PlanningRegister.ie
Dublin City Council · 3902/24 · Permission

45-47 Fairview Avenue Lower

25 apartments5 storeysNewcourt Retirement Fund Managers LimitedFairview, Dublin City Council

  1. 25 Jun 2024Received
  2. 15 Aug 2024Refuse permission
  3. 11 Sept 2024Appealed
  4. 22 Dec 2025Appeal: Refused
Status
Appeal decided — refused
Decision
Refuse permission · 15 Aug 2024
Size
25 apartments · up to 5 storeys
Uses
residential, apartments, retail
Applicant
Newcourt Retirement Fund Managers Limited
Site
920 m²
Appeal
ACP 320792 · Refused

Building progress councils’ figures, Q4 2025

25 homes proposed; none permitted yet (Q4 2025).

25
homes proposed
0
homes permitted
0
homes started on site
0
homes completed

completed · under construction · not started

Quarter by quarter
QuarterPermittedUnder constructionCompletedCompleted share
Q2 2025—00
Q3 2025000
Q4 2025000

The scheme

Newcourt Retirement Fund Managers Limited proposes the demolition of an existing three-storey commercial building at 45-47 Fairview Avenue Lower, Dublin 3. The development consists of two blocks containing 25 residential apartments and one commercial unit. The scheme includes basement parking, communal amenity space, and ancillary site works.

it proposes the construction of 25 residential apartments

What the register says

PERMISSION : The development will consist of: (i) demolition of existing three-storey commercial building; (ii) construction of a mixed-use development comprising 2 no. blocks, each with partial sedum roof and 4 no. rooflights, (Block A is three-storey over basement with set-back third floor level & Block B three storey over basement level with set-back fourth/fifth floor levels) which together accommodate 25 no. residential apartments (7 no. studio, 10 no. one bedroom & 8 no. two-bedroom - each served by private balcony/courtyard) and 1 no. commercial unit (77 sq.m); (iii) provision of refuse store, loading bay, storage lockers (26 no.), vehicular parking spaces (2 no.), bicycle parking spaces (49 no.) and bicyle servicing area at street/basement level; (iv) provision of communal amenity space (219 sq.m) and general planting at ground floor level; and, (v) all ancillary works inclusive of boundary treatments, visitor bicyle parking spaces (8 No. planting and SuDS, necessary to facilitate the development

Summary from the register record.

Planning timeline 4 steps

  • 25 Jun 2024
    Application lodged — Standard
  • 15 Aug 2024
    Council decision — Refuse
  • 10 Sept 2024
    Appealed to An Coimisiún Pleanála — ABP-320792-24
  • 22 Dec 2025
    Commission decision — Refused

The site 920 m²

Boundary of 45-47 Fairview Avenue Lower as the Dublin councils map it in the housing pipeline.

Planning applications inside the site 2 applications in the last 10 years

Appeals inside the site 4 with An Coimisiún Pleanála

Around 45-47 Fairview Avenue Lower 1 km

Explore from here
Click a dot to open its row.
Loading planning applications…
Free · during launch · limited time

Full planning report for 53.36363, -6.23562

Zoning, appeals, sold prices, flood and heritage — the whole area in one PDF.

No account, no payment. Not a statutory planning search.

Other big developments nearby within 2 km

Something wrong on this scheme page, or a record you want corrected or removed? Contact us and we will check it against the source.