PlanningRegister.ie
Fingal County Council · F22A/0477 · Permission

60 Main Street

Approved on appeal Aug 2024: 36 homes; building not started (Q2 2026).

Start notices are matched from the national building control register; a start on site can be missed.

JM Dunluce LtdHowth, Fingal County Council

One email to confirm. Unsubscribe in one click.

Status
Approved on appeal · no start notice yet
Council decision
Approved · 22 Mar 2023
Uses
residential
Applicant
JM Dunluce Ltd
Site
3,021 m²
Appeal
ACP 316294 · Approved with conditions · 9 Aug 2024

Building progress councils’ figures, Q2 2026

Quarter by quarter
QuarterPermittedUnder constructionCompletedCompleted share
Q2 20253600
Q3 20253600
Q4 20253600
Q1 20263600
Q2 20263600
Source and licence

The scheme

JM Dunluce Ltd proposes a development at 60 Main Street, Howth. The project involves the demolition of an existing structure and the construction of 36 residential units.

What the register says

The development will consist of: (i) Demolition of the existing single-storey function room currently in office use (376sq.m) to the rear of the site; (ii) Development of a residential scheme, totalling 36 no. residential units (comprising 14 no. 1 bed units and 22 no. 2 bed units). The scheme will consist of: (a) the construction of a 3 to 4 storeys (over-basement) building, consisting of 32 no. residential apartments, comprising 12 no. 1 bed unlts and 20 no. 2-bed units. Each unit will be provided with private open space in the form of a balcony or terrace. The structure will be provided with solar panels at rooftop level. {b) the change of use of the existing 2-storey office building fronting onto Main Street to residential use consisting of 2 no. 1-bed apartments and 2 no. 2 bed apartments. (c) The development will be served by a total of 68 no. bicycle parking spaces, consisting of 56 no. internal bicycle parking spaces to be provided at basement level and 12 no. bicycle parklng spaces to be provided at surface level. The development will provide for a total of 37 no. car parking spaces (including 2 no. mobllity impaired user parking spaces). (d) A communal landscaped area for all apartments at ground floor level. (iii) Associated site and infrastructural works are also proposed, which include: foul and surface water drainage, landscaping, boundary treatments, and all associated site development works necessary to facilitate the development. AI Received 24/02/2023…

Cut short by the council feed. Full text ↗

Summary from the register record.

Planning timeline 6 steps
  • 8 Sept 2022
    Application lodged — Standard
  • 22 Mar 2023
    Council decision — Grant
  • 18 Apr 2023
    Appealed to An Coimisiún Pleanála — ABP-316294-23
  • 9 Aug 2024
    Commission decision — Granted
  • 9 Aug 2024
    Final approval
  • 14 Aug 2027
    Approval runs out (estimate)

The site 3,021 m²

Boundary of 60 Main Street as the Dublin councils map it in the housing pipeline.

Planning applications inside the site 5 applications in the last 10 years

Appeals inside the site 2 with An Coimisiún Pleanála

Other big developments nearby within 2 km

Everything within 1 km on the map →

Something wrong on this scheme page, or a record you want corrected or removed? Contact us and we will check it against the source.