R2 — Existing residentialdevelopment plan 2022 2028 · 14 Dec 2022 – 31 Dec 2028
Z1: Sustainable Residential Neighbourhoods: To protect, provide and improve residential amenities.
What that means: An established residential area. The objective is to protect existing residential amenity as well as to provide housing — which is the objective a neighbour's objection to an overbearing extension is usually argued under.
This site is on an RZLT map — the draft map 2027 and the final map 2026 (1.73 ha). The owner is liable for an annual 3% tax on market value while it stays there. Submissions on the draft map closed 1 Apr 2026.
CHANGE OF USE: PERMISSION AND RETENTION: Planning permission is sought for retention of change of use from commercial storage / office building to gym facility with internal coffee shop for customers, also retention sought for recovery room and sauna with 2no outdoor ice baths to the side of gym facility and all associated site works.
RETENTION: Planning permission is sought for retention of change of use from commercial storage / office building to gym facility with internal coffee shop for customers, also retention sought for recovery room and sauna with 2no outdoor ice baths to the side of gym facility, permission also sought for traffic calming measures to entrance road at Shandon Gardens to site to enable traffic entering and exiting the site and all associated site works.
WEB2620/26received 30 Jun 2026decided 1 Jul 2026330 m away
RETENTION 1) the operation of a Coffee Shop in a container with signage, 2) a raised platform with side railings at the entrance, 3) a seating area to the front including 4 tables an 8 chairs, 4) 4 removable bollards with retractable tape ass associated works.
Permission is sought for
(i) demolition of existing single-storey extension to rear and
(ii) the construction of a new 2-storey extension to rear and
(iii) modifications to existing front elevation, entrance porch & steps and
(iv) all associated site & drainage works at 109 St Attracta’s Road, Cabra, Dublin7 D07 K2A8.
WEB1657/26received 20 Mar 2026decided 11 May 2026449 m away
Gina and Conor Cussen intend to apply for permission for the development of an existing terrace dwelling at no.47 Claremont Court, Glasnevin, Dublin 11, d11a6y4.
The development will consist of the following principal elements:
1) construction of a new single storey extension with roof lights to the rear of existing house.
2) new canopy over the main entrance to the front.
3) alterations to the internal layout and elevations, along with all associated landscaping and ancillary works.
WEB1655/26received 20 Mar 2026decided 11 May 20260 m away
Permission is sought for (i) demolition of existing single-storey extension to rear and (ii) the construction of a new 2-storey extension to rear and (iii) modifications to existing front elevation, entrance porch & steps and (iv) all associated site & drainage works at 109 St Attracta’s Road, Cabra, Dublin7 D07 K2A8.
WEB1569/26received 11 Mar 2026decided 12 Mar 2026449 m away
The Electricity Supply Board (ESB) intends to apply for permission for a 10-year approval for development at this site consisting of up to approximately 3.72 kilometres (km) of 38 kilovolts (kV) underground cable (UGC) across 3 no. routes at different locations in Dublin City with a total site area of c.4.23ha. The proposed UGC are located at the Ashtown, Glasnevin and North Wall areas within Dublin City. The proposed development consists of the following elements:
• Installation of 3no. new 38 kV underground cable routes, or cable route sections, and all associated site and development works within the administrative area of Dublin City Council (DCC) as outlined below and illustrated on the maps herein:
- The proposed Coolmine cable route section within DCC is approximately 1.14km in length connecting the permitted Ashtown 38 kV substation (ACP Ref. 314232) to the County Border with Fingal at Navan Road (R147).
- The proposed Glasnevin cable route is wholly within DCC and is approximately 1.2km in length connecting the existing Glasnevin 38kV substation to the permitted Clareville 38kV substation (ACP Ref. 314232).
- The proposed North Quays cable route is wholly within DCC and is approximately 1.38km in length connecting the permitted Spencer Dock 38kV substation (ACP Ref. 314232) with the existing 38 kV circuit on East Wall Road (R131).
The primary purpose of the proposed underground cables is to provide electrical power to the Dart+ West Railway project as granted under the DART+ West Railway Order (ACP Ref. 314232).
The proposed underground cable routes will incorporate the following elements:
• Communication links and fibre optic cables between all substations in the same trench as the UGC;
• Joint bays and communication chambers along the UGC alignment;
• Temporary construction laydown and work areas with ancillary staff facilities and parking, temporary access tracks, passing bays and water and utility crossings.
• All associated and ancillary above and below ground site development works, including works comprising or relating to permanent and temporary construction and roadworks and excavation (including HDD) and vegetation clearance.
Refer to the enclosed site and newspaper notices for a full description of development for the maps attached.
WEB1097/26received 16 Jan 2026decided 11 Mar 2026371 m away
The demolition of existing single storey rear extension.
The construction of a new two storey, flat-roof rear extension.
Ground floor (40m2) & First floor (18m2)
Minor alterations to existing dwelling
Demolition of existing rear garage and the construction of a new garage.
New vehicular entrance to rear garage.
WEB6084/25received 22 Dec 2025decided 9 Apr 2026485 m away
-The demolition of existing single storey rear extension.-The construction of a new two storey, flat-roof rear extension. Ground floor (40m2) & First floor (18m2) - Minor alterations to existing dwelling.- Demolition of existing rear garage and the construction of a new garage.- New vehicular entrance to rear garage.
WEB6022/25received 18 Dec 2025decided 22 Dec 2025485 m away
- The demolition of existing single storey rear extension.
- The construction of a new two storey, flat-roof rear extension.
Ground floor (40m2) & First floor (18m2)
- Minor alterations to existing dwelling.
- Construction of a new garage to the rear of the property, designed for vehicular parking.
WEB5933/25received 11 Dec 2025decided 12 Dec 2025485 m away
`description` is truncated at source (80 chars for DLR, 70 for Fingal) and `applicant` is null nationally — NPAD publishes neither in full.
PPR addresses are geocoded, not surveyed — a sale's position is as good as its address match (`rooftop_n` says how many are address-accurate). Beds, floor area, BER and asking price come from the matched daft.ie advertisement, not from the Register, and only where a match was found (`enriched_n`).
Third-party advertisement data captured by Cara from daft.ie. Not open data: internal analysis only, no redistribution of listing content. Business-contact details (licensed PSP name and branch) are retained per Cara DECISIONS 2026-08-19; agent phone numbers and all vendor/buyer identities are dropped.
No publishable utility-capacity record within the radius. 14 records from Esb substation withheld: source licence forbids redistribution; see the operator's own register.
Public land (LDA register of relevant lands)
Córas Iompair Éireann — Dublin city and suburbs
0.51 hafolio DN3267N102 m awayas of 1 Apr 2023
Córas Iompair Éireann — Dublin city and suburbs
0.95 hafolio DN3267N147 m awayas of 1 Apr 2023
Dublin City Council — Dublin city and suburbs
0.56 hafolio DN10877F350 m awayas of 1 Apr 2023
Dublin City Council — Dublin city and suburbs
1.33 hafolio DN111368F383 m awayas of 1 Apr 2023
Córas Iompair Éireann — Dublin city and suburbs
0.33 hafolio DN3267N477 m awayas of 1 Apr 2023
Córas Iompair Éireann — Dublin city and suburbs
0.67 hafolio DN3267N481 m awayas of 1 Apr 2023
The Office of Public Works — Dublin city and suburbs
all-rights-reserved (esbnetworks.ie disclaimer: personal/non-commercial, no modification or republication without written ESB permission) — permission NOT sought · not redistributable — shown as a flag only
Third-party advertisement data captured by Cara from daft.ie. Not open data: internal analysis only, no redistribution of listing content. Business-contact details (licensed PSP name and branch) are retained per Cara DECISIONS 2026-08-19; agent phone numbers and all vendor/buyer identities are dropped.
all-rights-reserved (esbnetworks.ie disclaimer: personal/non-commercial, no modification or republication without written ESB permission) — permission NOT sought · not redistributable, flag only
Generated 12 Sept 2026, 23:21 from the Planning Register store. Nothing on this page was fetched live: every figure was already in the store with the fetch time shown. Deadlines are derived from published receipt and decision dates under the Planning and Development Act 2000; confirm with the planning authority before relying on them.