PlanningRegister.ie
Planning report · Fingal County Council · 500 m around the house · the last 12 months · 31 Oct 2026, 00:40

Thormanby Court

53.38346, -6.05994

Homes here mostly date from the 2000s. Most home extensions nearby get approved (88%). A building site 465 m away stopped before it was finished.

See on the mapWatch this area

How planning works, with this area's numbers

steps can overlap · medians for home extensions within 1.5 km, 10 years
  1. 1ApplySite notice up, plans online
  2. 2Comments5 weeks, €20. Comment to keep your right to appeal
  3. 3Decision8 weeks by law. Here 50 days
  4. 4Appeal window4 weeks after the decision
  5. 5AppealHere about 7 months
  6. 6PermissionLasts 5 years
  7. 7StartStart notice to the council. Here about 8 months after
  8. 8Sign-offCompletion cert, or the owner opts out
Question 1

What's the planning story of this house?

Figure 1

When it was built, and the rules since

Most homes here were built 2001–10, under planning permission and building regulations.

Timeline from 1955: planning permission needed from October 1964, building regulations from June 1992, building records online from March 2014, sign-off opt-out from September 2015. Most homes here were built 2001–2010.1960197019801990200020102020Oct 1964permission neededJun 1992building regulationsMar 2014building records onlineSep 2015owners may opt out of sign-offThis houseBuilt: most homes in this small area date from 2001–2010 (census estimate)most built

Each line is a rule that applies to work done after it.

MeasuredEstimatecouncil register via NPAD · build years: CSO Census 2022, small area

On this site
R2
Zoning · Existing residential
No
Protected or listed · on the council's list
No
Vacant land tax · lived-in homes don't pay it
1 in 5
Radon (EPA) · homes with high radon
Zoning, protection, tax and flood: the detail
Zoning
What it says

RS - Residential: Ensure that any new development in existing areas would have a minimal impact on and enhance existing residential amenity.

ZoningR2 · Existing residential
What it says

RS - Residential: Provide for residential development and protect and improve residential amenity

An established residential area. The objective is to protect existing residential amenity as well as to provide housing — which is the objective a neighbour's objection to an overbearing extension is usually argued under.

the fingal development plan 2023 2029 · 5 Apr 2023 – 5 Apr 2029

Conservation area1 within 100 m Howth - Nashville Road & Park ACA
Radon1 in 5 homes have high radon (EPA)

Not on this site: protected building, heritage inventory, monument zone, EU nature site, EU bird site, natural heritage area, tree order, landslide risk, derelict list.

Licensed industrial sites within 1.0 km: licence W0312 (894 m)

Vacant land taxNo lived-in homes don't pay it
Flood riskNone mapped within 500 m
Within 500 mCountFor example
Conservation areas3Howth Historic Core ACA; Howth - Nashville Road & Park ACA
Natural heritage areas1Howth Head
Heritage inventory buildings13Royal Hotel; Howth Public Library
Radon grid squares5
Protected buildings5One of pair of redbrick gable-fronted Edwardian houses with traditional timber shops on ground floor; Church of the Assumption (RC)
EU nature sites1Howth Head SAC
Monuments1R149702
EU bird sites2Howth Head Coast SPA; North-West Irish Sea cSPA
How we work this out
'On this site' means the record's own map outline touches the registered parcel (or a 12 m circle round the point where there is no parcel). Only the council's own list confirms a protected building; ask the council if in doubt. The council's map for the vacant land tax shows this spot inside an area of existing homes. Homes people live in, and their gardens, don't pay the tax. The OPW flood map's licence lets us show a yes/no only. Land on the vacant land tax map nearby: 3 on the draft 2027 map; 3 on the final 2026 map.
Sources: Development plan zoning (councils), Architectural Conservation Areas, EPA licensed sites, EPA radon map, Residential Zoned Land Tax maps, Constraint layers (bundle), Natural Heritage Areas (NPWS), National Inventory of Architectural Heritage, Records of Protected Structures, Special Areas of Conservation (NPWS), Sites and Monuments Record, Special Protection Areas (NPWS) · fetched 25 Oct 2026, 23:43
SourceLicenceFetchedLink
Development plan zoning (councils)CC BY 4.025 Oct 2026, 23:06open
Architectural Conservation AreasCC BY 4.027 Sept 2026, 19:36open
EPA licensed sitesCC BY 4.027 Sept 2026, 19:36open
EPA radon mapCC BY 4.027 Sept 2026, 19:36open
Residential Zoned Land Tax mapsCC BY 4.025 Oct 2026, 23:43open
Constraint layers (bundle)CC BY 4.0, CC BY-NC-ND 4.027 Sept 2026, 19:37open
Natural Heritage Areas (NPWS)CC BY 4.027 Sept 2026, 19:27open
National Inventory of Architectural HeritageCC BY 4.027 Sept 2026, 19:35open
Records of Protected StructuresCC BY 4.027 Sept 2026, 19:36open
Special Areas of Conservation (NPWS)CC BY 4.027 Sept 2026, 19:27open
Sites and Monuments RecordCC BY 4.027 Sept 2026, 19:29open
Special Protection Areas (NPWS)CC BY 4.027 Sept 2026, 19:27open
How we work this out
Applications whose site outline (or map point) falls on this property. 'No sign building has started' means we found no notice to the council's building control office; small jobs don't always file one, so ask. A missing completion certificate is not proof of a problem: an owner can opt out of official sign-off for a house or extension built for themselves.
Sources: Building Control Management System (commencement notices), National Planning Application Database · fetched 30 Oct 2026, 23:02
SourceLicenceFetchedLink
Building Control Management System (commencement notices)CC BY 4.030 Oct 2026, 02:44open
National Planning Application DatabaseCC BY 4.030 Oct 2026, 23:02open
Question 2

Could you extend?

Nothing on this site restricts it: not protected, not in a conservation area.

Figure 2

What happened to applications like yours

Extensions here: 70–100% by type. A new house in a garden is harder: 47% approved, and 1 in 4 is asked for more information.

Single-storey rear19 decided · more info asked 21%
100% · council 92%
Two-storey rear10 decided · more info asked 20%
70% · council 81%
Attic or dormer22 decided · more info asked 36%
91% · council 92%
New house in a garden or site15 decided · more info asked 27%
47% · council 53%
Approved nearbyFingal overall

Decided applications within 1.5 km, received in the last 10 years. The kind of work is read from each description.

CalculatedOur classificationcouncil register via NPAD · 66 nearby, 2,337 council-wide

Extensions and refusals right beside you 3 within 250 m · 1 refused within 100 m

Extensions and refusals near you 3 extensions within 250 m · the last 12 months

2 approved1 no decision or withdrawn
KindAppliedApprovedRefused
Single-storey rear21—
Garden room11—

Refused within 100 m 1 in the last 12 months

  • F26A/0066 · change of use · refused 27 Mar 2026 · 75 m appeal invalid
How we work this out
Home extensions are read from the application's description (extension, attic or dormer, porch, garage conversion, garden room), so a few may be missed or mislabelled. The kind is the first that fits: a dormer with a rear extension counts as a dormer. Refusal reasons come from An Coimisiún Pleanála's inspector reports, so they exist only where the refusal was appealed (Dún Laoghaire-Rathdown so far). The council's own reasons are on its planning file.
Sources: National Planning Application Database, An Coimisiún Pleanála cases (ArcGIS feed) · fetched 30 Oct 2026, 23:02
SourceLicenceFetchedLink
National Planning Application DatabaseCC BY 4.030 Oct 2026, 23:02open
An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.030 Oct 2026, 23:01open
Sources: An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices), National Planning Application Database · fetched 30 Oct 2026, 23:02
SourceLicenceFetchedLink
An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.030 Oct 2026, 23:01open
Building Control Management System (commencement notices)CC BY 4.030 Oct 2026, 02:44open
National Planning Application DatabaseCC BY 4.030 Oct 2026, 23:02open
Question 3

How long, and what if someone objects?

Figure 3

A home extension's journey here

A decision takes 50 days. 1 in 5 is asked for more information, which adds about 93 days. Building starts about 8 months after permission.

Comments open: 5 weeks · €20; Council decision: 50 days; If more info asked (1 in 5): 153 days; Appeal window: 4 weeks; If appealed: +218 days; Building starts: 234 days after permission0 mo3 mo6 mo9 mo12 mo15 mo18 moComments openComments close 5 weeks after the application is lodged5 weeks · €20Council decisionDecision: median 50 days, middle half 47–54 (n=87)50 daysIf more info asked (1 in 5)With further information: median 153 days (n=9)153 daysAppeal windowAnyone who commented can appeal within 4 weeks of the decision4 weeksIf appealedAt An Coimisiún Pleanála: median 218 days (n=39, all appeals within 1.5 km)+218 daysBuilding startsStart notice: median 234 days after permission (n=53)234 days after permissionSigned off54% of owners opt out of sign-off

Bars are medians; whiskers show the middle half. Medians of separate steps don't add up exactly.

Calculated109 decided home extensions, 54 start notices, 39 decided appeals · within 1.5 km, 10 years · NPAD, BCMS, An Coimisiún Pleanála

Figure 4

What appeals changed

10 of 20 appealed refusals became permissions. 2 of 20 appealed approvals were reversed.

Refusals appealed20 decided
10 became permissions
Approvals appealed20 decided
2 reversed
Ended approvedEnded refusedWithdrawn, invalid or other

Every appeal decided within 1.5 km in 10 years, any kind of development.

CalculatedAn Coimisiún Pleanála cases linked to the council file

Appeals nearby 4 in the last 12 months

None of 1 changed the council's decision

  • 502175 Pending · 3 Main Street, Howth, Co.Dublin (D13X064, D13WP57, and D13K6Y3) · 444 m
  • 324322 Pending · Tara Hall, Balscadden Road, Howth, Co. Dublin · 403 m
  • 501181 Invalid · Brymore, Thormandy Road, Howth, Co. Dublin, D13 VK82 · 75 m
  • 500428 Refused · 30 Main Street, Howth, Co. Dublin, D13 P8K7 · 370 m report
Sources: An Coimisiún Pleanála cases (ArcGIS feed), Courts Service legal diary (judicial reviews), National Planning Application Database · fetched 30 Oct 2026, 23:12
SourceLicenceFetchedLink
An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.030 Oct 2026, 23:01open
Courts Service legal diary (judicial reviews)© the publisher30 Oct 2026, 23:12open
National Planning Application DatabaseCC BY 4.030 Oct 2026, 23:02open
Question 4

What's changing around you?

Street map around Thormanby Court with 15 numbered planning items
⌖ the houseOpen for commentsApproved, not startedBuilding site that stoppedRefusedBuilding startedEmpty land zoned for homesNo decision yetApproved
  1. 19 Nashville Park, Howth F26A/0921ENo decision yet · 296 m
  2. 260 Main Street F22A/0477Approved, no sign building has started · 373 m
  3. 36 Balscadden Road, Dublin SHD/009/21Building site that stopped · 465 m
  4. 4Brymore, Thormandy Road F26A/0066Refused · 75 m
  5. 574 Thormanby Road, Dublin F25A/0281EBuilding started · 168 m
  6. 61.3 ha zoned for homesEmpty land zoned for homes · 360 m
  7. 70.2 ha zoned for homesEmpty land zoned for homes · 405 m
  8. 82 Nashville Park, Howth F26A/0427ENo decision yet · 78 m
  9. 9Stagg Rock, Nashville Park F26A/0433EApproved · 216 m
  10. 103 Asgard Park, Howth F26A/0587Approved · 226 m
  11. 1159 Thormanby Lawns, Howth F26A/0680ENo decision yet · 231 m
  12. 12No59 Thormanby Lawns, Howth F26A/0049ERefused · 231 m
  13. 137 Dungriffin Villas, Howth F26A/0532EApproved · 256 m
  14. 14Balscadden House, Balscadden Road F25A/1068EApproved · 271 m
  15. 153 Dungriffin Villas, Howth F26A/0789ENo decision yet · 274 m
Figure 5

What happens to applications within 500 m

Permission isn't building. Of 73 permissions since 2016, 34 show a start notice and 2 have a completion certificate.

114 applications lodged within 500 m. Council: 71 approved, 20 refused. After appeals: 73 approved. Of those: 2 signed off, 14 built with the owner's opt-out, 18 started, 36 with no start notice found, 3 ran out.LODGEDCOUNCIL DECISIONAFTER APPEALSWHAT HAPPENED NEXT71: lodged → approved20: lodged → refused15: lodged → withdrawn or invalid8: lodged → undecided71: approved → approved17: refused → refused15: withdrawn or invalid → withdrawn8: undecided → undecided2 refused by the council, approved after an appeal1 refused by the council, withdrawn or invalid after an appeal36: approved → no start notice found14: approved → built, owner opted out18: approved → started, not signed off2: approved → signed off3: approved → ran out114 lodged114 lodged71 approved71 approved20 refused20 refused15 withdrawn or invalid15 withdrawn or invalid8 undecided8 undecided73 approved73 approved17 refused17 refused16 withdrawn16 withdrawn8 undecided8 undecided36 no start notice found36 no start notice found14 built, owner opted out14 built, owner opted out18 started, not signed off18 started, not signed off2 signed off2 signed off3 ran out3 ran out

Purple bands are refusals turned into permissions on appeal. "No start notice found" includes small jobs that never needed one and notices we couldn't match.

Measured114 applications in 10 years · NPAD, An Coimisiún Pleanála, BCMS start notices and completion certificates

Figure 6

The next 30 days

1 deadline within 500 m; the first closes 16 Nov 2026.

1 deadlines in the next 30 days: 2026-11-16 F26A/0921E: application received — Planning permission is sought for works to existing dwelling at 9 Nashville Park, Howth, Co. Dublin, D13 YH96, for Cian today5 Nov10 Nov15 Nov20 Nov25 Nov30 NovF26A/0921E: application received — Planning permission is sought for works to existing dwelling at 9 Nashville Park, Howth, Co. Dublin, D13 YH96, for Cian · 296 m away · 2026-11-16
Comments close
  • Comments close 16 Nov 202616 days left
    1F26A/0921E · application received — Planning permission is sought for works to existing dwelling at 9 Nashville Park, Howth, Co.…
    €20 to the council · 296 m away

Measuredcouncil registers and An Coimisiún Pleanála · deadlines worked out from the dates on file

Figure 7

Approved, stalled or planned, not built yet

36 homes 373 m away were approved Aug 2024 with no start notice yet; the permission runs to Aug 2029. 1 building site nearby stopped before sign-off.

6 Balscadden Road, Dublin · 180 homes: 180 homes, started Sep 2023, never signed off; 60 Main Street · 36 homes: 36 homes approved Aug 2024, not started202320242025202620272028202920306 Balscadden Road, Dublin · 180 homes465 m · SHD/009/21180 homes, started Sep 2023, never signed off180 homes, started Sep 2023, never signed off60 Main Street · 36 homes373 m · F22A/047736 homes approved Aug 2024, not started36 homes approved Aug 2024, not startedtoday

Each row is a dated fact from a public register: no score and no forecast.

Measuredcouncil registers, BCMS, derelict sites registers, development plan layers (CC BY 4.0)

Sites that could change 4 within 500 m

Building site that stopped 1

Approved, not started 1

Empty land zoned for homes 2

  • 61.3 ha zoned for homes · no homes built on it yet · 360 m
  • 70.2 ha zoned for homes · no homes built on it yet · 405 m
Sources: An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices), Derelict sites registers, Council meetings (ModernGov), National Planning Application Database, Residential Zoned Land Tax maps · fetched 30 Oct 2026, 23:02
SourceLicenceFetchedLink
An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.030 Oct 2026, 23:01open
Building Control Management System (commencement notices)CC BY 4.030 Oct 2026, 02:44open
Derelict sites registersCC BY 4.026 Oct 2026, 23:09open
Council meetings (ModernGov)Public30 Oct 2026, 02:17open
National Planning Application DatabaseCC BY 4.030 Oct 2026, 23:02open
Residential Zoned Land Tax mapsCC BY 4.025 Oct 2026, 23:43open
Figure 8

Applications within 500 m, by year

Between 13 and 25 a year; busiest 2024. 78% of decisions were approvals.

2021: 23, 2022: 13, 2023: 17, 2024: 25, 2025: 15, 2026: 2101020302021: 19 approved2021: 4 refused23’21*2022: 11 approved2022: 2 refused13’222023: 12 approved2023: 3 refused2023: 2 withdrawn or invalid17’232024: 12 approved2024: 5 refused2024: 8 withdrawn or invalid25’242025: 11 approved2025: 1 refused2025: 3 withdrawn or invalid15’252026: 6 approved2026: 5 refused2026: 2 withdrawn or invalid2026: 8 undecided21’26*
ApprovedRefusedWithdrawn or invalidUndecided

2021 and 2026 are part years (*). Exemption requests and time extensions are left out.

Measuredcouncil register via NPAD

Open for comments €20 to comment

Every application within 500 m 23 in the last 12 months

See every application on the map

How we work this out
Descriptions are shortened by the national planning database (to 80 characters in Dún Laoghaire-Rathdown, 70 in Fingal), and it does not publish applicants' names.
Sources: National Planning Application Database, An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices) · fetched 30 Oct 2026, 23:02
SourceLicenceFetchedLink
National Planning Application DatabaseCC BY 4.030 Oct 2026, 23:02open
An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.030 Oct 2026, 23:01open
Building Control Management System (commencement notices)CC BY 4.030 Oct 2026, 02:44open
Building work nearby 6 in the last 12 months
2 not signed off4 no sign-off needed
  • 9 Upper Cliff Road, Dublin, D13 RW60 · 12 Oct 2026 · 1 homes · start notice, opted out no sign-off needed · F25A/ 0447E · 483 m
  • 574 Thormanby Road, Dublin, D13 XA03 · 29 Jul 2026 · 1 homes · short notice no sign-off needed · F25A/0281E · 168 m
  • 5 The Haggard, Dublin, D13 K658 · 17 Jul 2026 · 1 homes · short notice no sign-off needed · F24A/0192 · 411 m
  • 7 Main Street, Dublin, D13 X0P2 · 2 Jul 2026 · 1 homes · 7-day notice not signed off · 429 m
  • Dungriffin Road, Dublin, D13 AV67 · 10 Jun 2026 · 7-day notice not signed off · 348 m
  • 1 Cannon Rock View, Dublin, Fingal, D13 Y102 · 4 Feb 2026 · 1 homes · short notice no sign-off needed · F25A/0723 · 320 m
How we work this out
Each row is a notice the builder sent to the council's building control office before work started. One notice can cover many homes. 'Signed off as finished' means a completion certificate is on file; work done under an opt-out or a short notice doesn't need one.
Source: Building Control Management System (commencement notices) · fetched 30 Oct 2026, 02:44
SourceLicenceFetchedLink
Building Control Management System (commencement notices)CC BY 4.030 Oct 2026, 02:44open
Homes coming 36 not started
How we work this out
Schemes of 10 or more homes approved since 2021, from the council and An Coimisiún Pleanála registers. 'Building started' means the builder told the council's building control office that work was starting (a commencement notice).
Sources: An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices), National Planning Application Database, Social housing construction status report · fetched 30 Oct 2026, 23:02
SourceLicenceFetchedLink
An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.030 Oct 2026, 23:01open
Building Control Management System (commencement notices)CC BY 4.030 Oct 2026, 02:44open
National Planning Application DatabaseCC BY 4.030 Oct 2026, 23:02open
Social housing construction status reportCC BY-SA 4.023 Oct 2026, 23:02open
Named places nearby: estate, schemes, crèches, schools

Named places estate, developments, inspections

Developments within 1.0 km

SchemeHomesProgressDistance
60 Main Street3636 not started (2026-Q2)338 m
Balscadden Road——369 m
Graymount3232 being built (2026-Q2)420 m
Somerville House27no activity on site reported (2026-Q2)512 m
Lands at Kitestown Road and Thormanb24no activity on site reported (2026-Q2)947 m

Who applies most nearby

  • Cleveland Estates Limited — 2 applications, latest 10 Jul 2026

Crèches and schools inspected

NameLatest inspectionDistance
Bracken Hill Nursery School · Crèche20 Nov 2024 · report · Tusla Early Years Inspectorate735 m
How we work this out
Organisations only: a person named on an application is never listed. Inspection dates and links are the publisher's; read their report for the findings.
Sources: Dublin housing delivery pipeline, National Planning Application Database, Applicant organisations (from the CRO), Department of Education school list, Tusla early years register · fetched 30 Oct 2026, 23:02
SourceLicenceFetchedLink
Dublin housing delivery pipelineCC BY 4.026 Oct 2026, 23:00open
National Planning Application DatabaseCC BY 4.030 Oct 2026, 23:02open
Applicant organisations (from the CRO)Derived by Planning Register25 Oct 2026, 23:01—
Department of Education school listCC BY 4.027 Oct 2026, 23:04open
Tusla early years registerPublic register28 Oct 2026, 23:19open
How busy is this area Busier than most of Fingal County Council.
Homes approved
Here36
Council middle0
Homes started
Here251
Council middle4
How we work this out
Homes approved counts schemes of 10 or more homes (one-off houses are not included). Homes started counts every home in a notice that building work was starting. The council figure is the middle value across the council's built-up squares of the same area (3.1 km², about a 1 km circle), so half of them saw more and half fewer.
Sources: An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices), National Planning Application Database · fetched 30 Oct 2026, 23:02
SourceLicenceFetchedLink
An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.030 Oct 2026, 23:01open
Building Control Management System (commencement notices)CC BY 4.030 Oct 2026, 02:44open
National Planning Application DatabaseCC BY 4.030 Oct 2026, 23:02open
Question 5

What's the area like?

Figure 9

This street block against the council

38% of homes built before 1971 (council 11%). 71% owner-occupied (council 67%).

Homes built before 1971
38% · council 11%
Homes built since 2001
34% · council 43%
Owner-occupied
71% · council 67%
Rented
26% · council 28%
Children under 15
16% · council 22%
Aged 65 and over
28% · council 11%
Households with 2+ cars
41% · council 42%
Work mainly from home
20% · council 12%
This small area (302 people)Fingal

MeasuredCSO Census 2022, Small Area Population Statistics (CC BY 4.0) · small area 267095033

Bus
138 m
Thormanby Lawns · 6, H3 · busiest stop within 500 m: 4 an hour at peak
Radon
1 in 5
homes here likely high (EPA). Test it
Nearest school
607 m
Scoil Mhuire Mxd, 349 pupils
Homes sold nearby
17
in 3 years (Property Price Register)
Schools, stops and the council

Schools

  • Scoil Mhuire Mxd · primary · 349 pupils · 607 m

Stops 16

  • Thormanby Lawns · 6, H3 · 3/hour at peak · 138 m
  • Thormanby Lawns · 6, H3 · 4/hour at peak · 183 m
  • Howth Church · 6, H3 · 3/hour at peak · 315 m
  • Upper Cliff Road · 6, H3 · 3/hour at peak · 368 m
  • Dungriffan Road · 6, H3 · 4/hour at peak · 391 m
  • Main Street Howth · 6, H3 · 3/hour at peak · 442 m
  • Main Street Howth · 6, H3 · 3/hour at peak · 460 m
  • Mariners Cove · 6, H3 · 3/hour at peak · 581 m

Schools growing or shrinking planning in 3 years · pupils last year

  • Scoil Mhuire Mxd · 607 m-3.6% pupils (349)

Council meetings 30 items

Public land

  • Fingal County Council · 1.83 ha · 363 m
  • Fingal County Council · 0.23 ha · 419 m
  • Fingal County Council · 0.21 ha · 442 m
  • Fingal County Council · 0.1 ha · 449 m
  • Fingal County Council · 0.48 ha · 498 m
Sources: Public transport stops and routes (NTA GTFS), Department of Education school list, National Planning Application Database, Council consultation portals, Council meetings (ModernGov), Land Development Agency public land register, cso_saps_2022, National Transport Authority, Fingal County Council and Dún Laoghaire-Rathdown County Council development plan layers (CC BY 4.0), dartplus.ie project extents over NTA GTFS rail shapes (CC BY 4.0), EPA strategic noise maps, Fingal County Council · fetched 30 Oct 2026, 23:02
SourceLicenceFetchedLink
Public transport stops and routes (NTA GTFS)CC BY 4.025 Oct 2026, 23:02open
Department of Education school listCC BY 4.027 Oct 2026, 23:04open
National Planning Application DatabaseCC BY 4.030 Oct 2026, 23:02open
Council consultation portalsPublic30 Oct 2026, 01:04open
Council meetings (ModernGov)Public30 Oct 2026, 02:17open
Land Development Agency public land registerCC BY 4.011 Sept 2026, 16:43open
cso_saps_2022CC BY 4.0—open
National Transport AuthorityCC BY 4.0——
Fingal County Council and Dún Laoghaire-Rathdown County Council development plan layers (CC BY 4.0)CC BY 4.0——
dartplus.ie project extents over NTA GTFS rail shapes (CC BY 4.0)CC BY 4.0——
EPA strategic noise mapsCC BY 4.0——
Fingal County CouncilCC BY 4.0——
Question 6

What to ask, and who

  1. High radon area (1 in 5 homes): has it been tested?
    Ask for: Radon test results.
    Seller
  2. Application 296 m away open for comments until 16 Nov 2026: comment?
    Ask for: The plans on the council's website (€20 to comment).
    Council
  3. Any work done without planning permission?
    Ask for: An opinion of compliance for the whole house.
    Seller · solicitor
Reference

Where this is, the terms, the sources

Townland
Howth
Electoral division
Howth
Electoral area
Howth-Malahide
Council
Fingal County Council
Everything we found, as a list 8 lines
  • Zoned R2 (existing residential); not protected; no vacant land tax; high radon area.
  • 4 sites nearby could change: 1 stalled build, 1 approved scheme, 2 empty zoned plots.
  • 1 application open for comments nearby; nearest closes 16 Nov 2026.
  • 1 application refused within 100 m since 2025; latest for change of use (2026).
  • 36 homes approved nearby, not started; largest 36 at 60 Main Street.
  • Thormanby Lawns (bus 6, H3) 183 m away: 4 an hour at morning peak; 23 from all stops within 500 m.
  • Inside Dublin Airport Noise Zone D.
  • Here (2022 census): 71% owner-occupied (council 67%); 5% of homes empty (council 5%); most built 2001–2010; 50% drive to work (council 52%); population up 1% since 2016.
What the terms mean 9 terms
  • Vacant land tax (Residential Zoned Land Tax (RZLT)): A yearly tax of 3% of the land's value on land that is zoned for homes and serviced but left unbuilt.
  • Building started (Commencement notice (BCMS)): The builder must tell the council's building control office 14 to 28 days before work starts.
  • Signed off as finished (Certificate of Compliance on Completion): A certificate filed when a building is finished, confirming it meets the building regulations.
  • Approved (Grant of permission): The council said yes, usually with conditions.
  • Conservation area (Architectural Conservation Area (ACA)): A street or area whose character is protected.
  • Comment on an application (Observation / submission): Anyone can comment on a planning application within five weeks of it being lodged, for a €20 fee.
  • Appeal (Appeal to An Coimisiún Pleanála): The applicant, or anyone who commented in time, can appeal the council's decision within four weeks.
  • What the land is zoned for (Zoning objective): The council's development plan sets what each area is for: homes, shops, open space and so on.
  • Building site that stopped (Commenced, no completion certificate): A housing build that told the council it was starting at least three years ago, passed its own planned finish date, and has never been signed off as finished.
Sources and licences 36
SourcePublisherLicenceFetched
EPA strategic noise maps—CC BY 4.0—
Fingal County Council—CC BY 4.0—
Fingal County Council and Dún Laoghaire-Rathdown County Council development plan layers (CC BY 4.0)—CC BY 4.0—
National Transport Authority—CC BY 4.0—
services-eu1.arcgis.comAn Coimisiún PleanálaCC BY 4.030 Oct 2026
data.nbco.gov.ieNational Building Control Office (BCMS)CC BY 4.030 Oct 2026
data.gov.ieVarious (see each layer)CC BY 4.0, CC BY-NC-ND 4.027 Sept 2026
services.arcgis.comLocal authorities (ACAs)CC BY 4.027 Sept 2026
gis.epa.ieEnvironmental Protection AgencyCC BY 4.027 Sept 2026
services-eu1.arcgis.comNational Parks and Wildlife ServiceCC BY 4.027 Sept 2026
services-eu1.arcgis.comNational Inventory of Architectural HeritageCC BY 4.027 Sept 2026
gis.epa.ieEnvironmental Protection AgencyCC BY 4.027 Sept 2026
services.arcgis.comLocal authorities (Record of Protected Structures)CC BY 4.027 Sept 2026
services-eu1.arcgis.comNational Parks and Wildlife ServiceCC BY 4.027 Sept 2026
services-eu1.arcgis.comNational Monuments Service (SMR)CC BY 4.027 Sept 2026
services-eu1.arcgis.comNational Parks and Wildlife ServiceCC BY 4.027 Sept 2026
dlrcoco.citizenspace.comLocal authorities (consultation portals)Public30 Oct 2026
www2.courts.ie—© the publisher30 Oct 2026
cso.ie—CC BY 4.0—
dartplus.ie project extents over NTA GTFS rail shapes (CC BY 4.0)—CC BY 4.0—
services-eu1.arcgis.comLocal authorities (derelict sites registers)CC BY 4.026 Oct 2026
services.arcgis.comDublin local authorities (housing delivery pipeline)CC BY 4.026 Oct 2026
esbnetworks.ie—© the publisher · flag only11 Sept 2026
transportforireland.ieNational Transport AuthorityCC BY 4.025 Oct 2026
lda.ieLand Development AgencyCC BY 4.011 Sept 2026
meetings.fingal.ieLocal authorities (council meetings)Public30 Oct 2026
services.arcgis.comDepartment of Housing (National Planning Application Database)CC BY 4.030 Oct 2026
organisationsPlanning Register (derived from applications and the CRO register)Derived by Planning Register25 Oct 2026
services-eu1.arcgis.comTailte ÉireannCC BY 4.011 Sept 2026
services-eu1.arcgis.comCSO, Tailte Éireann, OpenStreetMap contributorsCC BY 4.04 Oct 2026
propertypriceregister.ieProperty Services Regulatory Authority (PPR)© PSRA, PSI licence31 Oct 2026
services.arcgis.comLocal authorities (RZLT maps)CC BY 4.025 Oct 2026
gov.ieDepartment of EducationCC BY 4.027 Oct 2026
gov.ieDepartment of HousingCC BY-SA 4.023 Oct 2026
tusla.ieTusla (Early Years Inspectorate)Public register28 Oct 2026
services.arcgis.comLocal authorities via the Department of Housing (GZT / MyPlan)CC BY 4.025 Oct 2026
Measured
counted from a public register
Calculated
a rate or median we worked out from those counts
Our classification
we sorted it by reading each description
Estimate
inferred from another source (census, map data)
Rule summary
the law, simplified: check before relying on it
How we work this out
Generated 31 Oct 2026, 00:40 from the Planning Register store; nothing was fetched live. Not a legal search: the council's planning file is the record. Deadlines come from published dates under the Planning and Development Act 2000: confirm with the council before relying on them. Street map © OpenStreetMap contributors; building outlines © Overture Maps Foundation. The text version carries every figure with its source, for an AI assistant.