Planning report · Dublin City Council · 500 m around the house · the last 12 months · 2 Nov 2026, 23:58

Hampstead Avenue

53.38121, -6.26440

Homes here mostly date from 1919–1945. Home extensions nearby almost always get approved (98%).

See on the mapWatch this area

How planning works, with this area's numbers

steps can overlap · medians for home extensions within 1.5 km, 10 years
  1. 1ApplySite notice up, plans online
  2. 2Comments5 weeks, €20. Comment to keep your right to appeal
  3. 3Decision8 weeks by law. Here 55 days
  4. 4Appeal window4 weeks after the decision
  5. 5AppealHere about 4 months
  6. 6PermissionLasts 5 years
  7. 7StartStart notice to the council. Here about 5 months after
  8. 8Sign-offCompletion cert, or the owner opts out
Question 1

What's the planning story of this house?

Figure 1

When it was built, and the rules since

Most homes here were built 1919–45, before planning permission was needed.

Timeline from 1915: planning permission needed from October 1964, building regulations from June 1992, building records online from March 2014, sign-off opt-out from September 2015. Most homes here were built 1919–1945.19201930194019501960197019801990200020102020Oct 1964permission neededJun 1992building regulationsMar 2014building records onlineSep 2015owners may opt out of sign-offThis houseBuilt: most homes in this small area date from 1919–1945 (census estimate)most built

Each line is a rule that applies to work done after it.

MeasuredEstimatecouncil register via NPAD · build years: CSO Census 2022, small area

On this site
R2
Zoning · Existing residential
No
Protected or listed · on the council's list
No
Vacant land tax · lived-in homes don't pay it
1 in 20
Radon (EPA) · homes with high radon
Zoning, protection, tax and flood: the detail
Zoning
What it says

Zone Z2 - DEV PLAN 2022-2028

ZoningR2 · Existing residential
What it says

Z2: Residential Neighbourhoods (Conservation Areas): To protect and/or improve the amenities of residential conservation areas.

An established residential area. The objective is to protect existing residential amenity as well as to provide housing — which is the objective a neighbour's objection to an overbearing extension is usually argued under.

development plan 2022 2028 · 14 Dec 2022 – 31 Dec 2028

ZoningR2 · Existing residential
What it says

Z2: Residential Neighbourhoods (Conservation Areas): To protect and/or improve the amenities of residential conservation areas.

An established residential area. The objective is to protect existing residential amenity as well as to provide housing — which is the objective a neighbour's objection to an overbearing extension is usually argued under.

development plan 2022 2028 variation no 11 · 14 Dec 2022 – 31 Dec 2028

Protected building1 within 100 m House (at junction with Hampstead Avenue)
Heritage inventory1 within 100 m house
Radon1 in 20 homes have high radon (EPA)

Not on this site: monument zone, conservation area, EU nature site, EU bird site, natural heritage area, tree order, landslide risk, derelict list.

Vacant land taxNo lived-in homes don't pay it
Flood riskNone mapped within 500 m
Within 500 mCountFor example
Heritage inventory buildings9St. Clare's Residential Home; Cuil?n House
Radon grid squares1
Monuments7Mound; Ring-ditch
How we work this out
'On this site' means the record's own map outline touches the registered parcel (or a 12 m circle round the point where there is no parcel). Only the council's own list confirms a protected building; ask the council if in doubt. The council's map for the vacant land tax shows this spot inside an area of existing homes. Homes people live in, and their gardens, don't pay the tax. The OPW flood map's licence lets us show a yes/no only.
Sources: Development plan zoning (councils), National Inventory of Architectural Heritage, EPA radon map, Records of Protected Structures, Residential Zoned Land Tax maps, Constraint layers (bundle), Sites and Monuments Record · fetched 1 Nov 2026, 23:58
SourceLicenceFetchedLink
Development plan zoning (councils)CC BY 4.01 Nov 2026, 23:13open
National Inventory of Architectural HeritageCC BY 4.027 Sept 2026, 19:35open
EPA radon mapCC BY 4.027 Sept 2026, 19:36open
Records of Protected StructuresCC BY 4.0—open
Residential Zoned Land Tax mapsCC BY 4.01 Nov 2026, 23:58open
Constraint layers (bundle)CC BY 4.0, CC BY-NC-ND 4.027 Sept 2026, 19:37open
Sites and Monuments RecordCC BY 4.027 Sept 2026, 19:29open
How we work this out
Applications whose site outline (or map point) falls on this property. 'No sign building has started' means we found no notice to the council's building control office; small jobs don't always file one, so ask. A missing completion certificate is not proof of a problem: an owner can opt out of official sign-off for a house or extension built for themselves.
Sources: Building Control Management System (commencement notices), National Planning Application Database · fetched 2 Nov 2026, 23:00
SourceLicenceFetchedLink
Building Control Management System (commencement notices)CC BY 4.02 Nov 2026, 03:19open
National Planning Application DatabaseCC BY 4.02 Nov 2026, 23:00open
Question 2

Could you extend?

Nothing on this site restricts it: not protected, not in a conservation area.

Figure 2

What happened to applications like yours

Extensions are almost always approved here: 95–100% by type. A new house in a garden is harder: 75% approved, and 1 in 2 is asked for more information.

Single-storey rear98 decided · more info asked 20%
98% · council 97%
Two-storey rear62 decided · more info asked 27%
95% · council 96%
Two-storey side13 decided · more info asked 31%
100% · council 98%
Single-storey side10 decided · more info asked 10%
100% · council 99%
Attic or dormer186 decided · more info asked 11%
99% · council 96%
First-floor28 decided · more info asked 18%
96% · council 94%
Garage conversion28 decided · more info asked 11%
100% · council 99%
Porch or front16 decided · more info asked 19%
100% · council 97%
New house in a garden or site20 decided · more info asked 45%
75% · council 71%
Approved nearbyDublin overall

Decided applications within 1.5 km, received in the last 10 years. The kind of work is read from each description.

CalculatedOur classificationcouncil register via NPAD · 461 nearby, 5,771 council-wide

Extensions and refusals right beside you 4 within 250 m · 0 refused within 100 m

Extensions and refusals near you 4 extensions within 250 m · the last 12 months

2 approved2 no decision or withdrawn
KindAppliedApprovedRefused
Dormer or attic22—
Other20—

Refused within 100 m 0 in the last 12 months

Nothing refused this close in the last 12 months.

    How we work this out
    Home extensions are read from the application's description (extension, attic or dormer, porch, garage conversion, garden room), so a few may be missed or mislabelled. The kind is the first that fits: a dormer with a rear extension counts as a dormer. Refusal reasons come from An Coimisiún Pleanála's inspector reports, so they exist only where the refusal was appealed (Dún Laoghaire-Rathdown so far). The council's own reasons are on its planning file.
    Sources: National Planning Application Database, An Coimisiún Pleanála cases (ArcGIS feed) · fetched 2 Nov 2026, 23:00
    SourceLicenceFetchedLink
    National Planning Application DatabaseCC BY 4.02 Nov 2026, 23:00open
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.030 Oct 2026, 23:01open
    Sources: An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices), National Planning Application Database · fetched 2 Nov 2026, 23:00
    SourceLicenceFetchedLink
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.030 Oct 2026, 23:01open
    Building Control Management System (commencement notices)CC BY 4.02 Nov 2026, 03:19open
    National Planning Application DatabaseCC BY 4.02 Nov 2026, 23:00open
    Question 3

    How long, and what if someone objects?

    Figure 3

    A home extension's journey here

    A decision takes 55 days. 1 in 6 is asked for more information, which adds about 63 days. Building starts about 5 months after permission.

    Comments open: 5 weeks · €20; Council decision: 55 days; If more info asked (1 in 6): 124 days; Appeal window: 4 weeks; If appealed: +120 days; Building starts: 142 days after permission0 mo3 mo6 mo9 mo12 moComments openComments close 5 weeks after the application is lodged5 weeks · €20Council decisionDecision: median 55 days, middle half 53–55 (n=407)55 daysIf more info asked (1 in 6)With further information: median 124 days (n=84)124 daysAppeal windowAnyone who commented can appeal within 4 weeks of the decision4 weeksIf appealedAt An Coimisiún Pleanála: median 120 days (n=46, all appeals within 1.5 km)+120 daysBuilding startsStart notice: median 142 days after permission (n=268)142 days after permissionSigned off395 days after the start, for the few who file. 54% of owners opt out of sign-off

    Bars are medians; whiskers show the middle half. Medians of separate steps don't add up exactly.

    Calculated491 decided home extensions, 270 start notices, 46 decided appeals · within 1.5 km, 10 years · NPAD, BCMS, An Coimisiún Pleanála

    Figure 4

    What appeals changed

    6 of 16 appealed refusals became permissions. 1 of 32 appealed approvals were reversed.

    Refusals appealed16 decided
    6 became permissions
    Approvals appealed32 decided
    1 reversed
    Ended approvedEnded refusedWithdrawn, invalid or other

    Every appeal decided within 1.5 km in 10 years, any kind of development.

    CalculatedAn Coimisiún Pleanála cases linked to the council file

    Appeals nearby 1 in the last 12 months

    1 of 1 changed the council's decision

    • 500297 Granted · Rear of no. 36 Ballymun Road, Glasnevin Dublin 9 · 416 m report
    Sources: An Coimisiún Pleanála cases (ArcGIS feed), Courts Service legal diary (judicial reviews), National Planning Application Database · fetched 2 Nov 2026, 23:14
    SourceLicenceFetchedLink
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.030 Oct 2026, 23:01open
    Courts Service legal diary (judicial reviews)© the publisher2 Nov 2026, 23:14open
    National Planning Application DatabaseCC BY 4.02 Nov 2026, 23:00open
    Question 4

    What's changing around you?

    Street map around Hampstead Avenue with 5 numbered planning items
    ⌖ the houseLarge schemeApproved
    1. 1Balnagowan House, St. Mobhi Boithirin WEB2324/26No decision yet · 480 m
    2. 232 The Rise, Glasnevin WEB5935/25Approved · 117 m
    3. 386, Ballymun Road WEB1606/26Approved · 142 m
    4. 44, The Rise WEB2092/26Approved · 259 m
    5. 516 Dean Swift Road, Glasnevin WEB6017/25Approved · 449 m
    Figure 5

    What happens to applications within 500 m

    Permission isn't building. Of 58 permissions since 2016, 30 show a start notice and 1 has a completion certificate. Most owners opt out of sign-off.

    71 applications lodged within 500 m. Council: 57 approved, 5 refused. After appeals: 58 approved. Of those: 1 signed off, 20 built with the owner's opt-out, 9 started, 28 with no start notice found, 0 ran out.LODGEDCOUNCIL DECISIONAFTER APPEALSWHAT HAPPENED NEXT57: lodged → approved5: lodged → refused9: lodged → withdrawn or invalid56: approved → approved3: refused → refused9: withdrawn or invalid → withdrawn1 approved by the council, withdrawn or invalid after an appeal2 refused by the council, approved after an appeal28: approved → no start notice found20: approved → built, owner opted out9: approved → started, not signed off1: approved → signed off71 lodged71 lodged57 approved57 approved5 refused5 refused9 withdrawn or invalid9 withdrawn or invalid58 approved58 approved3 refused3 refused10 withdrawn10 withdrawn28 no start notice found28 no start notice found20 built, owner opted out20 built, owner opted out9 started, not signed off9 started, not signed off1 signed off1 signed off

    Purple bands are refusals turned into permissions on appeal. "No start notice found" includes small jobs that never needed one and notices we couldn't match.

    Measured71 applications in 10 years · NPAD, An Coimisiún Pleanála, BCMS start notices and completion certificates

    Figure 6

    The next 30 days

    Nothing closes within 500 m in the next 30 days.

      Measuredcouncil registers and An Coimisiún Pleanála · deadlines worked out from the dates on file

      Figure 7

      Applications within 500 m, by year

      Between 10 and 14 a year; busiest 2025. 92% of decisions were approvals.

      2021: 17, 2022: 10, 2023: 13, 2024: 11, 2025: 14, 2026: 6051015202021: 15 approved2021: 1 refused2021: 1 withdrawn or invalid17’21*2022: 9 approved2022: 1 refused10’222023: 12 approved2023: 1 refused13’232024: 10 approved2024: 1 withdrawn or invalid11’242025: 9 approved2025: 2 refused2025: 3 withdrawn or invalid14’252026: 2 approved2026: 4 withdrawn or invalid6’26*
      ApprovedRefusedWithdrawn or invalidUndecided

      2021 and 2026 are part years (*). Exemption requests and time extensions are left out.

      Measuredcouncil register via NPAD

      Every application within 500 m 10 in the last 12 months

      See every application on the map

      How we work this out
      Descriptions are shortened by the national planning database (to 80 characters in Dún Laoghaire-Rathdown, 70 in Fingal), and it does not publish applicants' names.
      Sources: National Planning Application Database, An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices) · fetched 2 Nov 2026, 23:00
      SourceLicenceFetchedLink
      National Planning Application DatabaseCC BY 4.02 Nov 2026, 23:00open
      An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.030 Oct 2026, 23:01open
      Building Control Management System (commencement notices)CC BY 4.02 Nov 2026, 03:19open
      Building work nearby 8 in the last 12 months
      1 not signed off7 no sign-off needed
      • 37 Lambay Road, Dublin 9, D09 CH04 · 5 Oct 2026 · short notice no sign-off needed · WEB2718/25 · 484 m
      • 36 Ballymun Road, Dublin 9 · 3 Sept 2026 · 2 homes · start notice, opted out no sign-off needed · WEB2285/25 PL-500297-DN-25 · 426 m
      • 46 Ballymun Road, Dublin 9, Dublin City, Dublin 9 · 15 Jun 2026 · 7-day notice not signed off · 2683/21 · 347 m
      • 16 Dean Swift Road, Glasnevin, Dublin 11, D11 C9T7 · 20 May 2026 · start notice, opted out no sign-off needed · WEB6017/25 · 468 m
      • 32 The Rise, Dublin 9, D09 H2H9 · 5 Feb 2026 · start notice, opted out no sign-off needed · 3736/24 · 127 m
      • 13 Ballymun Road, Dublin, Dublin 9, D09 Y5X8 · 23 Jan 2026 · start notice, opted out no sign-off needed · 3361/25 · 410 m
      • The Rise, Dublin, Dublin 9, D09 R7W2 · 23 Jan 2026 · start notice, opted out no sign-off needed · WEB2238/25 · 52 m
      • 400 Griffith Avenue, Dublin, Dublin 9, D09 R2T3 · 22 Jan 2026 · short notice no sign-off needed · WEB5005/25 · 395 m
      How we work this out
      Each row is a notice the builder sent to the council's building control office before work started. One notice can cover many homes. 'Signed off as finished' means a completion certificate is on file; work done under an opt-out or a short notice doesn't need one.
      Source: Building Control Management System (commencement notices) · fetched 2 Nov 2026, 03:19
      SourceLicenceFetchedLink
      Building Control Management System (commencement notices)CC BY 4.02 Nov 2026, 03:19open
      Homes coming 0 not started
      How we work this out
      Schemes of 10 or more homes approved since 2021, from the council and An Coimisiún Pleanála registers. 'Building started' means the builder told the council's building control office that work was starting (a commencement notice).
      Sources: An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices), National Planning Application Database, Social housing construction status report · fetched 2 Nov 2026, 23:00
      SourceLicenceFetchedLink
      An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.030 Oct 2026, 23:01open
      Building Control Management System (commencement notices)CC BY 4.02 Nov 2026, 03:19open
      National Planning Application DatabaseCC BY 4.02 Nov 2026, 23:00open
      Social housing construction status reportCC BY-SA 4.023 Oct 2026, 23:02open
      Named places nearby: estate, schemes, crèches, schools

      Named places estate, developments, inspections

      Developments within 1.0 km

      SchemeHomesProgressDistance
      Glenavon House52—323 m
      Balnagowan House30no activity on site reported (2026-Q2)480 m
      Glasnevin Autos101101 built (2026-Q1)739 m
      Collins Avenue Extension Development67—846 m

      Crèches and schools inspected

      NameLatest inspectionDistance
      Na Fianna Preschool · Crèche16 Apr 2026 · report · Tusla Early Years Inspectorate184 m
      Apples Montessori School · Crèche17 May 2024 · report · Tusla Early Years Inspectorate280 m
      Ballygall Community Playgroup · Crèche20 Apr 2026 · report · Tusla Early Years Inspectorate732 m
      Tír na NÓg · Crèche9 Oct 2024 · report · Tusla Early Years Inspectorate773 m
      Willow Tree Creche · Crèche27 Apr 2026 · report · Tusla Early Years Inspectorate827 m
      Little Stars Childcare · Crèche15 Apr 2025 · report · Tusla Early Years Inspectorate827 m
      Sandra's Playschool · Crèche11 Dec 2024 · report · Tusla Early Years Inspectorate849 m
      Prospect Montessori · Crèche1 Oct 2025 · report · Tusla Early Years Inspectorate976 m
      How we work this out
      Organisations only: a person named on an application is never listed. Inspection dates and links are the publisher's; read their report for the findings.
      Sources: Dublin housing delivery pipeline, National Planning Application Database, Department of Education school list, Tusla early years register · fetched 2 Nov 2026, 23:01
      SourceLicenceFetchedLink
      Dublin housing delivery pipelineCC BY 4.02 Nov 2026, 23:01open
      National Planning Application DatabaseCC BY 4.02 Nov 2026, 23:00open
      Department of Education school listCC BY 4.027 Oct 2026, 23:04open
      Tusla early years registerPublic register28 Oct 2026, 23:19open
      How busy is this area About as busy as most of Dublin City Council.
      Homes approved
      Here67
      Council middle52
      Homes started
      Here209
      Council middle174
      How we work this out
      Homes approved counts schemes of 10 or more homes (one-off houses are not included). Homes started counts every home in a notice that building work was starting. The council figure is the middle value across the council's built-up squares of the same area (3.1 km², about a 1 km circle), so half of them saw more and half fewer.
      Sources: An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices), National Planning Application Database · fetched 2 Nov 2026, 23:00
      SourceLicenceFetchedLink
      An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.030 Oct 2026, 23:01open
      Building Control Management System (commencement notices)CC BY 4.02 Nov 2026, 03:19open
      National Planning Application DatabaseCC BY 4.02 Nov 2026, 23:00open
      Question 5

      What's the area like?

      Figure 8

      This street block against the council

      88% of homes built before 1971 (council 52%). 81% owner-occupied (council 47%).

      Homes built before 1971
      88% · council 52%
      Homes built since 2001
      5% · council 19%
      Owner-occupied
      81% · council 47%
      Rented
      14% · council 45%
      Children under 15
      17% · council 15%
      Aged 65 and over
      17% · council 13%
      Households with 2+ cars
      38% · council 19%
      Work mainly from home
      17% · council 12%
      This small area (403 people)Dublin

      MeasuredCSO Census 2022, Small Area Population Statistics (CC BY 4.0) · small area 268157003

      Bus
      114 m
      Hampstead Avenue · 19, 70D, E1 · busiest stop within 500 m: 21 an hour at peak
      Radon
      1 in 20
      homes here likely high (EPA). Test it
      Nearest school
      209 m
      St Michaels Hse Spec Sc, 64 pupils
      Homes sold nearby
      25
      in 3 years (Property Price Register)
      Schools, stops and the council

      Schools

      • St Michaels Hse Spec Sc · primary · 64 pupils · 209 m
      • North Dublin Ns Project · primary · 214 pupils · 271 m
      • Glasnevin Educate Together NS · primary · 410 pupils · 422 m
      • St Ciarans Spec Sch · primary · 140 pupils · 652 m
      • Scoil na Croi Naofa · primary · 404 pupils · 739 m
      • Scoil Chaitriona · postprimary · 523 pupils · 747 m
      • St Mary's Secondary School · postprimary · 830 pupils · 805 m
      • Corpus Christi NS · primary · 398 pupils · 845 m

      Stops 56

      • Hampstead Avenue · 19, 70D, E1, E2 · 15/hour at peak · 114 m
      • The Rise · 19, 70D, E1, E2 · 21/hour at peak · 122 m
      • Hampstead Avenue · 19, 70D, E1, E2 · 21/hour at peak · 136 m
      • Griffith Avenue · N2 · 4/hour at peak · 223 m
      • Ballymun Road · 19, 70D, E1, E2 · 15/hour at peak · 245 m
      • Albert College Park · 19, 70D, E1, E2 · 15/hour at peak · 267 m
      • St Mobhi Road · N2 · 4/hour at peak · 302 m
      • Lambay Road · N2 · 4/hour at peak · 408 m

      Schools growing or shrinking planning in 3 years · pupils last year

      • St Michaels Hse Spec Sc · 209 m+10.3% pupils (64) · an extension 2023, approved
      • North Dublin Ns Project · 271 m0% pupils (214)
      • Glasnevin Educate Together NS · 422 m-0.5% pupils (410)
      • St Ciarans Spec Sch · 652 m-2.8% pupils (140)
      • Scoil na Croi Naofa · 739 m-2.2% pupils (404)
      • Scoil Chaitriona · 747 m0% pupils (523)

      Open consultations

      Council meetings 30 items

      Public land

      • Dublin City Council · 0.61 ha · 87 m
      • Dublin City Council · 0.14 ha · 95 m
      • Dublin City University · 28.09 ha · 271 m
      • Dublin City Council · 0.54 ha · 346 m
      • The Minister for Education and Skills · 0.99 ha · 351 m
      • Dublin City Council · 0.39 ha · 356 m
      Sources: Public transport stops and routes (NTA GTFS), Department of Education school list, National Planning Application Database, Council consultation portals, Council meetings (ModernGov), Land Development Agency public land register, cso_saps_2022, National Transport Authority, Fingal County Council and Dún Laoghaire-Rathdown County Council development plan layers (CC BY 4.0), dartplus.ie project extents over NTA GTFS rail shapes (CC BY 4.0), EPA strategic noise maps, Fingal County Council · fetched 2 Nov 2026, 23:00
      SourceLicenceFetchedLink
      Public transport stops and routes (NTA GTFS)CC BY 4.01 Nov 2026, 23:05open
      Department of Education school listCC BY 4.027 Oct 2026, 23:04open
      National Planning Application DatabaseCC BY 4.02 Nov 2026, 23:00open
      Council consultation portalsPublic2 Nov 2026, 01:11open
      Council meetings (ModernGov)Public2 Nov 2026, 02:27open
      Land Development Agency public land registerCC BY 4.011 Sept 2026, 16:43open
      cso_saps_2022CC BY 4.0—open
      National Transport AuthorityCC BY 4.0——
      Fingal County Council and Dún Laoghaire-Rathdown County Council development plan layers (CC BY 4.0)CC BY 4.0——
      dartplus.ie project extents over NTA GTFS rail shapes (CC BY 4.0)CC BY 4.0——
      EPA strategic noise mapsCC BY 4.0——
      Fingal County CouncilCC BY 4.0——
      Question 6

      What to ask, and who

      1. Any work done without planning permission?
        Ask for: An opinion of compliance for the whole house.
        Seller · solicitor
      Reference

      Where this is, the terms, the sources

      Electoral division
      Whitehall A
      Electoral area
      Artane-Whitehall
      Council
      Dublin City Council
      Everything we found, as a list 8 lines
      • Zoned R2 (existing residential); not protected; no vacant land tax.
      • Nothing nearby looks set to change.
      • The Rise (bus 19, 70D) 122 m away: 21 an hour at morning peak; 119 from all stops within 500 m.
      • Here (2022 census): 81% owner-occupied (council 47%); 3% of homes empty (council 8%); most built 1919–1945; 30% drive to work (council 28%); population down 5% since 2016.
      • 4 home extensions within 250 m since 2025. Most were dormers or attic conversions.
      • The council decides in a median 55 days (about 8 weeks); 1 in 4 is asked for more information.
      • Homes started within 1 km: 62 in the last year, 149 three years before.
      • 10 applications nearby in the last 12 months.
      What the terms mean 7 terms
      • Vacant land tax (Residential Zoned Land Tax (RZLT)): A yearly tax of 3% of the land's value on land that is zoned for homes and serviced but left unbuilt.
      • Building started (Commencement notice (BCMS)): The builder must tell the council's building control office 14 to 28 days before work starts.
      • Signed off as finished (Certificate of Compliance on Completion): A certificate filed when a building is finished, confirming it meets the building regulations.
      • Approved (Grant of permission): The council said yes, usually with conditions.
      • Protected building (Protected structure (Record of Protected Structures)): A building the council has listed for its heritage value.
      • Appeal (Appeal to An Coimisiún Pleanála): The applicant, or anyone who commented in time, can appeal the council's decision within four weeks.
      • What the land is zoned for (Zoning objective): The council's development plan sets what each area is for: homes, shops, open space and so on.
      Sources and licences 30
      SourcePublisherLicenceFetched
      EPA strategic noise maps—CC BY 4.0—
      Fingal County Council—CC BY 4.0—
      Fingal County Council and Dún Laoghaire-Rathdown County Council development plan layers (CC BY 4.0)—CC BY 4.0—
      National Transport Authority—CC BY 4.0—
      services-eu1.arcgis.comAn Coimisiún PleanálaCC BY 4.030 Oct 2026
      data.nbco.gov.ieNational Building Control Office (BCMS)CC BY 4.02 Nov 2026
      data.gov.ieVarious (see each layer)CC BY 4.0, CC BY-NC-ND 4.027 Sept 2026
      services-eu1.arcgis.comNational Inventory of Architectural HeritageCC BY 4.027 Sept 2026
      gis.epa.ieEnvironmental Protection AgencyCC BY 4.027 Sept 2026
      services-eu1.arcgis.comNational Monuments Service (SMR)CC BY 4.027 Sept 2026
      dlrcoco.citizenspace.comLocal authorities (consultation portals)Public2 Nov 2026
      www2.courts.ie—© the publisher2 Nov 2026
      cso.ie—CC BY 4.0—
      dartplus.ie project extents over NTA GTFS rail shapes (CC BY 4.0)—CC BY 4.0—
      services-eu1.arcgis.comLocal authorities (derelict sites registers)CC BY 4.02 Nov 2026
      services.arcgis.comDublin local authorities (housing delivery pipeline)CC BY 4.02 Nov 2026
      esbnetworks.ie—© the publisher · flag only11 Sept 2026
      transportforireland.ieNational Transport AuthorityCC BY 4.01 Nov 2026
      lda.ieLand Development AgencyCC BY 4.011 Sept 2026
      meetings.fingal.ieLocal authorities (council meetings)Public2 Nov 2026
      services.arcgis.comDepartment of Housing (National Planning Application Database)CC BY 4.02 Nov 2026
      services-eu1.arcgis.comTailte ÉireannCC BY 4.011 Sept 2026
      services-eu1.arcgis.comCSO, Tailte Éireann, OpenStreetMap contributorsCC BY 4.04 Oct 2026
      propertypriceregister.ieProperty Services Regulatory Authority (PPR)© PSRA, PSI licence2 Nov 2026
      data.gov.ieLocal authorities (Record of Protected Structures)CC BY 4.0—
      services.arcgis.comLocal authorities (RZLT maps)CC BY 4.01 Nov 2026
      gov.ieDepartment of EducationCC BY 4.027 Oct 2026
      gov.ieDepartment of HousingCC BY-SA 4.023 Oct 2026
      tusla.ieTusla (Early Years Inspectorate)Public register28 Oct 2026
      services.arcgis.comLocal authorities via the Department of Housing (GZT / MyPlan)CC BY 4.01 Nov 2026
      Measured
      counted from a public register
      Calculated
      a rate or median we worked out from those counts
      Our classification
      we sorted it by reading each description
      Estimate
      inferred from another source (census, map data)
      Rule summary
      the law, simplified: check before relying on it
      How we work this out
      Generated 2 Nov 2026, 23:58 from the Planning Register store; nothing was fetched live. Not a legal search: the council's planning file is the record. Deadlines come from published dates under the Planning and Development Act 2000: confirm with the council before relying on them. Street map © OpenStreetMap contributors; building outlines © Overture Maps Foundation. The text version carries every figure with its source, for an AI assistant.