PlanningRegister.ie
Planning report · Dublin City Council · 500 m around the house · the last 12 months · 25 Oct 2026, 09:28

The Village, Dublin

53.37542, -6.16632

Homes here mostly date from the 1980s. Home extensions nearby almost always get approved (99%).

See on the mapWatch this area

How planning works, with this area's numbers

steps can overlap · medians for home extensions within 1.5 km, 10 years
  1. 1ApplySite notice up, plans online
  2. 2Comments5 weeks, €20. Comment to keep your right to appeal
  3. 3Decision8 weeks by law. Here 55 days
  4. 4Appeal window4 weeks after the decision
  5. 5AppealHere about 4 months
  6. 6PermissionLasts 5 years
  7. 7StartStart notice to the council. Here about 4 months after
  8. 8Sign-offCompletion cert, or the owner opts out
Question 1

What's the planning story of this house?

Figure 1

When it was built, and the rules since

Most homes here were built 1981–90, after planning permission began and before building regulations (1992).

Timeline from 1955: planning permission needed from October 1964, building regulations from June 1992, building records online from March 2014, sign-off opt-out from September 2015. Most homes here were built 1981–1990.1960197019801990200020102020Oct 1964permission neededJun 1992building regulationsMar 2014building records onlineSep 2015owners may opt out of sign-offThis houseBuilt: most homes in this small area date from 1981–1990 (census estimate)most built

Each line is a rule that applies to work done after it.

MeasuredEstimatecouncil register via NPAD · build years: CSO Census 2022, small area

On this site
R2
Zoning · Existing residential
No
Protected or listed · on the council's list
No
Vacant land tax · lived-in homes don't pay it
1 in 20
Radon (EPA) · homes with high radon
Zoning, protection, tax and flood: the detail
Zoning
What it says

Zone Z1 - DEV PLAN 2022-2028

ZoningR2 · Existing residential
What it says

Z1: Sustainable Residential Neighbourhoods: To protect, provide and improve residential amenities.

An established residential area. The objective is to protect existing residential amenity as well as to provide housing — which is the objective a neighbour's objection to an overbearing extension is usually argued under.

development plan 2022 2028 · 14 Dec 2022 – 31 Dec 2028

ZoningR2 · Existing residential
What it says

Z1: Sustainable Residential Neighbourhoods: To protect, provide and improve residential amenities.

An established residential area. The objective is to protect existing residential amenity as well as to provide housing — which is the objective a neighbour's objection to an overbearing extension is usually argued under.

development plan 2022 2028 variation no 11 · 14 Dec 2022 – 31 Dec 2028

Heritage inventory1 within 100 m post box
Radon1 in 20 homes have high radon (EPA)

Not on this site: protected building, monument zone, conservation area, EU nature site, EU bird site, natural heritage area, tree order, landslide risk, derelict list.

Vacant land taxNo lived-in homes don't pay it
Flood riskWithin 100 m OPW map area within 100 m · floodinfo.ie
Within 500 mCountFor example
Natural heritage areas1North Dublin Bay
Heritage inventory buildings9Bettyglen; post box
Radon grid squares2
EU nature sites1North Dublin Bay SAC
Monuments8House - 16th/17th century; Armorial plaque
EU bird sites1North Bull Island SPA
How we work this out
'On this site' means the record's own map outline touches the registered parcel (or a 12 m circle round the point where there is no parcel). Only the council's own list confirms a protected building; ask the council if in doubt. The council's map for the vacant land tax shows this spot inside an area of existing homes. Homes people live in, and their gardens, don't pay the tax. The OPW flood map's licence lets us show a yes/no only.
Sources: Development plan zoning (councils), National Inventory of Architectural Heritage, EPA radon map, Residential Zoned Land Tax maps, Constraint layers (bundle), OPW flood maps (CFRAM), Natural Heritage Areas (NPWS), Special Areas of Conservation (NPWS), Sites and Monuments Record, Special Protection Areas (NPWS) · fetched 19 Oct 2026, 00:29
SourceLicenceFetchedLink
Development plan zoning (councils)CC BY 4.018 Oct 2026, 23:24open
National Inventory of Architectural HeritageCC BY 4.027 Sept 2026, 19:35open
EPA radon mapCC BY 4.027 Sept 2026, 19:36open
Residential Zoned Land Tax mapsCC BY 4.019 Oct 2026, 00:29open
Constraint layers (bundle)CC BY 4.0, CC BY-NC-ND 4.027 Sept 2026, 19:37open
OPW flood maps (CFRAM)CC BY-NC-ND 4.0 · shown as a yes/no only11 Sept 2026, 19:11open
Natural Heritage Areas (NPWS)CC BY 4.027 Sept 2026, 19:27open
Special Areas of Conservation (NPWS)CC BY 4.027 Sept 2026, 19:27open
Sites and Monuments RecordCC BY 4.027 Sept 2026, 19:29open
Special Protection Areas (NPWS)CC BY 4.027 Sept 2026, 19:27open
How we work this out
Applications whose site outline (or map point) falls on this property. 'No sign building has started' means we found no notice to the council's building control office; small jobs don't always file one, so ask. A missing completion certificate is not proof of a problem: an owner can opt out of official sign-off for a house or extension built for themselves.
Sources: Building Control Management System (commencement notices), National Planning Application Database · fetched 25 Oct 2026, 01:46
SourceLicenceFetchedLink
Building Control Management System (commencement notices)CC BY 4.025 Oct 2026, 01:46open
National Planning Application DatabaseCC BY 4.025 Oct 2026, 01:30open
Question 2

Could you extend?

Nothing on this site restricts it: not protected, not in a conservation area.

Figure 2

What happened to applications like yours

Extensions are almost always approved here: 93–100% by type. A new house in a garden is harder: 71% approved, and 1 in 7 is asked for more information.

Single-storey rear59 decided · more info asked 10%
100% · council 97%
Two-storey rear27 decided · more info asked 15%
100% · council 96%
Single-storey side10 decided · more info asked 0%
100% · council 99%
Attic or dormer130 decided · more info asked 10%
100% · council 96%
First-floor15 decided · more info asked 0%
100% · council 94%
Garage conversion17 decided · more info asked 0%
100% · council 99%
Porch or front15 decided · more info asked 7%
93% · council 97%
New house in a garden or site21 decided · more info asked 14%
71% · council 71%
Approved nearbyDublin overall

Decided applications within 1.5 km, received in the last 10 years. The kind of work is read from each description.

CalculatedOur classificationcouncil register via NPAD · 294 nearby, 5,547 council-wide

Extensions and refusals right beside you 4 within 250 m · 0 refused within 100 m

Extensions and refusals near you 4 extensions within 250 m · the last 12 months

2 approved2 no decision or withdrawn
KindAppliedApprovedRefused
Dormer or attic21—
Single-storey rear21—

Refused within 100 m 0 in the last 12 months

Nothing refused this close in the last 12 months.

    How we work this out
    Home extensions are read from the application's description (extension, attic or dormer, porch, garage conversion, garden room), so a few may be missed or mislabelled. The kind is the first that fits: a dormer with a rear extension counts as a dormer. Refusal reasons come from An Coimisiún Pleanála's inspector reports, so they exist only where the refusal was appealed (Dún Laoghaire-Rathdown so far). The council's own reasons are on its planning file.
    Sources: National Planning Application Database, An Coimisiún Pleanála cases (ArcGIS feed) · fetched 25 Oct 2026, 01:30
    SourceLicenceFetchedLink
    National Planning Application DatabaseCC BY 4.025 Oct 2026, 01:30open
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.023 Oct 2026, 23:08open
    Sources: An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices), National Planning Application Database · fetched 25 Oct 2026, 01:46
    SourceLicenceFetchedLink
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.023 Oct 2026, 23:08open
    Building Control Management System (commencement notices)CC BY 4.025 Oct 2026, 01:46open
    National Planning Application DatabaseCC BY 4.025 Oct 2026, 01:30open
    Question 3

    How long, and what if someone objects?

    Figure 3

    A home extension's journey here

    A decision takes 55 days. 1 in 10 is asked for more information, which adds about 63 days. Building starts about 4 months after permission.

    Comments open: 5 weeks · €20; Council decision: 55 days; If more info asked (1 in 10): 121 days; Appeal window: 4 weeks; If appealed: +126 days; Building starts: 121 days after permission0 mo3 mo6 mo9 mo12 moComments openComments close 5 weeks after the application is lodged5 weeks · €20Council decisionDecision: median 55 days, middle half 53–55 (n=271)55 daysIf more info asked (1 in 10)With further information: median 121 days (n=31)121 daysAppeal windowAnyone who commented can appeal within 4 weeks of the decision4 weeksIf appealedAt An Coimisiún Pleanála: median 126 days (n=39, all appeals within 1.5 km)+126 daysBuilding startsStart notice: median 121 days after permission (n=155)121 days after permissionSigned off681 days after the start, for the few who file. 53% of owners opt out of sign-off

    Bars are medians; whiskers show the middle half. Medians of separate steps don't add up exactly.

    Calculated302 decided home extensions, 159 start notices, 39 decided appeals · within 1.5 km, 10 years · NPAD, BCMS, An Coimisiún Pleanála

    Figure 4

    What appeals changed

    1 of 8 appealed refusals became permissions. 3 of 32 appealed approvals were reversed.

    Refusals appealed8 decided
    1 became permissions
    Approvals appealed32 decided
    3 reversed
    Ended approvedEnded refusedWithdrawn, invalid or other

    Every appeal decided within 1.5 km in 10 years, any kind of development.

    CalculatedAn Coimisiún Pleanála cases linked to the council file

    Question 4

    What's changing around you?

    Street map around The Village, Dublin with 6 numbered planning items
    ⌖ the houseApprovedNo decision yet
    1. 119 The Grove, Bettyglen WEB2412/26Approved · 95 m
    2. 27, The Grove WEB2251/26Approved · 112 m
    3. 349 Raheny Park, Raheny WEB1698/26Approved · 280 m
    4. 437 Maywood Park, Raheny 3477/25Approved · 313 m
    5. 535, Maywood Park 5182/26No decision yet · 315 m
    6. 690 Avondale Park, Raheny WEB1182/26Approved · 455 m
    Figure 5

    What happens to applications within 500 m

    Permission isn't building. Of 53 permissions since 2016, 25 show a start notice and 1 has a completion certificate.

    65 applications lodged within 500 m. Council: 54 approved, 1 refused. After appeals: 53 approved. Of those: 1 signed off, 12 built with the owner's opt-out, 12 started, 28 with no start notice found, 0 ran out.LODGEDCOUNCIL DECISIONAFTER APPEALSWHAT HAPPENED NEXT54: lodged → approved1: lodged → refused8: lodged → withdrawn or invalid2: lodged → undecided53: approved → approved8: withdrawn or invalid → withdrawn2: undecided → undecided1 approved by the council, withdrawn or invalid after an appeal1 refused by the council, undecided after an appeal28: approved → no start notice found12: approved → built, owner opted out12: approved → started, not signed off1: approved → signed off65 lodged65 lodged54 approved54 approved1 refused1 refused8 withdrawn or invalid8 withdrawn or invalid2 undecided2 undecided53 approved53 approved9 withdrawn9 withdrawn3 undecided3 undecided28 no start notice found28 no start notice found12 built, owner opted out12 built, owner opted out12 started, not signed off12 started, not signed off1 signed off1 signed off

    Purple bands are refusals turned into permissions on appeal. "No start notice found" includes small jobs that never needed one and notices we couldn't match.

    Measured65 applications in 10 years · NPAD, An Coimisiún Pleanála, BCMS start notices and completion certificates

    Figure 6

    The next 30 days

    Nothing closes within 500 m in the next 30 days.

      Measuredcouncil registers and An Coimisiún Pleanála · deadlines worked out from the dates on file

      Figure 7

      Applications within 500 m, by year

      Between 7 and 17 a year; busiest 2025. 98% of decisions were approvals.

      2021: 12, 2022: 10, 2023: 7, 2024: 10, 2025: 17, 2026: 9051015202021: 12 approved12’21*2022: 9 approved2022: 1 undecided10’222023: 7 approved7’232024: 9 approved2024: 1 refused10’242025: 13 approved2025: 4 withdrawn or invalid17’252026: 4 approved2026: 4 withdrawn or invalid2026: 1 undecided9’26*
      ApprovedRefusedWithdrawn or invalidUndecided

      2021 and 2026 are part years (*). Exemption requests and time extensions are left out.

      Measuredcouncil register via NPAD

      Every application within 500 m 10 in the last 12 months

      See every application on the map

      How we work this out
      Descriptions are shortened by the national planning database (to 80 characters in Dún Laoghaire-Rathdown, 70 in Fingal), and it does not publish applicants' names.
      Sources: National Planning Application Database, An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices) · fetched 25 Oct 2026, 01:46
      SourceLicenceFetchedLink
      National Planning Application DatabaseCC BY 4.025 Oct 2026, 01:30open
      An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.023 Oct 2026, 23:08open
      Building Control Management System (commencement notices)CC BY 4.025 Oct 2026, 01:46open
      Building work nearby 5 in the last 12 months
      5 no sign-off needed
      • 12 Maywood Grove, Dublin 5, D05 F9X6 · 21 Oct 2026 · short notice no sign-off needed · 5060/22 · 488 m
      • 104 Bettyglen, Dublin 5, D05 N248 · 6 Aug 2026 · short notice no sign-off needed · 3435/25 · 457 m
      • 49 Raheny Park, Dublin 5, D05 DH58 · 27 Jul 2026 · start notice, opted out no sign-off needed · WEB1698/26 · 298 m
      • 94 All Saints Road, Raheny, Dublin 5, D05 WN40 · 17 Dec 2025 · short notice no sign-off needed · WEB1919/25 · 420 m
      • 34 Maywood Avenue, Raheny, Dublin 5, D05 A365 · 17 Nov 2025 · start notice, opted out no sign-off needed · WEB2302/25 · 437 m
      How we work this out
      Each row is a notice the builder sent to the council's building control office before work started. One notice can cover many homes. 'Signed off as finished' means a completion certificate is on file; work done under an opt-out or a short notice doesn't need one.
      Source: Building Control Management System (commencement notices) · fetched 25 Oct 2026, 01:46
      SourceLicenceFetchedLink
      Building Control Management System (commencement notices)CC BY 4.025 Oct 2026, 01:46open
      0
      Named places nearby: estate, schemes, crèches, schools

      Named places estate, developments, inspections

      Developments within 1.0 km

      SchemeHomesProgressDistance
      St. Anne's Court102102 being built (2026-Q2)787 m
      52-58 Station Road105105 built (2025-Q2)913 m

      Crèches and schools inspected

      NameLatest inspectionDistance
      Maywood Montessori · Crèche23 Mar 2026 · report · Tusla Early Years Inspectorate375 m
      Parkmore Day Nursery · Crèche15 Jul 2025 · report · Tusla Early Years Inspectorate603 m
      TNN Creches Ltd T/A Tír na nÓg Too @ Rainbows End · Crèche21 Oct 2025 · report · Tusla Early Years Inspectorate723 m
      Raheny Montessori · Crèche13 Jan 2026 · report · Tusla Early Years Inspectorate892 m
      It's a Small World Montessori School · Crèche10 Sept 2024 · report · Tusla Early Years Inspectorate951 m
      How we work this out
      Organisations only: a person named on an application is never listed. Inspection dates and links are the publisher's; read their report for the findings.
      Sources: Dublin housing delivery pipeline, National Planning Application Database, Department of Education school list, Tusla early years register · fetched 25 Oct 2026, 01:30
      SourceLicenceFetchedLink
      Dublin housing delivery pipelineCC BY 4.019 Oct 2026, 23:03open
      National Planning Application DatabaseCC BY 4.025 Oct 2026, 01:30open
      Department of Education school listCC BY 4.027 Sept 2026, 23:32open
      Tusla early years registerPublic register21 Oct 2026, 23:37open
      How busy is this area Quieter than most of Dublin City Council.
      Homes approved
      Here0
      Council middle63
      Homes started
      Here104
      Council middle174
      How we work this out
      Homes approved counts schemes of 10 or more homes (one-off houses are not included). Homes started counts every home in a notice that building work was starting. The council figure is the middle value across the council's built-up squares of the same area (3.1 km², about a 1 km circle), so half of them saw more and half fewer.
      Sources: An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices), National Planning Application Database · fetched 25 Oct 2026, 01:46
      SourceLicenceFetchedLink
      An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.023 Oct 2026, 23:08open
      Building Control Management System (commencement notices)CC BY 4.025 Oct 2026, 01:46open
      National Planning Application DatabaseCC BY 4.025 Oct 2026, 01:30open
      Question 5

      What's the area like?

      Figure 8

      This street block against the council

      5% of homes built before 1971 (council 52%). 53% owner-occupied (council 47%).

      Homes built before 1971
      5% · council 52%
      Homes built since 2001
      30% · council 19%
      Owner-occupied
      53% · council 47%
      Rented
      42% · council 45%
      Children under 15
      12% · council 15%
      Aged 65 and over
      14% · council 13%
      Households with 2+ cars
      22% · council 19%
      Work mainly from home
      25% · council 12%
      This small area (199 people)Dublin

      MeasuredCSO Census 2022, Small Area Population Statistics (CC BY 4.0) · small area 268126008

      Bus
      77 m
      Watermill Road · 6 · busiest stop within 500 m: 1 an hour at peak
      Radon
      1 in 20
      homes here likely high (EPA). Test it
      Flood
      Yes
      OPW flood map area within 100 m
      Nearest school
      568 m
      Manor House School, 652 pupils
      Homes sold nearby
      43
      in 3 years (Property Price Register)
      Schools, stops and the council

      Schools

      • Manor House School · postprimary · 652 pupils · 568 m
      • Scoil Assaim Boys Seniors · primary · 293 pupils · 779 m
      • Scoil Aine Convent Senior · primary · 301 pupils · 806 m
      • Naiscoil Ide · primary · 299 pupils · 845 m

      Stops 32

      • Watermill Road · 6 · 1/hour at peak · 77 m
      • Causeway Road · 6 · 1/hour at peak · 97 m
      • St Anne's Pitches · 6 · 1/hour at peak · 295 m
      • St Anne's Pitches · 6 · 1/hour at peak · 306 m
      • Maywood · H2, H3 · 4/hour at peak · 501 m
      • Avondale Park · 31n, H2, H3 · 4/hour at peak · 513 m
      • Avondale Park · H2, H3 · 4/hour at peak · 531 m
      • Maywood · 31n, H2, H3 · 4/hour at peak · 543 m

      Schools growing or shrinking planning in 3 years · pupils last year

      • Manor House School · 568 m-2.5% pupils (652)
      • Scoil Assaim Boys Seniors · 779 m-6.4% pupils (293)
      • Scoil Aine Convent Senior · 806 m-2% pupils (301)
      • Naiscoil Ide · 845 m-2.6% pupils (299)

      Open consultations

      Council meetings 18 items

      Sources: Public transport stops and routes (NTA GTFS), Department of Education school list, National Planning Application Database, Council consultation portals, Council meetings (ModernGov), Land Development Agency public land register, cso_saps_2022, National Transport Authority, Fingal County Council and Dún Laoghaire-Rathdown County Council development plan layers (CC BY 4.0), dartplus.ie project extents over NTA GTFS rail shapes (CC BY 4.0), EPA strategic noise maps, Fingal County Council · fetched 25 Oct 2026, 01:51
      SourceLicenceFetchedLink
      Public transport stops and routes (NTA GTFS)CC BY 4.018 Oct 2026, 23:44open
      Department of Education school listCC BY 4.027 Sept 2026, 23:32open
      National Planning Application DatabaseCC BY 4.025 Oct 2026, 01:30open
      Council consultation portalsPublic25 Oct 2026, 01:52open
      Council meetings (ModernGov)Public25 Oct 2026, 01:51open
      Land Development Agency public land registerCC BY 4.011 Sept 2026, 16:43open
      cso_saps_2022CC BY 4.0—open
      National Transport AuthorityCC BY 4.0——
      Fingal County Council and Dún Laoghaire-Rathdown County Council development plan layers (CC BY 4.0)CC BY 4.0——
      dartplus.ie project extents over NTA GTFS rail shapes (CC BY 4.0)CC BY 4.0——
      EPA strategic noise mapsCC BY 4.0——
      Fingal County CouncilCC BY 4.0——
      Question 6

      What to ask, and who

      1. Flood risk area within 100 m: can you insure it?
        Ask for: A flood-cover quote before sale agreed.
        Insurer
      2. Any work done without planning permission?
        Ask for: An opinion of compliance for the whole house.
        Seller · solicitor
      Reference

      Where this is, the terms, the sources

      Electoral division
      Raheny-St. Assam
      Electoral area
      Donaghmede
      Council
      Dublin City Council
      Everything we found, as a list 8 lines
      • Zoned R2 (existing residential); not protected; no vacant land tax; flood risk area within 100 m.
      • Nothing nearby looks set to change.
      • Watermill Road (bus 6) 77 m away: 1 an hour at morning peak; 5 from all stops within 500 m.
      • Here (2022 census): 53% owner-occupied (council 47%); 10% of homes empty (council 8%); most built 1981–1990; 27% drive to work (council 28%); population up 7% since 2016.
      • 4 home extensions within 250 m since 2026. Most were dormers or attic conversions.
      • Around here the council decides in a median 54 days (about 8 weeks); 1 in 5 is asked for more information.
      • Homes started within 1 km: 102 in the last year, 0 three years before.
      • 10 applications nearby in the last 12 months; 100% approved (council 90%).
      What the terms mean 5 terms
      • Vacant land tax (Residential Zoned Land Tax (RZLT)): A yearly tax of 3% of the land's value on land that is zoned for homes and serviced but left unbuilt.
      • Building started (Commencement notice (BCMS)): The builder must tell the council's building control office 14 to 28 days before work starts.
      • Signed off as finished (Certificate of Compliance on Completion): A certificate filed when a building is finished, confirming it meets the building regulations.
      • Approved (Grant of permission): The council said yes, usually with conditions.
      • What the land is zoned for (Zoning objective): The council's development plan sets what each area is for: homes, shops, open space and so on.
      Sources and licences 33
      SourcePublisherLicenceFetched
      EPA strategic noise maps—CC BY 4.0—
      Fingal County Council—CC BY 4.0—
      Fingal County Council and Dún Laoghaire-Rathdown County Council development plan layers (CC BY 4.0)—CC BY 4.0—
      National Transport Authority—CC BY 4.0—
      services-eu1.arcgis.comAn Coimisiún PleanálaCC BY 4.023 Oct 2026
      data.nbco.gov.ieNational Building Control Office (BCMS)CC BY 4.025 Oct 2026
      data.gov.ieVarious (see each layer)CC BY 4.0, CC BY-NC-ND 4.027 Sept 2026
      s3.eu-west-1.amazonaws.comOffice of Public WorksCC BY-NC-ND 4.0 · flag only11 Sept 2026
      services-eu1.arcgis.comNational Parks and Wildlife ServiceCC BY 4.027 Sept 2026
      services-eu1.arcgis.comNational Inventory of Architectural HeritageCC BY 4.027 Sept 2026
      gis.epa.ieEnvironmental Protection AgencyCC BY 4.027 Sept 2026
      services-eu1.arcgis.comNational Parks and Wildlife ServiceCC BY 4.027 Sept 2026
      services-eu1.arcgis.comNational Monuments Service (SMR)CC BY 4.027 Sept 2026
      services-eu1.arcgis.comNational Parks and Wildlife ServiceCC BY 4.027 Sept 2026
      dlrcoco.citizenspace.comLocal authorities (consultation portals)Public25 Oct 2026
      www2.courts.ie—© the publisher24 Oct 2026
      cso.ie—CC BY 4.0—
      dartplus.ie project extents over NTA GTFS rail shapes (CC BY 4.0)—CC BY 4.0—
      services-eu1.arcgis.comLocal authorities (derelict sites registers)CC BY 4.019 Oct 2026
      services.arcgis.comDublin local authorities (housing delivery pipeline)CC BY 4.019 Oct 2026
      esbnetworks.ie—© the publisher · flag only11 Sept 2026
      transportforireland.ieNational Transport AuthorityCC BY 4.018 Oct 2026
      lda.ieLand Development AgencyCC BY 4.011 Sept 2026
      meetings.fingal.ieLocal authorities (council meetings)Public25 Oct 2026
      services.arcgis.comDepartment of Housing (National Planning Application Database)CC BY 4.025 Oct 2026
      services-eu1.arcgis.comTailte ÉireannCC BY 4.011 Sept 2026
      services-eu1.arcgis.comCSO, Tailte Éireann, OpenStreetMap contributorsCC BY 4.04 Oct 2026
      propertypriceregister.ieProperty Services Regulatory Authority (PPR)© PSRA, PSI licence25 Oct 2026
      services.arcgis.comLocal authorities (RZLT maps)CC BY 4.018 Oct 2026
      gov.ieDepartment of EducationCC BY 4.027 Sept 2026
      gov.ieDepartment of HousingCC BY-SA 4.023 Oct 2026
      tusla.ieTusla (Early Years Inspectorate)Public register21 Oct 2026
      services.arcgis.comLocal authorities via the Department of Housing (GZT / MyPlan)CC BY 4.018 Oct 2026
      Measured
      counted from a public register
      Calculated
      a rate or median we worked out from those counts
      Our classification
      we sorted it by reading each description
      Estimate
      inferred from another source (census, map data)
      Rule summary
      the law, simplified: check before relying on it
      How we work this out
      Generated 25 Oct 2026, 09:28 from the Planning Register store; nothing was fetched live. Not a legal search: the council's planning file is the record. Deadlines come from published dates under the Planning and Development Act 2000: confirm with the council before relying on them. Street map © OpenStreetMap contributors; building outlines © Overture Maps Foundation. The text version carries every figure with its source, for an AI assistant.