PlanningRegister.ie
Planning report · Dublin City Council · 500 m around the house · the last 12 months · 1 Nov 2026, 09:33

Dargle Road

53.36606, -6.25876

Homes here mostly date from the 1990s. Home extensions nearby almost always get approved (96%). 1614 homes approved 439 m away haven't started.

See on the mapWatch this area

How planning works, with this area's numbers

steps can overlap · medians for home extensions within 1.5 km, 10 years
  1. 1ApplySite notice up, plans online
  2. 2Comments5 weeks, €20. Comment to keep your right to appeal
  3. 3Decision8 weeks by law. Here 55 days
  4. 4Appeal window4 weeks after the decision
  5. 5AppealHere about 6 months
  6. 6PermissionLasts 5 years
  7. 7StartStart notice to the council. Here about 5 months after
  8. 8Sign-offCompletion cert, or the owner opts out
Question 1

What's the planning story of this house?

Figure 1

When it was built, and the rules since

Most homes here were built 1991–2000, under planning permission and building regulations.

Timeline from 1955: planning permission needed from October 1964, building regulations from June 1992, building records online from March 2014, sign-off opt-out from September 2015. Most homes here were built 1991–2000.1960197019801990200020102020Oct 1964permission neededJun 1992building regulationsMar 2014building records onlineSep 2015owners may opt out of sign-offThis houseAll of Dargle RoadBuilt: most homes in this small area date from 1991–2000 (census estimate)most built2021: 1 file on Dargle Road2022: 1 file on Dargle Road2023: 1 file on Dargle Road3 files

Each line is a rule that applies to work done after it.

MeasuredEstimatecouncil register via NPAD · build years: CSO Census 2022, small area

On this site
R2
Zoning · Existing residential
Yes
Protected or listed · a protected building (St. Alphonsus Monastery - including convent, chapel, university foundation stone and surrounding walls)
No
Vacant land tax · lived-in homes don't pay it
1 in 20
Radon (EPA) · homes with high radon
Zoning, protection, tax and flood: the detail
Zoning
What it says

Zone Z1 - DEV PLAN 2022-2028

ZoningR2 · Existing residential
What it says

Z1: Sustainable Residential Neighbourhoods: To protect, provide and improve residential amenities.

An established residential area. The objective is to protect existing residential amenity as well as to provide housing — which is the objective a neighbour's objection to an overbearing extension is usually argued under.

development plan 2022 2028 · 14 Dec 2022 – 31 Dec 2028

ZoningR2 · Existing residential
What it says

Z1: Sustainable Residential Neighbourhoods: To protect, provide and improve residential amenities.

An established residential area. The objective is to protect existing residential amenity as well as to provide housing — which is the objective a neighbour's objection to an overbearing extension is usually argued under.

development plan 2022 2028 variation no 11 · 14 Dec 2022 – 31 Dec 2028

Protected buildingOn this site St. Alphonsus Monastery - including convent, chapel, university foundation stone and surrounding walls
Radon1 in 20 homes have high radon (EPA)

Not on this site: monument zone, conservation area, EU nature site, EU bird site, natural heritage area, tree order, landslide risk, derelict list.

Licensed industrial sites within 1.0 km: Lithographic Web Press Limited (Glasnevin) (614 m); Lithographic Web Press Limited (Bray) (753 m); Rentsch Dublin Limited (829 m)

Vacant land taxNo lived-in homes don't pay it
Flood riskNearby OPW map area within 500 m · floodinfo.ie
Within 500 mCountFor example
Natural heritage areas1Royal Canal
Heritage inventory buildings72Binns Bridge; house
Radon grid squares1
Monuments2Ritual site - holy well; R149651
How we work this out
'On this site' means the record's own map outline touches the registered parcel (or a 12 m circle round the point where there is no parcel). Only the council's own list confirms a protected building; ask the council if in doubt. The council's map for the vacant land tax shows this spot inside an area of existing homes. Homes people live in, and their gardens, don't pay the tax. The OPW flood map's licence lets us show a yes/no only. Land on the vacant land tax map nearby: 1 on the draft 2027 map; 1 on the final 2026 map.
Sources: Development plan zoning (councils), National Inventory of Architectural Heritage, EPA radon map, EPA licensed facilities (LEAP), Records of Protected Structures, Residential Zoned Land Tax maps, Constraint layers (bundle), OPW flood maps (NIFM), Natural Heritage Areas (NPWS), Sites and Monuments Record · fetched 26 Oct 2026, 23:21
SourceLicenceFetchedLink
Development plan zoning (councils)CC BY 4.025 Oct 2026, 23:06open
National Inventory of Architectural HeritageCC BY 4.027 Sept 2026, 19:35open
EPA radon mapCC BY 4.027 Sept 2026, 19:36open
EPA licensed facilities (LEAP)CC BY 4.026 Oct 2026, 23:21open
Records of Protected StructuresCC BY 4.0—open
Residential Zoned Land Tax mapsCC BY 4.025 Oct 2026, 23:43open
Constraint layers (bundle)CC BY 4.0, CC BY-NC-ND 4.027 Sept 2026, 19:37open
OPW flood maps (NIFM)CC BY-NC-ND 4.0 · shown as a yes/no only11 Sept 2026, 19:11open
Natural Heritage Areas (NPWS)CC BY 4.027 Sept 2026, 19:27open
Sites and Monuments RecordCC BY 4.027 Sept 2026, 19:29open
How we work this out
Applications whose site outline (or map point) falls on this property. 'No sign building has started' means we found no notice to the council's building control office; small jobs don't always file one, so ask. A missing completion certificate is not proof of a problem: an owner can opt out of official sign-off for a house or extension built for themselves.
Sources: Building Control Management System (commencement notices), National Planning Application Database · fetched 1 Nov 2026, 05:02
SourceLicenceFetchedLink
Building Control Management System (commencement notices)CC BY 4.01 Nov 2026, 03:07open
National Planning Application DatabaseCC BY 4.01 Nov 2026, 05:02open
Question 2

Could you extend?

This is a protected building: almost any change, inside or out, needs permission.

Figure 2

What happened to applications like yours

Extensions are almost always approved here: 91–100% by type. A new house in a garden is harder: 66% approved, and 1 in 2 is asked for more information.

Single-storey rear106 decided · more info asked 15%
97% · council 97%
Two-storey rear91 decided · more info asked 24%
96% · council 96%
Two-storey side13 decided · more info asked 23%
100% · council 98%
Attic or dormer192 decided · more info asked 10%
98% · council 96%
First-floor45 decided · more info asked 22%
91% · council 94%
Garage conversion10 decided · more info asked 10%
100% · council 99%
New house in a garden or site59 decided · more info asked 44%
66% · council 71%
Approved nearbyDublin overall

Decided applications within 1.5 km, received in the last 10 years. The kind of work is read from each description.

CalculatedOur classificationcouncil register via NPAD · 516 nearby, 5,480 council-wide

Figure 3

Dargle Road, file by file since 2021

2 of 2 decided extensions on the road were approved.

3 planning files on Dargle Road since 2021, by kind and decision.202120222023202420252026Extensions, atticsNo. 14 · 2021 · two-storey rear · approved · 3627/21No. 37 · 2023 · attic conversion / dormer · approved · 4644/23Porches, roofs, otherNo. 14 · 2022 · first-floor · refused · 4636/22New house in a side garden
ApprovedRefusedWithdrawn or invalid

3 files with "Dargle Road" in the address within 600 m, other roads of the same name left out. Hover a dot for the house number and reference.

MeasuredOur classificationcouncil register via NPAD · 2021–2026

Extensions and refusals right beside you 5 within 250 m · 0 refused within 100 m

Extensions and refusals near you 5 extensions within 250 m · the last 12 months

4 approved1 no decision or withdrawn
KindAppliedApprovedRefused
Single-storey rear43—
Rear11—

Refused within 100 m 0 in the last 12 months

Nothing refused this close in the last 12 months.

    How we work this out
    Home extensions are read from the application's description (extension, attic or dormer, porch, garage conversion, garden room), so a few may be missed or mislabelled. The kind is the first that fits: a dormer with a rear extension counts as a dormer. Refusal reasons come from An Coimisiún Pleanála's inspector reports, so they exist only where the refusal was appealed (Dún Laoghaire-Rathdown so far). The council's own reasons are on its planning file.
    Sources: National Planning Application Database, An Coimisiún Pleanála cases (ArcGIS feed) · fetched 1 Nov 2026, 05:02
    SourceLicenceFetchedLink
    National Planning Application DatabaseCC BY 4.01 Nov 2026, 05:02open
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.030 Oct 2026, 23:01open
    Sources: An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices), National Planning Application Database · fetched 1 Nov 2026, 05:02
    SourceLicenceFetchedLink
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.030 Oct 2026, 23:01open
    Building Control Management System (commencement notices)CC BY 4.01 Nov 2026, 03:07open
    National Planning Application DatabaseCC BY 4.01 Nov 2026, 05:02open
    Question 3

    How long, and what if someone objects?

    Figure 4

    A home extension's journey here

    A decision takes 55 days. 1 in 6 is asked for more information, which adds about 70 days. Building starts about 5 months after permission.

    Comments open: 5 weeks · €20; Council decision: 55 days; If more info asked (1 in 6): 125 days; Appeal window: 4 weeks; If appealed: +196 days; Building starts: 137 days after permission0 mo3 mo6 mo9 mo12 mo15 moComments openComments close 5 weeks after the application is lodged5 weeks · €20Council decisionDecision: median 55 days, middle half 53–55 (n=452)55 daysIf more info asked (1 in 6)With further information: median 125 days (n=92)125 daysAppeal windowAnyone who commented can appeal within 4 weeks of the decision4 weeksIf appealedAt An Coimisiún Pleanála: median 196 days (n=140, all appeals within 1.5 km)+196 daysBuilding startsStart notice: median 137 days after permission (n=279)137 days after permissionSigned off481 days after the start, for the few who file. 45% of owners opt out of sign-off

    Bars are medians; whiskers show the middle half. Medians of separate steps don't add up exactly.

    Calculated544 decided home extensions, 284 start notices, 140 decided appeals · within 1.5 km, 10 years · NPAD, BCMS, An Coimisiún Pleanála

    Figure 5

    What appeals changed

    18 of 67 appealed refusals became permissions. 13 of 74 appealed approvals were reversed.

    Refusals appealed67 decided
    18 became permissions
    Approvals appealed74 decided
    13 reversed
    Ended approvedEnded refusedWithdrawn, invalid or other

    Every appeal decided within 1.5 km in 10 years, any kind of development.

    CalculatedAn Coimisiún Pleanála cases linked to the council file

    Appeals nearby 3 in the last 12 months

    1 of 3 changed the council's decision

    • 501125 Granted · 29 Saint Brigid's Road Upper, Dublin 9, D09E5R3 · 279 m report
    • 500718 Refused · Victoria Lane, to rear of & including No. 1 Hollybank Road, Dublin 9. · 211 m report
    • 500445 Granted with conditions · 10 Saint Alphonsus Road Lower, Drumcondra, Dublin 9 · 180 m report
    Sources: An Coimisiún Pleanála cases (ArcGIS feed), Courts Service legal diary (judicial reviews), National Planning Application Database · fetched 1 Nov 2026, 05:02
    SourceLicenceFetchedLink
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.030 Oct 2026, 23:01open
    Courts Service legal diary (judicial reviews)© the publisher31 Oct 2026, 23:12open
    National Planning Application DatabaseCC BY 4.01 Nov 2026, 05:02open
    Question 4

    What's changing around you?

    Street map around Dargle Road with 15 numbered planning items
    ⌖ the houseDerelict buildingApproved, not startedRefusedAppealApprovedNo decision yet
    1. 15 Glenarm Avenue, Dublin 9 DS1066Derelict building · 89 m
    2. 225 Dargle Road, Dublin 9 DS2236Derelict building · 90 m
    3. 348B-50A Drumcondra Road Lower Dublin 9 DS2010Derelict building · 267 m
    4. 4Turnpike Lane Development 4062/24Approved, no sign building has started · 268 m
    5. 55 Saint Patrick's Road, Dublin 9 DS1844Derelict building · 397 m
    6. 6Holy Cross College ABP-310860Approved, not started, approval runs out within a year · 439 m
    7. 7Victoria Lane Rear on 1 Hollybank Road, Dublin 9 Dublin WEB2931/26Refused · 160 m
    8. 810 Saint Alphonsus Road Lower, Drumcondra 500445Appeal: approved with conditions · 180 m
    9. 920, Carlingford Road WEB1452/26Approved · 72 m
    10. 10110, Drumcondra Road Lower WEB1581/26No decision yet · 127 m
    11. 1119, Hollybank Road WEB5942/25Approved · 158 m
    12. 1218 St. Joseph's Avenue, Drumcondra 5037/26Approved · 207 m
    13. 13Victoria Lane, to rear of & including No. 1 Hollybank Road WEB5625/25Refused · 211 m
    14. 1414, Saint Joseph's Avenue WEB5782/25Approved · 228 m
    15. 15Bus Stop 46, Drumcondra Road (o/s Nos. 138 & 139 WEB2681/26No decision yet · 257 m
    Figure 6

    What happens to applications within 500 m

    Permission isn't building. Of 129 permissions since 2016, 62 show a start notice and 6 have a completion certificate.

    177 applications lodged within 500 m. Council: 127 approved, 25 refused. After appeals: 129 approved. Of those: 6 signed off, 23 built with the owner's opt-out, 33 started, 67 with no start notice found, 0 ran out.LODGEDCOUNCIL DECISIONAFTER APPEALSWHAT HAPPENED NEXT127: lodged → approved25: lodged → refused20: lodged → withdrawn or invalid5: lodged → undecided126: approved → approved22: refused → refused20: withdrawn or invalid → withdrawn5: undecided → undecided1 approved by the council, refused after an appeal3 refused by the council, approved after an appeal67: approved → no start notice found23: approved → built, owner opted out33: approved → started, not signed off6: approved → signed off177 lodged177 lodged127 approved127 approved25 refused25 refused20 withdrawn or invalid20 withdrawn or invalid5 undecided5 undecided129 approved129 approved23 refused23 refused20 withdrawn20 withdrawn5 undecided5 undecided67 no start notice found67 no start notice found23 built, owner opted out23 built, owner opted out33 started, not signed off33 started, not signed off6 signed off6 signed off

    Purple bands are refusals turned into permissions on appeal. "No start notice found" includes small jobs that never needed one and notices we couldn't match.

    Measured177 applications in 10 years · NPAD, An Coimisiún Pleanála, BCMS start notices and completion certificates

    Figure 7

    The next 30 days

    Nothing closes within 500 m in the next 30 days.

      Measuredcouncil registers and An Coimisiún Pleanála · deadlines worked out from the dates on file

      Figure 8

      Approved, stalled or planned, not built yet

      1614 homes 439 m away were approved Nov 2021 with no start notice yet; the permission runs to Nov 2026. DART+ South West is planned 300 m away.

      Holy Cross College · 1614 homes: 1614 homes approved, not started; runs out Nov 2026; Turnpike Lane Development · 46 homes: 46 homes approved May 2025, not started; DART+ South West, DART+ South…: railway order granted (13 November 2024); DART+ West, DART+ West:…: railway order granted (July 2024)20212022202320242025202620272028202920302031Holy Cross College · 1614 homes439 m · ABP-3108601614 homes approved, not started; runs out Nov 20261614 homes approved, not started; runs out Nov 2026Turnpike Lane Development · 46 homes268 m · 4062/2446 homes approved May 2025, not started46 homes approved May 2025, not startedDART+ South West, DART+ South…300 m · plannedrailway order granted (13 November 2024)DART+ West, DART+ West:…304 m · plannedrailway order granted (July 2024)today

      Each row is a dated fact from a public register: no score and no forecast.

      Measuredcouncil registers, BCMS, derelict sites registers, development plan layers (CC BY 4.0)

      Sites that could change 6 within 500 m

      Derelict building 4

      • 15 Glenarm Avenue, Dublin 9 · derelict since Nov 2022 · 89 m
      • 225 Dargle Road, Dublin 9 · derelict since Sep 2026 · 90 m
      • 348B-50A Drumcondra Road Lower Dublin 9 · derelict since Sep 2025 · 267 m
      • 55 Saint Patrick's Road, Dublin 9 · derelict since Aug 2024 · 397 m

      Approved, not started, approval running out 1

      Approved, not started 1

      Sources: An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices), Derelict sites registers, Council meetings (ModernGov), National Planning Application Database, Residential Zoned Land Tax maps · fetched 1 Nov 2026, 05:02
      SourceLicenceFetchedLink
      An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.030 Oct 2026, 23:01open
      Building Control Management System (commencement notices)CC BY 4.01 Nov 2026, 03:07open
      Derelict sites registersCC BY 4.026 Oct 2026, 23:09open
      Council meetings (ModernGov)Public1 Nov 2026, 02:24open
      National Planning Application DatabaseCC BY 4.01 Nov 2026, 05:02open
      Residential Zoned Land Tax mapsCC BY 4.025 Oct 2026, 23:43open
      Figure 9

      Applications within 500 m, by year

      Between 23 and 41 a year; busiest 2022. 84% of decisions were approvals.

      2021: 30, 2022: 41, 2023: 23, 2024: 27, 2025: 31, 2026: 25010203040502021: 28 approved2021: 2 refused30’21*2022: 27 approved2022: 13 refused2022: 1 withdrawn or invalid41’222023: 20 approved2023: 2 refused2023: 1 withdrawn or invalid23’232024: 24 approved2024: 3 refused27’242025: 20 approved2025: 3 refused2025: 8 withdrawn or invalid31’252026: 8 approved2026: 2 refused2026: 10 withdrawn or invalid2026: 5 undecided25’26*
      ApprovedRefusedWithdrawn or invalidUndecided

      2021 and 2026 are part years (*). Exemption requests and time extensions are left out.

      Measuredcouncil register via NPAD

      Every application within 500 m 36 in the last 12 months

      See every application on the map

      How we work this out
      Descriptions are shortened by the national planning database (to 80 characters in Dún Laoghaire-Rathdown, 70 in Fingal), and it does not publish applicants' names.
      Sources: National Planning Application Database, An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices) · fetched 1 Nov 2026, 05:02
      SourceLicenceFetchedLink
      National Planning Application DatabaseCC BY 4.01 Nov 2026, 05:02open
      An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.030 Oct 2026, 23:01open
      Building Control Management System (commencement notices)CC BY 4.01 Nov 2026, 03:07open
      Building work nearby 17 in the last 12 months
      2 not signed off15 no sign-off needed
      • 135 Hollybank Road, Dublin 9 · 27 Oct 2026 · short notice no sign-off needed · WEB1002/26 · 383 m
      • 18 Saint Joseph's Avenue, Drumcondra, Dublin 9, D09 W1H2., Dublin 9, D09 W1H2 · 28 Sept 2026 · short notice no sign-off needed · 5037/26 · 212 m
      • 5 Iona Drive, Dublin 9, D09 E7Y7 · 14 Aug 2026 · short notice no sign-off needed · WEB5919/25 · 399 m
      • 5 Saint Brigid's Road Lower, Dublin 9, D09 Y2V8 · 4 Aug 2026 · short notice no sign-off needed · WEB1872/26 · 411 m
      • 44 Iona Crescent, Dublin 9, D09 K2T7 · 4 Aug 2026 · short notice no sign-off needed · 5063/26 · 400 m
      • 7 Saint Joseph's Avenue, Dublin 9, D09 R6F5 · 31 Jul 2026 · start notice, opted out no sign-off needed · WEB1666/26 · 276 m
      • 135 Hollybank Road, Dublin 9, D09 N9R2 · 15 Jul 2026 · start notice, opted out no sign-off needed · WEB1002/26 · 383 m
      • 25 Richmond Road, Dublin 3, D03 RW31 · 23 Jun 2026 · short notice no sign-off needed · WEB2732/25 · 466 m
      • 10 Drumcondra Road Lower, Dublin, Dublin 9, D09 KA87 · 8 Jun 2026 · start notice not signed off · 435 m
      • 6 Millmount Terrace, Dublin, Dublin 9, D09 E0E3 · 8 Jun 2026 · short notice no sign-off needed · WEB1134/25 · 343 m
      • 17 Grattan Parade, Dublin 9, D09 N8N8 · 23 Apr 2026 · short notice no sign-off needed · WEB5932/25 · 390 m
      • 14 Saint Joseph's Avenue, Dublin 9, D09 E3H4 · 14 Apr 2026 · start notice, opted out no sign-off needed · WEB5782/25 · 234 m
      • 76 Iona Road, Dublin, Dublin 9, D09 E6W2 · 2 Feb 2026 · short notice no sign-off needed · WEB2962/25 · 444 m
      • 43 Iona Villas, Dublin, Dublin 9, D09 W8A0 · 28 Jan 2026 · start notice, opted out no sign-off needed · WEB1596/25 · 454 m
      • 6 Drumcondra Road Upper, Dublin, Dublin 9, D09 H6K8 · 26 Dec 2025 · 7-day notice not signed off · 430 m
      • 16 Carlingford Road, DRUMCONDRA, Dublin 9, D09 HN44 · 20 Nov 2025 · start notice, opted out no sign-off needed · WEB2433/25 · 77 m
      • 15 Glenarm Avenue, Drumcondra, Dublin 9, Dublin 9, D09 A5Y4 · 6 Nov 2025 · start notice, opted out no sign-off needed · 3982/24 · 106 m
      How we work this out
      Each row is a notice the builder sent to the council's building control office before work started. One notice can cover many homes. 'Signed off as finished' means a completion certificate is on file; work done under an opt-out or a short notice doesn't need one.
      Source: Building Control Management System (commencement notices) · fetched 1 Nov 2026, 03:07
      SourceLicenceFetchedLink
      Building Control Management System (commencement notices)CC BY 4.01 Nov 2026, 03:07open
      Homes coming 1,660 not started
      How we work this out
      Schemes of 10 or more homes approved since 2021, from the council and An Coimisiún Pleanála registers. 'Building started' means the builder told the council's building control office that work was starting (a commencement notice).
      Sources: An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices), National Planning Application Database, Social housing construction status report · fetched 1 Nov 2026, 05:02
      SourceLicenceFetchedLink
      An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.030 Oct 2026, 23:01open
      Building Control Management System (commencement notices)CC BY 4.01 Nov 2026, 03:07open
      National Planning Application DatabaseCC BY 4.01 Nov 2026, 05:02open
      Social housing construction status reportCC BY-SA 4.023 Oct 2026, 23:02open
      Named places nearby: estate, schemes, crèches, schools

      Named places estate, developments, inspections

      Developments within 1.0 km

      SchemeHomesProgressDistance
      Former Holy Cross College11311131 not started (2026-Q2)205 m
      Turnpike Lane Development3939 not started (2026-Q2)242 m
      Clonliffe Family Hub50—280 m
      1943636 built (2025-Q2)410 m
      Former Leydens Wholesalers & Distributors107107 not started (2026-Q2)669 m
      Westward House54no activity on site reported (2026-Q2)724 m
      St. Vincent's Hospital Site779283 being built · 496 not started (2026-Q2)791 m
      The Addison Lodge and Glasnevin Lodge2727 built (2025-Q3)838 m

      Crèches and schools inspected

      NameLatest inspectionDistance
      Little Learners ABCD · Crèche9 Jul 2025 · report · Tusla Early Years Inspectorate288 m
      Cuddles 'n' Care · Crèche6 Nov 2024 · report · Tusla Early Years Inspectorate302 m
      Hyde & Seek Childcare (Millbourne) · Crèche20 Mar 2025 · report · Tusla Early Years Inspectorate412 m
      Little Learners · Crèche2 Apr 2025 · report · Tusla Early Years Inspectorate421 m
      Drumcondra Montessori School · Crèche2 Oct 2025 · report · Tusla Early Years Inspectorate645 m
      Old Mc Donalds · Crèche15 Sept 2025 · report · Tusla Early Years Inspectorate679 m
      Jonix Educational Services · Crèche2 Oct 2025 · report · Tusla Early Years Inspectorate742 m
      Links Childcare · Crèche24 Jun 2025 · report · Tusla Early Years Inspectorate754 m
      How we work this out
      Organisations only: a person named on an application is never listed. Inspection dates and links are the publisher's; read their report for the findings.
      Sources: Dublin housing delivery pipeline, National Planning Application Database, Department of Education school list, Tusla early years register · fetched 1 Nov 2026, 05:02
      SourceLicenceFetchedLink
      Dublin housing delivery pipelineCC BY 4.026 Oct 2026, 23:00open
      National Planning Application DatabaseCC BY 4.01 Nov 2026, 05:02open
      Department of Education school listCC BY 4.027 Oct 2026, 23:04open
      Tusla early years registerPublic register28 Oct 2026, 23:19open
      How busy is this area Busier than most of Dublin City Council.
      Homes approved
      Here59
      Council middle62
      Homes started
      Here2,420
      Council middle132
      How we work this out
      Homes approved counts schemes of 10 or more homes (one-off houses are not included). Homes started counts every home in a notice that building work was starting. The council figure is the middle value across the council's built-up squares of the same area (3.1 km², about a 1 km circle), so half of them saw more and half fewer.
      Sources: An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices), National Planning Application Database · fetched 1 Nov 2026, 05:02
      SourceLicenceFetchedLink
      An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.030 Oct 2026, 23:01open
      Building Control Management System (commencement notices)CC BY 4.01 Nov 2026, 03:07open
      National Planning Application DatabaseCC BY 4.01 Nov 2026, 05:02open
      Question 5

      What's the area like?

      Figure 10

      This street block against the council

      10% of homes built before 1971 (council 52%). 31% owner-occupied (council 47%).

      Homes built before 1971
      10% · council 52%
      Homes built since 2001
      25% · council 19%
      Owner-occupied
      31% · council 47%
      Rented
      63% · council 45%
      Children under 15
      8% · council 15%
      Aged 65 and over
      10% · council 13%
      Households with 2+ cars
      25% · council 19%
      Work mainly from home
      21% · council 12%
      This small area (185 people)Dublin

      MeasuredCSO Census 2022, Small Area Population Statistics (CC BY 4.0) · small area 268028012

      Bus
      188 m
      Archbishop's House · 1, 16, 19 · busiest stop within 500 m: 32 an hour at peak
      Planned
      300 m
      DART+ South West, DART+ South West: Hazelhatch and Celbridge - Drumcondra
      Radon
      1 in 20
      homes here likely high (EPA). Test it
      Flood
      Within 500 m
      OPW flood map area, not beside the house
      Nearest school
      326 m
      St Columbas Con G & I, 378 pupils
      Homes sold nearby
      85
      in 3 years, 3 new (Property Price Register)
      Schools, stops and the council

      Schools

      • St Columbas Con G & I · primary · 378 pupils · 326 m
      • Lindsay Road NS · primary · 95 pupils · 420 m
      • St Patricks N School · primary · 449 pupils · 462 m
      • Drumcondra NS · primary · 81 pupils · 710 m
      • Gaelscoil Áine · primary · 176 pupils · 847 m
      • Scoil Mobhi · primary · 248 pupils · 875 m
      • Gardiner Street Convent · primary · 298 pupils · 886 m
      • Scoil Ui Chonaill Boys Seniors · primary · 155 pupils · 894 m

      Stops 51

      • Archbishop's House · 1, 16, 19, 33, 33E, 33n · 21/hour at peak · 188 m
      • Botanic Ave · 1, 16, 19, 33, 33E, 33n · 22/hour at peak · 248 m
      • Archbishop's House · 1, 16, 16D, 19, 33, 41 · 29/hour at peak · 258 m
      • Botanic Ave · 1, 16, 16D, 19, 33, 41 · 27/hour at peak · 262 m
      • Drumcondra Stn · 1, 101, 16, 19, 33, 33E · 32/hour at peak · 333 m
      • Drumcondra · Dublin - Maynooth, Dublin - Portlaoise, Dublin - Sligo · 11/hour at peak · 339 m
      • Drumcondra Stn · 1, 101, 16, 16D, 19, 33 · 27/hour at peak · 423 m
      • St Patrick's Road · 40D, F1, F2, F3 · 19/hour at peak · 456 m

      Schools growing or shrinking planning in 3 years · pupils last year

      • St Columbas Con G & I · 326 m+1.9% pupils (378)
      • Lindsay Road NS · 420 m+2.2% pupils (95)
      • St Patricks N School · 462 m-1.3% pupils (449)
      • Drumcondra NS · 710 m+15.7% pupils (81)
      • Gaelscoil Áine · 847 m+23.9% pupils (176)
      • Scoil Mobhi · 875 m-1.6% pupils (248)

      Open consultations

      Council meetings 30 items

      Public land

      • Dublin City Council · 0.11 ha · 228 m
      • Railway Procurement Agency · 0.41 ha · 248 m
      • Dublin City Council · 0.17 ha · 257 m
      • Dublin City Council · 0.11 ha · 262 m
      • Dublin City University · 11.2 ha · 399 m
      • Dublin City Council · 1.41 ha · 412 m
      Sources: Public transport stops and routes (NTA GTFS), Department of Education school list, National Planning Application Database, Council consultation portals, Council meetings (ModernGov), Land Development Agency public land register, cso_saps_2022, National Transport Authority, Fingal County Council and Dún Laoghaire-Rathdown County Council development plan layers (CC BY 4.0), dartplus.ie project extents over NTA GTFS rail shapes (CC BY 4.0), EPA strategic noise maps, Fingal County Council · fetched 1 Nov 2026, 05:02
      SourceLicenceFetchedLink
      Public transport stops and routes (NTA GTFS)CC BY 4.025 Oct 2026, 23:02open
      Department of Education school listCC BY 4.027 Oct 2026, 23:04open
      National Planning Application DatabaseCC BY 4.01 Nov 2026, 05:02open
      Council consultation portalsPublic1 Nov 2026, 01:08open
      Council meetings (ModernGov)Public1 Nov 2026, 02:24open
      Land Development Agency public land registerCC BY 4.011 Sept 2026, 16:43open
      cso_saps_2022CC BY 4.0—open
      National Transport AuthorityCC BY 4.0——
      Fingal County Council and Dún Laoghaire-Rathdown County Council development plan layers (CC BY 4.0)CC BY 4.0——
      dartplus.ie project extents over NTA GTFS rail shapes (CC BY 4.0)CC BY 4.0——
      EPA strategic noise mapsCC BY 4.0——
      Fingal County CouncilCC BY 4.0——
      Question 6

      What to ask, and who

      1. Protected building: what changes would you be allowed?
        Ask for: A section 57 declaration from the council.
        Council
      2. Derelict building 89 m away (5 Glenarm Avenue, Dublin 9): is action under way?
        Ask for: The council's derelict sites register entry.
        Council
      3. Any work done without planning permission?
        Ask for: An opinion of compliance for the whole house.
        Seller · solicitor
      Reference

      Where this is, the terms, the sources

      Electoral division
      Botanic B
      Electoral area
      Cabra-Glasnevin
      Council
      Dublin City Council
      Everything we found, as a list 8 lines
      • Zoned R2 (existing residential); protected building; no vacant land tax.
      • 6 sites nearby could change: 4 derelict, 2 approved schemes.
      • 1,660 homes approved nearby, not started; largest 1614 at Holy Cross College.
      • Drumcondra Stn (bus 1, 101) 333 m away: 32 an hour at morning peak; 217 from all stops within 500 m. Planned: DART+ South West 300 m away, railway order granted (13 November 2024).
      • Here (2022 census): 63% rent (council 45%); 4% of homes empty (council 8%); most built 1991–2000; 18% drive to work (council 28%); population up 4% since 2016.
      • 5 home extensions within 250 m since 2025. Most were single-storey rear extensions.
      • The council decides in a median 55 days (about 8 weeks); 1 in 4 is asked for more information.
      • 3 appeals nearby decided in the last 12 months; 1 turned a refusal into a yes.
      What the terms mean 9 terms
      • Vacant land tax (Residential Zoned Land Tax (RZLT)): A yearly tax of 3% of the land's value on land that is zoned for homes and serviced but left unbuilt.
      • Building started (Commencement notice (BCMS)): The builder must tell the council's building control office 14 to 28 days before work starts.
      • Signed off as finished (Certificate of Compliance on Completion): A certificate filed when a building is finished, confirming it meets the building regulations.
      • Approved (Grant of permission): The council said yes, usually with conditions.
      • Approval ran out without being built (Permission lapsed / expired): Most permissions last five years.
      • Listed by the council as derelict (Derelict Sites Register): Councils keep a public list of land and buildings in a ruinous or dangerous state.
      • Protected building (Protected structure (Record of Protected Structures)): A building the council has listed for its heritage value.
      • Appeal (Appeal to An Coimisiún Pleanála): The applicant, or anyone who commented in time, can appeal the council's decision within four weeks.
      • What the land is zoned for (Zoning objective): The council's development plan sets what each area is for: homes, shops, open space and so on.
      Sources and licences 33
      SourcePublisherLicenceFetched
      EPA strategic noise maps—CC BY 4.0—
      Fingal County Council—CC BY 4.0—
      Fingal County Council and Dún Laoghaire-Rathdown County Council development plan layers (CC BY 4.0)—CC BY 4.0—
      National Transport Authority—CC BY 4.0—
      services-eu1.arcgis.comAn Coimisiún PleanálaCC BY 4.030 Oct 2026
      data.nbco.gov.ieNational Building Control Office (BCMS)CC BY 4.01 Nov 2026
      data.gov.ieVarious (see each layer)CC BY 4.0, CC BY-NC-ND 4.027 Sept 2026
      s3.eu-west-1.amazonaws.comOffice of Public WorksCC BY-NC-ND 4.0 · flag only11 Sept 2026
      services-eu1.arcgis.comNational Parks and Wildlife ServiceCC BY 4.027 Sept 2026
      services-eu1.arcgis.comNational Inventory of Architectural HeritageCC BY 4.027 Sept 2026
      gis.epa.ieEnvironmental Protection AgencyCC BY 4.027 Sept 2026
      services-eu1.arcgis.comNational Monuments Service (SMR)CC BY 4.027 Sept 2026
      dlrcoco.citizenspace.comLocal authorities (consultation portals)Public1 Nov 2026
      www2.courts.ie—© the publisher31 Oct 2026
      cso.ie—CC BY 4.0—
      dartplus.ie project extents over NTA GTFS rail shapes (CC BY 4.0)—CC BY 4.0—
      services-eu1.arcgis.comLocal authorities (derelict sites registers)CC BY 4.026 Oct 2026
      services.arcgis.comDublin local authorities (housing delivery pipeline)CC BY 4.026 Oct 2026
      data.epa.ieEnvironmental Protection Agency (LEAP licence register)CC BY 4.026 Oct 2026
      esbnetworks.ie—© the publisher · flag only11 Sept 2026
      transportforireland.ieNational Transport AuthorityCC BY 4.025 Oct 2026
      lda.ieLand Development AgencyCC BY 4.011 Sept 2026
      meetings.fingal.ieLocal authorities (council meetings)Public1 Nov 2026
      services.arcgis.comDepartment of Housing (National Planning Application Database)CC BY 4.01 Nov 2026
      services-eu1.arcgis.comTailte ÉireannCC BY 4.011 Sept 2026
      services-eu1.arcgis.comCSO, Tailte Éireann, OpenStreetMap contributorsCC BY 4.04 Oct 2026
      propertypriceregister.ieProperty Services Regulatory Authority (PPR)© PSRA, PSI licence1 Nov 2026
      data.gov.ieLocal authorities (Record of Protected Structures)CC BY 4.0—
      services.arcgis.comLocal authorities (RZLT maps)CC BY 4.025 Oct 2026
      gov.ieDepartment of EducationCC BY 4.027 Oct 2026
      gov.ieDepartment of HousingCC BY-SA 4.023 Oct 2026
      tusla.ieTusla (Early Years Inspectorate)Public register28 Oct 2026
      services.arcgis.comLocal authorities via the Department of Housing (GZT / MyPlan)CC BY 4.025 Oct 2026
      Measured
      counted from a public register
      Calculated
      a rate or median we worked out from those counts
      Our classification
      we sorted it by reading each description
      Estimate
      inferred from another source (census, map data)
      Rule summary
      the law, simplified: check before relying on it
      How we work this out
      Generated 1 Nov 2026, 09:33 from the Planning Register store; nothing was fetched live. Not a legal search: the council's planning file is the record. Deadlines come from published dates under the Planning and Development Act 2000: confirm with the council before relying on them. Street map © OpenStreetMap contributors; building outlines © Overture Maps Foundation. The text version carries every figure with its source, for an AI assistant.