- 95 Botanic Road, Glasnevin, Dublin 9, D09 W5H0 Registered Application
Conversion of existing attic space comprising of modification of existing roof structure, new access stairs, 2no. roof windows to the front and flat roof dormer to the rear.
WEB2857/26received 27 Jul 2026352 m away
- Unit 3 & 4, Block 2, Millfield View, Glasnevin Hill, Dublin 9 Application declared invalid
Combine two existing retail units (51 sqm & 39 sqm) into one single retail unit (90 sqm) unit (ground floor) with ancillary off-licence use (7.8 sqm) and a fresh produce display along the northern façade together with removal able external seating. The development will also include minor alterations to the shopfront and signage. All associated site and ancillary works at Unit 3 & 4, Millfield View, Block 2, Glasnevin Hill, Dublin 9.
WEB2567/26received 24 Jun 2026decided 29 Jul 2026324 m away
- 18 Cliftonville Road, Glasnevin, Dublin 9, D09 A2V5 Grant retention permission
RETENTION PERMISSION :The development will consist of Retention permission for 1. New roof light window to the front elevation. 2. A rear facing flat roof dormer attic window, (constructed larger in width and height to previously approved under planning grant application REF. 1372/07) the dormer is externally finished in dark-grey metal cladding, the attic use consists of a home office and WC.
WEB2376/26received 5 Jun 2026decided 28 Jul 2026306 m away
- 95 Botanic Road, Glasnevin, Dublin 9, D09 W5H0 Application declared invalid
Conversion of existing attic space comprising of modification of existing roof structure, new access stairs, 2no. roof windows to the front and flat roof dormer to the rear.
WEB2371/26received 5 Jun 2026decided 7 Jul 2026352 m away
- Balnagowan House, St. Mobhi Boithirin, Glasnevin, Dublin 9 (the western part of the site fronts The Haven) Additional information
PROTECTED STRUCTURE: Rectone Developments Ltd intend to apply for PERMISSION for a residential development comprising 30 no. units, on a site of c. 0.476 ha., on lands at Balnagowan House, St. Mobhi Boithirin, Glasnevin, Dublin 9 (the western part of the site fronts The Haven). Balnagowan House is a Protected Structure (RPS Ref. No. 8699).
The development will consist of: the demolition of 3 no. existing single storey outbuilding structures (total of 171.5 sq. m) together with part removal of the front existing boundary walls; the change of use of Balnagowan House (Block 1) from office to residential use to provide 4 no. 2 bed residential units (c.354.67 sq.m GFA), together with associated internal and external alterations and refurbishment works to facilitate the conversion (including removal of internal walls/partitions); the construction of a 3 storey duplex & apartment block (Block 2) to provide 4 no. 1 & 3 bed residential units with associated balconies & terraces; & the construction of 22 no. 2 & 3 bedroom 3 storey townhouses with associated private open spaces & balconies, to provide 30 no. residential units (c. 2365.9 sq. m GFA). The overall proposed residential development (c. 3099.81 sq.m GFA) (including Balnagowan House), will comprise 2 no. one bedroom units, 6 no. two bedroom units, & 22 no. three bedroom units. Pedestrian, cyclist, vehicular and emergency access will be provided off The Haven/ St. Mobhi Boithirin via. existing upgraded entrances. The access arrangements include alterations to the existing accesses to front & to the west of Balnagowan House, St. Mobhi Boithirin. The development will also consist of open space provision including all private, communal and public open space, hard and soft landscaping including internal cycle and pedestrian routes, pathways, boundary treatments, as well as a playground of 50sqm within the communal open area, street furniture, car parking (14 no. part internal gnd. fl. garage spaces to the townhouses & 14 no. surface spaces – 2 no. accessible & 5 no. EV charging – with 9 no. of the spaces accessed directly from St. Mobhi Boithirin), bicycle parking (16 no. long & 4 short stay spaces, covered and secure bicycle parking), ESB substations, piped infrastructural services & connections, ducting, plant, waste management & bin store provision, SuDS & attenuation infrastructure, signage, public lighting and all site development incl. all excavation works & service connections.
A Natura Impact Statement (NIS) has been prepared in respect of the proposed development.
WEB2324/26received 2 Jun 2026decided 24 Jul 202630 units441 m away
- 18, Cliftonville Road, Glasnevin, Dublin 9, D09 A2V5 Application declared invalid
RETENTION: The development will consist of Retention permission for 1. New roof light window to the front elevation. 2. A rear facing flat roof dormer attic window, (constructed larger in width and height to previously approved under planning grant application REF. 1372/07) the dormer is externally finished in dark-grey metal cladding, the attic use consists of a home office and WC.
WEB2059/26received 1 May 2026decided 5 May 2026306 m away
- Lands at Balnagowan House, St. Mobhi Boithirin, Glasnevin, Dublin 9 (the western part of the site fronts The Haven) Application declared invalid
PROTECTED STRUCTURE : Rectone Developments Ltd intend to apply for PERMISSION for a residential development comprising 30 no. units, on a site of c. 0.476 ha., on lands at Balnagowan House, St. Mobhi Boithirin, Glasnevin, Dublin 9 (the western part of the site fronts The Haven). Balnagowan House is a Protected Structure (RPS Ref. No. 8699).
The development will consist of: the demolition of 3 no. existing single storey outbuilding structures (total of 171.5 sq. m) together with part removal of the front existing boundary walls; the change of use of Balnagowan House (Block 1) from office to residential use to provide 4 no. 2 bed residential units (c.354.67 sq.m GFA), together with associated internal and external alterations and refurbishment works to facilitate the conversion (including removal of internal walls/partitions); the construction of a 3 storey duplex & apartment block (Block 2) to provide 4 no. 1 & 3 bed residential units with associated balconies & terraces; & the construction of 22 no. 2 & 3 bedroom 3 storey townhouses with associated private open spaces & balconies, to provide 30 no. residential units (c. 2365.9 sq. m GFA). The overall proposed residential development (c. 3099.81 sq.m GFA) (including Balnagowan House), will comprise 2 no. one bedroom units, 6 no. two bedroom units, & 22 no. three bedroom units. Pedestrian, cyclist, vehicular and emergency access will be provided off The Haven/ St. Mobhi Boithirin via. existing upgraded entrances. The access arrangements include alterations to the existing accesses to front & to the west of Balnagowan House, St. Mobhi Boithirin. The development will also consist of open space provision including all private, communal and public open space, hard and soft landscaping including internal cycle and pedestrian routes, pathways, boundary treatments, as well as a playground of 50sqm within the communal open area, street furniture, car parking (14 no. part internal gnd. fl. garage spaces to the townhouses & 14 no. surface spaces – 2 no. accessible & 5 no. EV charging – with 9 no. of the spaces accessed directly from St. Mobhi Boithirin), bicycle parking (16 no. long & 4 short stay spaces, covered and secure bicycle parking), ESB substations, piped infrastructural services & connections, ducting, plant, waste management & bin store provision, SuDS & attenuation infrastructure, signage, public lighting and all site development incl. all excavation works & service connections.
A Natura Impact Statement (NIS) has been prepared in respect of the proposed development.
WEB1836/26received 13 Apr 2026decided 19 May 202630 units441 m away
- Balnagowan House, St Mobhi Boithirin, Glasnevin, Dublin 9 (the western part of the site fronts The Haven) Application declared invalid
-PROTECTED STRUCTURE Rectone Developments Ltd intend to apply for PERMISSION for a residential development comprising 30 no. units, on a site of c. 0.476 ha., on lands at Balnagowan House, St. Mobhi Boithirin, Glasnevin, Dublin 9 (the western part of the site fronts The Haven). Balnagowan House is a Protected Structure (RPS Ref. No. 8699). The development will consist of: the demolition of 3 no. existing single storey outbuilding structures (total of 171.5 sq. m) together with part removal of the front existing boundary walls; the change of use of Balnagowan House (Block 1) from office to residential use to provide 4 no. 2 bed residential units (c.354.67 sq.m GFA), together with associated internal and external alterations and refurbishment works to facilitate the conversion (including removal of internal walls/partitions); the construction of a 3 storey duplex & apartment block (Block 2) to provide 4 no. 1 & 3 bed residential units with associated balconies & terraces; & the construction of 22 no. 2 & 3 bedroom 3 storey townhouses with associated private open spaces & balconies, to provide 30 no. residential units (c. 2365.9 sq. m GFA). The overall proposed residential development (c. 3099.81 sq.m GFA) (including Balnagowan House), will comprise 2 no. one bedroom units, 6 no. two bedroom units, & 22 no. three bedroom units. Pedestrian, cyclist, vehicular and emergency access will be provided off The Haven/ St. Mobhi Boithirin via. existing upgraded entrances. The access arrangements include alterations to the existing accesses to front & to the west of Balnagowan House, St. Mobhi Boithirin. The development will also consist of open space provision including all private, communal and public open space, hard and soft landscaping including internal cycle and pedestrian routes, pathways, boundary treatments, as well as a playground of 50sqm within the communal open area, street furniture, car parking (14 no. part internal gnd. fl. garage spaces to the townhouses & 14 no. surface spaces – 2 no. accessible & 5 no. EV charging – with 9 no. of the spaces accessed directly from St. Mobhi Boithirin), bicycle parking (16 no. long & 4 short stay spaces, covered and secure bicycle parking), ESB substations, piped infrastructural services & connections, ducting, plant, waste management & bin store provision, SuDS & attenuation infrastructure, signage, public lighting and all site development incl. all excavation works & service connections. A Natura Impact Statement (NIS) has been prepared in respect of the proposed development.
WEB1774/26received 2 Apr 2026decided 9 Apr 2026441 m away
- Balnagowan House, St. Mobhi Boithirin, Glasnevin, Dublin 9 (the western part of the site fronts The Haven) Application declared invalid
PROTECTED STRUCTURE: Rectone Developments Ltd intend to apply for PERMISSION for a residential development comprising 30 no. units, on a site of c. 0.476 ha., on lands at Balnagowan House, St. Mobhi Boithirin, Glasnevin, Dublin 9 (the western part of the site fronts The Haven). Balnagowan House is a Protected Structure (RPS Ref. No. 8699). The development will consist of: the demolition of 3 no. existing single storey outbuilding structures (total of 171.5 sq. m) together with part removal of the front existing boundary walls; the change of use of Balnagowan House (Block 1) from office to residential use to provide 4 no. 2 bed residential units (c.354.67 sq.m GFA), together with associated internal and external alterations and refurbishment works to facilitate the conversion (including removal of internal walls/partitions); the construction of a 3 storey duplex & apartment block (Block 2) to provide 4 no. 1 & 3 bed residential units with associated balconies & terraces; & the construction of 20 no. 2 & 3 bedroom 3 storey townhouses with associated private open spaces & balconies, to provide 30 no. residential units (c. 2365.9 sq. m GFA). The overall proposed residential development (c. 3099.81 sq.m GFA) (including Balnagowan House), will comprise 2 no. one bedroom units, 6 no. two bedroom units, & 22 no. three bedroom units. Pedestrian, cyclist, vehicular and emergency access will be provided off The Haven/ St. Mobhi Boithirin via. existing upgraded entrances. The access arrangements include alterations to the existing accesses to front & to the west of Balnagowan House, St. Mobhi Boithirin. The development will also consist of open space provision including all private, communal and public open space, hard and soft landscaping including internal cycle and pedestrian routes, pathways, boundary treatments, as well as a playground of 50sqm within the communal open area, street furniture, car parking (14 no. part internal gnd. fl. garage spaces to the townhouses & 14 no. surface spaces – 2 no. accessible & 5 no. EV charging – with 9 no. of the spaces accessed directly from St. Mobhi Boithirin), bicycle parking (16 no. long & 4 short stay spaces, covered and secure bicycle parking), ESB substations, piped infrastructural services & connections, ducting, plant, waste management & bin store provision, SuDS & attenuation infrastructure, signage, public lighting and all site development incl. all excavation works & service connections. A Natura Impact Statement (NIS) has been prepared in respect of the proposed development.
WEB1738/26received 31 Mar 2026decided 1 Apr 2026441 m away
- Unit 3 Botanic Business Centre,, Botanic Road, Dublin 9, (bounded by Iona Crescent to the east; and Former John Player’s Factory to the west [Protected Structure]), D09 TV05 Grant permission
PROTECTED STRUCTURE: We, Botanic Business Centre Unlimited Company, intend to apply for permission for development at Unit 3 Botanic Business Centre, Botanic Road, Dublin 9, D09 TV05 (bounded by Iona Crescent to the east; and Former John Player’s Factory to the west [Protected Structure]).
The development will consist of the proposed change of use of this single storey light industrial/ warehouse unit with ancillary offices at ground floor level and stores at mezzanine level to a car storage facility with ancillary offices at ground floor level (the stair access to the existing mezzanine level will be closed/blocked off); internal modifications to facilitate this use including upgrade works to provide additional office rooms, meeting room, and staff facilities including kitchen, showers, locker and changing rooms; proposed widening and associated upgrade works to the unit’s existing external northwestern access ramp; 9 no. proposed external bicycle spaces to the immediate south of the unit (i.e. 4 no. covered Sheffield stands and 1 no. cargo bicycle space); reconfiguration of the existing southeastern car parking spaces to include 1 no. EV charging space and widening of 1 no. existing car parking space to provide 1 no. EV charging/accessibility space; and all associated site works necessary to facilitate the development.
Planning permission for this change of use is being sought for a temporary period of 7 years.
WEB1705/26received 26 Mar 2026decided 20 May 2026476 m away
`description` is truncated at source (80 chars for DLR, 70 for Fingal) and `applicant` is null nationally — NPAD publishes neither in full.