by the national planning database (to 80 characters in Dún Laoghaire-Rathdown, 70 in Fingal), and it does not publish applicants' names.
    Sources: National Planning Application Database, An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices) · fetched 31 Oct 2026, 05:04
    SourceLicenceFetchedLink
    National Planning Application DatabaseCC BY 4.031 Oct 2026, 05:04open
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.030 Oct 2026, 23:01open
    Building Control Management System (commencement notices)CC BY 4.031 Oct 2026, 02:56open
    Building work nearby 11 in the last 12 months
    1 signed off as finished4 not signed off6 no sign-off needed
    • 71 Rathdown Road, Dublin, Dublin 7 · 19 Oct 2026 · 1 homes · start notice, opted out no sign-off needed · 3935/24 · 365 m
    • 9 Viking Place, Stonybatter, Dublin 7, Dublin 7, D07 E9K6 · 28 Sept 2026 · short notice no sign-off needed · 5613/25 · 431 m
    • 22 Ard Righ Road, Dublin 7, D07 A9R2 · 20 Jul 2026 · start notice, opted out no sign-off needed · WEB5555/25 · 447 m
    • 56 King Street North, Dublin, Dublin 7, D07 FW72 · 13 May 2026 · 7-day notice not signed off · 4269/22 · 444 m
    • 11 Viking Road, Dublin, Dublin 7, D07 R3P9 · 6 May 2026 · short notice no sign-off needed · 1118/26 · 418 m
    • Coleraine Street, Smithfiled, Dublin 7, D07 XW62 · 5 May 2026 · start notice not signed off · 484 m
    • 37 Manor Street, Dublin 7, D07 E371 · 13 Mar 2026 · start notice, opted out no sign-off needed · WEB2233/24 · 315 m
    • 38 Stoneybatter, dublin, Dublin 7, D07 X652 · 13 Feb 2026 · 7-day notice signed off · 317 m
    • 90 King Street North, Dublin, Dublin 7, D07 N7CV · 5 Feb 2026 · short notice no sign-off needed · 338 m
    • 1/2 Royal Canal Terrace, Phibsborough Road, Dublin 7, D07 NP74 · 27 Jan 2026 · 7-day notice not signed off · 3203/22 · 492 m
    • Stanhope Street, Dublin, Dublin 7 · 11 Dec 2025 · 7-day notice not signed off · WEB2802/24 · 61 m
    How we work this out
    Each row is a notice the builder sent to the council's building control office before work started. One notice can cover many homes. 'Signed off as finished' means a completion certificate is on file; work done under an opt-out or a short notice doesn't need one.
    Source: Building Control Management System (commencement notices) · fetched 31 Oct 2026, 02:56
    SourceLicenceFetchedLink
    Building Control Management System (commencement notices)CC BY 4.031 Oct 2026, 02:56open
    Homes coming 33 not started
    How we work this out
    Schemes of 10 or more homes approved since 2021, from the council and An Coimisiún Pleanála registers. 'Building started' means the builder told the council's building control office that work was starting (a commencement notice).
    Sources: An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices), National Planning Application Database, Social housing construction status report · fetched 31 Oct 2026, 05:04
    SourceLicenceFetchedLink
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.030 Oct 2026, 23:01open
    Building Control Management System (commencement notices)CC BY 4.031 Oct 2026, 02:56open
    National Planning Application DatabaseCC BY 4.031 Oct 2026, 05:04open
    Social housing construction status reportCC BY-SA 4.023 Oct 2026, 23:02open
    Named places nearby: estate, schemes, crèches, schools

    Named places estate, developments, inspections

    Developments within 1.0 km

    SchemeHomesProgressDistance
    No. 272020 not started (2026-Q2)222 m
    9-13 Blackhall Place200—361 m
    Constitution Hill Flats12446 being built · 78 not started (2026-Q2)409 m
    Brunswick Street North and Church Street Upper3333 not started (2026-Q2)414 m
    23-28 Prussia Street110107 being built · 3 not started (2026-Q2)432 m
    Park Shopping Centre and Prussia Street3232 not started (2026-Q2)502 m
    36-40 Dominic Street Upper9393 not started (2026-Q2)565 m
    1-6 Beresford Street189—626 m

    Crèches and schools inspected

    NameLatest inspectionDistance
    Rainbow Community Playgroup · Crèche25 Mar 2025 · report · Tusla Early Years Inspectorate276 m
    Rainbow Community Playgroup · Crèche12 Feb 2026 · report · Tusla Early Years Inspectorate276 m
    The Diverseminds Academy · Crèche20 Mar 2026 · report · Tusla Early Years Inspectorate332 m
    Tiny Toes Community Creche · Crèche4 Sept 2025 · report · Tusla Early Years Inspectorate357 m
    Little Stars Creche · Crèche27 Feb 2026 · report · Tusla Early Years Inspectorate398 m
    Constitution Hill Playgroup · Crèche15 Sept 2025 · report · Tusla Early Years Inspectorate491 m
    Seven Dwarfs Playgroup · Crèche16 Oct 2024 · report · Tusla Early Years Inspectorate545 m
    Pitter Patter Community Play Group · Crèche17 Feb 2026 · report · Tusla Early Years Inspectorate754 m
    How we work this out
    Organisations only: a person named on an application is never listed. Inspection dates and links are the publisher's; read their report for the findings.
    Sources: Dublin housing delivery pipeline, National Planning Application Database, Department of Education school list, Tusla early years register · fetched 31 Oct 2026, 05:04
    SourceLicenceFetchedLink
    Dublin housing delivery pipelineCC BY 4.026 Oct 2026, 23:00open
    National Planning Application DatabaseCC BY 4.031 Oct 2026, 05:04open
    Department of Education school listCC BY 4.027 Oct 2026, 23:04open
    Tusla early years registerPublic register28 Oct 2026, 23:19open
    How busy is this area Busier than most of Dublin City Council.
    Homes approved
    Here412
    Council middle52
    Homes started
    Here2,718
    Council middle98
    How we work this out
    Homes approved counts schemes of 10 or more homes (one-off houses are not included). Homes started counts every home in a notice that building work was starting. The council figure is the middle value across the council's built-up squares of the same area (3.1 km², about a 1 km circle), so half of them saw more and half fewer.
    Sources: An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices), National Planning Application Database · fetched 31 Oct 2026, 05:04
    SourceLicenceFetchedLink
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.030 Oct 2026, 23:01open
    Building Control Management System (commencement notices)CC BY 4.031 Oct 2026, 02:56open
    National Planning Application DatabaseCC BY 4.031 Oct 2026, 05:04open
    Question 5

    What's the area like?

    Figure 10

    This street block against the council

    83% of homes built before 1971 (council 52%). 51% owner-occupied (council 47%).

    Homes built before 1971
    83% · council 52%
    Homes built since 2001
    4% · council 19%
    Owner-occupied
    51% · council 47%
    Rented
    28% · council 45%
    Children under 15
    4% · council 15%
    Aged 65 and over
    6% · council 13%
    Households with 2+ cars
    6% · council 19%
    Work mainly from home
    3% · council 12%
    This small area (558 people)Dublin

    MeasuredCSO Census 2022, Small Area Population Statistics (CC BY 4.0) · small area 268002008

    Road noise
    55–59 dB
    day–night average (EPA 2022)
    Bus
    237 m
    Manor Street · 37, 39, 39A · busiest stop within 500 m: 24 an hour at peak
    Radon
    1 in 20
    homes here likely high (EPA). Test it
    Nearest school
    109 m
    St Josephs Secondary School, 283 pupils
    Homes sold nearby
    106
    in 3 years, 1 new (Property Price Register)
    Schools, stops and the council

    Schools

    • St Josephs Secondary School · postprimary · 283 pupils · 109 m
    • An Cosan CSS · primary · 56 pupils · 158 m
    • Stanhope Street Primary School · primary · 384 pupils · 173 m
    • Scoil Na Mbrathar Boys Senior School · primary · 120 pupils · 349 m
    • St Pauls C.B.S. · postprimary · 244 pupils · 392 m
    • Dublin 7 Educate Together NS · primary · 515 pupils · 429 m
    • Henrietta Street School · primary · 20 pupils · 642 m
    • St Gabriels NS · primary · 168 pupils · 707 m

    Stops 83

    • Manor Street · 37, 39, 39A, 39X, 70, N2 · 24/hour at peak · 237 m
    • Stoneybatter · 37, 39, 39A, 70, N2 · 14/hour at peak · 266 m
    • Stoneybatter · 37, 39, 39A, 70, N2 · 24/hour at peak · 276 m
    • Manor Street · 37, 39, 39A, 39X, 70, N2 · 14/hour at peak · 276 m
    • Aughrim Court · 37, N2 · 9/hour at peak · 407 m
    • Broadstone · Green · 13/hour at peak · 446 m
    • Broadstone · Green · 13/hour at peak · 447 m
    • Church St Upr · 23, 24 · 6/hour at peak · 453 m

    Schools growing or shrinking planning in 3 years · pupils last year

    • St Josephs Secondary School · 109 m+18.9% pupils (283)
    • An Cosan CSS · 158 m+93.1% pupils (56) · 14 classrooms 2024, approved
    • Stanhope Street Primary School · 173 m-4% pupils (384)
    • Scoil Na Mbrathar Boys Senior School · 349 m-7% pupils (120) · an extension 2025, approved
    • St Pauls C.B.S. · 392 m+11.4% pupils (244) · an extension 2025, approved
    • Dublin 7 Educate Together NS · 429 m+0.4% pupils (515)

    Open consultations

    Council meetings 30 items

    Public land

    • Grangegorman Development Agency · 0.21 ha · 21 m
    • Grangegorman Development Agency · 2.9 ha · 55 m
    • Grangegorman Development Agency · 0.13 ha · 55 m
    • Grangegorman Development Agency · 1.18 ha · 64 m
    • Grangegorman Development Agency · 1.5 ha · 91 m
    • Grangegorman Development Agency · 1.26 ha · 112 m
    Sources: Public transport stops and routes (NTA GTFS), Department of Education school list, National Planning Application Database, Council consultation portals, Council meetings (ModernGov), Land Development Agency public land register, cso_saps_2022, National Transport Authority, Fingal County Council and Dún Laoghaire-Rathdown County Council development plan layers (CC BY 4.0), dartplus.ie project extents over NTA GTFS rail shapes (CC BY 4.0), EPA strategic noise maps, Fingal County Council · fetched 31 Oct 2026, 05:04
    SourceLicenceFetchedLink
    Public transport stops and routes (NTA GTFS)CC BY 4.025 Oct 2026, 23:02open
    Department of Education school listCC BY 4.027 Oct 2026, 23:04open
    National Planning Application DatabaseCC BY 4.031 Oct 2026, 05:04open
    Council consultation portalsPublic31 Oct 2026, 01:06open
    Council meetings (ModernGov)Public31 Oct 2026, 02:21open
    Land Development Agency public land registerCC BY 4.011 Sept 2026, 16:43open
    cso_saps_2022CC BY 4.0—open
    National Transport AuthorityCC BY 4.0——
    Fingal County Council and Dún Laoghaire-Rathdown County Council development plan layers (CC BY 4.0)CC BY 4.0——
    dartplus.ie project extents over NTA GTFS rail shapes (CC BY 4.0)CC BY 4.0——
    EPA strategic noise mapsCC BY 4.0——
    Fingal County CouncilCC BY 4.0——
    Question 6

    What to ask, and who

    1. Garden room (WEB2802/24) started Dec 2025, never signed off: is it finished?
      Ask for: The completion certificate, or an engineer's opinion of compliance.
      Seller · solicitor
    2. Application 280 m away open for comments until 9 Nov 2026: comment?
      Ask for: The plans on the council's website (€20 to comment).
      Council
    3. Any work done without planning permission?
      Ask for: An opinion of compliance for the whole house.
      Seller · solicitor
    Reference

    Where this is, the terms, the sources

    Electoral division
    Arran Quay B
    Electoral area
    North Inner City
    Council
    Dublin City Council
    Everything we found, as a list 8 lines
    • 1 job on this site started but never signed off as finished.
    • Zoned R2 (existing residential); not protected; no vacant land tax.
    • 3 sites nearby could change: 1 derelict, 1 approved scheme, 1 empty zoned plot.
    • 2 applications open for comments nearby; nearest closes 9 Nov 2026.
    • 33 homes approved nearby, not started; largest 33 at Brunswick Street North and Church….
    • Manor Street (bus 37, 39) 237 m away: 24 an hour at morning peak; 154 from all stops within 500 m.
    • Noise from road traffic mapped at 55–59 dB (day-evening-night average, EPA 2022).
    • Here (2022 census): 51% owner-occupied (council 47%); 16% of homes empty (council 8%); most built before 1919; 5% drive to work (council 28%); population up 33% since 2016.
    What the terms mean 9 terms
    • Vacant land tax (Residential Zoned Land Tax (RZLT)): A yearly tax of 3% of the land's value on land that is zoned for homes and serviced but left unbuilt.
    • Building started (Commencement notice (BCMS)): The builder must tell the council's building control office 14 to 28 days before work starts.
    • Signed off as finished (Certificate of Compliance on Completion): A certificate filed when a building is finished, confirming it meets the building regulations.
    • Approved (Grant of permission): The council said yes, usually with conditions.
    • Listed by the council as derelict (Derelict Sites Register): Councils keep a public list of land and buildings in a ruinous or dangerous state.
    • Protected building (Protected structure (Record of Protected Structures)): A building the council has listed for its heritage value.
    • Comment on an application (Observation / submission): Anyone can comment on a planning application within five weeks of it being lodged, for a €20 fee.
    • Appeal (Appeal to An Coimisiún Pleanála): The applicant, or anyone who commented in time, can appeal the council's decision within four weeks.
    • What the land is zoned for (Zoning objective): The council's development plan sets what each area is for: homes, shops, open space and so on.
    Sources and licences 31
    SourcePublisherLicenceFetched
    EPA strategic noise maps—CC BY 4.0—
    Fingal County Council—CC BY 4.0—
    Fingal County Council and Dún Laoghaire-Rathdown County Council development plan layers (CC BY 4.0)—CC BY 4.0—
    National Transport Authority—CC BY 4.0—
    services-eu1.arcgis.comAn Coimisiún PleanálaCC BY 4.030 Oct 2026
    data.nbco.gov.ieNational Building Control Office (BCMS)CC BY 4.031 Oct 2026
    data.gov.ieVarious (see each layer)CC BY 4.0, CC BY-NC-ND 4.027 Sept 2026
    gis.epa.ieEnvironmental Protection AgencyCC BY 4.027 Sept 2026
    services-eu1.arcgis.comNational Inventory of Architectural HeritageCC BY 4.027 Sept 2026
    gis.epa.ieEnvironmental Protection AgencyCC BY 4.027 Sept 2026
    services-eu1.arcgis.comNational Monuments Service (SMR)CC BY 4.027 Sept 2026
    dlrcoco.citizenspace.comLocal authorities (consultation portals)Public31 Oct 2026
    www2.courts.ie—© the publisher30 Oct 2026
    cso.ie—CC BY 4.0—
    dartplus.ie project extents over NTA GTFS rail shapes (CC BY 4.0)—CC BY 4.0—
    services-eu1.arcgis.comLocal authorities (derelict sites registers)CC BY 4.026 Oct 2026
    services.arcgis.comDublin local authorities (housing delivery pipeline)CC BY 4.026 Oct 2026
    esbnetworks.ie—© the publisher · flag only11 Sept 2026
    transportforireland.ieNational Transport AuthorityCC BY 4.025 Oct 2026
    lda.ieLand Development AgencyCC BY 4.011 Sept 2026
    meetings.fingal.ieLocal authorities (council meetings)Public31 Oct 2026
    services.arcgis.comDepartment of Housing (National Planning Application Database)CC BY 4.031 Oct 2026
    services-eu1.arcgis.comTailte ÉireannCC BY 4.011 Sept 2026
    services-eu1.arcgis.comCSO, Tailte Éireann, OpenStreetMap contributorsCC BY 4.04 Oct 2026
    propertypriceregister.ieProperty Services Regulatory Authority (PPR)© PSRA, PSI licence31 Oct 2026
    data.gov.ieLocal authorities (Record of Protected Structures)CC BY 4.0—
    services.arcgis.comLocal authorities (RZLT maps)CC BY 4.025 Oct 2026
    gov.ieDepartment of EducationCC BY 4.027 Oct 2026
    gov.ieDepartment of HousingCC BY-SA 4.023 Oct 2026
    tusla.ieTusla (Early Years Inspectorate)Public register28 Oct 2026
    services.arcgis.comLocal authorities via the Department of Housing (GZT / MyPlan)CC BY 4.025 Oct 2026
    Measured
    counted from a public register
    Calculated
    a rate or median we worked out from those counts
    Our classification
    we sorted it by reading each description
    Estimate
    inferred from another source (census, map data)
    Rule summary
    the law, simplified: check before relying on it
    How we work this out
    Generated 31 Oct 2026, 20:28 from the Planning Register store; nothing was fetched live. Not a legal search: the council's planning file is the record. Deadlines come from published dates under the Planning and Development Act 2000: confirm with the council before relying on them. Street map © OpenStreetMap contributors; building outlines © Overture Maps Foundation. The text version carries every figure with its source, for an AI assistant.