How planning works, with this area's numbers

steps can overlap · medians for home extensions within 1.5 km, 10 years
  1. 1ApplySite notice up, plans online
  2. 2Comments5 weeks, €20. Comment to keep your right to appeal
  3. 3Decision8 weeks by law. Here 55 days
  4. 4Appeal window4 weeks after the decision
  5. 5AppealHere about 7 months
  6. 6PermissionLasts 5 years
  7. 7StartStart notice to the council. Here about 5 months after
  8. 8Sign-offCompletion cert, or the owner opts out
Question 1

What's the planning story of this house?

Figure 1

When it was built, and the rules since

Most homes here were built before 1919, before planning permission was needed.

Timeline from 1896: planning permission needed from October 1964, building regulations from June 1992, building records online from March 2014, sign-off opt-out from September 2015. Most homes here were built 1900–1918.1900191019201930194019501960197019801990200020102020Oct 1964permission neededJun 1992building regulationsMar 2014building records onlineSep 2015owners may opt out of sign-offThis houseBuilt: most homes in this small area date from 1900–1918 (census estimate)most built

Each line is a rule that applies to work done after it.

MeasuredEstimatecouncil register via NPAD · build years: CSO Census 2022, small area

On this site
R2
Zoning · Existing residential
No
Protected or listed · on the council's list
No
Vacant land tax · lived-in homes don't pay it
1 in 20
Radon (EPA) · homes with high radon
Zoning, protection, tax and flood: the detail
Zoning
What it says

Zone Z2 - DEV PLAN 2022-2028

ZoningR2 · Existing residential
What it says

Z2: Residential Neighbourhoods (Conservation Areas): To protect and/or improve the amenities of residential conservation areas.

An established residential area. The objective is to protect existing residential amenity as well as to provide housing — which is the objective a neighbour's objection to an overbearing extension is usually argued under.

development plan 2022 2028 · 14 Dec 2022 – 31 Dec 2028

ZoningR2 · Existing residential
What it says

Z2: Residential Neighbourhoods (Conservation Areas): To protect and/or improve the amenities of residential conservation areas.

An established residential area. The objective is to protect existing residential amenity as well as to provide housing — which is the objective a neighbour's objection to an overbearing extension is usually argued under.

development plan 2022 2028 variation no 11 · 14 Dec 2022 – 31 Dec 2028

Heritage inventory2 within 100 m house; Hendrons
Radon1 in 20 homes have high radon (EPA)

Not on this site: protected building, monument zone, conservation area, EU nature site, EU bird site, natural heritage area, tree order, landslide risk, derelict list.

Licensed industrial sites within 1.0 km: Mater Misericordiae University Hospital (486 m)

Vacant land taxNo lived-in homes don't pay it
Flood riskNone mapped within 500 m
Within 500 mCountFor example
Heritage inventory buildings226house
Radon grid squares1
Monuments10House - indeterminate date
How we work this out
'On this site' means the record's own map outline touches the registered parcel (or a 12 m circle round the point where there is no parcel). Only the council's own list confirms a protected building; ask the council if in doubt. The council's map for the vacant land tax shows this spot inside an area of existing homes. Homes people live in, and their gardens, don't pay the tax. The OPW flood map's licence lets us show a yes/no only. Land on the vacant land tax map nearby: 3 on the draft 2027 map; 1 on the final 2026 map.
Sources: Development plan zoning (councils), National Inventory of Architectural Heritage, EPA radon map, EPA licensed facilities (LEAP), Residential Zoned Land Tax maps, Constraint layers (bundle), Sites and Monuments Record · fetched 26 Oct 2026, 23:21
SourceLicenceFetchedLink
Development plan zoning (councils)CC BY 4.025 Oct 2026, 23:06open
National Inventory of Architectural HeritageCC BY 4.027 Sept 2026, 19:35open
EPA radon mapCC BY 4.027 Sept 2026, 19:36open
EPA licensed facilities (LEAP)CC BY 4.026 Oct 2026, 23:21open
Residential Zoned Land Tax mapsCC BY 4.025 Oct 2026, 23:43open
Constraint layers (bundle)CC BY 4.0, CC BY-NC-ND 4.027 Sept 2026, 19:37open
Sites and Monuments RecordCC BY 4.027 Sept 2026, 19:29open
How we work this out
Applications whose site outline (or map point) falls on this property. 'No sign building has started' means we found no notice to the council's building control office; small jobs don't always file one, so ask. A missing completion certificate is not proof of a problem: an owner can opt out of official sign-off for a house or extension built for themselves.
Sources: Building Control Management System (commencement notices), National Planning Application Database · fetched 31 Oct 2026, 05:04
SourceLicenceFetchedLink
Building Control Management System (commencement notices)CC BY 4.031 Oct 2026, 02:56open
National Planning Application DatabaseCC BY 4.031 Oct 2026, 05:04open
Question 2

Could you extend?

Nothing on this site restricts it: not protected, not in a conservation area.

Figure 2

What happened to applications like yours

Extensions are almost always approved here: 93–98% by type. A new house in a garden is harder: 69% approved, and 1 in 2 is asked for more information.

Single-storey rear92 decided · more info asked 13%
98% · council 97%
Two-storey rear63 decided · more info asked 14%
98% · council 96%
Attic or dormer127 decided · more info asked 9%
94% · council 96%
First-floor42 decided · more info asked 26%
93% · council 94%
New house in a garden or site62 decided · more info asked 44%
69% · council 71%
Approved nearbyDublin overall

Decided applications within 1.5 km, received in the last 10 years. The kind of work is read from each description.

CalculatedOur classificationcouncil register via NPAD · 386 nearby, 5,055 council-wide

Extensions and refusals right beside you 16 within 250 m · 3 refused within 100 m

Extensions and refusals near you 16 extensions within 250 m · the last 12 months

1 approved3 refused12 no decision or withdrawn
KindAppliedApprovedRefused
Dormer or attic703
Rear50—
Single-storey rear21—
Two-storey side20—

Refused within 100 m 3 in the last 12 months

  • WEB5798/25 · dormer or attic conversion · refused 29 Jan 2026 · 88 m
  • WEB5788/25 · dormer or attic conversion · refused 27 Jan 2026 · 98 m
  • WEB5751/25 · dormer or attic conversion · refused 23 Jan 2026 · 89 m
How we work this out
Home extensions are read from the application's description (extension, attic or dormer, porch, garage conversion, garden room), so a few may be missed or mislabelled. The kind is the first that fits: a dormer with a rear extension counts as a dormer. Refusal reasons come from An Coimisiún Pleanála's inspector reports, so they exist only where the refusal was appealed (Dún Laoghaire-Rathdown so far). The council's own reasons are on its planning file.
Sources: National Planning Application Database, An Coimisiún Pleanála cases (ArcGIS feed) · fetched 31 Oct 2026, 05:04
SourceLicenceFetchedLink
National Planning Application DatabaseCC BY 4.031 Oct 2026, 05:04open
An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.030 Oct 2026, 23:01open
Sources: An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices), National Planning Application Database · fetched 31 Oct 2026, 05:04
SourceLicenceFetchedLink
An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.030 Oct 2026, 23:01open
Building Control Management System (commencement notices)CC BY 4.031 Oct 2026, 02:56open
National Planning Application DatabaseCC BY 4.031 Oct 2026, 05:04open
Question 3

How long, and what if someone objects?

Figure 3

A home extension's journey here

A decision takes 55 days. 1 in 6 is asked for more information, which adds about 76 days. Building starts about 5 months after permission.

Comments open: 5 weeks · €20; Council decision: 55 days; If more info asked (1 in 6): 132 days; Appeal window: 4 weeks; If appealed: +210 days; Building starts: 144 days after permission0 mo3 mo6 mo9 mo12 mo15 mo18 moComments openComments close 5 weeks after the application is lodged5 weeks · €20Council decisionDecision: median 55 days, middle half 53–55 (n=358)55 daysIf more info asked (1 in 6)With further information: median 132 days (n=69)132 daysAppeal windowAnyone who commented can appeal within 4 weeks of the decision4 weeksIf appealedAt An Coimisiún Pleanála: median 210 days (n=176, all appeals within 1.5 km)+210 daysBuilding startsStart notice: median 144 days after permission (n=189)144 days after permissionSigned off441 days after the start, for the few who file. 33% of owners opt out of sign-off

Bars are medians; whiskers show the middle half. Medians of separate steps don't add up exactly.

Calculated427 decided home extensions, 192 start notices, 176 decided appeals · within 1.5 km, 10 years · NPAD, BCMS, An Coimisiún Pleanála

Figure 4

What appeals changed

27 of 90 appealed refusals became permissions. 9 of 88 appealed approvals were reversed.

Refusals appealed90 decided
27 became permissions
Approvals appealed88 decided
9 reversed
Ended approvedEnded refusedWithdrawn, invalid or other

Every appeal decided within 1.5 km in 10 years, any kind of development.

CalculatedAn Coimisiún Pleanála cases linked to the council file

Appeals nearby 4 in the last 12 months
  • 501755 Open · 32-33 Blessington Street, Dublin 7 · 240 m
  • 501598 Pending · 2 Western Way, Dublin 7, D07K1WX · 30 m
  • 501519 Pending · 26 Mountjoy Street, Phibsborough, Dublin 7, D07 X0X8 · 239 m
  • 500672 Other · 5 and 6 Henrietta Street, Dublin 1 · 321 m report
Sources: An Coimisiún Pleanála cases (ArcGIS feed), Courts Service legal diary (judicial reviews), National Planning Application Database · fetched 31 Oct 2026, 05:04
SourceLicenceFetchedLink
An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.030 Oct 2026, 23:01open
Courts Service legal diary (judicial reviews)© the publisher30 Oct 2026, 23:12open
National Planning Application DatabaseCC BY 4.031 Oct 2026, 05:04open
Question 4

What's changing around you?

Street map around Auburn Street with 15 numbered planning items
⌖ the houseOpen for commentsDerelict buildingApproved, not startedAppealRefusedEmpty land zoned for homes
  1. 18, Primrose Avenue WEB3539/26No decision yet · 125 m
  2. 290, Dorset Street Upper WEB3597/26No decision yet · 366 m
  3. 3No. 297 North Circular Road, Phibsborough WEB3516/26No decision yet · 451 m
  4. 460 Mountjoy Street, Dublin 7 DS1880Derelict building · 217 m
  5. 523 Blessington Street Dublin 7 D07DT6D DS1006Derelict building · 309 m
  6. 6Wellington Street Lower 3847/23Approved, no sign building has started · 336 m
  7. 7TYPEWRITER SHOP.IE 120 DORSET STREET UPPER DUBLIN 1 D01RX53 DS2073Derelict building · 349 m
  8. 8119 Dorset Street Upper, Dublin 1 DS2072Derelict building · 350 m
  9. 935/35A Bolton Street 4568/22Approved, no sign building has started · 372 m
  10. 10Edel House 3122/25Approved, no sign building has started · 446 m
  11. 11No. 22 Dominick Street Lower WEB5801/25Approved, no sign building has started · 486 m
  12. 122 Western Way, Dublin 7 501598Appeal: no decision yet · 30 m
  13. 13242, Phibsborough Road WEB5798/25Refused · 88 m
  14. 14241 Phibsborough Road, Dublin 7 WEB5751/25Refused · 89 m
  15. 150.3 ha zoned for homesEmpty land zoned for homes · 57 m
Figure 5

What happens to applications within 500 m

Permission isn't building. Of 125 permissions since 2016, 39 show a start notice and 10 have a completion certificate.

194 applications lodged within 500 m. Council: 126 approved, 21 refused. After appeals: 125 approved. Of those: 10 signed off, 6 built with the owner's opt-out, 23 started, 86 with no start notice found, 0 ran out.LODGEDCOUNCIL DECISIONAFTER APPEALSWHAT HAPPENED NEXT126: lodged → approved21: lodged → refused35: lodged → withdrawn or invalid12: lodged → undecided122: approved → approved18: refused → refused35: withdrawn or invalid → withdrawn12: undecided → undecided2 approved by the council, undecided after an appeal1 approved by the council, refused after an appeal1 approved by the council, withdrawn or invalid after an appeal3 refused by the council, approved after an appeal86: approved → no start notice found6: approved → built, owner opted out23: approved → started, not signed off10: approved → signed off194 lodged194 lodged126 approved126 approved21 refused21 refused35 withdrawn or invalid35 withdrawn or invalid12 undecided12 undecided125 approved125 approved19 refused19 refused36 withdrawn36 withdrawn14 undecided14 undecided86 no start notice found86 no start notice found6 built, owner opted out6 built, owner opted out23 started, not signed off23 started, not signed off10 signed off10 signed off

Purple bands are refusals turned into permissions on appeal. "No start notice found" includes small jobs that never needed one and notices we couldn't match.

Measured194 applications in 10 years · NPAD, An Coimisiún Pleanála, BCMS start notices and completion certificates

Figure 6

The next 30 days

3 deadlines within 500 m; the first closes 17 Nov 2026.

3 deadlines in the next 30 days: 2026-11-17 WEB3516/26: application received — PROTECTED STRUCTURE: The development will principally consist of: (i) the conservation, renovation and alteration of 'St; 2026-11-19 WEB3539/26: application received — The development will consist of a ground floor rear extension and all ancillary works.; 2026-11-26 WEB3597/26: application received — PROTECTED STRUCTURE: RETENTION : Retention Permission for replacement uPVC sash windows to front elevation to a protectetoday5 Nov10 Nov15 Nov20 Nov25 Nov30 NovWEB3516/26: application received — PROTECTED STRUCTURE: The development will principally consist of: (i) the conservation, renovation and alteration of 'St · 451 m away · 2026-11-17WEB3539/26: application received — The development will consist of a ground floor rear extension and all ancillary works. · 125 m away · 2026-11-19WEB3597/26: application received — PROTECTED STRUCTURE: RETENTION : Retention Permission for replacement uPVC sash windows to front elevation to a protecte · 366 m away · 2026-11-26
Comments close
  • Comments close 17 Nov 202617 days left
    3WEB3516/26 · application received — PROTECTED STRUCTURE: The development will principally consist of: (i) the conservation,…
    €20 to the council · 451 m away
  • Comments close 19 Nov 202619 days left
    1WEB3539/26 · application received — The development will consist of a ground floor rear extension and all ancillary works.
    €20 to the council · 125 m away
  • Comments close 26 Nov 202626 days left
    2WEB3597/26 · application received — PROTECTED STRUCTURE: RETENTION : Retention Permission for replacement uPVC sash windows to front…
    €20 to the council · 366 m away

Measuredcouncil registers and An Coimisiún Pleanála · deadlines worked out from the dates on file

Figure 7

Approved, stalled or planned, not built yet

31 homes 446 m away were approved Apr 2026 with no start notice yet; the permission runs to Apr 2031. 1 building site nearby stopped before sign-off.

Edel House · 31 homes: 31 homes approved Apr 2026, not started; 35/35A Bolton Street · 22 homes: 22 homes approved Mar 2023, not started; 11 Wellington Street… · 21 homes: 21 homes, started Oct 2022, never signed off; No. 22 Dominick Street… · 10 homes: 10 homes approved Mar 2026, not started20222023202420252026202720282029203020312032Edel House · 31 homes446 m · 3122/2531 homes approved Apr 2026, not started31 homes approved Apr 2026, not started35/35A Bolton Street · 22 homes372 m · 4568/2222 homes approved Mar 2023, not started22 homes approved Mar 2023, not started11 Wellington Street… · 21 homes337 m · 3167/2121 homes, started Oct 2022, never signed off21 homes, started Oct 2022, never signed offNo. 22 Dominick Street… · 10 homes486 m · WEB5801/2510 homes approved Mar 2026, not started10 homes approved Mar 2026, not startedtoday

Each row is a dated fact from a public register: no score and no forecast.

Measuredcouncil registers, BCMS, derelict sites registers, development plan layers (CC BY 4.0)

Sites that could change 12 within 500 m

Derelict building 7

  • 460 Mountjoy Street, Dublin 7 · derelict since Aug 2026 · 217 m
  • 523 Blessington Street Dublin 7 D07DT6D · derelict since Sep 2017 · 309 m
  • 7TYPEWRITER SHOP.IE 120 DORSET STREET UPPER DUBLIN 1 D01RX53 · derelict since Sep 2025 · 349 m
  • 8119 Dorset Street Upper, Dublin 1 · derelict since Sep 2025 · 350 m
  • 12 & 12A Granby Row, Dublin 1. · derelict since Aug 2026 · 411 m
  • 17/18 Frederick Street North Dublin 1 D01XP84; 18 Frederick Street North Dublin 1 · derelict since Aug 2024 · 459 m
  • 30 Frederick Street North Dublin 1 · derelict since Apr 2023 · 480 m

Building site that stopped 1

Approved, not started 3

Empty land zoned for homes 1

  • 150.3 ha zoned for homes · no homes built on it yet · 57 m
Sources: An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices), Derelict sites registers, Council meetings (ModernGov), National Planning Application Database, Residential Zoned Land Tax maps · fetched 31 Oct 2026, 05:04
SourceLicenceFetchedLink
An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.030 Oct 2026, 23:01open
Building Control Management System (commencement notices)CC BY 4.031 Oct 2026, 02:56open
Derelict sites registersCC BY 4.026 Oct 2026, 23:09open
Council meetings (ModernGov)Public31 Oct 2026, 02:21open
National Planning Application DatabaseCC BY 4.031 Oct 2026, 05:04open
Residential Zoned Land Tax mapsCC BY 4.025 Oct 2026, 23:43open
Figure 8

Applications within 500 m, by year

Between 26 and 44 a year; busiest 2025. 86% of decisions were approvals.

2021: 31, 2022: 26, 2023: 31, 2024: 31, 2025: 44, 2026: 31010203040502021: 29 approved2021: 1 refused2021: 1 undecided31’21*2022: 19 approved2022: 6 refused2022: 1 withdrawn or invalid26’222023: 23 approved2023: 5 refused2023: 3 withdrawn or invalid31’232024: 22 approved2024: 6 refused2024: 2 withdrawn or invalid2024: 1 undecided31’242025: 26 approved2025: 3 refused2025: 15 withdrawn or invalid44’252026: 7 approved2026: 14 withdrawn or invalid2026: 10 undecided31’26*
ApprovedRefusedWithdrawn or invalidUndecided

2021 and 2026 are part years (*). Exemption requests and time extensions are left out.

Measuredcouncil register via NPAD

Open for comments €20 to comment

Every application within 500 m 43 in the last 12 months

See every application on the map

How we work this out
Descriptions are shortened by the national planning database (to 80 characters in Dún Laoghaire-Rathdown, 70 in Fingal), and it does not publish applicants' names.
Sources: National Planning Application Database, An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices) · fetched 31 Oct 2026, 05:04
SourceLicenceFetchedLink
National Planning Application DatabaseCC BY 4.031 Oct 2026, 05:04open
An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.030 Oct 2026, 23:01open
Building Control Management System (commencement notices)CC BY 4.031 Oct 2026, 02:56open
Building work nearby 15 in the last 12 months
10 not signed off5 no sign-off needed
  • 16 Wellington Street Lower, Dublin 7 · 4 Nov 2026 · 36 homes · start notice not signed off · WEB5482/25 · 313 m
  • 71 Rathdown Road, Dublin, Dublin 7 · 19 Oct 2026 · 1 homes · start notice, opted out no sign-off needed · 3935/24 · 420 m
  • 17 Geraldine Street, Dublin, Dublin 7, D07 F59T · 17 Oct 2026 · start notice, opted out no sign-off needed · WEB2742/25 · 236 m
  • 36-40 Dominick Street Upper, Dublin 7, D07 KDV5 · 15 Sept 2026 · 90 homes · 7-day notice not signed off · ABP-320953-24 & 4790/23 · 106 m
  • 21 Phibsborough Road, Dublin 7 · 4 Sept 2026 · 7-day notice not signed off · WEB2661/25 · 246 m
  • 23 Phibsborough Road, Dublin 7, D07 W20W · 23 Jul 2026 · short notice no sign-off needed · WEB5097/25 · 204 m
  • 1/2 Royal Canal Terrace, Dublin 7 · 2 Jun 2026 · start notice not signed off · 3203/22 · 137 m
  • Coleraine Street, Smithfiled, Dublin 7, D07 XW62 · 5 May 2026 · start notice not signed off · 458 m
  • 23 Blessington Street, Dublin 7, D07 DT6D · 13 Apr 2026 · 4 homes · start notice not signed off · 0010/25 · 309 m
  • 2 Myrtle Street, Dublin, Dublin 7, D07 Y7P3 · 30 Mar 2026 · short notice no sign-off needed · 3023/25 · 92 m
  • DUBLIN BUS,21 Phibsborough Road, Dublin, Dublin 7, D07 F77P · 2 Mar 2026 · start notice not signed off · 3228/23 · 182 m
  • Eccles Street, Dublin 7, D07 R2WY · 18 Feb 2026 · start notice not signed off · 437 m
  • 36 Blessington Street, Dublin, Dublin 7, D07 A4XY · 10 Feb 2026 · 4 homes · 7-day notice not signed off · WEB1751/25 · 241 m
  • 1/2 Royal Canal Terrace, Phibsborough Road, Dublin 7, D07 NP74 · 27 Jan 2026 · 7-day notice not signed off · 3203/22 · 151 m
  • 36 Primrose Avenue, Phibsborough, Dublin 7, D07 WK7K · 16 Jan 2026 · short notice no sign-off needed · WEB2843/25 · 145 m
How we work this out
Each row is a notice the builder sent to the council's building control office before work started. One notice can cover many homes. 'Signed off as finished' means a completion certificate is on file; work done under an opt-out or a short notice doesn't need one.
Source: Building Control Management System (commencement notices) · fetched 31 Oct 2026, 02:56
SourceLicenceFetchedLink
Building Control Management System (commencement notices)CC BY 4.031 Oct 2026, 02:56open
Homes coming 89 not started
How we work this out
Schemes of 10 or more homes approved since 2021, from the council and An Coimisiún Pleanála registers. 'Building started' means the builder told the council's building control office that work was starting (a commencement notice).
Sources: An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices), National Planning Application Database, Social housing construction status report · fetched 31 Oct 2026, 05:04
SourceLicenceFetchedLink
An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.030 Oct 2026, 23:01open
Building Control Management System (commencement notices)CC BY 4.031 Oct 2026, 02:56open
National Planning Application DatabaseCC BY 4.031 Oct 2026, 05:04open
Social housing construction status reportCC BY-SA 4.023 Oct 2026, 23:02open
Named places nearby: estate, schemes, crèches, schools

Named places estate, developments, inspections

Developments within 1.0 km

SchemeHomesProgressDistance
36-40 Dominic Street Upper9393 not started (2026-Q2)57 m
St. Mary's Place Flats163163 being built (2026-Q2)245 m
James McSweeney House3535 being built (2026-Q2)263 m
Constitution Hill Flats12446 being built · 78 not started (2026-Q2)269 m
12-16A Wellington Street Lower3636 not started (2026-Q2)292 m
Former Des Kelly Site96—501 m
Brunswick Street North and Church Street Upper3333 not started (2026-Q2)583 m
Phibsborough Shopping Centre23no activity on site reported (2026-Q2)585 m

Crèches and schools inspected

NameLatest inspectionDistance
Constitution Hill Playgroup · Crèche15 Sept 2025 · report · Tusla Early Years Inspectorate175 m
Suantrai Creche · Crèche26 Sept 2025 · report · Tusla Early Years Inspectorate451 m
Portobello Montessori · Crèche18 Sept 2025 · report · Tusla Early Years Inspectorate511 m
LYCS Early Years Education Service · Crèche24 Apr 2025 · report · Tusla Early Years Inspectorate535 m
The Children's Place · Crèche25 Feb 2025 · report · Tusla Early Years Inspectorate561 m
Pitter Patter Community Play Group · Crèche17 Feb 2026 · report · Tusla Early Years Inspectorate699 m
Little Stars Creche · Crèche27 Feb 2026 · report · Tusla Early Years Inspectorate739 m
St. Peter's Montessori School · Crèche7 Apr 2025 · report · Tusla Early Years Inspectorate772 m
How we work this out
Organisations only: a person named on an application is never listed. Inspection dates and links are the publisher's; read their report for the findings.
Sources: Dublin housing delivery pipeline, National Planning Application Database, Department of Education school list, Tusla early years register · fetched 31 Oct 2026, 05:04
SourceLicenceFetchedLink
Dublin housing delivery pipelineCC BY 4.026 Oct 2026, 23:00open
National Planning Application DatabaseCC BY 4.031 Oct 2026, 05:04open
Department of Education school listCC BY 4.027 Oct 2026, 23:04open
Tusla early years registerPublic register28 Oct 2026, 23:19open
How busy is this area Busier than most of Dublin City Council.
Homes approved
Here627
Council middle52
Homes started
Here857
Council middle98
How we work this out
Homes approved counts schemes of 10 or more homes (one-off houses are not included). Homes started counts every home in a notice that building work was starting. The council figure is the middle value across the council's built-up squares of the same area (3.1 km², about a 1 km circle), so half of them saw more and half fewer.
Sources: An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices), National Planning Application Database · fetched 31 Oct 2026, 05:04
SourceLicenceFetchedLink
An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.030 Oct 2026, 23:01open
Building Control Management System (commencement notices)CC BY 4.031 Oct 2026, 02:56open
National Planning Application DatabaseCC BY 4.031 Oct 2026, 05:04open
Question 5

What's the area like?

Figure 9

This street block against the council

66% of homes built before 1971 (council 52%). 40% owner-occupied (council 47%).

Homes built before 1971
66% · council 52%
Homes built since 2001
4% · council 19%
Owner-occupied
40% · council 47%
Rented
55% · council 45%
Children under 15
3% · council 15%
Aged 65 and over
21% · council 13%
Households with 2+ cars
8% · council 19%
Work mainly from home
19% · council 12%
This small area (163 people)Dublin

MeasuredCSO Census 2022, Small Area Population Statistics (CC BY 4.0) · small area 268081018

Bus
126 m
Broadstone · 103, 109X, 23 · busiest stop within 500 m: 23 an hour at peak
Radon
1 in 20
homes here likely high (EPA). Test it
Nearest school
312 m
Paradise Place ETNS, 239 pupils
Homes sold nearby
522
in 3 years, 446 new (Property Price Register)
Schools, stops and the council

Schools

  • Paradise Place ETNS · primary · 239 pupils · 312 m
  • Henrietta Street School · primary · 20 pupils · 330 m
  • Mount Carmel Secondary School · postprimary · 386 pupils · 467 m
  • Dublin 7 Educate Together NS · primary · 515 pupils · 554 m
  • An Cosan CSS · primary · 56 pupils · 596 m
  • St Pauls C.B.S. · postprimary · 244 pupils · 626 m
  • Belvedere College S.J · postprimary · 1011 pupils · 641 m
  • Hospital School CHI at Temple Street · primary · 66 pupils · 659 m

Stops 111

  • Broadstone · 103, 109X, 23, 24, E1, E2 · 21/hour at peak · 126 m
  • Western Way · 88n, E1, E2 · 13/hour at peak · 138 m
  • Western Way · E1, E2 · 15/hour at peak · 142 m
  • Broadstone · 103, 23, 24, 88n, E1, E2 · 23/hour at peak · 143 m
  • Phibsborough Road · 23, 24, 88n, E1, E2, KL01 · 19/hour at peak · 189 m
  • Phibsborough Road · 23, 24, E1, E2 · 21/hour at peak · 201 m
  • Broadstone · Green · 13/hour at peak · 222 m
  • Broadstone · Green · 13/hour at peak · 227 m

Schools growing or shrinking planning in 3 years · pupils last year

  • Paradise Place ETNS · 312 m+0.8% pupils (239)
  • Henrietta Street School · 330 m0% pupils (20)
  • Mount Carmel Secondary School · 467 m-3% pupils (386)
  • Dublin 7 Educate Together NS · 554 m+0.4% pupils (515)
  • An Cosan CSS · 596 m+93.1% pupils (56) · 14 classrooms 2024, approved
  • St Pauls C.B.S. · 626 m+11.4% pupils (244) · an extension 2025, approved

Open consultations

Council meetings 30 items

Public land

  • Dublin City Council · 0.21 ha · 32 m
  • Dublin City Council · 1.24 ha · 135 m
  • Córas Iompair Éireann · 10.6 ha · 164 m
  • Dublin City Council · 0.42 ha · 232 m
  • Dublin City Council · 0.69 ha · 256 m
  • Health Service Executive · 1.62 ha · 305 m
Sources: Public transport stops and routes (NTA GTFS), Department of Education school list, National Planning Application Database, Council consultation portals, Council meetings (ModernGov), Land Development Agency public land register, cso_saps_2022, National Transport Authority, Fingal County Council and Dún Laoghaire-Rathdown County Council development plan layers (CC BY 4.0), dartplus.ie project extents over NTA GTFS rail shapes (CC BY 4.0), EPA strategic noise maps, Fingal County Council · fetched 31 Oct 2026, 05:04
SourceLicenceFetchedLink
Public transport stops and routes (NTA GTFS)CC BY 4.025 Oct 2026, 23:02open
Department of Education school listCC BY 4.027 Oct 2026, 23:04open
National Planning Application DatabaseCC BY 4.031 Oct 2026, 05:04open
Council consultation portalsPublic31 Oct 2026, 01:06open
Council meetings (ModernGov)Public31 Oct 2026, 02:21open
Land Development Agency public land registerCC BY 4.011 Sept 2026, 16:43open
cso_saps_2022CC BY 4.0—open
National Transport AuthorityCC BY 4.0——
Fingal County Council and Dún Laoghaire-Rathdown County Council development plan layers (CC BY 4.0)CC BY 4.0——
dartplus.ie project extents over NTA GTFS rail shapes (CC BY 4.0)CC BY 4.0——
EPA strategic noise mapsCC BY 4.0——
Fingal County CouncilCC BY 4.0——
Question 6

What to ask, and who

  1. A dormer or attic conversion 88 m away was refused in 2026: could yours be?
    Ask for: The refusal reasons on the council's file for WEB5798/25.
    Council
  2. Application 125 m away open for comments until 19 Nov 2026: comment?
    Ask for: The plans on the council's website (€20 to comment).
    Council
  3. Any work done without planning permission?
    Ask for: An opinion of compliance for the whole house.
    Seller · solicitor
Reference

Where this is, the terms, the sources

Electoral division
Inns Quay B
Electoral area
Cabra-Glasnevin
Council
Dublin City Council
Everything we found, as a list 8 lines
  • Zoned R2 (existing residential); not protected; no vacant land tax.
  • 12 sites nearby could change: 7 derelict, 1 stalled build, 3 approved schemes, 1 empty zoned plot.
  • 3 applications open for comments nearby; nearest closes 19 Nov 2026.
  • 3 applications refused within 100 m since 2025; latest a dormer or attic conversion (2026).
  • 89 homes approved nearby, not started; largest 31 at Edel House.
  • Dorset Street Upr (bus 1, 122) 490 m away: 36 an hour at morning peak; 359 from all stops within 500 m.
  • Here (2022 census): 54% rent (council 45%); 6% of homes empty (council 8%); most built before 1919; 22% drive to work (council 28%); population up 24% since 2016.
  • 16 home extensions within 250 m since 2025. Most were dormers or attic conversions. 3 dormers or attic conversions refused.
What the terms mean 9 terms
  • Vacant land tax (Residential Zoned Land Tax (RZLT)): A yearly tax of 3% of the land's value on land that is zoned for homes and serviced but left unbuilt.
  • Building started (Commencement notice (BCMS)): The builder must tell the council's building control office 14 to 28 days before work starts.
  • Signed off as finished (Certificate of Compliance on Completion): A certificate filed when a building is finished, confirming it meets the building regulations.
  • Approved (Grant of permission): The council said yes, usually with conditions.
  • Listed by the council as derelict (Derelict Sites Register): Councils keep a public list of land and buildings in a ruinous or dangerous state.
  • Comment on an application (Observation / submission): Anyone can comment on a planning application within five weeks of it being lodged, for a €20 fee.
  • Appeal (Appeal to An Coimisiún Pleanála): The applicant, or anyone who commented in time, can appeal the council's decision within four weeks.
  • What the land is zoned for (Zoning objective): The council's development plan sets what each area is for: homes, shops, open space and so on.
  • Building site that stopped (Commenced, no completion certificate): A housing build that told the council it was starting at least three years ago, passed its own planned finish date, and has never been signed off as finished.
Sources and licences 30
SourcePublisherLicenceFetched
EPA strategic noise maps—CC BY 4.0—
Fingal County Council—CC BY 4.0—
Fingal County Council and Dún Laoghaire-Rathdown County Council development plan layers (CC BY 4.0)—CC BY 4.0—
National Transport Authority—CC BY 4.0—
services-eu1.arcgis.comAn Coimisiún PleanálaCC BY 4.030 Oct 2026
data.nbco.gov.ieNational Building Control Office (BCMS)CC BY 4.031 Oct 2026
data.gov.ieVarious (see each layer)CC BY 4.0, CC BY-NC-ND 4.027 Sept 2026
services-eu1.arcgis.comNational Inventory of Architectural HeritageCC BY 4.027 Sept 2026
gis.epa.ieEnvironmental Protection AgencyCC BY 4.027 Sept 2026
services-eu1.arcgis.comNational Monuments Service (SMR)CC BY 4.027 Sept 2026
dlrcoco.citizenspace.comLocal authorities (consultation portals)Public31 Oct 2026
www2.courts.ie—© the publisher30 Oct 2026
cso.ie—CC BY 4.0—
dartplus.ie project extents over NTA GTFS rail shapes (CC BY 4.0)—CC BY 4.0—
services-eu1.arcgis.comLocal authorities (derelict sites registers)CC BY 4.026 Oct 2026
services.arcgis.comDublin local authorities (housing delivery pipeline)CC BY 4.026 Oct 2026
data.epa.ieEnvironmental Protection Agency (LEAP licence register)CC BY 4.026 Oct 2026
esbnetworks.ie—© the publisher · flag only11 Sept 2026
transportforireland.ieNational Transport AuthorityCC BY 4.025 Oct 2026
lda.ieLand Development AgencyCC BY 4.011 Sept 2026
meetings.fingal.ieLocal authorities (council meetings)Public31 Oct 2026
services.arcgis.comDepartment of Housing (National Planning Application Database)CC BY 4.031 Oct 2026
services-eu1.arcgis.comTailte ÉireannCC BY 4.011 Sept 2026
services-eu1.arcgis.comCSO, Tailte Éireann, OpenStreetMap contributorsCC BY 4.04 Oct 2026
propertypriceregister.ieProperty Services Regulatory Authority (PPR)© PSRA, PSI licence31 Oct 2026
services.arcgis.comLocal authorities (RZLT maps)CC BY 4.025 Oct 2026
gov.ieDepartment of EducationCC BY 4.027 Oct 2026
gov.ieDepartment of HousingCC BY-SA 4.023 Oct 2026
tusla.ieTusla (Early Years Inspectorate)Public register28 Oct 2026
services.arcgis.comLocal authorities via the Department of Housing (GZT / MyPlan)CC BY 4.025 Oct 2026
Measured
counted from a public register
Calculated
a rate or median we worked out from those counts
Our classification
we sorted it by reading each description
Estimate
inferred from another source (census, map data)
Rule summary
the law, simplified: check before relying on it
How we work this out
Generated 31 Oct 2026, 20:35 from the Planning Register store; nothing was fetched live. Not a legal search: the council's planning file is the record. Deadlines come from published dates under the Planning and Development Act 2000: confirm with the council before relying on them. Street map © OpenStreetMap contributors; building outlines © Overture Maps Foundation. The text version carries every figure with its source, for an AI assistant.