PlanningRegister.ie
Planning report · Dublin City Council · 500 m around the house · the last 12 months · 1 Nov 2026, 08:54

Millmount Terrace

53.36848, -6.25573

Homes here mostly date from before 1919. 1 planning file on this house, the latest from 2025. Home extensions nearby almost always get approved (96%). 1614 homes approved 465 m away haven't started.

See on the mapWatch this area

How planning works, with this area's numbers

steps can overlap · medians for home extensions within 1.5 km, 10 years
  1. 1ApplySite notice up, plans online
  2. 2Comments5 weeks, €20. Comment to keep your right to appeal
  3. 3Decision8 weeks by law. Here 55 days
  4. 4Appeal window4 weeks after the decision
  5. 5AppealHere about 8 months
  6. 6PermissionLasts 5 years
  7. 7StartStart notice to the council. Here about 4 months after
  8. 8Sign-offCompletion cert, or the owner opts out
Question 1

What's the planning story of this house?

Figure 1

When it was built, and the rules since

Most homes here were built before 1919, before planning permission was needed. 1 planning file on this house, the latest from 2025.

Timeline from 1896: planning permission needed from October 1964, building regulations from June 1992, building records online from March 2014, sign-off opt-out from September 2015. Most homes here were built 1900–1918. 1 planning file on this house.1900191019201930194019501960197019801990200020102020Oct 1964permission neededJun 1992building regulationsMar 2014building records onlineSep 2015owners may opt out of sign-offThis houseBuilt: most homes in this small area date from 1900–1918 (census estimate)most built2025: WEB1134/25 · attic or dormer, approved

Each line is a rule that applies to work done after it.

MeasuredEstimatecouncil register via NPAD · build years: CSO Census 2022, small area

  1. 2025
    WEB1134/25 · attic or dormer · approved 2025 · started, no sign-off needed
    approvedstartedsigned off?
On this site
R2
Zoning · Existing residential
No
Protected or listed · on the council's list
No
Vacant land tax · lived-in homes don't pay it
1 in 20
Radon (EPA) · homes with high radon
Zoning, protection, tax and flood: the detail
Zoning
What it says

Zone Z1 - DEV PLAN 2022-2028

ZoningR2 · Existing residential
What it says

Z1: Sustainable Residential Neighbourhoods: To protect, provide and improve residential amenities.

An established residential area. The objective is to protect existing residential amenity as well as to provide housing — which is the objective a neighbour's objection to an overbearing extension is usually argued under.

development plan 2022 2028 · 14 Dec 2022 – 31 Dec 2028

ZoningR2 · Existing residential
What it says

Z1: Sustainable Residential Neighbourhoods: To protect, provide and improve residential amenities.

An established residential area. The objective is to protect existing residential amenity as well as to provide housing — which is the objective a neighbour's objection to an overbearing extension is usually argued under.

development plan 2022 2028 variation no 11 · 14 Dec 2022 – 31 Dec 2028

Heritage inventory2 within 100 m Drumcondra Bridge; Statue of Our Lady
Radon1 in 20 homes have high radon (EPA)

Not on this site: protected building, monument zone, conservation area, EU nature site, EU bird site, natural heritage area, tree order, landslide risk, derelict list.

Licensed industrial sites within 1.0 km: Lithographic Web Press Limited (Glasnevin) (785 m); Lithographic Web Press Limited (Bray) (922 m); Rentsch Dublin Limited (943 m)

Vacant land taxNo lived-in homes don't pay it
Flood riskWithin 100 m OPW map area within 100 m · floodinfo.ie
Within 500 mCountFor example
Heritage inventory buildings74post box; Church of St. John the Baptist
Radon grid squares1
Monuments7Ritual site - holy well; House - 16th/17th century
How we work this out
'On this site' means the record's own map outline touches the registered parcel (or a 12 m circle round the point where there is no parcel). Only the council's own list confirms a protected building; ask the council if in doubt. The council's map for the vacant land tax shows this spot inside an area of existing homes. Homes people live in, and their gardens, don't pay the tax. The OPW flood map's licence lets us show a yes/no only.
Sources: Development plan zoning (councils), National Inventory of Architectural Heritage, EPA radon map, EPA licensed facilities (LEAP), Residential Zoned Land Tax maps, Constraint layers (bundle), OPW flood maps (NIFM), Sites and Monuments Record · fetched 26 Oct 2026, 23:21
SourceLicenceFetchedLink
Development plan zoning (councils)CC BY 4.025 Oct 2026, 23:06open
National Inventory of Architectural HeritageCC BY 4.027 Sept 2026, 19:35open
EPA radon mapCC BY 4.027 Sept 2026, 19:36open
EPA licensed facilities (LEAP)CC BY 4.026 Oct 2026, 23:21open
Residential Zoned Land Tax mapsCC BY 4.025 Oct 2026, 23:43open
Constraint layers (bundle)CC BY 4.0, CC BY-NC-ND 4.027 Sept 2026, 19:37open
OPW flood maps (NIFM)CC BY-NC-ND 4.0 · shown as a yes/no only11 Sept 2026, 19:11open
Sites and Monuments RecordCC BY 4.027 Sept 2026, 19:29open
How we work this out
Applications whose site outline (or map point) falls on this property. 'No sign building has started' means we found no notice to the council's building control office; small jobs don't always file one, so ask. A missing completion certificate is not proof of a problem: an owner can opt out of official sign-off for a house or extension built for themselves.
Sources: Building Control Management System (commencement notices), National Planning Application Database · fetched 1 Nov 2026, 05:02
SourceLicenceFetchedLink
Building Control Management System (commencement notices)CC BY 4.01 Nov 2026, 03:07open
National Planning Application DatabaseCC BY 4.01 Nov 2026, 05:02open
Question 2

Could you extend?

Nothing on this site restricts it: not protected, not in a conservation area.

Figure 2

What happened to applications like yours

Extensions are almost always approved here: 91–100% by type. A new house in a garden is harder: 65% approved, and 1 in 2 is asked for more information.

Single-storey rear99 decided · more info asked 17%
97% · council 97%
Two-storey rear86 decided · more info asked 24%
95% · council 96%
Two-storey side15 decided · more info asked 27%
100% · council 98%
Attic or dormer191 decided · more info asked 10%
99% · council 96%
First-floor45 decided · more info asked 24%
91% · council 94%
Garage conversion14 decided · more info asked 7%
100% · council 99%
New house in a garden or site51 decided · more info asked 45%
65% · council 71%
Approved nearbyDublin overall

Decided applications within 1.5 km, received in the last 10 years. The kind of work is read from each description.

CalculatedOur classificationcouncil register via NPAD · 501 nearby, 5,480 council-wide

Extensions and refusals right beside you 5 within 250 m · 0 refused within 100 m

Extensions and refusals near you 5 extensions within 250 m · the last 12 months

1 approved4 no decision or withdrawn
KindAppliedApprovedRefused
Dormer or attic30—
Single-storey rear21—

Refused within 100 m 0 in the last 12 months

Nothing refused this close in the last 12 months.

    How we work this out
    Home extensions are read from the application's description (extension, attic or dormer, porch, garage conversion, garden room), so a few may be missed or mislabelled. The kind is the first that fits: a dormer with a rear extension counts as a dormer. Refusal reasons come from An Coimisiún Pleanála's inspector reports, so they exist only where the refusal was appealed (Dún Laoghaire-Rathdown so far). The council's own reasons are on its planning file.
    Sources: National Planning Application Database, An Coimisiún Pleanála cases (ArcGIS feed) · fetched 1 Nov 2026, 05:02
    SourceLicenceFetchedLink
    National Planning Application DatabaseCC BY 4.01 Nov 2026, 05:02open
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.030 Oct 2026, 23:01open
    Sources: An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices), National Planning Application Database · fetched 1 Nov 2026, 05:02
    SourceLicenceFetchedLink
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.030 Oct 2026, 23:01open
    Building Control Management System (commencement notices)CC BY 4.01 Nov 2026, 03:07open
    National Planning Application DatabaseCC BY 4.01 Nov 2026, 05:02open
    Question 3

    How long, and what if someone objects?

    Figure 3

    A home extension's journey here

    A decision takes 55 days. 1 in 6 is asked for more information, which adds about 71 days. Building starts about 4 months after permission.

    Comments open: 5 weeks · €20; Council decision: 55 days; If more info asked (1 in 6): 126 days; Appeal window: 4 weeks; If appealed: +232 days; Building starts: 133 days after permission0 mo3 mo6 mo9 mo12 mo15 mo18 moComments openComments close 5 weeks after the application is lodged5 weeks · €20Council decisionDecision: median 55 days, middle half 53–55 (n=437)55 daysIf more info asked (1 in 6)With further information: median 126 days (n=92)126 daysAppeal windowAnyone who commented can appeal within 4 weeks of the decision4 weeksIf appealedAt An Coimisiún Pleanála: median 232 days (n=120, all appeals within 1.5 km)+232 daysBuilding startsStart notice: median 133 days after permission (n=287)133 days after permissionSigned off486 days after the start, for the few who file. 47% of owners opt out of sign-off

    Bars are medians; whiskers show the middle half. Medians of separate steps don't add up exactly.

    Calculated529 decided home extensions, 293 start notices, 120 decided appeals · within 1.5 km, 10 years · NPAD, BCMS, An Coimisiún Pleanála

    Figure 4

    What appeals changed

    14 of 58 appealed refusals became permissions. 10 of 64 appealed approvals were reversed.

    Refusals appealed58 decided
    14 became permissions
    Approvals appealed64 decided
    10 reversed
    Ended approvedEnded refusedWithdrawn, invalid or other

    Every appeal decided within 1.5 km in 10 years, any kind of development.

    CalculatedAn Coimisiún Pleanála cases linked to the council file

    Appeals nearby 4 in the last 12 months

    1 of 3 changed the council's decision

    • 500637 Granted with conditions · 2A Ormond Road, Drumcondra, Dublin 9, D09EH60 with entrance off the… · 326 m report
    • 500718 Refused · Victoria Lane, to rear of & including No. 1 Hollybank Road, Dublin 9. · 131 m report
    • 324210 Pending · 93 Church Avenue, Drumcondra, Dublin 9 · 363 m
    • 500445 Granted with conditions · 10 Saint Alphonsus Road Lower, Drumcondra, Dublin 9 · 482 m report
    Sources: An Coimisiún Pleanála cases (ArcGIS feed), Courts Service legal diary (judicial reviews), National Planning Application Database · fetched 1 Nov 2026, 05:02
    SourceLicenceFetchedLink
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.030 Oct 2026, 23:01open
    Courts Service legal diary (judicial reviews)© the publisher31 Oct 2026, 23:12open
    National Planning Application DatabaseCC BY 4.01 Nov 2026, 05:02open
    Question 4

    What's changing around you?

    Street map around Millmount Terrace with 15 numbered planning items
    ⌖ the houseDerelict buildingApproved, not startedAppealBuilding startedNo decision yetApprovedRefused
    1. 15 Glenarm Avenue, Dublin 9 DS1066Derelict building · 264 m
    2. 225 Dargle Road, Dublin 9 DS2236Derelict building · 354 m
    3. 38 Ferguson Road Dublin 9 D09E3E5 DS982Derelict building · 379 m
    4. 4Holy Cross College ABP-310860Approved, not started, approval runs out within a year · 465 m
    5. 5Turnpike Lane Development 4062/24Approved, no sign building has started · 466 m
    6. 6Victoria Lane, to rear of & including No. 1 Hollybank Road 500718Appeal: refused · 131 m
    7. 76 Millmount Terrace, Dublin WEB1134/25Building started · 6 m
    8. 825 Richmond Road, Dublin 3 WEB2732/25Building started · 170 m
    9. 911 Millmount Place, Dublin 9 WEB6099/25No decision yet · 19 m
    10. 1019, Hollybank Road WEB5942/25Approved · 142 m
    11. 11Bus Stop 46, Drumcondra Road (o/s Nos. 138 & 139 WEB2681/26No decision yet · 148 m
    12. 1220, Carlingford Road WEB1452/26Approved · 254 m
    13. 13110, Drumcondra Road Lower WEB1581/26No decision yet · 256 m
    14. 14Victoria Lane Rear on 1 Hollybank Road, Dublin 9 Dublin WEB2931/26Refused · 266 m
    15. 1521 Church Avenue, Drumcondra WEB5612/25Approved · 357 m
    Figure 5

    What happens to applications within 500 m

    Permission isn't building. Of 97 permissions since 2016, 44 show a start notice and 4 have a completion certificate.

    136 applications lodged within 500 m. Council: 94 approved, 22 refused. After appeals: 97 approved. Of those: 4 signed off, 14 built with the owner's opt-out, 26 started, 53 with no start notice found, 0 ran out.LODGEDCOUNCIL DECISIONAFTER APPEALSWHAT HAPPENED NEXT94: lodged → approved22: lodged → refused18: lodged → withdrawn or invalid2: lodged → undecided94: approved → approved19: refused → refused18: withdrawn or invalid → withdrawn2: undecided → undecided3 refused by the council, approved after an appeal53: approved → no start notice found14: approved → built, owner opted out26: approved → started, not signed off4: approved → signed off136 lodged136 lodged94 approved94 approved22 refused22 refused18 withdrawn or invalid18 withdrawn or invalid2 undecided2 undecided97 approved97 approved19 refused19 refused18 withdrawn18 withdrawn2 undecided2 undecided53 no start notice found53 no start notice found14 built, owner opted out14 built, owner opted out26 started, not signed off26 started, not signed off4 signed off4 signed off

    Purple bands are refusals turned into permissions on appeal. "No start notice found" includes small jobs that never needed one and notices we couldn't match.

    Measured136 applications in 10 years · NPAD, An Coimisiún Pleanála, BCMS start notices and completion certificates

    Figure 6

    The next 30 days

    Nothing closes within 500 m in the next 30 days.

      Measuredcouncil registers and An Coimisiún Pleanála · deadlines worked out from the dates on file

      Figure 7

      Approved, stalled or planned, not built yet

      1614 homes 465 m away were approved Nov 2021 with no start notice yet; the permission runs to Nov 2026. DART+ South West is planned 629 m away.

      Holy Cross College · 1614 homes: 1614 homes approved, not started; runs out Nov 2026; Turnpike Lane Development · 46 homes: 46 homes approved May 2025, not started; DART+ South West, DART+ South…: railway order granted (13 November 2024); DART+ West, DART+ West:…: railway order granted (July 2024)20212022202320242025202620272028202920302031Holy Cross College · 1614 homes465 m · ABP-3108601614 homes approved, not started; runs out Nov 20261614 homes approved, not started; runs out Nov 2026Turnpike Lane Development · 46 homes466 m · 4062/2446 homes approved May 2025, not started46 homes approved May 2025, not startedDART+ South West, DART+ South…629 m · plannedrailway order granted (13 November 2024)DART+ West, DART+ West:…633 m · plannedrailway order granted (July 2024)today

      Each row is a dated fact from a public register: no score and no forecast.

      Measuredcouncil registers, BCMS, derelict sites registers, development plan layers (CC BY 4.0)

      Sites that could change 5 within 500 m

      Derelict building 3

      • 15 Glenarm Avenue, Dublin 9 · derelict since Nov 2022 · 264 m
      • 225 Dargle Road, Dublin 9 · derelict since Sep 2026 · 354 m
      • 38 Ferguson Road Dublin 9 D09E3E5 · derelict since Sep 2017 · 379 m

      Approved, not started, approval running out 1

      Approved, not started 1

      Sources: An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices), Derelict sites registers, Council meetings (ModernGov), National Planning Application Database, Residential Zoned Land Tax maps · fetched 1 Nov 2026, 05:02
      SourceLicenceFetchedLink
      An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.030 Oct 2026, 23:01open
      Building Control Management System (commencement notices)CC BY 4.01 Nov 2026, 03:07open
      Derelict sites registersCC BY 4.026 Oct 2026, 23:09open
      Council meetings (ModernGov)Public1 Nov 2026, 02:24open
      National Planning Application DatabaseCC BY 4.01 Nov 2026, 05:02open
      Residential Zoned Land Tax mapsCC BY 4.025 Oct 2026, 23:43open
      Figure 8

      Applications within 500 m, by year

      Between 17 and 33 a year; busiest 2022. 81% of decisions were approvals.

      2021: 27, 2022: 33, 2023: 17, 2024: 23, 2025: 25, 2026: 110102030402021: 27 approved27’21*2022: 19 approved2022: 13 refused2022: 1 withdrawn or invalid33’222023: 14 approved2023: 2 refused2023: 1 withdrawn or invalid17’232024: 18 approved2024: 2 refused2024: 3 withdrawn or invalid23’242025: 14 approved2025: 3 refused2025: 8 withdrawn or invalid25’252026: 2 approved2026: 2 refused2026: 5 withdrawn or invalid2026: 2 undecided11’26*
      ApprovedRefusedWithdrawn or invalidUndecided

      2021 and 2026 are part years (*). Exemption requests and time extensions are left out.

      Measuredcouncil register via NPAD

      Every application within 500 m 20 in the last 12 months

      See every application on the map

      How we work this out
      Descriptions are shortened by the national planning database (to 80 characters in Dún Laoghaire-Rathdown, 70 in Fingal), and it does not publish applicants' names.
      Sources: National Planning Application Database, An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices) · fetched 1 Nov 2026, 05:02
      SourceLicenceFetchedLink
      National Planning Application DatabaseCC BY 4.01 Nov 2026, 05:02open
      An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.030 Oct 2026, 23:01open
      Building Control Management System (commencement notices)CC BY 4.01 Nov 2026, 03:07open
      Building work nearby 11 in the last 12 months
      1 not signed off10 no sign-off needed
      • 135 Hollybank Road, Dublin 9 · 27 Oct 2026 · short notice no sign-off needed · WEB1002/26 · 491 m
      • 93 Church Road, Drumcondra, Dublin 9, D09 Y1R8 · 8 Sept 2026 · short notice no sign-off needed · WEB1902/26 · 381 m
      • 4 Grace Park Gardens, Dublin 9, D09 YD39 · 4 Sept 2026 · short notice no sign-off needed · 460 m
      • 85 Walsh Road, Dublin 9, D09 C5R7 · 29 Jul 2026 · start notice, opted out no sign-off needed · WEB1224/26 · 499 m
      • 135 Hollybank Road, Dublin 9, D09 N9R2 · 15 Jul 2026 · start notice, opted out no sign-off needed · WEB1002/26 · 491 m
      • 825 Richmond Road, Dublin 3, D03 RW31 · 23 Jun 2026 · short notice no sign-off needed · WEB2732/25 · 170 m
      • 76 Millmount Terrace, Dublin, Dublin 9, D09 E0E3 · 8 Jun 2026 · short notice no sign-off needed · WEB1134/25 · 6 m
      • 35 Clonturk Park, Dublin, Dublin 9, D09 A0E6 · 16 Mar 2026 · short notice no sign-off needed · WEB2907/25 · 267 m
      • 6 Drumcondra Road Upper, Dublin, Dublin 9, D09 H6K8 · 26 Dec 2025 · 7-day notice not signed off · 98 m
      • 16 Carlingford Road, DRUMCONDRA, Dublin 9, D09 HN44 · 20 Nov 2025 · start notice, opted out no sign-off needed · WEB2433/25 · 265 m
      • 15 Glenarm Avenue, Drumcondra, Dublin 9, Dublin 9, D09 A5Y4 · 6 Nov 2025 · start notice, opted out no sign-off needed · 3982/24 · 278 m
      How we work this out
      Each row is a notice the builder sent to the council's building control office before work started. One notice can cover many homes. 'Signed off as finished' means a completion certificate is on file; work done under an opt-out or a short notice doesn't need one.
      Source: Building Control Management System (commencement notices) · fetched 1 Nov 2026, 03:07
      SourceLicenceFetchedLink
      Building Control Management System (commencement notices)CC BY 4.01 Nov 2026, 03:07open
      Homes coming 1,660 not started
      • 12 Ferguson Road, Drumcondra, Dublin 9 · Completed · 1 homes · 391 m
      • 190 -192 Moore Haven, Drumcondra Road Upper, Dublin 9. · Stage 4 tender approval · 8 homes · 391 m
      • 194-198 Clonliffe Road, Drumcondra, Dublin 9 · Completed · 33 homes · 391 m
      • 66 Clonliffe Road, Drumcondra, Dublin 3 · Stage 4 tender approval · 1 homes · 391 m
      How we work this out
      Schemes of 10 or more homes approved since 2021, from the council and An Coimisiún Pleanála registers. 'Building started' means the builder told the council's building control office that work was starting (a commencement notice).
      Sources: An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices), National Planning Application Database, Social housing construction status report · fetched 1 Nov 2026, 05:02
      SourceLicenceFetchedLink
      An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.030 Oct 2026, 23:01open
      Building Control Management System (commencement notices)CC BY 4.01 Nov 2026, 03:07open
      National Planning Application DatabaseCC BY 4.01 Nov 2026, 05:02open
      Social housing construction status reportCC BY-SA 4.023 Oct 2026, 23:02open
      Named places nearby: estate, schemes, crèches, schools

      Named places estate, developments, inspections

      Developments within 1.0 km

      SchemeHomesProgressDistance
      Former Holy Cross College11311131 not started (2026-Q2)177 m
      Turnpike Lane Development3939 not started (2026-Q2)441 m
      Clonliffe Family Hub50—442 m
      Former Leydens Wholesalers & Distributors107107 not started (2026-Q2)533 m
      1943636 built (2025-Q2)541 m
      St. Vincent's Hospital Site779283 being built · 496 not started (2026-Q2)593 m
      Former Carmelite Convent of the Incarnation19034 built · 43 being built · 113 not started (2026-Q2)698 m
      Richmond Road and Convent Avenue104104 not started (2026-Q2)802 m

      Crèches and schools inspected

      NameLatest inspectionDistance
      Hyde & Seek Childcare (Millbourne) · Crèche20 Mar 2025 · report · Tusla Early Years Inspectorate218 m
      Drumcondra Montessori School · Crèche2 Oct 2025 · report · Tusla Early Years Inspectorate327 m
      Old Mc Donalds · Crèche15 Sept 2025 · report · Tusla Early Years Inspectorate491 m
      Little Learners · Crèche2 Apr 2025 · report · Tusla Early Years Inspectorate527 m
      Little Learners ABCD · Crèche9 Jul 2025 · report · Tusla Early Years Inspectorate580 m
      Cuddles 'n' Care · Crèche6 Nov 2024 · report · Tusla Early Years Inspectorate634 m
      Links Childcare · Crèche24 Jun 2025 · report · Tusla Early Years Inspectorate762 m
      Tír na NÓg · Crèche9 Oct 2024 · report · Tusla Early Years Inspectorate811 m
      How we work this out
      Organisations only: a person named on an application is never listed. Inspection dates and links are the publisher's; read their report for the findings.
      Sources: Dublin housing delivery pipeline, National Planning Application Database, Department of Education school list, Tusla early years register · fetched 1 Nov 2026, 05:02
      SourceLicenceFetchedLink
      Dublin housing delivery pipelineCC BY 4.026 Oct 2026, 23:00open
      National Planning Application DatabaseCC BY 4.01 Nov 2026, 05:02open
      Department of Education school listCC BY 4.027 Oct 2026, 23:04open
      Tusla early years registerPublic register28 Oct 2026, 23:19open
      How busy is this area Busier than most of Dublin City Council.
      Homes approved
      Here100
      Council middle63
      Homes started
      Here2,396
      Council middle174
      How we work this out
      Homes approved counts schemes of 10 or more homes (one-off houses are not included). Homes started counts every home in a notice that building work was starting. The council figure is the middle value across the council's built-up squares of the same area (3.1 km², about a 1 km circle), so half of them saw more and half fewer.
      Sources: An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices), National Planning Application Database · fetched 1 Nov 2026, 05:02
      SourceLicenceFetchedLink
      An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.030 Oct 2026, 23:01open
      Building Control Management System (commencement notices)CC BY 4.01 Nov 2026, 03:07open
      National Planning Application DatabaseCC BY 4.01 Nov 2026, 05:02open
      Question 5

      What's the area like?

      Figure 9

      This street block against the council

      58% owner-occupied (council 47%).

      Homes built before 1971
      56% · council 52%
      Homes built since 2001
      2% · council 19%
      Owner-occupied
      58% · council 47%
      Rented
      36% · council 45%
      Children under 15
      14% · council 15%
      Aged 65 and over
      18% · council 13%
      Households with 2+ cars
      14% · council 19%
      Work mainly from home
      16% · council 12%
      This small area (236 people)Dublin

      MeasuredCSO Census 2022, Small Area Population Statistics (CC BY 4.0) · small area 268060001

      Bus
      139 m
      Botanic Ave · 1, 16, 19 · busiest stop within 500 m: 28 an hour at peak
      Planned
      629 m
      DART+ South West, DART+ South West: Hazelhatch and Celbridge - Drumcondra
      Radon
      1 in 20
      homes here likely high (EPA). Test it
      Flood
      Yes
      OPW flood map area within 100 m
      Nearest school
      257 m
      St Patricks N School, 449 pupils
      Homes sold nearby
      65
      in 3 years, 2 new (Property Price Register)
      Schools, stops and the council

      Schools

      • St Patricks N School · primary · 449 pupils · 257 m
      • Drumcondra NS · primary · 81 pupils · 421 m
      • St Columbas Con G & I · primary · 378 pupils · 553 m
      • St Josephs For Blind Ns · primary · 48 pupils · 623 m
      • Grace Park Educate Together National School · primary · 409 pupils · 695 m
      • Corpus Christi NS · primary · 398 pupils · 718 m
      • Lindsay Road NS · primary · 95 pupils · 721 m
      • Gaelscoil Áine · primary · 176 pupils · 735 m

      Stops 47

      • Botanic Ave · 1, 16, 19, 33, 33E, 33n · 22/hour at peak · 139 m
      • Botanic Ave · 1, 16, 16D, 19, 33, 41 · 27/hour at peak · 153 m
      • Drumcondra Village · 1, 101, 16, 16D, 180, 19 · 27/hour at peak · 195 m
      • Drumcondra Village · 1, 101, 16, 180, 19, 33 · 28/hour at peak · 204 m
      • Archbishop's House · 1, 16, 19, 33, 33E, 33n · 21/hour at peak · 292 m
      • St Patrick's Campus · 1, 16, 19, 33, 33E, 33n · 22/hour at peak · 374 m
      • St Patrick's Campus · 1, 16, 16D, 19, 33, 41 · 27/hour at peak · 384 m
      • Archbishop's House · 1, 16, 16D, 19, 33, 41 · 29/hour at peak · 519 m

      Schools growing or shrinking planning in 3 years · pupils last year

      • St Patricks N School · 257 m-1.3% pupils (449)
      • Drumcondra NS · 421 m+15.7% pupils (81)
      • St Columbas Con G & I · 553 m+1.9% pupils (378)
      • St Josephs For Blind Ns · 623 m-5.9% pupils (48) · an extension 2024, approved
      • Grace Park Educate Together National School · 695 m-0.7% pupils (409)
      • Corpus Christi NS · 718 m-1% pupils (398) · 2 classrooms 2025, approved

      Open consultations

      Council meetings 30 items

      Public land

      • Dublin City Council · 0.17 ha · 36 m
      • Dublin City Council · 0.11 ha · 53 m
      • Dublin City University · 11.2 ha · 67 m
      • Dublin City Council · 1.41 ha · 216 m
      • Dublin City Council · 0.88 ha · 300 m
      • Dublin City University · 8.6 ha · 385 m
      Sources: Public transport stops and routes (NTA GTFS), Department of Education school list, National Planning Application Database, Council consultation portals, Council meetings (ModernGov), Land Development Agency public land register, cso_saps_2022, National Transport Authority, Fingal County Council and Dún Laoghaire-Rathdown County Council development plan layers (CC BY 4.0), dartplus.ie project extents over NTA GTFS rail shapes (CC BY 4.0), EPA strategic noise maps, Fingal County Council · fetched 1 Nov 2026, 05:02
      SourceLicenceFetchedLink
      Public transport stops and routes (NTA GTFS)CC BY 4.025 Oct 2026, 23:02open
      Department of Education school listCC BY 4.027 Oct 2026, 23:04open
      National Planning Application DatabaseCC BY 4.01 Nov 2026, 05:02open
      Council consultation portalsPublic1 Nov 2026, 01:08open
      Council meetings (ModernGov)Public1 Nov 2026, 02:24open
      Land Development Agency public land registerCC BY 4.011 Sept 2026, 16:43open
      cso_saps_2022CC BY 4.0—open
      National Transport AuthorityCC BY 4.0——
      Fingal County Council and Dún Laoghaire-Rathdown County Council development plan layers (CC BY 4.0)CC BY 4.0——
      dartplus.ie project extents over NTA GTFS rail shapes (CC BY 4.0)CC BY 4.0——
      EPA strategic noise mapsCC BY 4.0——
      Fingal County CouncilCC BY 4.0——
      Question 6

      What to ask, and who

      1. Attic or dormer (WEB1134/25) built without official sign-off: built properly?
        Ask for: An engineer's opinion of compliance.
        Seller · solicitor
      2. Flood risk area within 100 m: can you insure it?
        Ask for: A flood-cover quote before sale agreed.
        Insurer
      3. Building work started 6 m away: for how long?
        Ask for: The planning conditions for WEB1134/25.
        Agent · council
      4. Any work done without planning permission?
        Ask for: An opinion of compliance for the whole house.
        Seller · solicitor
      Reference

      Where this is, the terms, the sources

      Electoral division
      Drumcondra South C
      Electoral area
      Cabra-Glasnevin
      Council
      Dublin City Council
      Everything we found, as a list 8 lines
      • 1 application on this site; latest WEB1134/25, approved 2025, started, no sign-off needed.
      • Zoned R2 (existing residential); not protected; no vacant land tax; flood risk area within 100 m.
      • 5 sites nearby could change: 3 derelict, 2 approved schemes.
      • 1,660 homes approved nearby, not started; largest 1614 at Holy Cross College.
      • Drumcondra Village (bus 1, 101) 204 m away: 28 an hour at morning peak; 175 from all stops within 500 m. Planned: DART+ South West 629 m away, railway order granted (13 November 2024).
      • Here (2022 census): 58% owner-occupied (council 47%); 6% of homes empty (council 8%); most built before 1919; 23% drive to work (council 28%); population down 5% since 2016.
      • 5 home extensions within 250 m since 2025. Most were dormers or attic conversions.
      • The council decides in a median 55 days (about 8 weeks); 1 in 4 is asked for more information.
      What the terms mean 8 terms
      • Vacant land tax (Residential Zoned Land Tax (RZLT)): A yearly tax of 3% of the land's value on land that is zoned for homes and serviced but left unbuilt.
      • Building started (Commencement notice (BCMS)): The builder must tell the council's building control office 14 to 28 days before work starts.
      • Signed off as finished (Certificate of Compliance on Completion): A certificate filed when a building is finished, confirming it meets the building regulations.
      • Approved (Grant of permission): The council said yes, usually with conditions.
      • Approval ran out without being built (Permission lapsed / expired): Most permissions last five years.
      • Listed by the council as derelict (Derelict Sites Register): Councils keep a public list of land and buildings in a ruinous or dangerous state.
      • Appeal (Appeal to An Coimisiún Pleanála): The applicant, or anyone who commented in time, can appeal the council's decision within four weeks.
      • What the land is zoned for (Zoning objective): The council's development plan sets what each area is for: homes, shops, open space and so on.
      Sources and licences 31
      SourcePublisherLicenceFetched
      EPA strategic noise maps—CC BY 4.0—
      Fingal County Council—CC BY 4.0—
      Fingal County Council and Dún Laoghaire-Rathdown County Council development plan layers (CC BY 4.0)—CC BY 4.0—
      National Transport Authority—CC BY 4.0—
      services-eu1.arcgis.comAn Coimisiún PleanálaCC BY 4.030 Oct 2026
      data.nbco.gov.ieNational Building Control Office (BCMS)CC BY 4.01 Nov 2026
      data.gov.ieVarious (see each layer)CC BY 4.0, CC BY-NC-ND 4.027 Sept 2026
      s3.eu-west-1.amazonaws.comOffice of Public WorksCC BY-NC-ND 4.0 · flag only11 Sept 2026
      services-eu1.arcgis.comNational Inventory of Architectural HeritageCC BY 4.027 Sept 2026
      gis.epa.ieEnvironmental Protection AgencyCC BY 4.027 Sept 2026
      services-eu1.arcgis.comNational Monuments Service (SMR)CC BY 4.027 Sept 2026
      dlrcoco.citizenspace.comLocal authorities (consultation portals)Public1 Nov 2026
      www2.courts.ie—© the publisher31 Oct 2026
      cso.ie—CC BY 4.0—
      dartplus.ie project extents over NTA GTFS rail shapes (CC BY 4.0)—CC BY 4.0—
      services-eu1.arcgis.comLocal authorities (derelict sites registers)CC BY 4.026 Oct 2026
      services.arcgis.comDublin local authorities (housing delivery pipeline)CC BY 4.026 Oct 2026
      data.epa.ieEnvironmental Protection Agency (LEAP licence register)CC BY 4.026 Oct 2026
      esbnetworks.ie—© the publisher · flag only11 Sept 2026
      transportforireland.ieNational Transport AuthorityCC BY 4.025 Oct 2026
      lda.ieLand Development AgencyCC BY 4.011 Sept 2026
      meetings.fingal.ieLocal authorities (council meetings)Public1 Nov 2026
      services.arcgis.comDepartment of Housing (National Planning Application Database)CC BY 4.01 Nov 2026
      services-eu1.arcgis.comTailte ÉireannCC BY 4.011 Sept 2026
      services-eu1.arcgis.comCSO, Tailte Éireann, OpenStreetMap contributorsCC BY 4.04 Oct 2026
      propertypriceregister.ieProperty Services Regulatory Authority (PPR)© PSRA, PSI licence1 Nov 2026
      services.arcgis.comLocal authorities (RZLT maps)CC BY 4.025 Oct 2026
      gov.ieDepartment of EducationCC BY 4.027 Oct 2026
      gov.ieDepartment of HousingCC BY-SA 4.023 Oct 2026
      tusla.ieTusla (Early Years Inspectorate)Public register28 Oct 2026
      services.arcgis.comLocal authorities via the Department of Housing (GZT / MyPlan)CC BY 4.025 Oct 2026
      Measured
      counted from a public register
      Calculated
      a rate or median we worked out from those counts
      Our classification
      we sorted it by reading each description
      Estimate
      inferred from another source (census, map data)
      Rule summary
      the law, simplified: check before relying on it
      How we work this out
      Generated 1 Nov 2026, 08:54 from the Planning Register store; nothing was fetched live. Not a legal search: the council's planning file is the record. Deadlines come from published dates under the Planning and Development Act 2000: confirm with the council before relying on them. Street map © OpenStreetMap contributors; building outlines © Overture Maps Foundation. The text version carries every figure with its source, for an AI assistant.