Planning report · Dublin City Council · 500 m around the house · the last 12 months · 31 Oct 2026, 22:00

Ross Street

53.35408, -6.29367

Homes here mostly date from before 1919. Home extensions nearby almost always get approved (95%).

See on the mapWatch this area

How planning works, with this area's numbers

steps can overlap · medians for home extensions within 1.5 km, 10 years
  1. 1ApplySite notice up, plans online
  2. 2Comments5 weeks, €20. Comment to keep your right to appeal
  3. 3Decision8 weeks by law. Here 55 days
  4. 4Appeal window4 weeks after the decision
  5. 5AppealHere about 6 months
  6. 6PermissionLasts 5 years
  7. 7StartStart notice to the council. Here about 5 months after
  8. 8Sign-offCompletion cert, or the owner opts out
Question 1

What's the planning story of this house?

Figure 1

When it was built, and the rules since

Most homes here were built before 1919, before planning permission was needed.

Timeline from 1896: planning permission needed from October 1964, building regulations from June 1992, building records online from March 2014, sign-off opt-out from September 2015. Most homes here were built 1900–1918.1900191019201930194019501960197019801990200020102020Oct 1964permission neededJun 1992building regulationsMar 2014building records onlineSep 2015owners may opt out of sign-offThis houseBuilt: most homes in this small area date from 1900–1918 (census estimate)most built

Each line is a rule that applies to work done after it.

MeasuredEstimatecouncil register via NPAD · build years: CSO Census 2022, small area

On this site
R2
Zoning · Existing residential
No
Protected or listed · on the council's list
No
Vacant land tax · lived-in homes don't pay it
1 in 20
Radon (EPA) · homes with high radon
Zoning, protection, tax and flood: the detail
Zoning
What it says

Zone Z2 - DEV PLAN 2022-2028

ZoningR2 · Existing residential
What it says

Z2: Residential Neighbourhoods (Conservation Areas): To protect and/or improve the amenities of residential conservation areas.

An established residential area. The objective is to protect existing residential amenity as well as to provide housing — which is the objective a neighbour's objection to an overbearing extension is usually argued under.

development plan 2022 2028 · 14 Dec 2022 – 31 Dec 2028

ZoningR2 · Existing residential
What it says

Z2: Residential Neighbourhoods (Conservation Areas): To protect and/or improve the amenities of residential conservation areas.

An established residential area. The objective is to protect existing residential amenity as well as to provide housing — which is the objective a neighbour's objection to an overbearing extension is usually argued under.

development plan 2022 2028 variation no 11 · 14 Dec 2022 – 31 Dec 2028

Protected building41 within 100 m House; House
Heritage inventory9 within 100 m house; house
Radon1 in 20 homes have high radon (EPA)

Not on this site: monument zone, conservation area, EU nature site, EU bird site, natural heritage area, tree order, landslide risk, derelict list.

Licensed industrial sites within 1.0 km: licence P0301 (831 m)

Vacant land taxNo lived-in homes don't pay it
Flood riskNone mapped within 500 m
Within 500 mCountFor example
Heritage inventory buildings77Phoenix Park; worker's house
Radon grid squares1
Monuments6House - 18th/19th century; Barracks
How we work this out
'On this site' means the record's own map outline touches the registered parcel (or a 12 m circle round the point where there is no parcel). Only the council's own list confirms a protected building; ask the council if in doubt. The council's map for the vacant land tax shows this spot inside an area of existing homes. Homes people live in, and their gardens, don't pay the tax. The OPW flood map's licence lets us show a yes/no only. Land on the vacant land tax map nearby: 2 on the draft 2027 map; 2 on the final 2026 map.
Sources: Development plan zoning (councils), EPA licensed sites, National Inventory of Architectural Heritage, EPA radon map, Records of Protected Structures, Residential Zoned Land Tax maps, Constraint layers (bundle), Sites and Monuments Record · fetched 25 Oct 2026, 23:43
SourceLicenceFetchedLink
Development plan zoning (councils)CC BY 4.025 Oct 2026, 23:06open
EPA licensed sitesCC BY 4.027 Sept 2026, 19:36open
National Inventory of Architectural HeritageCC BY 4.027 Sept 2026, 19:35open
EPA radon mapCC BY 4.027 Sept 2026, 19:36open
Records of Protected StructuresCC BY 4.0—open
Residential Zoned Land Tax mapsCC BY 4.025 Oct 2026, 23:43open
Constraint layers (bundle)CC BY 4.0, CC BY-NC-ND 4.027 Sept 2026, 19:37open
Sites and Monuments RecordCC BY 4.027 Sept 2026, 19:29open
How we work this out
Applications whose site outline (or map point) falls on this property. 'No sign building has started' means we found no notice to the council's building control office; small jobs don't always file one, so ask. A missing completion certificate is not proof of a problem: an owner can opt out of official sign-off for a house or extension built for themselves.
Sources: Building Control Management System (commencement notices), National Planning Application Database · fetched 31 Oct 2026, 05:04
SourceLicenceFetchedLink
Building Control Management System (commencement notices)CC BY 4.031 Oct 2026, 02:56open
National Planning Application DatabaseCC BY 4.031 Oct 2026, 05:04open
Question 2

Could you extend?

Nothing on this site restricts it: not protected, not in a conservation area.

Figure 2

What happened to applications like yours

Extensions are almost always approved here: 90–100% by type. A new house in a garden is harder: 65% approved, and 1 in 2 are asked for more information.

Single-storey rear64 decided · more info asked 12%
98% · council 97%
Two-storey rear47 decided · more info asked 19%
100% · council 96%
Single-storey side11 decided · more info asked 18%
100% · council 99%
Attic or dormer90 decided · more info asked 9%
90% · council 96%
First-floor22 decided · more info asked 23%
95% · council 94%
New house in a garden or site34 decided · more info asked 53%
65% · council 71%
Approved nearbyDublin overall

Decided applications within 1.5 km, received in the last 10 years. The kind of work is read from each description.

CalculatedOur classificationcouncil register via NPAD · 268 nearby, 5,202 council-wide

Extensions and refusals right beside you 1 within 250 m · 0 refused within 100 m

Extensions and refusals near you 1 extensions within 250 m · the last 12 months

1 approved
KindAppliedApprovedRefused
Two-storey rear11—

Refused within 100 m 0 in the last 12 months

Nothing refused this close in the last 12 months.

    How we work this out
    Home extensions are read from the application's description (extension, attic or dormer, porch, garage conversion, garden room), so a few may be missed or mislabelled. The kind is the first that fits: a dormer with a rear extension counts as a dormer. Refusal reasons come from An Coimisiún Pleanála's inspector reports, so they exist only where the refusal was appealed (Dún Laoghaire-Rathdown so far). The council's own reasons are on its planning file.
    Sources: National Planning Application Database, An Coimisiún Pleanála cases (ArcGIS feed) · fetched 31 Oct 2026, 05:04
    SourceLicenceFetchedLink
    National Planning Application DatabaseCC BY 4.031 Oct 2026, 05:04open
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.030 Oct 2026, 23:01open
    Sources: An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices), National Planning Application Database · fetched 31 Oct 2026, 05:04
    SourceLicenceFetchedLink
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.030 Oct 2026, 23:01open
    Building Control Management System (commencement notices)CC BY 4.031 Oct 2026, 02:56open
    National Planning Application DatabaseCC BY 4.031 Oct 2026, 05:04open
    Question 3

    How long, and what if someone objects?

    Figure 3

    A home extension's journey here

    A decision takes 55 days. 1 in 7 is asked for more information, which adds about 80 days. Building starts about 5 months after permission.

    Comments open: 5 weeks · €20; Council decision: 55 days; If more info asked (1 in 7): 144 days; Appeal window: 4 weeks; If appealed: +168 days; Building starts: 150 days after permission0 mo3 mo6 mo9 mo12 mo15 moComments openComments close 5 weeks after the application is lodged5 weeks · €20Council decisionDecision: median 55 days, middle half 53–55 (n=247)55 daysIf more info asked (1 in 7)With further information: median 144 days (n=42)144 daysAppeal windowAnyone who commented can appeal within 4 weeks of the decision4 weeksIf appealedAt An Coimisiún Pleanála: median 168 days (n=64, all appeals within 1.5 km)+168 daysBuilding startsStart notice: median 150 days after permission (n=124)150 days after permissionSigned off316 days after the start, for the few who file. 46% of owners opt out of sign-off

    Bars are medians; whiskers show the middle half. Medians of separate steps don't add up exactly.

    Calculated289 decided home extensions, 127 start notices, 64 decided appeals · within 1.5 km, 10 years · NPAD, BCMS, An Coimisiún Pleanála

    Figure 4

    What appeals changed

    9 of 32 appealed refusals became permissions. 1 of 32 appealed approvals were reversed.

    Refusals appealed32 decided
    9 became permissions
    Approvals appealed32 decided
    1 reversed
    Ended approvedEnded refusedWithdrawn, invalid or other

    Every appeal decided within 1.5 km in 10 years, any kind of development.

    CalculatedAn Coimisiún Pleanála cases linked to the council file

    Appeals nearby 4 in the last 12 months

    None of 1 changed the council's decision

    • 324665 Pending · Stanley Court 62/63, Sr?id Na Pr?ise, Stoneybatter, Dublin 7, Ireland · 440 m
    • 501668 Pending · 187, North Circular Road, Cabra East, Dublin 7, D07 Y9K5 · 462 m
    • 500989 Refused · 97, North Circular Road, Dublin 7 · 115 m report
    • 501302 Invalid · 20 Murtagh Road, Stoneybatter, Dublin 7, D07 W6Y4 · 437 m
    Sources: An Coimisiún Pleanála cases (ArcGIS feed), Courts Service legal diary (judicial reviews), National Planning Application Database · fetched 31 Oct 2026, 05:04
    SourceLicenceFetchedLink
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.030 Oct 2026, 23:01open
    Courts Service legal diary (judicial reviews)© the publisher30 Oct 2026, 23:12open
    National Planning Application DatabaseCC BY 4.031 Oct 2026, 05:04open
    Question 4

    What's changing around you?

    Street map around Ross Street with 15 numbered planning items
    ⌖ the houseWindow closingDerelict buildingLarge schemeRefusedBuilding startedEmpty land zoned for homesApprovedNo decision yet
    1. 1The Coachhouse, at the rear of 85 North Circular Road WEB3028/26No decision yet · 141 m
    2. 244 North Circular Road, Dublin 7 DS2141Derelict building · 173 m
    3. 368 Prussia Street Dublin 7; 68A Prussia Street Dublin 7 DS691Derelict building · 427 m
    4. 412 Everton Avenue Dublin 7 D07RX5V DS1650Derelict building · 460 m
    5. 5Marlborough Road, Dublin 7 WEB2510/26No decision yet · 159 m
    6. 697, North Circular Road WEB5965/25Refused · 115 m
    7. 7Montpelier Road, Dublin WEB1201/26Building started · 185 m
    8. 80.7 ha zoned for homesEmpty land zoned for homes · 203 m
    9. 90.8 ha zoned for homesEmpty land zoned for homes · 445 m
    10. 10Retail Unit No. 1, Montpelier Avenue WEB1846/26Approved · 155 m
    11. 1162 Oxmantown Road, Stoneybatter WEB5725/25Approved · 180 m
    12. 12Unit 3, Ashford House WEB1201/26Approved · 221 m
    13. 1330, Swords Street WEB2601/26No decision yet · 259 m
    14. 14107, Oxmantown Road WEB2022/26Approved · 288 m
    15. 1514 Niall Street, Stoneybatter WEB2788/26No decision yet · 290 m
    Figure 5

    What happens to applications within 500 m

    Permission isn't building. Of 86 permissions since 2016, 36 show a start notice and 7 have a completion certificate.

    125 applications lodged within 500 m. Council: 86 approved, 18 refused. After appeals: 86 approved. Of those: 7 signed off, 12 built with the owner's opt-out, 17 started, 50 with no start notice found, 0 ran out.LODGEDCOUNCIL DECISIONAFTER APPEALSWHAT HAPPENED NEXT86: lodged → approved18: lodged → refused15: lodged → withdrawn or invalid6: lodged → undecided84: approved → approved15: refused → refused15: withdrawn or invalid → withdrawn6: undecided → undecided2 approved by the council, withdrawn or invalid after an appeal2 refused by the council, approved after an appeal1 refused by the council, undecided after an appeal50: approved → no start notice found12: approved → built, owner opted out17: approved → started, not signed off7: approved → signed off125 lodged125 lodged86 approved86 approved18 refused18 refused15 withdrawn or invalid15 withdrawn or invalid6 undecided6 undecided86 approved86 approved15 refused15 refused17 withdrawn17 withdrawn7 undecided7 undecided50 no start notice found50 no start notice found12 built, owner opted out12 built, owner opted out17 started, not signed off17 started, not signed off7 signed off7 signed off

    Purple bands are refusals turned into permissions on appeal. "No start notice found" includes small jobs that never needed one and notices we couldn't match.

    Measured125 applications in 10 years · NPAD, An Coimisiún Pleanála, BCMS start notices and completion certificates

    Figure 6

    The next 30 days

    1 deadline within 500 m; the first closes 6 Nov 2026.

    1 deadlines in the next 30 days: 2026-11-06 WEB3028/26: ADDITIONAL INFORMATION — PROTECTED STRUCTURE: The development will consist of a sensitive refurbishment of a two-storey protected structure, a twtoday5 Nov10 Nov15 Nov20 Nov25 Nov30 NovWEB3028/26: ADDITIONAL INFORMATION — PROTECTED STRUCTURE: The development will consist of a sensitive refurbishment of a two-storey protected structure, a tw · 141 m away · 2026-11-06
    Time to appeal ends
    • Time to appeal ends 6 Nov 20266 days left
      1WEB3028/26 · ADDITIONAL INFORMATION — PROTECTED STRUCTURE: The development will consist of a sensitive refurbishment of a two-storey…
      €220 to An Coimisiún Pleanála (€110 observer) · 141 m away

    Measuredcouncil registers and An Coimisiún Pleanála · deadlines worked out from the dates on file

    Figure 7

    Approved, stalled or planned, not built yet

    DART+ South West is planned 202 m away.

    DART+ South West, DART+ South…: railway order granted (13 November 2024); DART+ South West, Dublin…: railway order granted (13 November 2024)20242025202620272028DART+ South West, DART+ South…202 m · plannedrailway order granted (13 November 2024)DART+ South West, Dublin…854 m · plannedrailway order granted (13 November 2024)today

    Each row is a dated fact from a public register: no score and no forecast.

    Measuredcouncil registers, BCMS, derelict sites registers, development plan layers (CC BY 4.0)

    Sites that could change 5 within 500 m

    Derelict building 3

    • 244 North Circular Road, Dublin 7 · derelict since Apr 2026 · 173 m
    • 368 Prussia Street Dublin 7; 68A Prussia Street Dublin 7 · derelict since Apr 2023 · 427 m
    • 412 Everton Avenue Dublin 7 D07RX5V · derelict since Feb 2026 · 460 m

    Empty land zoned for homes 2

    • 80.7 ha zoned for homes · no homes built on it yet · 203 m
    • 90.8 ha zoned for homes · no homes built on it yet · 445 m
    Sources: An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices), Derelict sites registers, Council meetings (ModernGov), National Planning Application Database, Residential Zoned Land Tax maps · fetched 31 Oct 2026, 05:04
    SourceLicenceFetchedLink
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.030 Oct 2026, 23:01open
    Building Control Management System (commencement notices)CC BY 4.031 Oct 2026, 02:56open
    Derelict sites registersCC BY 4.026 Oct 2026, 23:09open
    Council meetings (ModernGov)Public31 Oct 2026, 02:21open
    National Planning Application DatabaseCC BY 4.031 Oct 2026, 05:04open
    Residential Zoned Land Tax mapsCC BY 4.025 Oct 2026, 23:43open
    Figure 8

    Applications within 500 m, by year

    Between 11 and 29 a year; busiest 2025. 83% of decisions were approvals.

    2021: 16, 2022: 24, 2023: 26, 2024: 11, 2025: 29, 2026: 1901020302021: 13 approved2021: 3 refused16’21*2022: 21 approved2022: 3 refused24’222023: 21 approved2023: 4 refused2023: 1 undecided26’232024: 9 approved2024: 1 refused2024: 1 withdrawn or invalid11’242025: 14 approved2025: 6 refused2025: 9 withdrawn or invalid29’252026: 8 approved2026: 1 refused2026: 5 withdrawn or invalid2026: 5 undecided19’26*
    ApprovedRefusedWithdrawn or invalidUndecided

    2021 and 2026 are part years (*). Exemption requests and time extensions are left out.

    Measuredcouncil register via NPAD

    Every application within 500 m 24 in the last 12 months

    See every application on the map

    How we work this out
    Descriptions are shortened by the national planning database (to 80 characters in Dún Laoghaire-Rathdown, 70 in Fingal), and it does not publish applicants' names.
    Sources: National Planning Application Database, An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices) · fetched 31 Oct 2026, 05:04
    SourceLicenceFetchedLink
    National Planning Application DatabaseCC BY 4.031 Oct 2026, 05:04open
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.030 Oct 2026, 23:01open
    Building Control Management System (commencement notices)CC BY 4.031 Oct 2026, 02:56open
    Building work nearby 15 in the last 12 months
    1 signed off as finished8 not signed off6 no sign-off needed
    • 29b, 30 and 31 Prussia Street, Dublin, Dublin 7, D07 WK52 · 12 Oct 2026 · start notice not signed off · ABP-312102-21 · 441 m
    • 36 Murtagh Road, Dublin, Dublin 7, D07 R6V4 · 25 Sept 2026 · short notice no sign-off needed · WEB1802/26 · 412 m
    • 26 Aughrim Street, Dublin 7, D07 DA39 · 7 Sept 2026 · short notice no sign-off needed · WEB1713/26 · 354 m
    • 35 Murtagh Road, Dublin 7, D07 YRR0 · 24 Aug 2026 · short notice no sign-off needed · WEB1801/26 · 407 m
    • Montpelier Avenue, Dublin, Dublin 7 · 18 Aug 2026 · start notice signed off · WEB1846/26 · 214 m
    • 7Montpelier Road, Dublin, Dublin 7, D07CD5T · 6 Jul 2026 · start notice not signed off · WEB1201/26 · 185 m
    • 25 Prussia Street, Dublin 7 · 1 Jul 2026 · 7-day notice not signed off · LRD6057/24-S3A · 450 m
    • 16A Jerome Connor Place, Dublin, Dublin 7 · 26 Jun 2026 · 1 homes · start notice, opted out no sign-off needed · 5129/22 · 298 m
    • 23 Prussia Street, Dublin · 18 May 2026 · 110 homes · 7-day notice not signed off · WEBLRD6103/26-S3 · 454 m
    • 23 Prussia Street, Dublin, Dublin 7 · 30 Mar 2026 · 102 homes · 7-day notice not signed off · LRD6057/24-S3A · 454 m
    • 23 Prussia Street, Knockatee, Dublin 7 · 6 Feb 2026 · 102 homes · 7-day notice not signed off · LRD6057/24-S3A · 453 m
    • Marlborough Road (to the rear of properties on Marlborough Mews), Dublin 7 · 30 Jan 2026 · 31 homes · 7-day notice not signed off · ABP-317483-23 [5046/22] · 199 m
    • Marlborough Road (to the rear of properties on Marlborough Mews), Dublin 7 · 30 Jan 2026 · 31 homes · 7-day notice not signed off · ABP-317483-23 [5046/22] · 191 m
    • 70 Aughrim Street, Dublin, Dublin 7, D07 E0P4 · 12 Jan 2026 · short notice no sign-off needed · WEB1695/25 · 295 m
    • 4 Doon Avenue, Dublin, Dublin 7, D07 F9V9 · 17 Nov 2025 · short notice no sign-off needed · 4408/24 · 481 m
    How we work this out
    Each row is a notice the builder sent to the council's building control office before work started. One notice can cover many homes. 'Signed off as finished' means a completion certificate is on file; work done under an opt-out or a short notice doesn't need one.
    Source: Building Control Management System (commencement notices) · fetched 31 Oct 2026, 02:56
    SourceLicenceFetchedLink
    Building Control Management System (commencement notices)CC BY 4.031 Oct 2026, 02:56open
    Homes coming 0 not started
    How we work this out
    Schemes of 10 or more homes approved since 2021, from the council and An Coimisiún Pleanála registers. 'Building started' means the builder told the council's building control office that work was starting (a commencement notice).
    Sources: An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices), National Planning Application Database, Social housing construction status report · fetched 31 Oct 2026, 05:04
    SourceLicenceFetchedLink
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.030 Oct 2026, 23:01open
    Building Control Management System (commencement notices)CC BY 4.031 Oct 2026, 02:56open
    National Planning Application DatabaseCC BY 4.031 Oct 2026, 05:04open
    Social housing construction status reportCC BY-SA 4.023 Oct 2026, 23:02open
    Named places nearby: estate, schemes, crèches, schools

    Named places estate, developments, inspections

    Developments within 1.0 km

    SchemeHomesProgressDistance
    O'Devaney Gardens and St. Bricin's Military Hospital1046379 built · 667 being built (2026-Q2)62 m
    Marlborough Road Development3131 being built (2026-Q2)159 m
    Blackhorse Avenue Industrial Estate6868 built (2025-Q4)248 m
    23-28 Prussia Street110107 being built · 3 not started (2026-Q2)441 m
    Park Shopping Centre and Prussia Street3232 not started (2026-Q2)444 m
    Former Westbrook Motors Property2323 not started (2026-Q2)600 m
    No. 272020 not started (2026-Q2)654 m
    42A Parkgate Street578578 not started (2026-Q2)672 m

    Crèches and schools inspected

    NameLatest inspectionDistance
    Seven Dwarfs Playgroup · Crèche16 Oct 2024 · report · Tusla Early Years Inspectorate444 m
    Tiny Toes Community Creche · Crèche4 Sept 2025 · report · Tusla Early Years Inspectorate552 m
    Jumblies · Crèche26 Jan 2026 · report · Tusla Early Years Inspectorate582 m
    The Diverseminds Academy · Crèche20 Mar 2026 · report · Tusla Early Years Inspectorate584 m
    Tracey’s Tots Preschool · Crèche1 Oct 2024 · report · Tusla Early Years Inspectorate767 m
    Rainbow Community Playgroup · Crèche12 Feb 2026 · report · Tusla Early Years Inspectorate825 m
    Rainbow Community Playgroup · Crèche25 Mar 2025 · report · Tusla Early Years Inspectorate825 m
    Happy Days · Crèche22 Jan 2025 · report · Tusla Early Years Inspectorate867 m
    How we work this out
    Organisations only: a person named on an application is never listed. Inspection dates and links are the publisher's; read their report for the findings.
    Sources: Dublin housing delivery pipeline, National Planning Application Database, Department of Education school list, Tusla early years register · fetched 31 Oct 2026, 05:04
    SourceLicenceFetchedLink
    Dublin housing delivery pipelineCC BY 4.026 Oct 2026, 23:00open
    National Planning Application DatabaseCC BY 4.031 Oct 2026, 05:04open
    Department of Education school listCC BY 4.027 Oct 2026, 23:04open
    Tusla early years registerPublic register28 Oct 2026, 23:19open
    How busy is this area Busier than most of Dublin City Council.
    Homes approved
    Here60
    Council middle50
    Homes started
    Here3,077
    Council middle111
    How we work this out
    Homes approved counts schemes of 10 or more homes (one-off houses are not included). Homes started counts every home in a notice that building work was starting. The council figure is the middle value across the council's built-up squares of the same area (3.1 km², about a 1 km circle), so half of them saw more and half fewer.
    Sources: An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices), National Planning Application Database · fetched 31 Oct 2026, 05:04
    SourceLicenceFetchedLink
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.030 Oct 2026, 23:01open
    Building Control Management System (commencement notices)CC BY 4.031 Oct 2026, 02:56open
    National Planning Application DatabaseCC BY 4.031 Oct 2026, 05:04open
    Question 5

    What's the area like?

    Figure 9

    This street block against the council

    87% of homes built before 1971 (council 52%). 13% owner-occupied (council 47%).

    Homes built before 1971
    87% · council 52%
    Homes built since 2001
    1% · council 19%
    Owner-occupied
    13% · council 47%
    Rented
    71% · council 45%
    Children under 15
    6% · council 15%
    Aged 65 and over
    9% · council 13%
    Households with 2+ cars
    0% · council 19%
    Work mainly from home
    10% · council 12%
    This small area (153 people)Dublin

    MeasuredCSO Census 2022, Small Area Population Statistics (CC BY 4.0) · small area 268004016/268004017

    Bus
    75 m
    Oxmantown Road · 11, 11B · busiest stop within 500 m: 9 an hour at peak
    Planned
    202 m
    DART+ South West, DART+ South West: Hazelhatch and Celbridge - Drumcondra
    Radon
    1 in 20
    homes here likely high (EPA). Test it
    Nearest school
    201 m
    St Gabriels NS, 168 pupils
    Homes sold nearby
    89
    in 3 years, 12 new (Property Price Register)
    Schools, stops and the council

    Schools

    • St Gabriels NS · primary · 168 pupils · 201 m
    • Stanhope Street Primary School · primary · 384 pupils · 760 m
    • St Josephs Secondary School · postprimary · 283 pupils · 810 m
    • Dublin 7 Educate Together NS · primary · 515 pupils · 965 m

    Stops 73

    • Oxmantown Road · 11, 11B · 2/hour at peak · 75 m
    • North Circular Road · 11, 11B · 4/hour at peak · 112 m
    • Marlborough Road · 11, 11B · 4/hour at peak · 133 m
    • O'Devaney Gardens · 11, 11B · 2/hour at peak · 142 m
    • Aughrim Street · 37, N2 · 9/hour at peak · 210 m
    • St David's Terrace · 37, N2 · 7/hour at peak · 229 m
    • St David's Terrace · 37, N2 · 9/hour at peak · 236 m
    • Holy Family Church · 37, N2 · 9/hour at peak · 275 m

    Schools growing or shrinking planning in 3 years · pupils last year

    • St Gabriels NS · 201 m-4.5% pupils (168)
    • Stanhope Street Primary School · 760 m-4% pupils (384)
    • St Josephs Secondary School · 810 m+18.9% pupils (283)
    • Dublin 7 Educate Together NS · 965 m+0.4% pupils (515)

    Open consultations

    Council meetings 30 items

    Public land

    • Dublin City Council · 1.99 ha · 62 m
    • Dublin City Council · 2.32 ha · 162 m
    • Dublin City Council · 0.4 ha · 199 m
    • Dublin City Council · 0.88 ha · 208 m
    • The Minister for Defence · 2.64 ha · 211 m
    • Dublin City Council · 0.31 ha · 217 m
    Sources: Public transport stops and routes (NTA GTFS), Department of Education school list, National Planning Application Database, Council consultation portals, Council meetings (ModernGov), Land Development Agency public land register, cso_saps_2022, National Transport Authority, Fingal County Council and Dún Laoghaire-Rathdown County Council development plan layers (CC BY 4.0), dartplus.ie project extents over NTA GTFS rail shapes (CC BY 4.0), EPA strategic noise maps, Fingal County Council · fetched 31 Oct 2026, 05:04
    SourceLicenceFetchedLink
    Public transport stops and routes (NTA GTFS)CC BY 4.025 Oct 2026, 23:02open
    Department of Education school listCC BY 4.027 Oct 2026, 23:04open
    National Planning Application DatabaseCC BY 4.031 Oct 2026, 05:04open
    Council consultation portalsPublic31 Oct 2026, 01:06open
    Council meetings (ModernGov)Public31 Oct 2026, 02:21open
    Land Development Agency public land registerCC BY 4.011 Sept 2026, 16:43open
    cso_saps_2022CC BY 4.0—open
    National Transport AuthorityCC BY 4.0——
    Fingal County Council and Dún Laoghaire-Rathdown County Council development plan layers (CC BY 4.0)CC BY 4.0——
    dartplus.ie project extents over NTA GTFS rail shapes (CC BY 4.0)CC BY 4.0——
    EPA strategic noise mapsCC BY 4.0——
    Fingal County CouncilCC BY 4.0——
    Question 6

    What to ask, and who

    1. Decision 141 m away can be appealed until 6 Nov 2026: appeal?
      Ask for: The decision on the council's website (€220 to appeal).
      Council
    2. Any work done without planning permission?
      Ask for: An opinion of compliance for the whole house.
      Seller · solicitor
    Reference

    Where this is, the terms, the sources

    Electoral division
    Arran Quay D
    Electoral area
    North Inner City
    Council
    Dublin City Council
    Everything we found, as a list 8 lines
    • Zoned R2 (existing residential); not protected; no vacant land tax.
    • 5 sites nearby could change: 3 derelict, 2 empty zoned plots.
    • Prussia Street (bus 39, 39A) 475 m away: 15 an hour at morning peak; 124 from all stops within 500 m. Planned: DART+ South West 202 m away, railway order granted (13 November 2024).
    • Here (2022 census): 71% rent (council 45%); 9% of homes empty (council 8%); most built before 1919; 7% drive to work (council 28%); population up 6% since 2016.
    • 1 home extension within 250 m since 2025.
    • The council decides in a median 55 days (about 8 weeks); 1 in 4 is asked for more information.
    • Homes started within 1 km: 828 in the last year, 1,076 three years before.
    • 24 applications nearby in the last 12 months; 77% approved (council 90%); 12% for work already built (council 14%).
    What the terms mean 8 terms
    • Vacant land tax (Residential Zoned Land Tax (RZLT)): A yearly tax of 3% of the land's value on land that is zoned for homes and serviced but left unbuilt.
    • Building started (Commencement notice (BCMS)): The builder must tell the council's building control office 14 to 28 days before work starts.
    • Signed off as finished (Certificate of Compliance on Completion): A certificate filed when a building is finished, confirming it meets the building regulations.
    • Approved (Grant of permission): The council said yes, usually with conditions.
    • Listed by the council as derelict (Derelict Sites Register): Councils keep a public list of land and buildings in a ruinous or dangerous state.
    • Protected building (Protected structure (Record of Protected Structures)): A building the council has listed for its heritage value.
    • Appeal (Appeal to An Coimisiún Pleanála): The applicant, or anyone who commented in time, can appeal the council's decision within four weeks.
    • What the land is zoned for (Zoning objective): The council's development plan sets what each area is for: homes, shops, open space and so on.
    Sources and licences 31
    SourcePublisherLicenceFetched
    EPA strategic noise maps—CC BY 4.0—
    Fingal County Council—CC BY 4.0—
    Fingal County Council and Dún Laoghaire-Rathdown County Council development plan layers (CC BY 4.0)—CC BY 4.0—
    National Transport Authority—CC BY 4.0—
    services-eu1.arcgis.comAn Coimisiún PleanálaCC BY 4.030 Oct 2026
    data.nbco.gov.ieNational Building Control Office (BCMS)CC BY 4.031 Oct 2026
    data.gov.ieVarious (see each layer)CC BY 4.0, CC BY-NC-ND 4.027 Sept 2026
    gis.epa.ieEnvironmental Protection AgencyCC BY 4.027 Sept 2026
    services-eu1.arcgis.comNational Inventory of Architectural HeritageCC BY 4.027 Sept 2026
    gis.epa.ieEnvironmental Protection AgencyCC BY 4.027 Sept 2026
    services-eu1.arcgis.comNational Monuments Service (SMR)CC BY 4.027 Sept 2026
    dlrcoco.citizenspace.comLocal authorities (consultation portals)Public31 Oct 2026
    www2.courts.ie—© the publisher30 Oct 2026
    cso.ie—CC BY 4.0—
    dartplus.ie project extents over NTA GTFS rail shapes (CC BY 4.0)—CC BY 4.0—
    services-eu1.arcgis.comLocal authorities (derelict sites registers)CC BY 4.026 Oct 2026
    services.arcgis.comDublin local authorities (housing delivery pipeline)CC BY 4.026 Oct 2026
    esbnetworks.ie—© the publisher · flag only11 Sept 2026
    transportforireland.ieNational Transport AuthorityCC BY 4.025 Oct 2026
    lda.ieLand Development AgencyCC BY 4.011 Sept 2026
    meetings.fingal.ieLocal authorities (council meetings)Public31 Oct 2026
    services.arcgis.comDepartment of Housing (National Planning Application Database)CC BY 4.031 Oct 2026
    services-eu1.arcgis.comTailte ÉireannCC BY 4.011 Sept 2026
    services-eu1.arcgis.comCSO, Tailte Éireann, OpenStreetMap contributorsCC BY 4.04 Oct 2026
    propertypriceregister.ieProperty Services Regulatory Authority (PPR)© PSRA, PSI licence31 Oct 2026
    data.gov.ieLocal authorities (Record of Protected Structures)CC BY 4.0—
    services.arcgis.comLocal authorities (RZLT maps)CC BY 4.025 Oct 2026
    gov.ieDepartment of EducationCC BY 4.027 Oct 2026
    gov.ieDepartment of HousingCC BY-SA 4.023 Oct 2026
    tusla.ieTusla (Early Years Inspectorate)Public register28 Oct 2026
    services.arcgis.comLocal authorities via the Department of Housing (GZT / MyPlan)CC BY 4.025 Oct 2026
    Measured
    counted from a public register
    Calculated
    a rate or median we worked out from those counts
    Our classification
    we sorted it by reading each description
    Estimate
    inferred from another source (census, map data)
    Rule summary
    the law, simplified: check before relying on it
    How we work this out
    Generated 31 Oct 2026, 22:00 from the Planning Register store; nothing was fetched live. Not a legal search: the council's planning file is the record. Deadlines come from published dates under the Planning and Development Act 2000: confirm with the council before relying on them. Street map © OpenStreetMap contributors; building outlines © Overture Maps Foundation. The text version carries every figure with its source, for an AI assistant.