PlanningRegister.ie
Planning report · Dublin City Council · 500 m around the house · the last 12 months · 1 Nov 2026, 06:32

Belvidere Avenue

53.35986, -6.25795

Homes here mostly date from before 1919. 3 planning files on this house, the latest from 2026. Home extensions nearby almost always get approved (93%). A building site 224 m away stopped before it was finished.

See on the mapWatch this area

How planning works, with this area's numbers

steps can overlap · medians for home extensions within 1.5 km, 10 years
  1. 1ApplySite notice up, plans online
  2. 2Comments5 weeks, €20. Comment to keep your right to appeal
  3. 3Decision8 weeks by law. Here 55 days
  4. 4Appeal window4 weeks after the decision
  5. 5AppealHere about 7 months
  6. 6PermissionLasts 5 years
  7. 7StartStart notice to the council. Here about 4 months after
  8. 8Sign-offCompletion cert, or the owner opts out
Question 1

What's the planning story of this house?

Figure 1

When it was built, and the rules since

Most homes here were built before 1919, before planning permission was needed. 3 planning files on this house, the latest from 2026.

Timeline from 1896: planning permission needed from October 1964, building regulations from June 1992, building records online from March 2014, sign-off opt-out from September 2015. Most homes here were built 1900–1918. 3 planning files on this house.1900191019201930194019501960197019801990200020102020Oct 1964permission neededJun 1992building regulationsMar 2014building records onlineSep 2015owners may opt out of sign-offThis houseAll of Belvidere AvenueBuilt: most homes in this small area date from 1900–1918 (census estimate)most built2026: WEB2594/26 · apartments, undecided2026: WEB2005/26 · apartments, withdrawn or invalid2023: 5380/22 · work already done, refused2022: 3 files on Belvidere Avenue3 files

Each line is a rule that applies to work done after it.

MeasuredEstimatecouncil register via NPAD · build years: CSO Census 2022, small area

  1. 2026
    WEB2594/26 · apartments · no decision yet
    approved?started?signed off?
  2. 2026
    WEB2005/26 · apartments · withdrawn
    approved?started?signed off?
  3. 2023
    5380/22 · work already done · refused 2023
    approvedstartedsigned off?
On this site
R2
Zoning · Existing residential
Yes
Protected or listed · a protected building (House); a building in the national heritage inventory (50010721)
No
Vacant land tax · lived-in homes don't pay it
1 in 20
Radon (EPA) · homes with high radon
Zoning, protection, tax and flood: the detail
Zoning
What it says

Zone Z2 - DEV PLAN 2022-2028

ZoningR2 · Existing residential
What it says

Z2: Residential Neighbourhoods (Conservation Areas): To protect and/or improve the amenities of residential conservation areas.

An established residential area. The objective is to protect existing residential amenity as well as to provide housing — which is the objective a neighbour's objection to an overbearing extension is usually argued under.

development plan 2022 2028 · 14 Dec 2022 – 31 Dec 2028

ZoningR2 · Existing residential
What it says

Z2: Residential Neighbourhoods (Conservation Areas): To protect and/or improve the amenities of residential conservation areas.

An established residential area. The objective is to protect existing residential amenity as well as to provide housing — which is the objective a neighbour's objection to an overbearing extension is usually argued under.

development plan 2022 2028 variation no 11 · 14 Dec 2022 – 31 Dec 2028

Protected buildingOn this site House; House
Heritage inventoryOn this site house; house
Radon1 in 20 homes have high radon (EPA)

Not on this site: monument zone, conservation area, EU nature site, EU bird site, natural heritage area, tree order, landslide risk, derelict list.

Licensed industrial sites within 1.0 km: Mater Misericordiae University Hospital (589 m)

Vacant land taxNo lived-in homes don't pay it
Flood riskNone mapped within 500 m
Within 500 mCountFor example
Natural heritage areas1Royal Canal
Heritage inventory buildings327Aurora Bar and Grill; T & J. Hogan / Bleecker St
Radon grid squares1
Monuments2House - indeterminate date; R178403
How we work this out
'On this site' means the record's own map outline touches the registered parcel (or a 12 m circle round the point where there is no parcel). Only the council's own list confirms a protected building; ask the council if in doubt. The council's map for the vacant land tax shows this spot inside an area of existing homes. Homes people live in, and their gardens, don't pay the tax. The OPW flood map's licence lets us show a yes/no only. Land on the vacant land tax map nearby: 3 on the draft 2027 map; 3 on the final 2026 map.
Sources: Development plan zoning (councils), National Inventory of Architectural Heritage, EPA radon map, EPA licensed facilities (LEAP), Records of Protected Structures, Residential Zoned Land Tax maps, Constraint layers (bundle), Natural Heritage Areas (NPWS), Sites and Monuments Record · fetched 26 Oct 2026, 23:21
SourceLicenceFetchedLink
Development plan zoning (councils)CC BY 4.025 Oct 2026, 23:06open
National Inventory of Architectural HeritageCC BY 4.027 Sept 2026, 19:35open
EPA radon mapCC BY 4.027 Sept 2026, 19:36open
EPA licensed facilities (LEAP)CC BY 4.026 Oct 2026, 23:21open
Records of Protected StructuresCC BY 4.0—open
Residential Zoned Land Tax mapsCC BY 4.025 Oct 2026, 23:43open
Constraint layers (bundle)CC BY 4.0, CC BY-NC-ND 4.027 Sept 2026, 19:37open
Natural Heritage Areas (NPWS)CC BY 4.027 Sept 2026, 19:27open
Sites and Monuments RecordCC BY 4.027 Sept 2026, 19:29open
How we work this out
Applications whose site outline (or map point) falls on this property. 'No sign building has started' means we found no notice to the council's building control office; small jobs don't always file one, so ask. A missing completion certificate is not proof of a problem: an owner can opt out of official sign-off for a house or extension built for themselves.
Sources: Building Control Management System (commencement notices), National Planning Application Database · fetched 1 Nov 2026, 05:02
SourceLicenceFetchedLink
Building Control Management System (commencement notices)CC BY 4.01 Nov 2026, 03:07open
National Planning Application DatabaseCC BY 4.01 Nov 2026, 05:02open
Question 2

Could you extend?

This is a protected building: almost any change, inside or out, needs permission.

Figure 2

What happened to applications like yours

Extensions are almost always approved here: 91–96% by type. A new house in a garden is harder: 69% approved, and 1 in 2 is asked for more information.

Single-storey rear81 decided · more info asked 14%
96% · council 97%
Two-storey rear75 decided · more info asked 20%
93% · council 96%
Attic or dormer162 decided · more info asked 11%
95% · council 96%
First-floor34 decided · more info asked 32%
91% · council 94%
New house in a garden or site62 decided · more info asked 45%
69% · council 71%
Approved nearbyDublin overall

Decided applications within 1.5 km, received in the last 10 years. The kind of work is read from each description.

CalculatedOur classificationcouncil register via NPAD · 414 nearby, 5,055 council-wide

Figure 3

Belvidere Avenue, file by file since 2022

1 of 1 decided extensions on the road were approved.

3 planning files on Belvidere Avenue since 2022, by kind and decision.20222023202420252026Extensions, atticsNo. 7 · 2022 · single-storey rear · withdrawn or invalid · 3576/22No. 7 · 2022 · two-storey rear · withdrawn or invalid · WEB1339/22No. 7 · 2022 · first-floor · approved · WEB1973/22Porches, roofs, otherNew house in a side garden
ApprovedRefusedWithdrawn or invalid

3 files with "Belvidere Avenue" in the address within 600 m, other roads of the same name left out. Hover a dot for the house number and reference.

MeasuredOur classificationcouncil register via NPAD · 2022–2026

Extensions and refusals right beside you 4 within 250 m · 0 refused within 100 m

Extensions and refusals near you 4 extensions within 250 m · the last 12 months

2 approved2 no decision or withdrawn
KindAppliedApprovedRefused
First-floor21—
Dormer or attic11—
Single-storey rear10—

Refused within 100 m 0 in the last 12 months

Nothing refused this close in the last 12 months.

    How we work this out
    Home extensions are read from the application's description (extension, attic or dormer, porch, garage conversion, garden room), so a few may be missed or mislabelled. The kind is the first that fits: a dormer with a rear extension counts as a dormer. Refusal reasons come from An Coimisiún Pleanála's inspector reports, so they exist only where the refusal was appealed (Dún Laoghaire-Rathdown so far). The council's own reasons are on its planning file.
    Sources: National Planning Application Database, An Coimisiún Pleanála cases (ArcGIS feed) · fetched 1 Nov 2026, 05:02
    SourceLicenceFetchedLink
    National Planning Application DatabaseCC BY 4.01 Nov 2026, 05:02open
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.030 Oct 2026, 23:01open
    Sources: An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices), National Planning Application Database · fetched 1 Nov 2026, 05:02
    SourceLicenceFetchedLink
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.030 Oct 2026, 23:01open
    Building Control Management System (commencement notices)CC BY 4.01 Nov 2026, 03:07open
    National Planning Application DatabaseCC BY 4.01 Nov 2026, 05:02open
    Question 3

    How long, and what if someone objects?

    Figure 4

    A home extension's journey here

    A decision takes 55 days. 1 in 5 is asked for more information, which adds about 77 days. Building starts about 4 months after permission.

    Comments open: 5 weeks · €20; Council decision: 55 days; If more info asked (1 in 5): 132 days; Appeal window: 4 weeks; If appealed: +227 days; Building starts: 122 days after permission0 mo3 mo6 mo9 mo12 mo15 mo18 moComments openComments close 5 weeks after the application is lodged5 weeks · €20Council decisionDecision: median 55 days, middle half 53–55 (n=358)55 daysIf more info asked (1 in 5)With further information: median 132 days (n=82)132 daysAppeal windowAnyone who commented can appeal within 4 weeks of the decision4 weeksIf appealedAt An Coimisiún Pleanála: median 227 days (n=158, all appeals within 1.5 km)+227 daysBuilding startsStart notice: median 122 days after permission (n=205)122 days after permissionSigned off476 days after the start, for the few who file. 39% of owners opt out of sign-off

    Bars are medians; whiskers show the middle half. Medians of separate steps don't add up exactly.

    Calculated440 decided home extensions, 208 start notices, 158 decided appeals · within 1.5 km, 10 years · NPAD, BCMS, An Coimisiún Pleanála

    Figure 5

    What appeals changed

    19 of 75 appealed refusals became permissions. 15 of 85 appealed approvals were reversed.

    Refusals appealed75 decided
    19 became permissions
    Approvals appealed85 decided
    15 reversed
    Ended approvedEnded refusedWithdrawn, invalid or other

    Every appeal decided within 1.5 km in 10 years, any kind of development.

    CalculatedAn Coimisiún Pleanála cases linked to the council file

    Appeals nearby 7 in the last 12 months

    1 of 3 changed the council's decision

    • 502229 Pending · 80, Saint Ignatius Road, Dublin 7 · 301 m
    • 324547 Pending · 28 Jones Road, Dublin 3 · 329 m
    • 324467 Open · Westward House, 10, 10A and 10B, Russell Street, Dublin 1, D01 F300 · 209 m
    • 501125 Granted · 29 Saint Brigid's Road Upper, Dublin 9, D09E5R3 · 490 m report
    • 501023 Refused · 53 Gardiner Street Upper (corner site with frontage also on Sherrard… · 213 m report
    • 500544 Granted with conditions · 18 Summer Street North, Mountjoy, Dublin 1 · 482 m report
    • 500445 Granted with conditions · 10 Saint Alphonsus Road Lower, Drumcondra, Dublin 9 · 471 m report
    Sources: An Coimisiún Pleanála cases (ArcGIS feed), Courts Service legal diary (judicial reviews), National Planning Application Database · fetched 1 Nov 2026, 05:02
    SourceLicenceFetchedLink
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.030 Oct 2026, 23:01open
    Courts Service legal diary (judicial reviews)© the publisher31 Oct 2026, 23:12open
    National Planning Application DatabaseCC BY 4.01 Nov 2026, 05:02open
    Question 4

    What's changing around you?

    Street map around Belvidere Avenue with 15 numbered planning items
    ⌖ the houseOpen for commentsBuilding site that stoppedDerelict buildingBuilding startedEmpty land zoned for homesApprovedNo decision yetRefused
    1. 15, Belvedere Avenue WEB3589/26No decision yet · 53 m
    2. 253A, Dorset Street Lower WEB3398/26No decision yet · 182 m
    3. 326, Buckingham Street Upper WEB3587/26No decision yet · 381 m
    4. 410 Belvedere Court, Dublin 2556/20Building site that stopped · 224 m
    5. 5The School of Wresting Building, Saint Ignatius Road DS1688Derelict building · 356 m
    6. 65 Saint Patrick's Road, Dublin 9 DS1844Derelict building · 384 m
    7. 7Derelict site DS1882 DS1882Derelict building · 424 m
    8. 83 Grand Canal Quay, Dublin 2 WEB2853/25Building started · 96 m
    9. 90.5 ha zoned for homesEmpty land zoned for homes · 170 m
    10. 100.2 ha zoned for homesEmpty land zoned for homes · 244 m
    11. 1141, Belvedere Road WEB1629/26Approved · 133 m
    12. 12Rear of 6 North Belvedere Place, Mountjoy WEB1502/26No decision yet · 194 m
    13. 1353 Gardiner Street Upper (corner site with frontage also on Sherrard Street Upper), Dublin 1 WEB6034/25Refused · 213 m
    14. 1455, Russell Avenue WEB1142/26Approved · 225 m
    15. 1598 St. Ignatius Road, Phibsborough WEB2159/26No decision yet · 239 m
    Figure 6

    What happens to applications within 500 m

    Permission isn't building. Of 131 permissions since 2016, 54 show a start notice and 13 have a completion certificate.

    198 applications lodged within 500 m. Council: 131 approved, 30 refused. After appeals: 131 approved. Of those: 13 signed off, 13 built with the owner's opt-out, 28 started, 77 with no start notice found, 0 ran out.LODGEDCOUNCIL DECISIONAFTER APPEALSWHAT HAPPENED NEXT131: lodged → approved30: lodged → refused28: lodged → withdrawn or invalid9: lodged → undecided128: approved → approved25: refused → refused28: withdrawn or invalid → withdrawn9: undecided → undecided1 approved by the council, undecided after an appeal1 approved by the council, refused after an appeal1 approved by the council, withdrawn or invalid after an appeal3 refused by the council, approved after an appeal2 refused by the council, withdrawn or invalid after an appeal77: approved → no start notice found13: approved → built, owner opted out28: approved → started, not signed off13: approved → signed off198 lodged198 lodged131 approved131 approved30 refused30 refused28 withdrawn or invalid28 withdrawn or invalid9 undecided9 undecided131 approved131 approved26 refused26 refused31 withdrawn31 withdrawn10 undecided10 undecided77 no start notice found77 no start notice found13 built, owner opted out13 built, owner opted out28 started, not signed off28 started, not signed off13 signed off13 signed off

    Purple bands are refusals turned into permissions on appeal. "No start notice found" includes small jobs that never needed one and notices we couldn't match.

    Measured198 applications in 10 years · NPAD, An Coimisiún Pleanála, BCMS start notices and completion certificates

    Figure 7

    The next 30 days

    7 deadlines within 500 m; the first closes 3 Nov 2026.

    7 deadlines in the next 30 days: 2026-11-03 WEB3398/26: application received — The proposed development consists of: The change of use of the former GAA ticket-office premises to a massage and treatm; 2026-11-06 DCC consultation opened: Golden Lane Part 8 Planning; 2026-11-06 DCC consultation closes 2026-11-06: Golden Lane Part 8 Planning; 2026-11-08 DCC consultation opened: Dublin City Local Biodiversity Action Plan - Public Consultation; 2026-11-13 DCC consultation opened: Expression of Interest: Temporary Community Use of Rathmines Post Office, Dublin 6; 2026-11-25 WEB3589/26: application received — The development will consist of the extension to the rear of an existing mid-terrace dwelling on a site area 0.0142 hect; 2026-11-25 WEB3587/26: application received — PERMISSION & RETENTION : Retention of planning permission is sought by James Cheng and Jessica Yue for two storey extenstoday6 Nov11 Nov16 Nov21 Nov26 Nov1 DecWEB3398/26: application received — The proposed development consists of: The change of use of the former GAA ticket-office premises to a massage and treatm · 182 m away · 2026-11-03DCC consultation opened: Golden Lane Part 8 Planning · 463 m away · 2026-11-06DCC consultation closes 2026-11-06: Golden Lane Part 8 Planning · 463 m away · 2026-11-06DCC consultation opened: Dublin City Local Biodiversity Action Plan - Public Consultation · 463 m away · 2026-11-08DCC consultation opened: Expression of Interest: Temporary Community Use of Rathmines Post Office, Dublin 6 · 463 m away · 2026-11-13WEB3589/26: application received — The development will consist of the extension to the rear of an existing mid-terrace dwelling on a site area 0.0142 hect · 53 m away · 2026-11-25WEB3587/26: application received — PERMISSION & RETENTION : Retention of planning permission is sought by James Cheng and Jessica Yue for two storey extens · 381 m away · 2026-11-25
    Comments closeOther deadlines
    • Comments close 3 Nov 20262 days left
      2WEB3398/26 · application received — The proposed development consists of: The change of use of the former GAA ticket-office premises…
      €20 to the council · 182 m away
    • Consultation closes 6 Nov 20265 days left
      Golden Lane Part 8 Planning
      463 m away
    • Consultation closes 6 Nov 20265 days left
      Golden Lane Part 8 Planning
      463 m away
    • Consultation closes 8 Nov 20267 days left
      Dublin City Local Biodiversity Action Plan - Public Consultation
      463 m away
    • Consultation closes 13 Nov 202612 days left
      Expression of Interest: Temporary Community Use of Rathmines Post Office, Dublin 6
      463 m away
    • Comments close 25 Nov 202624 days left
      1WEB3589/26 · application received — The development will consist of the extension to the rear of an existing mid-terrace dwelling on…
      €20 to the council · 53 m away
    • Comments close 25 Nov 202624 days left
      3WEB3587/26 · application received — PERMISSION & RETENTION : Retention of planning permission is sought by James Cheng and Jessica…
      €20 to the council · 381 m away

    Measuredcouncil registers and An Coimisiún Pleanála · deadlines worked out from the dates on file

    Figure 8

    Approved, stalled or planned, not built yet

    1 building site nearby stopped before sign-off. DART+ West is planned 301 m away.

    10 Belvedere Court, Dublin · 13 homes: 13 homes, started Nov 2022, never signed off; DART+ West, DART+ West:…: railway order granted (July 2024); DART+ South West, Drumcondra: railway order granted (13 November 2024)202220232024202520262027202810 Belvedere Court, Dublin · 13 homes224 m · 2556/2013 homes, started Nov 2022, never signed off13 homes, started Nov 2022, never signed offDART+ West, DART+ West:…301 m · plannedrailway order granted (July 2024)DART+ South West, Drumcondra353 m · plannedrailway order granted (13 November 2024)today

    Each row is a dated fact from a public register: no score and no forecast.

    Measuredcouncil registers, BCMS, derelict sites registers, development plan layers (CC BY 4.0)

    Sites that could change 7 within 500 m

    Derelict building 4

    • 5The School of Wresting Building, Saint Ignatius Road · derelict since Dec 2024 · 356 m
    • 65 Saint Patrick's Road, Dublin 9 · derelict since Aug 2024 · 384 m
    • 7Derelict site DS1882 · derelict since Aug 2026 · 424 m
    • 48B-50A Drumcondra Road Lower Dublin 9 · derelict since Sep 2025 · 428 m

    Building site that stopped 1

    • 410 Belvedere Court, Dublin · 13 homes, started Nov 2022, never signed off · 224 m

    Empty land zoned for homes 2

    • 90.5 ha zoned for homes · no homes built on it yet · 170 m
    • 100.2 ha zoned for homes · no homes built on it yet · 244 m
    Sources: An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices), Derelict sites registers, Council meetings (ModernGov), National Planning Application Database, Residential Zoned Land Tax maps · fetched 1 Nov 2026, 05:02
    SourceLicenceFetchedLink
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.030 Oct 2026, 23:01open
    Building Control Management System (commencement notices)CC BY 4.01 Nov 2026, 03:07open
    Derelict sites registersCC BY 4.026 Oct 2026, 23:09open
    Council meetings (ModernGov)Public1 Nov 2026, 02:24open
    National Planning Application DatabaseCC BY 4.01 Nov 2026, 05:02open
    Residential Zoned Land Tax mapsCC BY 4.025 Oct 2026, 23:43open
    Figure 9

    Applications within 500 m, by year

    Between 26 and 39 a year; busiest 2022. 81% of decisions were approvals.

    2021: 35, 2022: 39, 2023: 30, 2024: 33, 2025: 26, 2026: 350102030402021: 26 approved2021: 8 refused2021: 1 undecided35’21*2022: 28 approved2022: 8 refused2022: 3 withdrawn or invalid39’222023: 24 approved2023: 5 refused2023: 1 withdrawn or invalid30’232024: 27 approved2024: 3 refused2024: 3 withdrawn or invalid33’242025: 15 approved2025: 5 refused2025: 5 withdrawn or invalid2025: 1 undecided26’252026: 11 approved2026: 1 refused2026: 16 withdrawn or invalid2026: 7 undecided35’26*
    ApprovedRefusedWithdrawn or invalidUndecided

    2021 and 2026 are part years (*). Exemption requests and time extensions are left out.

    Measuredcouncil register via NPAD

    Open for comments €20 to comment

    Every application within 500 m 43 in the last 12 months

    See every application on the map

    How we work this out
    Descriptions are shortened by the national planning database (to 80 characters in Dún Laoghaire-Rathdown, 70 in Fingal), and it does not publish applicants' names.
    Sources: National Planning Application Database, An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices) · fetched 1 Nov 2026, 05:02
    SourceLicenceFetchedLink
    National Planning Application DatabaseCC BY 4.01 Nov 2026, 05:02open
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.030 Oct 2026, 23:01open
    Building Control Management System (commencement notices)CC BY 4.01 Nov 2026, 03:07open
    Building work nearby 20 in the last 12 months
    1 signed off as finished6 not signed off13 no sign-off needed
    • 83 Grand Canal Quay, Dublin 2, Dublin, D02 WC65 · 20 Oct 2026 · 7-day notice not signed off · WEB2853/25 · 96 m
    • Ridgefield, Aikens Village, Stepaside, Dublin 18, Dublin · 12 Oct 2026 · 209 homes · 7-day notice not signed off · LRD25A/0641/WEB · 96 m
    • 14B Glenamuck Cottages, Dublin 18, Dublin · 12 Oct 2026 · 1 homes · start notice, opted out no sign-off needed · D24A/0925 · 96 m
    • Ridgefield, Aikens Village, Stepaside, Dublin 18, Dublin · 7 Oct 2026 · 209 homes · 7-day notice not signed off · LRD25A/0641/WEB · 96 m
    • 18 Saint Joseph's Avenue, Drumcondra, Dublin 9, D09 W1H2., Dublin 9, D09 W1H2 · 28 Sept 2026 · short notice no sign-off needed · 5037/26 · 490 m
    • Fitzgibbon Street, Dublin 1 · 7 Aug 2026 · 22 homes · start notice not signed off · WEB2100/24 · 314 m
    • 5 Saint Brigid's Road Lower, Dublin 9, D09 Y2V8 · 4 Aug 2026 · short notice no sign-off needed · WEB1872/26 · 446 m
    • 7 Saint Joseph's Avenue, Dublin 9, D09 R6F5 · 31 Jul 2026 · start notice, opted out no sign-off needed · WEB1666/26 · 441 m
    • 1 Gardiner Street Upper, Dublin 1, D01 Y9T1 · 30 Jun 2026 · short notice no sign-off needed · WEB1676/26 · 346 m
    • 55 Russell Avenue, Dublin 3, D03 W248 · 12 Jun 2026 · start notice, opted out no sign-off needed · WEB1142/26 · 237 m
    • 10 Drumcondra Road Lower, Dublin, Dublin 9, D09 KA87 · 8 Jun 2026 · start notice not signed off · 274 m
    • 44 Innisfallen Parade, Dublin, Dublin 7, D07 WN84 · 21 May 2026 · start notice, opted out no sign-off needed · 1984/24 · 495 m
    • 89 Saint Ignatius Road, Phibsborough, Dublin 7, D07 C6V0 · 13 May 2026 · short notice no sign-off needed · 303 m
    • 74 Saint Ignatius Road, phibsborough, Dublin 7, D07 XT68 · 29 Apr 2026 · short notice no sign-off needed · WEB1089/26 · 398 m
    • 17 Grattan Parade, Dublin 9, D09 N8N8 · 23 Apr 2026 · short notice no sign-off needed · WEB5932/25 · 346 m
    • 14 Saint Joseph's Avenue, Dublin 9, D09 E3H4 · 14 Apr 2026 · start notice, opted out no sign-off needed · WEB5782/25 · 473 m
    • 433 North Circular Road, Dublin, Dublin 7, D07 FK53 · 6 Apr 2026 · short notice no sign-off needed · WEB2931/25 · 457 m
    • Eccles Street, Dublin, Dublin 7, D07 WKW8 · 17 Mar 2026 · start notice signed off · 484 m
    • 425 North Circular Road, Dublin, Dublin 7, D07 F865 · 19 Nov 2025 · 1 homes · start notice not signed off · WEB2012/24 · 493 m
    • 30 Belvidere Road, Dublin, Dublin 1, D01 F5W0 · 1 Nov 2025 · start notice, opted out no sign-off needed · 3223/25 · 101 m
    How we work this out
    Each row is a notice the builder sent to the council's building control office before work started. One notice can cover many homes. 'Signed off as finished' means a completion certificate is on file; work done under an opt-out or a short notice doesn't need one.
    Source: Building Control Management System (commencement notices) · fetched 1 Nov 2026, 03:07
    SourceLicenceFetchedLink
    Building Control Management System (commencement notices)CC BY 4.01 Nov 2026, 03:07open
    Homes coming 0 not started
    How we work this out
    Schemes of 10 or more homes approved since 2021, from the council and An Coimisiún Pleanála registers. 'Building started' means the builder told the council's building control office that work was starting (a commencement notice).
    Sources: An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices), National Planning Application Database, Social housing construction status report · fetched 1 Nov 2026, 05:02
    SourceLicenceFetchedLink
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.030 Oct 2026, 23:01open
    Building Control Management System (commencement notices)CC BY 4.01 Nov 2026, 03:07open
    National Planning Application DatabaseCC BY 4.01 Nov 2026, 05:02open
    Social housing construction status reportCC BY-SA 4.023 Oct 2026, 23:02open
    Named places nearby: estate, schemes, crèches, schools

    Named places estate, developments, inspections

    Developments within 1.0 km

    SchemeHomesProgressDistance
    Westward House54no activity on site reported (2026-Q2)208 m
    Fitzgibbon Street Development2222 being built (2026-Q2)270 m
    49-53 North Great Charles Street52—321 m
    Matt Talbot Court Estate9292 not started (2026-Q2)398 m
    Clonliffe Family Hub50—406 m
    Former Holy Cross College11311131 not started (2026-Q2)414 m
    1943636 built (2025-Q2)424 m
    Turnpike Lane Development3939 not started (2026-Q2)491 m

    Crèches and schools inspected

    NameLatest inspectionDistance
    Jonix Educational Services · Crèche2 Oct 2025 · report · Tusla Early Years Inspectorate118 m
    The Georgian Montessori Primary School CLG · Crèche19 Jun 2024 · report · Tusla Early Years Inspectorate203 m
    St. Brigid's Day Nursery · Crèche5 Sept 2024 · report · Tusla Early Years Inspectorate300 m
    Little Learners Dublin Adult Learning Centre · Crèche24 Apr 2026 · report · Tusla Early Years Inspectorate375 m
    Little Learners ABCD · Crèche9 Jul 2025 · report · Tusla Early Years Inspectorate405 m
    Ozanam House Early Learning Centre · Crèche1 Aug 2024 · report · Tusla Early Years Inspectorate415 m
    LYCS Early Years Education Service · Crèche24 Apr 2025 · report · Tusla Early Years Inspectorate559 m
    Little People's Academy Ltd · Crèche7 Jan 2026 · report · Tusla Early Years Inspectorate571 m
    How we work this out
    Organisations only: a person named on an application is never listed. Inspection dates and links are the publisher's; read their report for the findings.
    Sources: Dublin housing delivery pipeline, National Planning Application Database, Department of Education school list, Tusla early years register · fetched 1 Nov 2026, 05:02
    SourceLicenceFetchedLink
    Dublin housing delivery pipelineCC BY 4.026 Oct 2026, 23:00open
    National Planning Application DatabaseCC BY 4.01 Nov 2026, 05:02open
    Department of Education school listCC BY 4.027 Oct 2026, 23:04open
    Tusla early years registerPublic register28 Oct 2026, 23:19open
    How busy is this area Busier than most of Dublin City Council.
    Homes approved
    Here266
    Council middle62
    Homes started
    Here1,228
    Council middle118
    How we work this out
    Homes approved counts schemes of 10 or more homes (one-off houses are not included). Homes started counts every home in a notice that building work was starting. The council figure is the middle value across the council's built-up squares of the same area (3.1 km², about a 1 km circle), so half of them saw more and half fewer.
    Sources: An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices), National Planning Application Database · fetched 1 Nov 2026, 05:02
    SourceLicenceFetchedLink
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.030 Oct 2026, 23:01open
    Building Control Management System (commencement notices)CC BY 4.01 Nov 2026, 03:07open
    National Planning Application DatabaseCC BY 4.01 Nov 2026, 05:02open
    Question 5

    What's the area like?

    Figure 10

    This street block against the council

    65% of homes built before 1971 (council 52%). 15% owner-occupied (council 47%).

    Homes built before 1971
    65% · council 52%
    Homes built since 2001
    2% · council 19%
    Owner-occupied
    15% · council 47%
    Rented
    76% · council 45%
    Children under 15
    7% · council 15%
    Aged 65 and over
    9% · council 13%
    Households with 2+ cars
    2% · council 19%
    Work mainly from home
    8% · council 12%
    This small area (303 people)Dublin

    MeasuredCSO Census 2022, Small Area Population Statistics (CC BY 4.0) · small area 268010006

    Bus
    194 m
    Dorset Street Lwr · 1, 16, 16D · busiest stop within 500 m: 46 an hour at peak
    Planned
    301 m
    DART+ West, DART+ West: Connolly - Maynooth
    Radon
    1 in 20
    homes here likely high (EPA). Test it
    Nearest school
    206 m
    Gardiner Street Convent, 298 pupils
    Homes sold nearby
    117
    in 3 years, 2 new (Property Price Register)
    Schools, stops and the council

    Schools

    • Gardiner Street Convent · primary · 298 pupils · 206 m
    • Hospital School CHI at Temple Street · primary · 66 pupils · 428 m
    • Scoil Ui Chonaill Boys Seniors · primary · 155 pupils · 433 m
    • O'Connell School · postprimary · 222 pupils · 509 m
    • Belvedere College S.J · postprimary · 1011 pupils · 558 m
    • An Taonad Reamhscoile · primary · 96 pupils · 653 m
    • Lindsay Road NS · primary · 95 pupils · 721 m
    • Rutland National School · primary · 152 pupils · 747 m

    Stops 90

    • Dorset Street Lwr · 1, 16, 16D, 19, 33, 40D · 46/hour at peak · 194 m
    • Dorset Street Lwr · 1, 109X, 111X, 16, 19, 33 · 39/hour at peak · 207 m
    • Gardiner St Upr · 33, 33E, 33n, 41, 41B, 41C · 8/hour at peak · 251 m
    • Drumcondra Stn · 1, 101, 16, 16D, 19, 33 · 27/hour at peak · 273 m
    • St Patrick's Road · 109X, 40D, 980, F1, F2, F3 · 15/hour at peak · 287 m
    • St Patrick's Road · 40D, F1, F2, F3 · 19/hour at peak · 309 m
    • Mountjoy Square · 7, 7A, 7B, 7D, 7E · 4/hour at peak · 316 m
    • Synnott Row · 122 · 4/hour at peak · 324 m

    Schools growing or shrinking planning in 3 years · pupils last year

    • Gardiner Street Convent · 206 m-4.8% pupils (298)
    • Hospital School CHI at Temple Street · 428 m-4.3% pupils (66)
    • Scoil Ui Chonaill Boys Seniors · 433 m0% pupils (155)
    • O'Connell School · 509 m+3.3% pupils (222)
    • Belvedere College S.J · 558 m+0.7% pupils (1,011)
    • An Taonad Reamhscoile · 653 m+3.2% pupils (96)

    Open consultations

    Council meetings 30 items

    Public land

    • Health Service Executive · 1.12 ha · 327 m
    • Railway Procurement Agency · 0.41 ha · 382 m
    • Health Service Executive · 5.18 ha · 434 m
    • City of Dublin Education and Training Board · 0.26 ha · 437 m
    • Córas Iompair Éireann · 0.13 ha · 470 m
    • Córas Iompair Éireann · 0.25 ha · 494 m
    Sources: Public transport stops and routes (NTA GTFS), Department of Education school list, National Planning Application Database, Council consultation portals, Council meetings (ModernGov), Land Development Agency public land register, cso_saps_2022, National Transport Authority, Fingal County Council and Dún Laoghaire-Rathdown County Council development plan layers (CC BY 4.0), dartplus.ie project extents over NTA GTFS rail shapes (CC BY 4.0), EPA strategic noise maps, Fingal County Council · fetched 1 Nov 2026, 05:02
    SourceLicenceFetchedLink
    Public transport stops and routes (NTA GTFS)CC BY 4.025 Oct 2026, 23:02open
    Department of Education school listCC BY 4.027 Oct 2026, 23:04open
    National Planning Application DatabaseCC BY 4.01 Nov 2026, 05:02open
    Council consultation portalsPublic1 Nov 2026, 01:08open
    Council meetings (ModernGov)Public1 Nov 2026, 02:24open
    Land Development Agency public land registerCC BY 4.011 Sept 2026, 16:43open
    cso_saps_2022CC BY 4.0—open
    National Transport AuthorityCC BY 4.0——
    Fingal County Council and Dún Laoghaire-Rathdown County Council development plan layers (CC BY 4.0)CC BY 4.0——
    dartplus.ie project extents over NTA GTFS rail shapes (CC BY 4.0)CC BY 4.0——
    EPA strategic noise mapsCC BY 4.0——
    Fingal County CouncilCC BY 4.0——
    Question 6

    What to ask, and who

    1. Keeping work already done was refused (5380/22, 2023): was it removed?
      Ask for: Proof it was removed, or a later grant.
      Seller · solicitor
    2. Apartments (WEB2594/26) awaits a decision: what is planned?
      Ask for: The application on the council's website.
      Seller · solicitor
    3. Protected building: what changes would you be allowed?
      Ask for: A section 57 declaration from the council.
      Council
    4. Stalled build 224 m away (10 Belvedere Court, Dublin): what happens next?
      Ask for: The planning file for 2556/20.
      Council
    5. Application 53 m away open for comments until 25 Nov 2026: comment?
      Ask for: The plans on the council's website (€20 to comment).
      Council
    6. Any work done without planning permission?
      Ask for: An opinion of compliance for the whole house.
      Seller · solicitor
    Reference

    Where this is, the terms, the sources

    Electoral division
    Ballybough B
    Electoral area
    North Inner City
    Council
    Dublin City Council
    Everything we found, as a list 8 lines
    • 3 applications on this site; latest WEB2594/26, no decision yet.
    • Zoned R2 (existing residential); protected building; heritage-listed; no vacant land tax.
    • 7 sites nearby could change: 4 derelict, 1 stalled build, 2 empty zoned plots.
    • 3 applications open for comments nearby; nearest closes 25 Nov 2026.
    • Dorset Street Lwr (bus 1, 16) 194 m away: 46 an hour at morning peak; 352 from all stops within 500 m. Planned: DART+ West 301 m away, railway order granted (July 2024).
    • Here (2022 census): 76% rent (council 45%); 10% of homes empty (council 8%); most built before 1919; 10% drive to work (council 28%); population up 13% since 2016.
    • 4 home extensions within 250 m since 2026. Most were first-floor extensions.
    • The council decides in a median 55 days (about 8 weeks); 1 in 4 is asked for more information.
    What the terms mean 11 terms
    • Vacant land tax (Residential Zoned Land Tax (RZLT)): A yearly tax of 3% of the land's value on land that is zoned for homes and serviced but left unbuilt.
    • Building started (Commencement notice (BCMS)): The builder must tell the council's building control office 14 to 28 days before work starts.
    • Signed off as finished (Certificate of Compliance on Completion): A certificate filed when a building is finished, confirming it meets the building regulations.
    • Approved (Grant of permission): The council said yes, usually with conditions.
    • Listed by the council as derelict (Derelict Sites Register): Councils keep a public list of land and buildings in a ruinous or dangerous state.
    • Protected building (Protected structure (Record of Protected Structures)): A building the council has listed for its heritage value.
    • Comment on an application (Observation / submission): Anyone can comment on a planning application within five weeks of it being lodged, for a €20 fee.
    • Appeal (Appeal to An Coimisiún Pleanála): The applicant, or anyone who commented in time, can appeal the council's decision within four weeks.
    • Permission for work already done (Retention permission): An application to keep something that was built without permission.
    • What the land is zoned for (Zoning objective): The council's development plan sets what each area is for: homes, shops, open space and so on.
    • Building site that stopped (Commenced, no completion certificate): A housing build that told the council it was starting at least three years ago, passed its own planned finish date, and has never been signed off as finished.
    Sources and licences 32
    SourcePublisherLicenceFetched
    EPA strategic noise maps—CC BY 4.0—
    Fingal County Council—CC BY 4.0—
    Fingal County Council and Dún Laoghaire-Rathdown County Council development plan layers (CC BY 4.0)—CC BY 4.0—
    National Transport Authority—CC BY 4.0—
    services-eu1.arcgis.comAn Coimisiún PleanálaCC BY 4.030 Oct 2026
    data.nbco.gov.ieNational Building Control Office (BCMS)CC BY 4.01 Nov 2026
    data.gov.ieVarious (see each layer)CC BY 4.0, CC BY-NC-ND 4.027 Sept 2026
    services-eu1.arcgis.comNational Parks and Wildlife ServiceCC BY 4.027 Sept 2026
    services-eu1.arcgis.comNational Inventory of Architectural HeritageCC BY 4.027 Sept 2026
    gis.epa.ieEnvironmental Protection AgencyCC BY 4.027 Sept 2026
    services-eu1.arcgis.comNational Monuments Service (SMR)CC BY 4.027 Sept 2026
    dlrcoco.citizenspace.comLocal authorities (consultation portals)Public1 Nov 2026
    www2.courts.ie—© the publisher31 Oct 2026
    cso.ie—CC BY 4.0—
    dartplus.ie project extents over NTA GTFS rail shapes (CC BY 4.0)—CC BY 4.0—
    services-eu1.arcgis.comLocal authorities (derelict sites registers)CC BY 4.026 Oct 2026
    services.arcgis.comDublin local authorities (housing delivery pipeline)CC BY 4.026 Oct 2026
    data.epa.ieEnvironmental Protection Agency (LEAP licence register)CC BY 4.026 Oct 2026
    esbnetworks.ie—© the publisher · flag only11 Sept 2026
    transportforireland.ieNational Transport AuthorityCC BY 4.025 Oct 2026
    lda.ieLand Development AgencyCC BY 4.011 Sept 2026
    meetings.fingal.ieLocal authorities (council meetings)Public1 Nov 2026
    services.arcgis.comDepartment of Housing (National Planning Application Database)CC BY 4.01 Nov 2026
    services-eu1.arcgis.comTailte ÉireannCC BY 4.011 Sept 2026
    services-eu1.arcgis.comCSO, Tailte Éireann, OpenStreetMap contributorsCC BY 4.04 Oct 2026
    propertypriceregister.ieProperty Services Regulatory Authority (PPR)© PSRA, PSI licence1 Nov 2026
    data.gov.ieLocal authorities (Record of Protected Structures)CC BY 4.0—
    services.arcgis.comLocal authorities (RZLT maps)CC BY 4.025 Oct 2026
    gov.ieDepartment of EducationCC BY 4.027 Oct 2026
    gov.ieDepartment of HousingCC BY-SA 4.023 Oct 2026
    tusla.ieTusla (Early Years Inspectorate)Public register28 Oct 2026
    services.arcgis.comLocal authorities via the Department of Housing (GZT / MyPlan)CC BY 4.025 Oct 2026
    Measured
    counted from a public register
    Calculated
    a rate or median we worked out from those counts
    Our classification
    we sorted it by reading each description
    Estimate
    inferred from another source (census, map data)
    Rule summary
    the law, simplified: check before relying on it
    How we work this out
    Generated 1 Nov 2026, 06:32 from the Planning Register store; nothing was fetched live. Not a legal search: the council's planning file is the record. Deadlines come from published dates under the Planning and Development Act 2000: confirm with the council before relying on them. Street map © OpenStreetMap contributors; building outlines © Overture Maps Foundation. The text version carries every figure with its source, for an AI assistant.