R2 — Existing residentialdevelopment plan 2022 2028 · 14 Dec 2022 – 31 Dec 2028
Z2: Residential Neighbourhoods (Conservation Areas): To protect and/or improve the amenities of residential conservation areas.
What that means: An established residential area. The objective is to protect existing residential amenity as well as to provide housing — which is the objective a neighbour's objection to an overbearing extension is usually argued under.
This site is on an RZLT map — the draft map 2027 and the final map 2026 (3.67 ha). The owner is liable for an annual 3% tax on market value while it stays there. Submissions on the draft map closed 1 Apr 2026.
PROTECTED STRUCTURE: Permission was granted for demolition of single storey studio building 17m2 & construction single storey studio building 34m2 and associated site works under 3791/21 / ABP-312621-22. Permission sought to alter approved planning and construct single storey studio building 40m2, new boundary treatment, car parking space with EV charge point, bin and bike store and all associated site works.
The removal of an existing shed and awning and its replacement with a new single storey flat roof extension to the side and rear with 4no. new rooflights, the relocation of 1no. window at first floor level from the rear to the side elevation, and all associated ancillary site and boundary works.
The development will consist of a single storey flat roof extension containing a kitchen, bathroom and family room to the rear of 23 St Declan's Terrace, Marino
The development consists of modifications to the existing boundary to the front of an existing dwelling to create a new vehicular access which will exit onto Marino Green, Marino, Dublin 3. Hard landscaping to be added to a portion of the garden to the front of the house to create a new single parking space, public pathway to be dished and all associated works.
WEB2330/26received 2 Jun 2026decided 23 Jul 2026379 m away
PROTECTED STRUCTURE: Permission was granted for demolition of single storey studio building 17m2 & construction single storey studio building 34m2 and associated site works under 3791/21 / ABP-312621-22. Permission sought to alter approved planning and construct single storey studio building 40m2, new boundary treatment, car parking space with EV charge point, bin and bike store and all associated site works.
WEB2275/26received 26 May 2026decided 29 Jun 2026291 m away
PROTECTED STRUCTURE Permission was granted for demolition of single storey studio building 17m2 & construction single storey studio building 34m2 and associated site works under 3791/21 / ABP-312621-22. Permission sought to alter approved planning and construct single storey studio building 40m2, new boundary treatment, car parking space with EV charge point, bin and bike store and all associated site works.
WEB2244/26received 22 May 2026decided 25 May 2026291 m away
The development will consist of a two-storey side extension to the existing dwelling, incorporating a flat roof, together with minor alterations and upgrades to the existing house. The proposed works also include the provision of a new vehicular entrance, including dishing of the existing kerb.
WEB2176/26received 15 May 2026decided 6 Jul 2026101 m away
(a) Demolition of existing dividing garden wall & part demolition of dividing railing at side (North East Elevation),(b)- Part demolition of
external walls at side & rear and demolition of existing garden shed at rear (North East & South East Elevations),(c)-Construction of a single storey flat roof extension to front, side & rear of property (North West, North East,& South East Elevations), containing kitchen/dining area, utility room, shower room and extended hallway, with sliding doors at rear (South East Elevation), entrance door &
window at front (North West Elevation),(d)- Forming of new vehicular entrance at front with of street parking and resurfacing with new permeable finish, together with associated site works.
5093/26received 10 Apr 2026decided 4 Jun 2026195 m away
`description` is truncated at source (80 chars for DLR, 70 for Fingal) and `applicant` is null nationally — NPAD publishes neither in full.
PPR addresses are geocoded, not surveyed — a sale's position is as good as its address match (`rooftop_n` says how many are address-accurate). Beds, floor area, BER and asking price come from the matched daft.ie advertisement, not from the Register, and only where a match was found (`enriched_n`).
Third-party advertisement data captured by Cara from daft.ie. Not open data: internal analysis only, no redistribution of listing content. Business-contact details (licensed PSP name and branch) are retained per Cara DECISIONS 2026-08-19; agent phone numbers and all vendor/buyer identities are dropped.
No publishable utility-capacity record within the radius. 10 records from Esb substation withheld: source licence forbids redistribution; see the operator's own register.
Public land (LDA register of relevant lands)
An Post — Dublin city and suburbs
0.15 hafolio DN73923L237 m awayas of 1 Apr 2023
Health Service Executive — Dublin city and suburbs
0.26 hafolio DN88701L254 m awayas of 1 Apr 2023
Health Service Executive — Dublin city and suburbs
all-rights-reserved (esbnetworks.ie disclaimer: personal/non-commercial, no modification or republication without written ESB permission) — permission NOT sought · not redistributable — shown as a flag only
Third-party advertisement data captured by Cara from daft.ie. Not open data: internal analysis only, no redistribution of listing content. Business-contact details (licensed PSP name and branch) are retained per Cara DECISIONS 2026-08-19; agent phone numbers and all vendor/buyer identities are dropped.
all-rights-reserved (esbnetworks.ie disclaimer: personal/non-commercial, no modification or republication without written ESB permission) — permission NOT sought · not redistributable, flag only
Generated 13 Sept 2026, 00:12 from the Planning Register store. Nothing on this page was fetched live: every figure was already in the store with the fetch time shown. Deadlines are derived from published receipt and decision dates under the Planning and Development Act 2000; confirm with the planning authority before relying on them.