PlanningRegister.ie
Planning report · Dublin City Council · 500 m around the house · the last 12 months · 26 Oct 2026, 03:06

Dublin Tunnel, Whitehall

53.36149, -6.23403

Homes here mostly date from before 1919. Home extensions nearby almost always get approved (97%).

See on the mapWatch this area

How planning works, with this area's numbers

steps can overlap · medians for home extensions within 1.5 km, 10 years
  1. 1ApplySite notice up, plans online
  2. 2Comments5 weeks, €20. Comment to keep your right to appeal
  3. 3Decision8 weeks by law. Here 55 days
  4. 4Appeal window4 weeks after the decision
  5. 5AppealHere about 7 months
  6. 6PermissionLasts 5 years
  7. 7StartStart notice to the council. Here about 4 months after
  8. 8Sign-offCompletion cert, or the owner opts out
Question 1

What's the planning story of this house?

Figure 1

When it was built, and the rules since

Most homes here were built before 1919, before planning permission was needed.

Timeline from 1896: planning permission needed from October 1964, building regulations from June 1992, building records online from March 2014, sign-off opt-out from September 2015. Most homes here were built 1900–1918.1900191019201930194019501960197019801990200020102020Oct 1964permission neededJun 1992building regulationsMar 2014building records onlineSep 2015owners may opt out of sign-offThis houseBuilt: most homes in this small area date from 1900–1918 (census estimate)most built

Each line is a rule that applies to work done after it.

MeasuredEstimatecouncil register via NPAD · build years: CSO Census 2022, small area

On this site
G5
Zoning · Open space and amenity
No
Protected or listed · on the council's list
No
Vacant land tax · not on the map
1 in 20
Radon (EPA) · homes with high radon
Zoning, protection, tax and flood: the detail
Zoning
What it says

Zone Z9 - DEV PLAN 2022-2028

ZoningG5 · Open space and amenity
What it says

Z9: Amenity/Open Space Lands/Green Network: To preserve, provide and improve recreational amenity, open space and ecosystem services.

Land zoned to stay open — parks, playing fields, amenity corridors. Built development is very hard to justify, which also means the view is protected.

development plan 2022 2028 · 14 Dec 2022 – 31 Dec 2028

ZoningG5 · Open space and amenity
What it says

Z9: Amenity/Open Space Lands/Green Network: To preserve, provide and improve recreational amenity, open space and ecosystem services.

Land zoned to stay open — parks, playing fields, amenity corridors. Built development is very hard to justify, which also means the view is protected.

development plan 2022 2028 variation no 11 · 14 Dec 2022 – 31 Dec 2028

Radon1 in 20 homes have high radon (EPA)

Not on this site: protected building, heritage inventory, monument zone, conservation area, EU nature site, EU bird site, natural heritage area, tree order, landslide risk, derelict list.

Licensed industrial sites within 1.0 km: Everlac Paints Ltd (388 m); Cahill Printers Limited (592 m); licence W0083 (925 m)

Vacant land taxNo not on the map
Flood riskWithin 100 m OPW map area within 100 m · floodinfo.ie
Within 500 mCountFor example
Licensed industrial sites1Everlac Paints Ltd
Natural heritage areas1North Dublin Bay
Heritage inventory buildings17St. Mary's Church; Garadice House
Radon grid squares1
Monuments1R149625
EU bird sites1South Dublin Bay and River Tolka Estuary SPA
How we work this out
'On this site' means the record's own map outline touches the registered parcel (or a 12 m circle round the point where there is no parcel). Only the council's own list confirms a protected building; ask the council if in doubt. The OPW flood map's licence lets us show a yes/no only. Land on the vacant land tax map nearby: 3 on the draft 2027 map; 3 on the final 2026 map.
Sources: Development plan zoning (councils), EPA licensed sites, EPA radon map, EPA licensed facilities (LEAP), Residential Zoned Land Tax maps, Constraint layers (bundle), OPW flood maps (CFRAM), OPW flood maps (NIFM), Natural Heritage Areas (NPWS), National Inventory of Architectural Heritage, Sites and Monuments Record, Special Protection Areas (NPWS) · fetched 25 Oct 2026, 23:43
SourceLicenceFetchedLink
Development plan zoning (councils)CC BY 4.025 Oct 2026, 23:06open
EPA licensed sitesCC BY 4.027 Sept 2026, 19:36open
EPA radon mapCC BY 4.027 Sept 2026, 19:36open
EPA licensed facilities (LEAP)CC BY 4.019 Oct 2026, 23:51open
Residential Zoned Land Tax mapsCC BY 4.025 Oct 2026, 23:43open
Constraint layers (bundle)CC BY 4.0, CC BY-NC-ND 4.027 Sept 2026, 19:37open
OPW flood maps (CFRAM)CC BY-NC-ND 4.0 · shown as a yes/no only11 Sept 2026, 19:11open
OPW flood maps (NIFM)CC BY-NC-ND 4.0 · shown as a yes/no only11 Sept 2026, 19:11open
Natural Heritage Areas (NPWS)CC BY 4.027 Sept 2026, 19:27open
National Inventory of Architectural HeritageCC BY 4.027 Sept 2026, 19:35open
Sites and Monuments RecordCC BY 4.027 Sept 2026, 19:29open
Special Protection Areas (NPWS)CC BY 4.027 Sept 2026, 19:27open
How we work this out
Applications whose site outline (or map point) falls on this property. 'No sign building has started' means we found no notice to the council's building control office; small jobs don't always file one, so ask. A missing completion certificate is not proof of a problem: an owner can opt out of official sign-off for a house or extension built for themselves.
Sources: Building Control Management System (commencement notices), National Planning Application Database · fetched 26 Oct 2026, 01:57
SourceLicenceFetchedLink
Building Control Management System (commencement notices)CC BY 4.026 Oct 2026, 01:57open
National Planning Application DatabaseCC BY 4.026 Oct 2026, 01:32open
Question 2

Could you extend?

Nothing on this site restricts it: not protected, not in a conservation area.

Figure 2

What happened to applications like yours

Extensions are almost always approved here: 90–100% by type. A new house in a garden is harder: 74% approved, and 1 in 2 are asked for more information.

Single-storey rear68 decided · more info asked 21%
99% · council 97%
Two-storey rear61 decided · more info asked 18%
98% · council 96%
Two-storey side11 decided · more info asked 36%
100% · council 98%
Single-storey side10 decided · more info asked 30%
100% · council 99%
Attic or dormer119 decided · more info asked 11%
98% · council 96%
First-floor29 decided · more info asked 21%
90% · council 94%
Garage conversion11 decided · more info asked 27%
100% · council 99%
New house in a garden or site43 decided · more info asked 51%
74% · council 71%
Approved nearbyDublin overall

Decided applications within 1.5 km, received in the last 10 years. The kind of work is read from each description.

CalculatedOur classificationcouncil register via NPAD · 352 nearby, 5,598 council-wide

Extensions and refusals right beside you 0 within 250 m · 0 refused within 100 m

Extensions and refusals near you 0 extensions within 250 m · the last 12 months

No home extensions within 250 m in the last 12 months.

Refused within 100 m 0 in the last 12 months

Nothing refused this close in the last 12 months.

    How we work this out
    Home extensions are read from the application's description (extension, attic or dormer, porch, garage conversion, garden room), so a few may be missed or mislabelled. The kind is the first that fits: a dormer with a rear extension counts as a dormer. Refusal reasons come from An Coimisiún Pleanála's inspector reports, so they exist only where the refusal was appealed (Dún Laoghaire-Rathdown so far). The council's own reasons are on its planning file.
    Sources: National Planning Application Database, An Coimisiún Pleanála cases (ArcGIS feed) · fetched 26 Oct 2026, 01:32
    SourceLicenceFetchedLink
    National Planning Application DatabaseCC BY 4.026 Oct 2026, 01:32open
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.023 Oct 2026, 23:08open
    Sources: An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices), National Planning Application Database · fetched 26 Oct 2026, 01:57
    SourceLicenceFetchedLink
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.023 Oct 2026, 23:08open
    Building Control Management System (commencement notices)CC BY 4.026 Oct 2026, 01:57open
    National Planning Application DatabaseCC BY 4.026 Oct 2026, 01:32open
    Question 3

    How long, and what if someone objects?

    Figure 3

    A home extension's journey here

    A decision takes 55 days. 1 in 5 is asked for more information, which adds about 75 days. Building starts about 4 months after permission.

    Comments open: 5 weeks · €20; Council decision: 55 days; If more info asked (1 in 5): 131 days; Appeal window: 4 weeks; If appealed: +211 days; Building starts: 118 days after permission0 mo3 mo6 mo9 mo12 mo15 mo18 moComments openComments close 5 weeks after the application is lodged5 weeks · €20Council decisionDecision: median 55 days, middle half 54–55 (n=292)55 daysIf more info asked (1 in 5)With further information: median 131 days (n=67)131 daysAppeal windowAnyone who commented can appeal within 4 weeks of the decision4 weeksIf appealedAt An Coimisiún Pleanála: median 211 days (n=99, all appeals within 1.5 km)+211 daysBuilding startsStart notice: median 118 days after permission (n=176)118 days after permissionSigned off519 days after the start, for the few who file. 57% of owners opt out of sign-off

    Bars are medians; whiskers show the middle half. Medians of separate steps don't add up exactly.

    Calculated359 decided home extensions, 181 start notices, 99 decided appeals · within 1.5 km, 10 years · NPAD, BCMS, An Coimisiún Pleanála

    Figure 4

    What appeals changed

    9 of 31 appealed refusals became permissions. 14 of 69 appealed approvals were reversed.

    Refusals appealed31 decided
    9 became permissions
    Approvals appealed69 decided
    14 reversed
    Ended approvedEnded refusedWithdrawn, invalid or other

    Every appeal decided within 1.5 km in 10 years, any kind of development.

    CalculatedAn Coimisiún Pleanála cases linked to the council file

    Question 4

    What's changing around you?

    Street map around Dublin Tunnel, Whitehall with 14 numbered planning items
    ⌖ the houseWindow closingDerelict buildingApproved, not startedEmpty land zoned for homesApprovedRefused
    1. 122, Hope Avenue WEB2952/26Approved · 349 m
    2. 218 Cadogan Road Dublin 3 D03K650 DS912Derelict building · 339 m
    3. 320 Faith Avenue Dublin 3 D03PP21 DS1916Derelict building · 377 m
    4. 447/49 Fairview Strand Dublin 3 D03E271 DS1017Derelict building · 446 m
    5. 547/49 Fairview Strand WEB5185/25Approved, no sign building has started · 454 m
    6. 60.1 ha zoned for homesEmpty land zoned for homes · 243 m
    7. 70.6 ha zoned for homesEmpty land zoned for homes · 305 m
    8. 82, Haverty Road WEB1513/26Approved · 335 m
    9. 9Site to rear of 13 Windsor Avenue, on Windsor Lane WEB5901/25Approved · 339 m
    10. 1017, Cadogan Road WEB5873/25Approved · 356 m
    11. 1134 Cadogan Road, Dublin 3 WEB1135/26Approved · 377 m
    12. 12Bank Of Ireland, 26 Marino Mart WEB1247/26Approved · 406 m
    13. 1316, Saint Aidan's Park WEB1711/26Approved · 451 m
    14. 1418 Crescent Gardens, East Wall 5091/26Refused · 492 m
    Figure 5

    What happens to applications within 500 m

    Permission isn't building. Of 85 permissions since 2016, 28 show a start notice and 6 have a completion certificate.

    115 applications lodged within 500 m. Council: 88 approved, 12 refused. After appeals: 85 approved. Of those: 6 signed off, 9 built with the owner's opt-out, 13 started, 57 with no start notice found, 0 ran out.LODGEDCOUNCIL DECISIONAFTER APPEALSWHAT HAPPENED NEXT88: lodged → approved12: lodged → refused15: lodged → withdrawn or invalid85: approved → approved12: refused → refused15: withdrawn or invalid → withdrawn2 approved by the council, refused after an appeal1 approved by the council, withdrawn or invalid after an appeal57: approved → no start notice found9: approved → built, owner opted out13: approved → started, not signed off6: approved → signed off115 lodged115 lodged88 approved88 approved12 refused12 refused15 withdrawn or invalid15 withdrawn or invalid85 approved85 approved14 refused14 refused16 withdrawn16 withdrawn57 no start notice found57 no start notice found9 built, owner opted out9 built, owner opted out13 started, not signed off13 started, not signed off6 signed off6 signed off

    Purple bands are refusals turned into permissions on appeal. "No start notice found" includes small jobs that never needed one and notices we couldn't match.

    Measured115 applications in 10 years · NPAD, An Coimisiún Pleanála, BCMS start notices and completion certificates

    Figure 6

    The next 30 days

    1 deadline within 500 m; the first closes 27 Oct 2026.

    1 deadlines in the next 30 days: 2026-10-27 WEB2952/26: GRANT PERMISSION — The development will consist of the demolition of the existing single-storey structure and construction of a part singletoday31 Oct5 Nov10 Nov15 Nov20 Nov25 NovWEB2952/26: GRANT PERMISSION — The development will consist of the demolition of the existing single-storey structure and construction of a part single · 349 m away · 2026-10-27
    Time to appeal ends
    • Time to appeal ends 27 Oct 20261 day left
      1WEB2952/26 · GRANT PERMISSION — The development will consist of the demolition of the existing single-storey structure and…
      €220 to An Coimisiún Pleanála (€110 observer) · 349 m away

    Measuredcouncil registers and An Coimisiún Pleanála · deadlines worked out from the dates on file

    Figure 7

    Approved, stalled or planned, not built yet

    DART+ West is planned 549 m away.

    DART+ West, DART+ West:…: railway order granted (July 2024)20242025202620272028DART+ West, DART+ West:…549 m · plannedrailway order granted (July 2024)today

    Each row is a dated fact from a public register: no score and no forecast.

    Measuredcouncil registers, BCMS, derelict sites registers, development plan layers (CC BY 4.0)

    Sites that could change 5 within 500 m

    Derelict building 3

    • 218 Cadogan Road Dublin 3 D03K650 · derelict since Jul 2022 · 339 m
    • 320 Faith Avenue Dublin 3 D03PP21 · derelict since Jul 2024 · 377 m
    • 447/49 Fairview Strand Dublin 3 D03E271 · derelict since Apr 2026 · 446 m

    Empty land zoned for homes 2

    • 60.1 ha zoned for homes · no homes built on it yet · 243 m
    • 70.6 ha zoned for homes · no homes built on it yet · 305 m
    Sources: An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices), Derelict sites registers, Council meetings (ModernGov), National Planning Application Database, Residential Zoned Land Tax maps · fetched 26 Oct 2026, 01:57
    SourceLicenceFetchedLink
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.023 Oct 2026, 23:08open
    Building Control Management System (commencement notices)CC BY 4.026 Oct 2026, 01:57open
    Derelict sites registersCC BY 4.019 Oct 2026, 23:17open
    Council meetings (ModernGov)Public26 Oct 2026, 01:54open
    National Planning Application DatabaseCC BY 4.026 Oct 2026, 01:32open
    Residential Zoned Land Tax mapsCC BY 4.025 Oct 2026, 23:43open
    Figure 8

    Applications within 500 m, by year

    Between 15 and 25 a year; busiest 2022. 88% of decisions were approvals.

    2021: 26, 2022: 25, 2023: 15, 2024: 17, 2025: 18, 2026: 1401020302021: 20 approved2021: 3 refused2021: 3 withdrawn or invalid26’21*2022: 21 approved2022: 4 refused25’222023: 14 approved2023: 1 refused15’232024: 16 approved2024: 1 refused17’242025: 12 approved2025: 2 refused2025: 4 withdrawn or invalid18’252026: 5 approved2026: 1 refused2026: 8 withdrawn or invalid14’26*
    ApprovedRefusedWithdrawn or invalidUndecided

    2021 and 2026 are part years (*). Exemption requests and time extensions are left out.

    Measuredcouncil register via NPAD

    Every application within 500 m 18 in the last 12 months

    See every application on the map

    How we work this out
    Descriptions are shortened by the national planning database (to 80 characters in Dún Laoghaire-Rathdown, 70 in Fingal), and it does not publish applicants' names.
    Sources: National Planning Application Database, An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices) · fetched 26 Oct 2026, 01:57
    SourceLicenceFetchedLink
    National Planning Application DatabaseCC BY 4.026 Oct 2026, 01:32open
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.023 Oct 2026, 23:08open
    Building Control Management System (commencement notices)CC BY 4.026 Oct 2026, 01:57open
    Building work nearby 6 in the last 12 months
    6 no sign-off needed
    • 34 Cadogan Road, Dublin, Dublin 3, D03 XY07 · 25 May 2026 · short notice no sign-off needed · WEB1135/26 · 383 m
    • 2 Haverty Road, Marino, Dublin 3, D03 V026 · 25 Mar 2026 · start notice, opted out no sign-off needed · WEB2610/25 · 348 m
    • 1 Edges Corner, Fairview, Dublin, Dublin 3 · 2 Mar 2026 · 1 homes · start notice, opted out no sign-off needed · WEB2216/25 · 413 m
    • 14 Leinster Street East, Dublin, Dublin 3, D03 RC99 · 24 Feb 2026 · start notice, opted out no sign-off needed · WEB1611/22 · 468 m
    • 14 Fairview Green, Dublin 3, D03 T8K3 · 25 Nov 2025 · short notice no sign-off needed · WEB1908/25 · 460 m
    • 124 Shelmartin Avenue, Dublin 3, D03 T8P3 · 14 Nov 2025 · short notice no sign-off needed · WEB2250/25 · 479 m
    How we work this out
    Each row is a notice the builder sent to the council's building control office before work started. One notice can cover many homes. 'Signed off as finished' means a completion certificate is on file; work done under an opt-out or a short notice doesn't need one.
    Source: Building Control Management System (commencement notices) · fetched 26 Oct 2026, 01:57
    SourceLicenceFetchedLink
    Building Control Management System (commencement notices)CC BY 4.026 Oct 2026, 01:57open
    Homes coming 10 not started
    How we work this out
    Schemes of 10 or more homes approved since 2021, from the council and An Coimisiún Pleanála registers. 'Building started' means the builder told the council's building control office that work was starting (a commencement notice).
    Sources: An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices), National Planning Application Database, Social housing construction status report · fetched 26 Oct 2026, 01:57
    SourceLicenceFetchedLink
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.023 Oct 2026, 23:08open
    Building Control Management System (commencement notices)CC BY 4.026 Oct 2026, 01:57open
    National Planning Application DatabaseCC BY 4.026 Oct 2026, 01:32open
    Social housing construction status reportCC BY-SA 4.023 Oct 2026, 23:02open
    Named places nearby: estate, schemes, crèches, schools

    Named places estate, developments, inspections

    Developments within 1.0 km

    SchemeHomesProgressDistance
    45-47 Fairview Avenue Lower25no activity on site reported (2025-Q4)244 m
    Ready Mix Site6868 not started (2026-Q2)305 m
    19 and 21 Esmond Avenue2121 not started (2026-Q2)469 m
    61-65 Fairview Strand and 3 Esmond Avenue8282 not started (2026-Q2)483 m
    9/9a Richmond Avenue2828 being built (2026-Q2)666 m
    17-19 Richmond Avenue2121 not started (2026-Q2)670 m
    St. Vincent's Hospital Site779283 being built · 496 not started (2026-Q2)726 m
    Richmond Road and Convent Avenue104104 not started (2026-Q2)770 m

    Crèches and schools inspected

    NameLatest inspectionDistance
    Fairview Creche and Montessori · Crèche3 Jul 2025 · report · Tusla Early Years Inspectorate415 m
    Lullabys Montessori & Afterschool · Crèche13 May 2025 · report · Tusla Early Years Inspectorate430 m
    Westwood Childcare · Crèche10 Mar 2026 · report · Tusla Early Years Inspectorate442 m
    Smart Kids Creche/Montessori · Crèche7 Nov 2024 · report · Tusla Early Years Inspectorate633 m
    Larkin Childcare Facility · Crèche15 Aug 2024 · report · Tusla Early Years Inspectorate648 m
    Lullaby's Creche & Montessori · Crèche15 Apr 2025 · report · Tusla Early Years Inspectorate663 m
    First Steps Creche and Montessori · Crèche9 Sept 2024 · report · Tusla Early Years Inspectorate690 m
    Larkin Early Education Service · Crèche11 Mar 2026 · report · Tusla Early Years Inspectorate749 m
    How we work this out
    Organisations only: a person named on an application is never listed. Inspection dates and links are the publisher's; read their report for the findings.
    Sources: Dublin housing delivery pipeline, National Planning Application Database, Department of Education school list, Tusla early years register · fetched 26 Oct 2026, 01:32
    SourceLicenceFetchedLink
    Dublin housing delivery pipelineCC BY 4.019 Oct 2026, 23:03open
    National Planning Application DatabaseCC BY 4.026 Oct 2026, 01:32open
    Department of Education school listCC BY 4.027 Sept 2026, 23:32open
    Tusla early years registerPublic register21 Oct 2026, 23:37open
    How busy is this area Busier than most of Dublin City Council.
    Homes approved
    Here139
    Council middle52
    Homes started
    Here1,130
    Council middle95
    How we work this out
    Homes approved counts schemes of 10 or more homes (one-off houses are not included). Homes started counts every home in a notice that building work was starting. The council figure is the middle value across the council's built-up squares of the same area (3.1 km², about a 1 km circle), so half of them saw more and half fewer.
    Sources: An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices), National Planning Application Database · fetched 26 Oct 2026, 01:57
    SourceLicenceFetchedLink
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.023 Oct 2026, 23:08open
    Building Control Management System (commencement notices)CC BY 4.026 Oct 2026, 01:57open
    National Planning Application DatabaseCC BY 4.026 Oct 2026, 01:32open
    Question 5

    What's the area like?

    Figure 9

    This street block against the council

    70% of homes built before 1971 (council 52%). 14% owner-occupied (council 47%).

    Homes built before 1971
    70% · council 52%
    Homes built since 2001
    8% · council 19%
    Owner-occupied
    14% · council 47%
    Rented
    84% · council 45%
    Children under 15
    9% · council 15%
    Aged 65 and over
    4% · council 13%
    Households with 2+ cars
    6% · council 19%
    Work mainly from home
    8% · council 12%
    This small area (350 people)Dublin

    MeasuredCSO Census 2022, Small Area Population Statistics (CC BY 4.0) · small area 268049004

    Rail noise
    60–64 dB
    day–night average (EPA 2022)
    Bus
    203 m
    Fairview · 130, 14, 15 · busiest stop within 500 m: 45 an hour at peak
    Planned
    549 m
    DART+ West, DART+ West: Connolly - Maynooth
    Radon
    1 in 20
    homes here likely high (EPA). Test it
    Flood
    Yes
    OPW flood map area within 100 m
    Nearest school
    270 m
    St Josephs C.B.S., 310 pupils
    Homes sold nearby
    941
    in 3 years, 50 new (Property Price Register)
    Schools, stops and the council

    Schools

    • St Josephs C.B.S. · postprimary · 310 pupils · 270 m
    • Marino College · postprimary · 297 pupils · 364 m
    • St Joseph¿s Primary School, An Edmund Rice School · primary · 116 pupils · 369 m
    • St Marys NS · primary · 212 pupils · 412 m
    • Howth Rd Mxd NS · primary · 89 pupils · 606 m
    • St Columbas NS Mxd · primary · 90 pupils · 629 m
    • St Joseph'S Adolescent School · primary · 11 pupils · 843 m
    • St Josephs Mxd NS · primary · 211 pupils · 862 m

    Stops 61

    • Fairview · 130, 14, 15, 27, 27A, 27B · 45/hour at peak · 203 m
    • Fairview · 130, 14, 15, 27, 27A, 27B · 43/hour at peak · 218 m
    • Eastpoint · N4 · 5/hour at peak · 257 m
    • Annesley Br Road · 29n, 31n · 263 m
    • Eastpoint · N4 · 5/hour at peak · 270 m
    • North Strand FS · 53 · 1/hour at peak · 315 m
    • Portside Ct · 53 · 1/hour at peak · 366 m
    • Marino Mart · 130, 14, 15, 27, 27A, 27B · 43/hour at peak · 367 m

    Schools growing or shrinking planning in 3 years · pupils last year

    • St Josephs C.B.S. · 270 m+17.9% pupils (310) · temporary classrooms 2024, approved
    • Marino College · 363 m+7.2% pupils (297)
    • St Joseph¿s Primary School, An Edmund Rice School · 369 m+0.9% pupils (116) · temporary classrooms 2024, approved
    • St Marys NS · 412 m+2.9% pupils (212)
    • Howth Rd Mxd NS · 606 m-4.3% pupils (89)
    • St Columbas NS Mxd · 629 m-1.1% pupils (90)

    Open consultations

    Council meetings 30 items

    Public land

    • Dublin City Council · 21.32 ha · 0 m
    • Córas Iompair Éireann · 5.06 ha · 131 m
    • Dublin City Council · 3.34 ha · 186 m
    • Dublin City Council · 5.2 ha · 202 m
    • Dublin City Council · 0.56 ha · 233 m
    • Dublin City Council · 0.14 ha · 240 m
    Sources: Public transport stops and routes (NTA GTFS), Department of Education school list, National Planning Application Database, Council consultation portals, Council meetings (ModernGov), Land Development Agency public land register, cso_saps_2022, National Transport Authority, Fingal County Council and Dún Laoghaire-Rathdown County Council development plan layers (CC BY 4.0), dartplus.ie project extents over NTA GTFS rail shapes (CC BY 4.0), EPA strategic noise maps, Fingal County Council · fetched 26 Oct 2026, 01:54
    SourceLicenceFetchedLink
    Public transport stops and routes (NTA GTFS)CC BY 4.025 Oct 2026, 23:02open
    Department of Education school listCC BY 4.027 Sept 2026, 23:32open
    National Planning Application DatabaseCC BY 4.026 Oct 2026, 01:32open
    Council consultation portalsPublic26 Oct 2026, 00:55open
    Council meetings (ModernGov)Public26 Oct 2026, 01:54open
    Land Development Agency public land registerCC BY 4.011 Sept 2026, 16:43open
    cso_saps_2022CC BY 4.0—open
    National Transport AuthorityCC BY 4.0——
    Fingal County Council and Dún Laoghaire-Rathdown County Council development plan layers (CC BY 4.0)CC BY 4.0——
    dartplus.ie project extents over NTA GTFS rail shapes (CC BY 4.0)CC BY 4.0——
    EPA strategic noise mapsCC BY 4.0——
    Fingal County CouncilCC BY 4.0——
    Question 6

    What to ask, and who

    1. Flood risk area within 100 m: can you insure it?
      Ask for: A flood-cover quote before sale agreed.
      Insurer
    2. Zoned G5 (open space and amenity), not for homes: could you extend?
      Ask for: A solicitor's or planner's view.
      Solicitor · planner
    3. Any work done without planning permission?
      Ask for: An opinion of compliance for the whole house.
      Seller · solicitor
    Reference

    Where this is, the terms, the sources

    Electoral division
    Clontarf West D
    Electoral area
    Clontarf
    Council
    Dublin City Council
    Everything we found, as a list 8 lines
    • Zoned G5 (open space and amenity); not protected; no vacant land tax; flood risk area within 100 m.
    • 5 sites nearby could change: 3 derelict, 2 empty zoned plots.
    • 10 homes approved nearby, not started; largest 10 at 47/49 Fairview Strand.
    • North Strand FS (bus 130, 14) 411 m away: 46 an hour at morning peak; 280 from all stops within 500 m. Planned: DART+ West 549 m away, railway order granted (July 2024).
    • Noise from rail mapped at 60–64 dB (day-evening-night average, EPA 2022).
    • Here (2022 census): 84% rent (council 45%); 6% of homes empty (council 8%); most built before 1919; 14% drive to work (council 28%); population up 10% since 2016.
    • The council decides in a median 55 days (about 8 weeks); 1 in 4 is asked for more information.
    • Homes started within 1 km: 856 in the last year, 153 three years before.
    What the terms mean 7 terms
    • Vacant land tax (Residential Zoned Land Tax (RZLT)): A yearly tax of 3% of the land's value on land that is zoned for homes and serviced but left unbuilt.
    • Building started (Commencement notice (BCMS)): The builder must tell the council's building control office 14 to 28 days before work starts.
    • Signed off as finished (Certificate of Compliance on Completion): A certificate filed when a building is finished, confirming it meets the building regulations.
    • Approved (Grant of permission): The council said yes, usually with conditions.
    • Listed by the council as derelict (Derelict Sites Register): Councils keep a public list of land and buildings in a ruinous or dangerous state.
    • Appeal (Appeal to An Coimisiún Pleanála): The applicant, or anyone who commented in time, can appeal the council's decision within four weeks.
    • What the land is zoned for (Zoning objective): The council's development plan sets what each area is for: homes, shops, open space and so on.
    Sources and licences 35
    SourcePublisherLicenceFetched
    EPA strategic noise maps—CC BY 4.0—
    Fingal County Council—CC BY 4.0—
    Fingal County Council and Dún Laoghaire-Rathdown County Council development plan layers (CC BY 4.0)—CC BY 4.0—
    National Transport Authority—CC BY 4.0—
    services-eu1.arcgis.comAn Coimisiún PleanálaCC BY 4.023 Oct 2026
    data.nbco.gov.ieNational Building Control Office (BCMS)CC BY 4.026 Oct 2026
    data.gov.ieVarious (see each layer)CC BY 4.0, CC BY-NC-ND 4.027 Sept 2026
    gis.epa.ieEnvironmental Protection AgencyCC BY 4.027 Sept 2026
    s3.eu-west-1.amazonaws.comOffice of Public WorksCC BY-NC-ND 4.0 · flag only11 Sept 2026
    s3.eu-west-1.amazonaws.comOffice of Public WorksCC BY-NC-ND 4.0 · flag only11 Sept 2026
    services-eu1.arcgis.comNational Parks and Wildlife ServiceCC BY 4.027 Sept 2026
    services-eu1.arcgis.comNational Inventory of Architectural HeritageCC BY 4.027 Sept 2026
    gis.epa.ieEnvironmental Protection AgencyCC BY 4.027 Sept 2026
    services-eu1.arcgis.comNational Monuments Service (SMR)CC BY 4.027 Sept 2026
    services-eu1.arcgis.comNational Parks and Wildlife ServiceCC BY 4.027 Sept 2026
    dlrcoco.citizenspace.comLocal authorities (consultation portals)Public26 Oct 2026
    www2.courts.ie—© the publisher25 Oct 2026
    cso.ie—CC BY 4.0—
    dartplus.ie project extents over NTA GTFS rail shapes (CC BY 4.0)—CC BY 4.0—
    services-eu1.arcgis.comLocal authorities (derelict sites registers)CC BY 4.019 Oct 2026
    services.arcgis.comDublin local authorities (housing delivery pipeline)CC BY 4.019 Oct 2026
    data.epa.ieEnvironmental Protection Agency (LEAP licence register)CC BY 4.019 Oct 2026
    esbnetworks.ie—© the publisher · flag only11 Sept 2026
    transportforireland.ieNational Transport AuthorityCC BY 4.025 Oct 2026
    lda.ieLand Development AgencyCC BY 4.011 Sept 2026
    meetings.fingal.ieLocal authorities (council meetings)Public26 Oct 2026
    services.arcgis.comDepartment of Housing (National Planning Application Database)CC BY 4.026 Oct 2026
    services-eu1.arcgis.comTailte ÉireannCC BY 4.011 Sept 2026
    services-eu1.arcgis.comCSO, Tailte Éireann, OpenStreetMap contributorsCC BY 4.04 Oct 2026
    propertypriceregister.ieProperty Services Regulatory Authority (PPR)© PSRA, PSI licence26 Oct 2026
    services.arcgis.comLocal authorities (RZLT maps)CC BY 4.025 Oct 2026
    gov.ieDepartment of EducationCC BY 4.027 Sept 2026
    gov.ieDepartment of HousingCC BY-SA 4.023 Oct 2026
    tusla.ieTusla (Early Years Inspectorate)Public register21 Oct 2026
    services.arcgis.comLocal authorities via the Department of Housing (GZT / MyPlan)CC BY 4.025 Oct 2026
    Measured
    counted from a public register
    Calculated
    a rate or median we worked out from those counts
    Our classification
    we sorted it by reading each description
    Estimate
    inferred from another source (census, map data)
    Rule summary
    the law, simplified: check before relying on it
    How we work this out
    Generated 26 Oct 2026, 03:06 from the Planning Register store; nothing was fetched live. Not a legal search: the council's planning file is the record. Deadlines come from published dates under the Planning and Development Act 2000: confirm with the council before relying on them. Street map © OpenStreetMap contributors; building outlines © Overture Maps Foundation. The text version carries every figure with its source, for an AI assistant.