- 67 Bargy Road, East Wall, Dublin 3 Grant permission
Construction of a two storey flat roof extension at the rear/side , alteration to existing gable window and formation of additional gable wall windows , new vehicular entrance driveway and front boundary wall and piers , dishing of existing kerb and all associated works.
5067/26received 19 Mar 2026decided 8 May 2026459 m away
- 5B East Road, East Wall, Dublin 3 Grant permission
At ground floor level, change of use from an existing retail unit to 2no. 2-bedroom apartments with communal open space and a single storey extension to the rear and associated internal alterations and external elevational treatments to the rear and on East Road, at 5b East Road, East Wall, Dublin 3.
WEB1083/26received 15 Jan 2026decided 2 Jul 20262 units393 m away
- 5B East Road, East Wall, Dublin 3 Application declared invalid
At ground floor level, change of use from an existing retail unit to 2no. 2-bedroom apartments with communal open space and a single storey extension to the rear and associated internal alterations and external elevational treatments to the rear and on East Road, at 5b East Road, East Wall, Dublin 3.
WEB6077/25received 22 Dec 2025decided 2 Jan 2026393 m away
- 5B East Road, East Wall, Dublin 3 Application declared invalid
Change of use from an existing retail unit to 2no. 2-bedroom apartments with communal open space and a single storey extension to the rear and associated internal alterations and external elevational treatments to the rear and on East Road, at 5b East Road, East Wall, Dublin 3.
WEB6009/25received 17 Dec 2025decided 18 Dec 2025393 m away
- Block U, East Point Business Park, Alfie Byrne Road, Dublin 3 Grant permission
CHANGE OF USE: The proposed development will consist of the change of use of the Block U building from office use to medical use (total 1591.5 sq.m GFA) and is described on a level-by-level basis as follows:
Ground Floor: 7no. Consulting rooms, 2no. Offices, Entrance Lobby (incl. Waiting area and Reception), Record room, Staff room with Kitchenette, Storeroom, Comm/IT room, 2no. Utility rooms and all ancillary accommodation.
First Floor: 3no. Labs, 2no. Offices, 2no. Utility rooms, Waiting area, Teaching/Training room, Support room, 2 no. Stores, Staff Room, and all ancillary accommodation.
Second Floor: 3no. Labs, 2no. Offices, 2no. Utility rooms, Waiting area, Teaching/Training room, Support room, Kitchenette, AHU Room, and all ancillary accommodation.
The proposed development involves modifications to the internal layout of the Block U building consisting of 3 floors to facilitate this change of use from office space to medical use. To facilitate the proposed change of use at second floor level, a reduction in the size of the skylight on roof of the Block U building is proposed. No alterations are proposed to the external façades of the Block U building.
In total 25no. car parking spaces (including 2no. accessible spaces) are proposed to serve the proposed development. The proposed development involves the reconfiguration of existing car parking arrangements for the Block U building to facilitate an increase from 1no. to 2no. accessible spaces and an overall reduction from 28no. to 25no. car parking spaces in total. The proposed development will be served by 2no. existing covered bicycle parking stores together providing a total of 30no. bicycle parking spaces. Planning permission is also sought for the relocation of existing bins to a new bin store and collection area to the rear of the Block U building in the southwest corner of the subject site as well as all ancillary site services and site development works.
WEB5557/25received 31 Oct 2025decided 18 Dec 2025358 m away
- Unit 13 and Unit 14, Docklands Innovation Park, 128–130 East Wall Road, Dublin 3 Grant permission and retention permission
PERMISSION AND RETENTION: We, EWR Innovation Park Limited, intend to apply for retention permission and planning permission for development at Unit 13 and Unit 14, Docklands Innovation Park, 128-130 East Wall Road, Dublin 3. The development will consist of: - Retention permission is sought for the change of use of Unit 13 at first floor level from office use to gym use; and Planning permission is sought for the change of use of Unit 14 from office use to educational and/or office use at first and second floors.
WEB5545/25received 30 Oct 2025decided 18 Dec 2025415 m away
- Block U, East Point Business Park, Alfie Byrne Road, Dublin 3 Application declared invalid
CHANGE OF USE: The proposed development will consist of the change of use of the Block U building from office use to medical use (total 1591.5 sq.m GFA) and is described on a level-by-level basis as follows:
Ground Floor: 7no. Consulting rooms, 2no. Offices, Entrance Lobby (incl. Waiting area and Reception), Record room, Staff room with Kitchenette, Storeroom, Comm/IT room, 2no. Utility rooms and all ancillary accommodation.
First Floor: 3no. Labs, 2no. Offices, 2no. Utility rooms, Waiting area, Teaching/Training room, Support room, 2 no. Stores, Staff Room, and all ancillary accommodation.
Second Floor: 3no. Labs, 2no. Offices, 2no. Utility rooms, Waiting area, Teaching/Training room, Support room, Kitchenette, AHU Room, and all ancillary accommodation.
The proposed development involves modifications to the internal layout of the Block U building consisting of 3 floors to facilitate this change of use from office space to medical use. To facilitate the proposed change of use at second floor level, a reduction in the size of the skylight on roof of the Block U building is proposed. No alterations are proposed to the external façades of the Block U building.
In total 25no. car parking spaces (including 2no. accessible spaces) are proposed to serve the proposed development. The proposed development involves the reconfiguration of existing car parking arrangements for the Block U building to facilitate an increase from 1no. to 2no. accessible spaces and an overall reduction from 28no. to 25no. car parking spaces in total. The proposed development will be served by 2no. existing covered bicycle parking stores together providing a total of 30no. bicycle parking spaces. Planning permission is also sought for the relocation of existing bins to a new bin store and collection area to the rear of the Block U building in the southwest corner of the subject site as well as all ancillary site services and site development works.
WEB5502/25received 24 Oct 2025decided 30 Oct 2025358 m away
- Site on Promenade Road, Dublin Port, Dublin 1 Grant permission
The development will consist of
Amendments to the previously granted planning permission Reg. Ref. 5283/22 to include:
1. Demolition of the existing 2 storey office building as it has significant structural defects identified from site investigations post planning permission Reg. Ref. 5283/22.
2. Reconstruction and extension of the permitted 3 storey Artist Workspaces at ground floor (10.7 sqm), at first floor (10.7 sqm), at second floor (4.2 sqm) and at the maintenance deck (3.3 sqm) to provide 28.9 sqm total gross floor area of extension.
3. Alterations to replace the permitted window at first floor to the East elevation with corner windows at first and second floor to the East and North Elevations.
4. Reconstruction of the 2no. single storey industrial sheds as permitted that have been demolished under Reg. Ref 4483/19 due to significant structural defects identified from site investigations post planning permission Reg. Ref. 5283/22. The shed to the east is to be located approx. 3m further to the East and extended by 1.6 sqm. The shed to the west is to be extended by 41.5 sqm to provide 43.1 sqm total gross floor area of extension of ancillary storage.
5. Expand the permitted use as Artist Workspaces to include alternative uses as an Innovation Hub with ancillary office space and cycle repair workshop.
6. Erect a pedestrian and vehicular gate serving a vehicular entrance point off Promenade Road and erection of fixed boundary railings to the north site boundary extending along Promenade Road.
7. Amendments to the signage detail to provide placeholder text that will be subject to a future agreement with the Local Authority.
8. Associated amendments required to landscaping and site services.
WEB1611/25received 21 Mar 2025decided 15 May 2025270 m away
- Building P8, East Point Business Park, Alfie Byrne Road, Dublin 3, D03 E372 Grant permission
The proposed development will consist of the change of use Building P8 from office use to medical use (GFA: 3534 sq.m) and is described on a level-by-level basis as follows:
Ground Floor: 3no. Physiotherapy rooms, Office Reception, 3no. Offices, Entrance Lobby (incl. Waiting area and Reception), Staff Room, Storage room, First Aid room, 2no.Staff Showers, Kitchenette, and all ancillary accommodation;
First Floor: 7no. Consulting rooms, Treatment room, 2no. Utility rooms, Interview room, 4 no. Stores, 2no. Offices, Staff Kitchen/Lounge, Reception/ Admin room, Breakout space, and all ancillary accommodation;
Second Floor: 8no. Consulting rooms, Treatment room, Reception, 4no. Offices, Interview room, 2no. Utility rooms,3no. Stores, Comms/IT room, Hot desking, and all ancillary accommodation;
Third Floor: 8no. Consulting rooms, Treatment room, Reception, 5 no. Offices, 2no. Utility rooms, 3no. Stores, Comms/IT room, Staff Kitchen Lounge, and all ancillary accommodation;
Fourth Floor: 3no. Research Labs, 6no. Offices, IT Hub, Waiting area, Teaching space/Meeting room, 2no. Utility rooms, Staff Kitchen Lounge, and all ancillary accommodation;
Fifth Floor: 3no. Research Labs, 2no. Utility rooms, 4no. Offices, Reception, Store, Waiting area, and all ancillary accommodation;
The proposal involves modifications to the internal layout of the Building P8 building consisting of 6 floors, to facilitate this change of use from office space to medical use. Minor alterations to the external façade of the southern elevation of the building are proposed to facilitate the change of use. The proposed development involves the reconfiguration of the existing parking arrangements to facilitate an increase in the number of spaces available from 30no. to 34no. spaces (includes the provision of 2no. accessible parking spaces) and increase in bicycle parking spaces from 48no. to 60no. spaces. Planning permission is also sought for the creation of a pedestrian linkage on the western side of the building for accessibility to the car parking area, installation of new Perspex cover over the existing Bike racks and all ancillary site services and site development works.
WEB1473/25received 7 Mar 2025decided 1 May 20250 m away
- Site at Promenade Road, Dublin Port, Dublin 1 Application declared invalid
Dublin Port Company intend to apply for permission for development comprising amendments to the development permitted under Reg. Ref. 5283/22 on a site at Promenade Road, Dublin Port, Dublin 1.
The proposed development comprising amendments to the permitted scheme consists of:
1. Demolition of existing 2 storey office building as it has significant structural defects identified from site investigations post planning permission Reg. Ref. 5283/22.
2. Reconstruction and extension of the permitted 3 storey Artist Workspace (13.9 sqm) at ground floor, (13.9 sqm) at first floor, (10.1sqm) at second floor, and (5sqm) at maintenance deck, to provide (42.9 sqm) total area of extension.
3. Reconstruction of part (276.6sqm) of the 2no. industrial sheds as permitted that have been demolished (under Reg. Ref 4483/19).
4. Expand the permitted use as Artist Workspaces to include alternative uses as an Innovation lab/ hub centre, bicycle repair workshop, and support offices.
5. Erect a pedestrian and vehicular gate serving a vehicular entrance point off Promenade Road and erection of fixed boundary railings to the north site boundary extending along Promenade Road.
6. Associated modifications to landscaping and site services.
WEB1264/25received 12 Feb 2025decided 19 Feb 2025270 m away
`description` is truncated at source (80 chars for DLR, 70 for Fingal) and `applicant` is null nationally — NPAD publishes neither in full.