PlanningRegister.ie
Planning report · Dublin City Council · 500 m around the house · the last 12 months · 1 Nov 2026, 00:44

Valentia Road, Dublin

53.37687, -6.25724

Homes here mostly date from 1919–1945. 1 planning file on this house, the latest from 2021. Home extensions nearby almost always get approved (97%). 1 application nearby open for comments.

See on the mapWatch this area

How planning works, with this area's numbers

steps can overlap · medians for home extensions within 1.5 km, 10 years
  1. 1ApplySite notice up, plans online
  2. 2Comments5 weeks, €20. Comment to keep your right to appeal
  3. 3Decision8 weeks by law. Here 55 days
  4. 4Appeal window4 weeks after the decision
  5. 5AppealHere about 4 months
  6. 6PermissionLasts 5 years
  7. 7StartStart notice to the council. Here about 5 months after
  8. 8Sign-offCompletion cert, or the owner opts out
Question 1

What's the planning story of this house?

Figure 1

When it was built, and the rules since

Most homes here were built 1919–45, before planning permission was needed. 1 planning file on this house, the latest from 2021.

Timeline from 1915: planning permission needed from October 1964, building regulations from June 1992, building records online from March 2014, sign-off opt-out from September 2015. Most homes here were built 1919–1945. 1 planning file on this house.19201930194019501960197019801990200020102020Oct 1964permission neededJun 1992building regulationsMar 2014building records onlineSep 2015owners may opt out of sign-offThis houseAll of Valentia RoadBuilt: most homes in this small area date from 1919–1945 (census estimate)most built2021: 2282/21 · garden room, approved2023: 1 file on Valentia Road2024: 1 file on Valentia Road2025: 3 files on Valentia Road5 files

Each line is a rule that applies to work done after it.

MeasuredEstimatecouncil register via NPAD · build years: CSO Census 2022, small area

  1. 2021
    2282/21 · garden room · approved 2021 · started, no sign-off needed
    approvedstartedsigned off?
On this site
R2
Zoning · Existing residential
No
Protected or listed · on the council's list
No
Vacant land tax · lived-in homes don't pay it
1 in 20
Radon (EPA) · homes with high radon
Zoning, protection, tax and flood: the detail
Zoning
What it says

Zone Z1 - DEV PLAN 2022-2028

ZoningR2 · Existing residential
What it says

Z1: Sustainable Residential Neighbourhoods: To protect, provide and improve residential amenities.

An established residential area. The objective is to protect existing residential amenity as well as to provide housing — which is the objective a neighbour's objection to an overbearing extension is usually argued under.

development plan 2022 2028 · 14 Dec 2022 – 31 Dec 2028

ZoningR2 · Existing residential
What it says

Z1: Sustainable Residential Neighbourhoods: To protect, provide and improve residential amenities.

An established residential area. The objective is to protect existing residential amenity as well as to provide housing — which is the objective a neighbour's objection to an overbearing extension is usually argued under.

development plan 2022 2028 variation no 11 · 14 Dec 2022 – 31 Dec 2028

Heritage inventory1 within 100 m Corpus Christi Catholic Church
Radon1 in 20 homes have high radon (EPA)

Not on this site: protected building, monument zone, conservation area, EU nature site, EU bird site, natural heritage area, tree order, landslide risk, derelict list.

Vacant land taxNo lived-in homes don't pay it
Flood riskNone mapped within 500 m
Within 500 mCountFor example
Heritage inventory buildings7Elmhurst Nursing Home; Whitehall Delivery Office
Radon grid squares1
Monuments3Ring-ditch; R182353
How we work this out
'On this site' means the record's own map outline touches the registered parcel (or a 12 m circle round the point where there is no parcel). Only the council's own list confirms a protected building; ask the council if in doubt. The council's map for the vacant land tax shows this spot inside an area of existing homes. Homes people live in, and their gardens, don't pay the tax. The OPW flood map's licence lets us show a yes/no only.
Sources: Development plan zoning (councils), National Inventory of Architectural Heritage, EPA radon map, Residential Zoned Land Tax maps, Constraint layers (bundle), Sites and Monuments Record · fetched 25 Oct 2026, 23:43
SourceLicenceFetchedLink
Development plan zoning (councils)CC BY 4.025 Oct 2026, 23:06open
National Inventory of Architectural HeritageCC BY 4.027 Sept 2026, 19:35open
EPA radon mapCC BY 4.027 Sept 2026, 19:36open
Residential Zoned Land Tax mapsCC BY 4.025 Oct 2026, 23:43open
Constraint layers (bundle)CC BY 4.0, CC BY-NC-ND 4.027 Sept 2026, 19:37open
Sites and Monuments RecordCC BY 4.027 Sept 2026, 19:29open
How we work this out
Applications whose site outline (or map point) falls on this property. 'No sign building has started' means we found no notice to the council's building control office; small jobs don't always file one, so ask. A missing completion certificate is not proof of a problem: an owner can opt out of official sign-off for a house or extension built for themselves.
Sources: Building Control Management System (commencement notices), National Planning Application Database · fetched 31 Oct 2026, 23:00
SourceLicenceFetchedLink
Building Control Management System (commencement notices)CC BY 4.031 Oct 2026, 02:56open
National Planning Application DatabaseCC BY 4.031 Oct 2026, 23:00open
Question 2

Could you extend?

Nothing on this site restricts it: not protected, not in a conservation area.

Figure 2

What happened to applications like yours

Extensions are almost always approved here: 92–100% by type. A new house in a garden is harder: 69% approved, and 1 in 3 is asked for more information.

Single-storey rear96 decided · more info asked 20%
98% · council 97%
Two-storey rear62 decided · more info asked 31%
95% · council 96%
Two-storey side12 decided · more info asked 33%
100% · council 98%
Single-storey side10 decided · more info asked 20%
100% · council 99%
Attic or dormer216 decided · more info asked 9%
99% · council 96%
First-floor24 decided · more info asked 17%
92% · council 94%
Garage conversion26 decided · more info asked 8%
100% · council 99%
Porch or front13 decided · more info asked 15%
100% · council 97%
New house in a garden or site29 decided · more info asked 38%
69% · council 71%
Approved nearbyDublin overall

Decided applications within 1.5 km, received in the last 10 years. The kind of work is read from each description.

CalculatedOur classificationcouncil register via NPAD · 488 nearby, 5,771 council-wide

Figure 3

Valentia Road, file by file since 2023

4 of 4 decided extensions on the road were approved.

5 planning files on Valentia Road since 2023, by kind and decision.2023202420252026Extensions, atticsNo. 23 · 2023 · two-storey rear · approved · WEB1368/23No. 21 · 2024 · attic conversion / dormer · approved · WEB2554/24No. 29 · 2025 · two-storey rear · approved · WEB5861/25No. 11 · 2025 · rear · withdrawn or invalid · WEB5910/25No. 11 · 2025 · rear · approved · WEB5928/25Porches, roofs, otherNew house in a side garden
ApprovedRefusedWithdrawn or invalid

5 files with "Valentia Road" in the address within 600 m, other roads of the same name left out. Hover a dot for the house number and reference.

MeasuredOur classificationcouncil register via NPAD · 2023–2026

Extensions and refusals right beside you 9 within 250 m · 0 refused within 100 m

Extensions and refusals near you 9 extensions within 250 m · the last 12 months

5 of 6 approved (83%) · most common: rear

5 approved1 refused3 no decision or withdrawn
KindAppliedApprovedRefused
Rear311
Single-storey rear31—
Dormer or attic22—
Two-storey rear11—

Refused within 100 m 0 in the last 12 months

Nothing refused this close in the last 12 months.

    How we work this out
    Home extensions are read from the application's description (extension, attic or dormer, porch, garage conversion, garden room), so a few may be missed or mislabelled. The kind is the first that fits: a dormer with a rear extension counts as a dormer. Refusal reasons come from An Coimisiún Pleanála's inspector reports, so they exist only where the refusal was appealed (Dún Laoghaire-Rathdown so far). The council's own reasons are on its planning file.
    Sources: National Planning Application Database, An Coimisiún Pleanála cases (ArcGIS feed) · fetched 31 Oct 2026, 23:00
    SourceLicenceFetchedLink
    National Planning Application DatabaseCC BY 4.031 Oct 2026, 23:00open
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.030 Oct 2026, 23:01open
    Sources: An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices), National Planning Application Database · fetched 31 Oct 2026, 23:00
    SourceLicenceFetchedLink
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.030 Oct 2026, 23:01open
    Building Control Management System (commencement notices)CC BY 4.031 Oct 2026, 02:56open
    National Planning Application DatabaseCC BY 4.031 Oct 2026, 23:00open
    Question 3

    How long, and what if someone objects?

    Figure 4

    A home extension's journey here

    A decision takes 55 days. 1 in 6 is asked for more information, which adds about 72 days. Building starts about 5 months after permission.

    Comments open: 5 weeks · €20; Council decision: 55 days; If more info asked (1 in 6): 128 days; Appeal window: 4 weeks; If appealed: +133 days; Building starts: 142 days after permission0 mo3 mo6 mo9 mo12 mo15 moComments openComments close 5 weeks after the application is lodged5 weeks · €20Council decisionDecision: median 55 days, middle half 53–55 (n=435)55 daysIf more info asked (1 in 6)With further information: median 128 days (n=85)128 daysAppeal windowAnyone who commented can appeal within 4 weeks of the decision4 weeksIf appealedAt An Coimisiún Pleanála: median 133 days (n=77, all appeals within 1.5 km)+133 daysBuilding startsStart notice: median 142 days after permission (n=275)142 days after permissionSigned off441 days after the start, for the few who file. 51% of owners opt out of sign-off

    Bars are medians; whiskers show the middle half. Medians of separate steps don't add up exactly.

    Calculated520 decided home extensions, 281 start notices, 77 decided appeals · within 1.5 km, 10 years · NPAD, BCMS, An Coimisiún Pleanála

    Figure 5

    What appeals changed

    11 of 33 appealed refusals became permissions. 3 of 46 appealed approvals were reversed.

    Refusals appealed33 decided
    11 became permissions
    Approvals appealed46 decided
    3 reversed
    Ended approvedEnded refusedWithdrawn, invalid or other

    Every appeal decided within 1.5 km in 10 years, any kind of development.

    CalculatedAn Coimisiún Pleanála cases linked to the council file

    Appeals nearby 3 in the last 12 months

    None of 1 changed the council's decision

    • 501155 Refused · Rear of 45A, Home Farm Road and Clare Road, Drumcondra, Dublin 9, D09… · 285 m report
    • 501641 Open · 37, Drumcondra Road Upper, Dublin 9 · 479 m
    • 501351 Pending · 47, Drumcondra Road Upper, Drumcondra, Dublin 9, D09 A8P0 · 441 m
    Sources: An Coimisiún Pleanála cases (ArcGIS feed), Courts Service legal diary (judicial reviews), National Planning Application Database · fetched 31 Oct 2026, 23:12
    SourceLicenceFetchedLink
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.030 Oct 2026, 23:01open
    Courts Service legal diary (judicial reviews)© the publisher31 Oct 2026, 23:12open
    National Planning Application DatabaseCC BY 4.031 Oct 2026, 23:00open
    Question 4

    What's changing around you?

    Street map around Valentia Road, Dublin with 15 numbered planning items
    ⌖ the houseOpen for commentsWindow closingRefusedBuilding startedApprovedNo decision yet
    1. 144, Home Farm Park WEB3407/26No decision yet · 415 m
    2. 236, Home Farm Road WEB3141/26Approved · 244 m
    3. 3Mont La Verna, 35 Bantry Road WEB5635/25Refused · 151 m
    4. 429 Valentia Road, Drumcondra WEB5861/25Building started · 56 m
    5. 529 Valentia Road, Dublin 9 WEB5861/25Approved · 47 m
    6. 611 Valentia Road, Drumcondra WEB5928/25Approved · 158 m
    7. 743 Clare Road, Drumcondra 5162/26No decision yet · 166 m
    8. 822, Walnut Lawn WEB1234/26Approved · 204 m
    9. 9No. 12, Clare Road WEB2385/26Approved · 245 m
    10. 1017, Achill Road WEB2156/26Approved · 272 m
    11. 11Rear of 45A, Home Farm Road and Clare Road WEB1153/26Refused · 285 m
    12. 128 Rathlin Road, Dublin 9 WEB2564/26No decision yet · 375 m
    13. 134, The Rise WEB2092/26Approved · 424 m
    14. 1447, Drumcondra Road Upper WEB1600/26Approved · 441 m
    15. 1537, Drumcondra Road Upper WEB1270/26Approved · 479 m
    Figure 6

    What happens to applications within 500 m

    Permission isn't building. Of 109 permissions since 2016, 59 show a start notice and 2 have a completion certificate. Most owners opt out of sign-off.

    140 applications lodged within 500 m. Council: 112 approved, 6 refused. After appeals: 109 approved. Of those: 2 signed off, 30 built with the owner's opt-out, 27 started, 50 with no start notice found, 0 ran out.LODGEDCOUNCIL DECISIONAFTER APPEALSWHAT HAPPENED NEXT112: lodged → approved6: lodged → refused19: lodged → withdrawn or invalid3: lodged → undecided109: approved → approved5: refused → refused19: withdrawn or invalid → withdrawn3: undecided → undecided2 approved by the council, undecided after an appeal1 approved by the council, withdrawn or invalid after an appeal1 refused by the council, withdrawn or invalid after an appeal50: approved → no start notice found30: approved → built, owner opted out27: approved → started, not signed off2: approved → signed off140 lodged140 lodged112 approved112 approved6 refused6 refused19 withdrawn or invalid19 withdrawn or invalid3 undecided3 undecided109 approved109 approved5 refused5 refused21 withdrawn21 withdrawn5 undecided5 undecided50 no start notice found50 no start notice found30 built, owner opted out30 built, owner opted out27 started, not signed off27 started, not signed off2 signed off2 signed off

    Purple bands are refusals turned into permissions on appeal. "No start notice found" includes small jobs that never needed one and notices we couldn't match.

    Measured140 applications in 10 years · NPAD, An Coimisiún Pleanála, BCMS start notices and completion certificates

    Figure 7

    The next 30 days

    2 deadlines within 500 m; the first closes 4 Nov 2026.

    2 deadlines in the next 30 days: 2026-11-04 WEB3407/26: application received — A 1/2 storey detached Auxiliary Dwelling House (1bed) structure with mezzanine level, mono pitch roof, solar panels and ; 2026-11-17 WEB3141/26: GRANT PERMISSION — The demolition of the existing rear extension and outhouse and the construction of a new single-storey, flat-roofed reartoday6 Nov11 Nov16 Nov21 Nov26 Nov1 DecWEB3407/26: application received — A 1/2 storey detached Auxiliary Dwelling House (1bed) structure with mezzanine level, mono pitch roof, solar panels and · 415 m away · 2026-11-04WEB3141/26: GRANT PERMISSION — The demolition of the existing rear extension and outhouse and the construction of a new single-storey, flat-roofed rear · 244 m away · 2026-11-17
    Comments closeTime to appeal ends
    • Comments close 4 Nov 20263 days left
      1WEB3407/26 · application received — A 1/2 storey detached Auxiliary Dwelling House (1bed) structure with mezzanine level, mono pitch…
      €20 to the council · 415 m away
    • Time to appeal ends 17 Nov 202616 days left
      2WEB3141/26 · GRANT PERMISSION — The demolition of the existing rear extension and outhouse and the construction of a new…
      €220 to An Coimisiún Pleanála (€110 observer) · 244 m away

    Measuredcouncil registers and An Coimisiún Pleanála · deadlines worked out from the dates on file

    Figure 8

    Applications within 500 m, by year

    Between 16 and 31 a year; busiest 2024. 95% of decisions were approvals.

    2021: 24, 2022: 16, 2023: 23, 2024: 31, 2025: 27, 2026: 190102030402021: 23 approved2021: 1 refused24’21*2022: 15 approved2022: 1 withdrawn or invalid16’222023: 21 approved2023: 1 refused2023: 1 withdrawn or invalid23’232024: 28 approved2024: 3 withdrawn or invalid31’242025: 18 approved2025: 3 refused2025: 6 withdrawn or invalid27’252026: 7 approved2026: 1 refused2026: 8 withdrawn or invalid2026: 3 undecided19’26*
    ApprovedRefusedWithdrawn or invalidUndecided

    2021 and 2026 are part years (*). Exemption requests and time extensions are left out.

    Measuredcouncil register via NPAD

    Open for comments €20 to comment

    Every application within 500 m 23 in the last 12 months

    See every application on the map

    How we work this out
    Descriptions are shortened by the national planning database (to 80 characters in Dún Laoghaire-Rathdown, 70 in Fingal), and it does not publish applicants' names.
    Sources: National Planning Application Database, An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices) · fetched 31 Oct 2026, 23:00
    SourceLicenceFetchedLink
    National Planning Application DatabaseCC BY 4.031 Oct 2026, 23:00open
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.030 Oct 2026, 23:01open
    Building Control Management System (commencement notices)CC BY 4.031 Oct 2026, 02:56open
    Building work nearby 12 in the last 12 months
    1 not signed off11 no sign-off needed
    • 37 Lambay Road, Dublin 9, D09 CH04 · 5 Oct 2026 · short notice no sign-off needed · WEB2718/25 · 301 m
    • 22 Walnut Lawn, Dublin 9, D09 X0C2 · 10 Jun 2026 · short notice no sign-off needed · WEB1234/26 · 220 m
    • 11 Valentia Road, Drumcondra, Dublin 9 · 27 May 2026 · short notice no sign-off needed · 5928/25 · 269 m
    • 429 Valentia Road, Drumcondra, Dublin 9, D09 CP20 · 26 May 2026 · start notice, opted out no sign-off needed · WEB5861/25 · 56 m
    • 29 Valentia Road, Drumcondra, Dublin 9, D09 CP20 · 14 May 2026 · start notice, opted out no sign-off needed · WEB5861/25 · 56 m
    • 69 Hardiman Road, Drumcondra, Dublin 9, Dublin 9, D09 X9X9 · 26 Feb 2026 · start notice, opted out no sign-off needed · WEB2365/25 · 391 m
    • 14 Bantry Road, Drumcondra, Dublin 9, D09 YC53 · 3 Feb 2026 · start notice, opted out no sign-off needed · WEB2955/25 · 149 m
    • 31 Hardiman Road, Dublin, Dublin 9, D09 VY73 · 27 Jan 2026 · start notice, opted out no sign-off needed · 4453/24 · 368 m
    • 400 Griffith Avenue, Dublin, Dublin 9, D09 R2T3 · 22 Jan 2026 · short notice no sign-off needed · WEB5005/25 · 372 m
    • 35 Bantry Road, Drumcondra, Dublin 9, D09 FC95 · 19 Jan 2026 · start notice not signed off · WEB1275/25 · 162 m
    • 21 Walsh Road, Dublin, Dublin 9, D09 VF96 · 16 Jan 2026 · start notice, opted out no sign-off needed · WEB1440/25 · 368 m
    • 6 Sherkin Gardens, Dublin, Dublin 9, D09 K2X4 · 12 Nov 2025 · start notice, opted out no sign-off needed · 3155/25 · 298 m
    How we work this out
    Each row is a notice the builder sent to the council's building control office before work started. One notice can cover many homes. 'Signed off as finished' means a completion certificate is on file; work done under an opt-out or a short notice doesn't need one.
    Source: Building Control Management System (commencement notices) · fetched 31 Oct 2026, 02:56
    SourceLicenceFetchedLink
    Building Control Management System (commencement notices)CC BY 4.031 Oct 2026, 02:56open
    0
    Named places nearby: estate, schemes, crèches, schools

    Named places estate, developments, inspections

    Developments within 1.0 km

    SchemeHomesProgressDistance
    Balnagowan House30no activity on site reported (2026-Q2)572 m
    Glenavon House52—585 m
    Swords Road, Whitehall2929 not started (2025-Q4)793 m
    Glasnevin Autos101101 built (2026-Q1)805 m
    Former Carmelite Convent of the Incarnation19034 built · 43 being built · 113 not started (2026-Q2)851 m
    Collins Avenue Extension Development67—899 m
    The Addison Lodge and Glasnevin Lodge2727 built (2025-Q3)945 m
    Collin's Ave and Swords Road Development8383 not started (2026-Q2)981 m

    Crèches and schools inspected

    NameLatest inspectionDistance
    Apples Montessori School · Crèche17 May 2024 · report · Tusla Early Years Inspectorate407 m
    Tír na NÓg · Crèche9 Oct 2024 · report · Tusla Early Years Inspectorate479 m
    Old Mc Donalds · Crèche15 Sept 2025 · report · Tusla Early Years Inspectorate557 m
    Prospect Montessori · Crèche1 Oct 2025 · report · Tusla Early Years Inspectorate773 m
    Hyde & Seek Childcare (Millbourne) · Crèche20 Mar 2025 · report · Tusla Early Years Inspectorate796 m
    Na Fianna Preschool · Crèche16 Apr 2026 · report · Tusla Early Years Inspectorate860 m
    Drumcondra Montessori School · Crèche2 Oct 2025 · report · Tusla Early Years Inspectorate883 m
    How we work this out
    Organisations only: a person named on an application is never listed. Inspection dates and links are the publisher's; read their report for the findings.
    Sources: Dublin housing delivery pipeline, National Planning Application Database, Department of Education school list, Tusla early years register · fetched 31 Oct 2026, 23:00
    SourceLicenceFetchedLink
    Dublin housing delivery pipelineCC BY 4.026 Oct 2026, 23:00open
    National Planning Application DatabaseCC BY 4.031 Oct 2026, 23:00open
    Department of Education school listCC BY 4.027 Oct 2026, 23:04open
    Tusla early years registerPublic register28 Oct 2026, 23:19open
    How busy is this area Busier than most of Dublin City Council.
    Homes approved
    Here94
    Council middle62
    Homes started
    Here881
    Council middle132
    How we work this out
    Homes approved counts schemes of 10 or more homes (one-off houses are not included). Homes started counts every home in a notice that building work was starting. The council figure is the middle value across the council's built-up squares of the same area (3.1 km², about a 1 km circle), so half of them saw more and half fewer.
    Sources: An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices), National Planning Application Database · fetched 31 Oct 2026, 23:00
    SourceLicenceFetchedLink
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.030 Oct 2026, 23:01open
    Building Control Management System (commencement notices)CC BY 4.031 Oct 2026, 02:56open
    National Planning Application DatabaseCC BY 4.031 Oct 2026, 23:00open
    Question 5

    What's the area like?

    Figure 9

    This street block against the council

    99% of homes built before 1971 (council 52%). 85% owner-occupied (council 47%).

    Homes built before 1971
    99% · council 52%
    Homes built since 2001
    1% · council 19%
    Owner-occupied
    85% · council 47%
    Rented
    6% · council 45%
    Children under 15
    16% · council 15%
    Aged 65 and over
    24% · council 13%
    Households with 2+ cars
    39% · council 19%
    Work mainly from home
    23% · council 12%
    This small area (275 people)Dublin

    MeasuredCSO Census 2022, Small Area Population Statistics (CC BY 4.0) · small area 268060006

    Bus
    56 m
    Walnut Rise · N2 · busiest stop within 500 m: 5 an hour at peak
    Radon
    1 in 20
    homes here likely high (EPA). Test it
    Nearest school
    225 m
    Corpus Christi NS, 398 pupils
    Homes sold nearby
    48
    in 3 years (Property Price Register)
    Schools, stops and the council

    Schools

    • Corpus Christi NS · primary · 398 pupils · 225 m
    • Scoil Chaitriona · postprimary · 523 pupils · 420 m
    • Scoil Mobhi · primary · 248 pupils · 550 m
    • Dominican College · postprimary · 799 pupils · 600 m
    • Gaelscoil Áine · primary · 176 pupils · 601 m
    • Clonturk College · postprimary · 968 pupils · 662 m
    • St Michaels Hse Spec Sc · primary · 64 pupils · 720 m
    • St Patricks N School · primary · 449 pupils · 745 m

    Stops 52

    • Walnut Rise · N2 · 4/hour at peak · 56 m
    • Walnut Rise · N2 · 4/hour at peak · 59 m
    • Clare Road · N2 · 4/hour at peak · 158 m
    • Griffith Lawns · N2 · 4/hour at peak · 186 m
    • Clare Road · N2 · 4/hour at peak · 244 m
    • Corpus Christi NS · 19 · 5/hour at peak · 248 m
    • Walsh Road · 19 · 3/hour at peak · 284 m
    • Ferguson Road · 19 · 3/hour at peak · 301 m

    Schools growing or shrinking planning in 3 years · pupils last year

    • Corpus Christi NS · 225 m-1% pupils (398) · 2 classrooms 2025, approved
    • Scoil Chaitriona · 420 m0% pupils (523)
    • Scoil Mobhi · 550 m-1.6% pupils (248)
    • Dominican College · 600 m-1% pupils (799)
    • Gaelscoil Áine · 600 m+23.9% pupils (176)
    • Clonturk College · 662 m+3.1% pupils (968)

    Open consultations

    Council meetings 30 items

    Public land

    • Dublin City Council · 0.39 ha · 274 m
    • Dublin City Council · 0.36 ha · 323 m
    • An Post · 0.34 ha · 352 m
    • The Office of Public Works · 3.27 ha · 361 m
    • Dublin City University · 11.2 ha · 398 m
    Sources: Public transport stops and routes (NTA GTFS), Department of Education school list, National Planning Application Database, Council consultation portals, Council meetings (ModernGov), Land Development Agency public land register, cso_saps_2022, National Transport Authority, Fingal County Council and Dún Laoghaire-Rathdown County Council development plan layers (CC BY 4.0), dartplus.ie project extents over NTA GTFS rail shapes (CC BY 4.0), EPA strategic noise maps, Fingal County Council · fetched 31 Oct 2026, 23:00
    SourceLicenceFetchedLink
    Public transport stops and routes (NTA GTFS)CC BY 4.025 Oct 2026, 23:02open
    Department of Education school listCC BY 4.027 Oct 2026, 23:04open
    National Planning Application DatabaseCC BY 4.031 Oct 2026, 23:00open
    Council consultation portalsPublic31 Oct 2026, 01:06open
    Council meetings (ModernGov)Public31 Oct 2026, 02:21open
    Land Development Agency public land registerCC BY 4.011 Sept 2026, 16:43open
    cso_saps_2022CC BY 4.0—open
    National Transport AuthorityCC BY 4.0——
    Fingal County Council and Dún Laoghaire-Rathdown County Council development plan layers (CC BY 4.0)CC BY 4.0——
    dartplus.ie project extents over NTA GTFS rail shapes (CC BY 4.0)CC BY 4.0——
    EPA strategic noise mapsCC BY 4.0——
    Fingal County CouncilCC BY 4.0——
    Question 6

    What to ask, and who

    1. Garden room (2282/21) built without official sign-off: built properly?
      Ask for: An engineer's opinion of compliance.
      Seller · solicitor
    2. Application 415 m away open for comments until 4 Nov 2026: comment?
      Ask for: The plans on the council's website (€20 to comment).
      Council
    3. Decision 244 m away can be appealed until 17 Nov 2026: appeal?
      Ask for: The decision on the council's website (€220 to appeal).
      Council
    4. Building work started 56 m away: for how long?
      Ask for: The planning conditions for WEB5861/25.
      Agent · council
    5. Any work done without planning permission?
      Ask for: An opinion of compliance for the whole house.
      Seller · solicitor
    Reference

    Where this is, the terms, the sources

    Electoral division
    Drumcondra South C
    Electoral area
    Cabra-Glasnevin
    Council
    Dublin City Council
    Everything we found, as a list 8 lines
    • 1 application on this site; latest 2282/21, approved 2021, started, no sign-off needed.
    • Zoned R2 (existing residential); not protected; no vacant land tax.
    • Nothing nearby looks set to change.
    • 1 application open for comments nearby; nearest closes 4 Nov 2026.
    • Whitehall Village (bus 1, 101) 470 m away: 22 an hour at morning peak; 136 from all stops within 500 m.
    • Here (2022 census): 84% owner-occupied (council 47%); 15% of homes empty (council 8%); most built 1919–1945; 37% drive to work (council 28%); population down 5% since 2016.
    • 9 home extensions within 250 m since 2025: 5 approved (83%). Most were rear extensions. 1 rear extension refused.
    • The council decides in a median 55 days (about 8 weeks); 1 in 4 is asked for more information.
    What the terms mean 7 terms
    • Vacant land tax (Residential Zoned Land Tax (RZLT)): A yearly tax of 3% of the land's value on land that is zoned for homes and serviced but left unbuilt.
    • Building started (Commencement notice (BCMS)): The builder must tell the council's building control office 14 to 28 days before work starts.
    • Signed off as finished (Certificate of Compliance on Completion): A certificate filed when a building is finished, confirming it meets the building regulations.
    • Approved (Grant of permission): The council said yes, usually with conditions.
    • Comment on an application (Observation / submission): Anyone can comment on a planning application within five weeks of it being lodged, for a €20 fee.
    • Appeal (Appeal to An Coimisiún Pleanála): The applicant, or anyone who commented in time, can appeal the council's decision within four weeks.
    • What the land is zoned for (Zoning objective): The council's development plan sets what each area is for: homes, shops, open space and so on.
    Sources and licences 29
    SourcePublisherLicenceFetched
    EPA strategic noise maps—CC BY 4.0—
    Fingal County Council—CC BY 4.0—
    Fingal County Council and Dún Laoghaire-Rathdown County Council development plan layers (CC BY 4.0)—CC BY 4.0—
    National Transport Authority—CC BY 4.0—
    services-eu1.arcgis.comAn Coimisiún PleanálaCC BY 4.030 Oct 2026
    data.nbco.gov.ieNational Building Control Office (BCMS)CC BY 4.031 Oct 2026
    data.gov.ieVarious (see each layer)CC BY 4.0, CC BY-NC-ND 4.027 Sept 2026
    services-eu1.arcgis.comNational Inventory of Architectural HeritageCC BY 4.027 Sept 2026
    gis.epa.ieEnvironmental Protection AgencyCC BY 4.027 Sept 2026
    services-eu1.arcgis.comNational Monuments Service (SMR)CC BY 4.027 Sept 2026
    dlrcoco.citizenspace.comLocal authorities (consultation portals)Public31 Oct 2026
    www2.courts.ie—© the publisher31 Oct 2026
    cso.ie—CC BY 4.0—
    dartplus.ie project extents over NTA GTFS rail shapes (CC BY 4.0)—CC BY 4.0—
    services-eu1.arcgis.comLocal authorities (derelict sites registers)CC BY 4.026 Oct 2026
    services.arcgis.comDublin local authorities (housing delivery pipeline)CC BY 4.026 Oct 2026
    esbnetworks.ie—© the publisher · flag only11 Sept 2026
    transportforireland.ieNational Transport AuthorityCC BY 4.025 Oct 2026
    lda.ieLand Development AgencyCC BY 4.011 Sept 2026
    meetings.fingal.ieLocal authorities (council meetings)Public31 Oct 2026
    services.arcgis.comDepartment of Housing (National Planning Application Database)CC BY 4.031 Oct 2026
    services-eu1.arcgis.comTailte ÉireannCC BY 4.011 Sept 2026
    services-eu1.arcgis.comCSO, Tailte Éireann, OpenStreetMap contributorsCC BY 4.04 Oct 2026
    propertypriceregister.ieProperty Services Regulatory Authority (PPR)© PSRA, PSI licence1 Nov 2026
    services.arcgis.comLocal authorities (RZLT maps)CC BY 4.025 Oct 2026
    gov.ieDepartment of EducationCC BY 4.027 Oct 2026
    gov.ieDepartment of HousingCC BY-SA 4.023 Oct 2026
    tusla.ieTusla (Early Years Inspectorate)Public register28 Oct 2026
    services.arcgis.comLocal authorities via the Department of Housing (GZT / MyPlan)CC BY 4.025 Oct 2026
    Measured
    counted from a public register
    Calculated
    a rate or median we worked out from those counts
    Our classification
    we sorted it by reading each description
    Estimate
    inferred from another source (census, map data)
    Rule summary
    the law, simplified: check before relying on it
    How we work this out
    Generated 1 Nov 2026, 00:44 from the Planning Register store; nothing was fetched live. Not a legal search: the council's planning file is the record. Deadlines come from published dates under the Planning and Development Act 2000: confirm with the council before relying on them. Street map © OpenStreetMap contributors; building outlines © Overture Maps Foundation. The text version carries every figure with its source, for an AI assistant.