Evora Park
Homes here mostly date from the 1970s. Most home extensions nearby get approved (89%). A building site 422 m away stopped before it was finished.
How planning works, with this area's numbers
steps can overlap · medians for home extensions within 1.5 km, 10 years- 1ApplySite notice up, plans online
- 2Comments5 weeks, €20. Comment to keep your right to appeal
- 3Decision8 weeks by law. Here 51 days
- 4Appeal window4 weeks after the decision
- 5AppealHere about 5 months
- 6PermissionLasts 5 years
- 7StartStart notice to the council. Here about 7 months after
- 8Sign-offCompletion cert, or the owner opts out
What's the planning story of this house?
When it was built, and the rules since
Most homes here were built 1971–80, after planning permission began and before building regulations (1992).
Each line is a rule that applies to work done after it.
MeasuredEstimatecouncil register via NPAD · build years: CSO Census 2022, small area
- 1 Feb 2023 · notice that building work was starting · no official sign-off needed for this kind of work
Zoning, protection, tax and flood: the detail
What it says
RS - Residential: Ensure that any new development in existing areas would have a minimal impact on and enhance existing residential amenity.
What it says
RS - Residential: Provide for residential development and protect and improve residential amenity
An established residential area. The objective is to protect existing residential amenity as well as to provide housing — which is the objective a neighbour's objection to an overbearing extension is usually argued under.
the fingal development plan 2023 2029 · 5 Apr 2023 – 5 Apr 2029
Not on this site: protected building, heritage inventory, monument zone, EU nature site, EU bird site, natural heritage area, tree order, landslide risk, derelict list.
Licensed industrial sites within 1.0 km: licence W0312 (321 m)
| Within 500 m | Count | For example |
|---|---|---|
| Conservation areas | 3 | Howth Castle Demesne ACA; Howth Historic Core ACA |
| Licensed industrial sites | 1 | W0312 |
| Natural heritage areas | 2 | Baldoyle Bay; Howth Head |
| Heritage inventory buildings | 27 | Howth Railway Station; viaduct |
| Radon grid squares | 5 | |
| Protected buildings | 13 | Former Station Masters House; Howth Station |
| EU nature sites | 2 | Baldoyle Bay SAC; Howth Head SAC |
| Monuments | 15 | Cist; Church |
| EU bird sites | 1 | North-West Irish Sea cSPA |
How we work this out
Sources: Development plan zoning (councils), Architectural Conservation Areas, EPA licensed sites, EPA radon map, Residential Zoned Land Tax maps, Constraint layers (bundle), Natural Heritage Areas (NPWS), National Inventory of Architectural Heritage, Records of Protected Structures, Special Areas of Conservation (NPWS), Sites and Monuments Record, Special Protection Areas (NPWS) · fetched 25 Oct 2026, 23:43
| Source | Licence | Fetched | Link |
|---|---|---|---|
| Development plan zoning (councils) | CC BY 4.0 | 25 Oct 2026, 23:06 | open |
| Architectural Conservation Areas | CC BY 4.0 | 27 Sept 2026, 19:36 | open |
| EPA licensed sites | CC BY 4.0 | 27 Sept 2026, 19:36 | open |
| EPA radon map | CC BY 4.0 | 27 Sept 2026, 19:36 | open |
| Residential Zoned Land Tax maps | CC BY 4.0 | 25 Oct 2026, 23:43 | open |
| Constraint layers (bundle) | CC BY 4.0, CC BY-NC-ND 4.0 | 27 Sept 2026, 19:37 | open |
| Natural Heritage Areas (NPWS) | CC BY 4.0 | 27 Sept 2026, 19:27 | open |
| National Inventory of Architectural Heritage | CC BY 4.0 | 27 Sept 2026, 19:35 | open |
| Records of Protected Structures | CC BY 4.0 | 27 Sept 2026, 19:36 | open |
| Special Areas of Conservation (NPWS) | CC BY 4.0 | 27 Sept 2026, 19:27 | open |
| Sites and Monuments Record | CC BY 4.0 | 27 Sept 2026, 19:29 | open |
| Special Protection Areas (NPWS) | CC BY 4.0 | 27 Sept 2026, 19:27 | open |
How we work this out
Sources: Building Control Management System (commencement notices), National Planning Application Database · fetched 1 Nov 2026, 05:02
| Source | Licence | Fetched | Link |
|---|---|---|---|
| Building Control Management System (commencement notices) | CC BY 4.0 | 1 Nov 2026, 03:07 | open |
| National Planning Application Database | CC BY 4.0 | 1 Nov 2026, 05:02 | open |
Could you extend?
Nothing on this site restricts it: not protected, not in a conservation area.
What happened to applications like yours
Extensions here: 75–100% by type. A new house in a garden is harder: 50% approved, and 1 in 5 is asked for more information.
Decided applications within 1.5 km, received in the last 10 years. The kind of work is read from each description.
CalculatedOur classificationcouncil register via NPAD · 59 nearby, 2,337 council-wide
Evora Park, file by file since 2021
2 of 2 decided extensions on the road were approved.
5 files with "Evora Park" in the address within 600 m, other roads of the same name left out. Hover a dot for the house number and reference.
MeasuredOur classificationcouncil register via NPAD · 2021–2026
Extensions and refusals right beside you 0 within 250 m · 0 refused within 100 m
Extensions and refusals near you 0 extensions within 250 m · the last 12 months
No home extensions within 250 m in the last 12 months.
Refused within 100 m 0 in the last 12 months
Nothing refused this close in the last 12 months.
How we work this out
Sources: An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices), National Planning Application Database · fetched 1 Nov 2026, 05:02
| Source | Licence | Fetched | Link |
|---|---|---|---|
| An Coimisiún Pleanála cases (ArcGIS feed) | CC BY 4.0 | 30 Oct 2026, 23:01 | open |
| Building Control Management System (commencement notices) | CC BY 4.0 | 1 Nov 2026, 03:07 | open |
| National Planning Application Database | CC BY 4.0 | 1 Nov 2026, 05:02 | open |
How long, and what if someone objects?
A home extension's journey here
A decision takes 51 days. 1 in 5 is asked for more information, which adds about 94 days. Building starts about 7 months after permission.
Bars are medians; whiskers show the middle half. Medians of separate steps don't add up exactly.
Calculated110 decided home extensions, 53 start notices, 35 decided appeals · within 1.5 km, 10 years · NPAD, BCMS, An Coimisiún Pleanála
What appeals changed
10 of 18 appealed refusals became permissions. 1 of 18 appealed approvals were reversed.
Every appeal decided within 1.5 km in 10 years, any kind of development.
CalculatedAn Coimisiún Pleanála cases linked to the council file
Appeals nearby 2 in the last 12 months
None of 1 changed the council's decision
- 502175 Pending · 3 Main Street, Howth, Co.Dublin (D13X064, D13WP57, and D13K6Y3) · 328 m
- 500428 Refused · 30 Main Street, Howth, Co. Dublin, D13 P8K7 · 464 m report
Sources: An Coimisiún Pleanála cases (ArcGIS feed), Courts Service legal diary (judicial reviews), National Planning Application Database · fetched 1 Nov 2026, 05:02
| Source | Licence | Fetched | Link |
|---|---|---|---|
| An Coimisiún Pleanála cases (ArcGIS feed) | CC BY 4.0 | 30 Oct 2026, 23:01 | open |
| Courts Service legal diary (judicial reviews) | © the publisher | 31 Oct 2026, 23:12 | open |
| National Planning Application Database | CC BY 4.0 | 1 Nov 2026, 05:02 | open |
What's changing around you?
- 16 Balscadden Road, Dublin SHD/009/21
- 260 Main Street F22A/0477
- 31.3 ha zoned for homes
- 40.2 ha zoned for homes
- 571 Grace O'Malley Road, Howth F26A/0268
- 643 Church Street, Howth F26A/0304E
- 73A, Harbour Road F26A/0189E
- 8Ground Floor, Unit 2 F26A/0009
- 9No. 6 St. Lawrence Terrace, Howth F26A/0851E
- 102 St Lawrence Road, Howth F25A/1085E
- 113 Main Street, Howth F26A/0609E
- 1220 Abbey Street, Howth F25A/1133E
- 1314 Abbey Street, Howth F26A/0854E
- 147 Main Street, Howth F26A/0165E
- 1548 Saint Peter’s Terrace, Howth F26A/0745E
What happens to applications within 500 m
Permission isn't building. Of 77 permissions since 2016, 32 show a start notice and 2 have a completion certificate.
Purple bands are refusals turned into permissions on appeal. "No start notice found" includes small jobs that never needed one and notices we couldn't match.
Measured121 applications in 10 years · NPAD, An Coimisiún Pleanála, BCMS start notices and completion certificates
The next 30 days
Nothing closes within 500 m in the next 30 days.
Measuredcouncil registers and An Coimisiún Pleanála · deadlines worked out from the dates on file
Approved, stalled or planned, not built yet
36 homes 439 m away were approved Aug 2024 with no start notice yet; the permission runs to Aug 2029. 1 building site nearby stopped before sign-off.
Each row is a dated fact from a public register: no score and no forecast.
Measuredcouncil registers, BCMS, derelict sites registers, development plan layers (CC BY 4.0)
Sites that could change 4 within 500 m
Building site that stopped 1
- 16 Balscadden Road, Dublin · 180 homes, started Sep 2023, never signed off · 422 m
Approved, not started 1
- 60 Main Street · 36 homes approved Aug 2024, not started · 439 m
Empty land zoned for homes 2
- 31.3 ha zoned for homes · no homes built on it yet · 356 m
- 40.2 ha zoned for homes · no homes built on it yet · 367 m
Sources: An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices), Derelict sites registers, Council meetings (ModernGov), National Planning Application Database, Residential Zoned Land Tax maps · fetched 1 Nov 2026, 05:02
| Source | Licence | Fetched | Link |
|---|---|---|---|
| An Coimisiún Pleanála cases (ArcGIS feed) | CC BY 4.0 | 30 Oct 2026, 23:01 | open |
| Building Control Management System (commencement notices) | CC BY 4.0 | 1 Nov 2026, 03:07 | open |
| Derelict sites registers | CC BY 4.0 | 26 Oct 2026, 23:09 | open |
| Council meetings (ModernGov) | Public | 1 Nov 2026, 02:24 | open |
| National Planning Application Database | CC BY 4.0 | 1 Nov 2026, 05:02 | open |
| Residential Zoned Land Tax maps | CC BY 4.0 | 25 Oct 2026, 23:43 | open |
Applications within 500 m, by year
Between 16 and 24 a year; busiest 2024. 79% of decisions were approvals.
2021 and 2026 are part years (*). Exemption requests and time extensions are left out.
Measuredcouncil register via NPAD
Every application within 500 m 20 in the last 12 months
See every application on the map
- 1314 Abbey Street,, Howth,, Co. Dublin, D13 EY77 No decision yetPermission is being sought on behalf of Honey & Hope Ltd for planning permission for development at this…
- 9No. 6 St. Lawrence Terrace, Howth, Co. Dublin No decision yetThe planning permission will consist of the following: (1) New roof extension over existing ground floor…
- 14 Abbey Street,, Howth,, Co. Dublin, D13 EY77 Other decisionThe proposed development will consist of (1) change of use from Music School to a Cafe/Wine Bar (2) front…
- 1548 Saint Peter’s Terrace, Howth, Co. Dublin, D13 PE83 No decision yetThe development will consist of the provision of a 3.6m wide vehicular
- Rear of 'Sound View' Tuckett's Lane, Howth, Dublin 13, D13 AX99 No decision yetThe construction of 1 no. 2-storey, 2-bed, detached house with 1 no. s
- 113 Main Street, Howth, Co.Dublin (D13X064, D13WP57, and D13K6Y3) Refused(i) partial change of use, with associated internal reconfiguration, o
- Abbey View, 10/11 Abbey Street, Howth, Co. Dublin, D13 RV12 No decision yetThe proposed development comprises alterations and extensions to the e
- Sound View, Tuckett's Lane, Howth, D13AX99 Withdrawn or not valid1 no. 2-storey, 2 bed detached houes with 1 no. skylight and 1 no. cle
- 23, Asgard Park, Howth, Dublin 13, D13 E868 ApprovedProposed (1) single storey extensions to front, side & rere, & (2) gro
- Ground floor Restaurant Unit Block D of the Claremont Residential Deve ApprovedThe development will consist of the provision of 1 no. illuminated SU
- 643 Church Street, Howth, Co. Dublin, D13CP8R ApprovedRetention permission and permission for alterations to a residential d
- Ground floor Restaurant Unit, Block D of the Claremont Residential Dev Withdrawn or not validThe development will consist of the provision of 1 no. illuminated SUS
- 571 Grace O'Malley Road, Howth, Co.Dublin No decision yetThe development ill consist of: (i) building a single storey bay
- 3 Main Street, Howth, Co. Dublin, [Eircode Nos. D13 X064, D13 WP57, an Refused1. The partial change of use of the existing three storey mixed-use bu
- 73A, Harbour Road, Howth, D13 T8Y7 No decision yetFOR A SITE LOCATED AT 3A HARBOUR ROAD, HOWTH, DUBLIN, D13 T8Y7.PERMIS
- 147 Main Street, Howth, Dublin, D13 X0P2 ApprovedChange of use of existing building at ground floor level from Cafe / W
- 8Ground Floor, Unit 2, Island View House, Harbour Road, Howth, Co. Dubl RefusedThe development will consist of : Retention of updated
- 1220 Abbey Street, Howth, Co. Dublin, D13 A027 RefusedRetention is sought for the removal of front wall & railings to create
- 102 St Lawrence Road, Howth, Co Dublin, D13H006 ApprovedAlterations to Front Garden and Boundary Wall to Provide Part M Compli
- Ground Floor Unit, 2 Island View House, Harbour Road, Howth, Co. Dubli Withdrawn or not validThe development will consist of :
How we work this out
Sources: National Planning Application Database, An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices) · fetched 1 Nov 2026, 05:02
| Source | Licence | Fetched | Link |
|---|---|---|---|
| National Planning Application Database | CC BY 4.0 | 1 Nov 2026, 05:02 | open |
| An Coimisiún Pleanála cases (ArcGIS feed) | CC BY 4.0 | 30 Oct 2026, 23:01 | open |
| Building Control Management System (commencement notices) | CC BY 4.0 | 1 Nov 2026, 03:07 | open |
Building work nearby 9 in the last 12 months
- Sushida - Block D, Claremont, Howth Road, Howth, Co. Dublin, Dublin · 4 Aug 2026 · 7-day notice not signed off · F26A/0312E · 438 m
- 5 The Haggard, Dublin, D13 K658 · 17 Jul 2026 · 1 homes · short notice no sign-off needed · F24A/0192 · 466 m
- 7 Main Street, Dublin, D13 X0P2 · 2 Jul 2026 · 1 homes · 7-day notice not signed off · 374 m
- 16A West Pier, Howth Fishery Harbour,Howth, Dublin 13, Fingal, D13 V2K8 · 21 May 2026 · 7-day notice not signed off · F24A/0522 · 353 m
- 46 Grace O'Malley Drive, Dublin, Fingal, D13 CX46 · 5 May 2026 · short notice no sign-off needed · F25A/0701E · 404 m
- 47 Evora Crescent, Howth, Dublin, Fingal, D13 TY30 · 15 Apr 2026 · start notice, opted out no sign-off needed · F25A/0738E · 98 m
- 15 Grace O'Malley Drive, Dublin, Fingal, D13 F292 · 2 Mar 2026 · start notice, opted out no sign-off needed · F25A/0246E · 230 m
- 21 Grace O'Malley Road, Dublin, Fingal, D13 YT95 · 2 Feb 2026 · 1 homes · start notice, opted out no sign-off needed · F24A/1032E · 173 m
- Dunbo Hill, Dublin, Fingal, D13DX54 · 6 Jan 2026 · 1 homes · start notice, opted out no sign-off needed · F25A/0030 · 117 m
How we work this out
Source: Building Control Management System (commencement notices) · fetched 1 Nov 2026, 03:07
| Source | Licence | Fetched | Link |
|---|---|---|---|
| Building Control Management System (commencement notices) | CC BY 4.0 | 1 Nov 2026, 03:07 | open |
Homes coming 36 not started
- Balscadden Road and Former Bailey Court Hotel · 180 homes · building started · 421 m
- 260 Main Street · 36 homes · not started · runs out 9 Aug 2029 · 439 m
How we work this out
Sources: An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices), National Planning Application Database, Social housing construction status report · fetched 1 Nov 2026, 05:02
| Source | Licence | Fetched | Link |
|---|---|---|---|
| An Coimisiún Pleanála cases (ArcGIS feed) | CC BY 4.0 | 30 Oct 2026, 23:01 | open |
| Building Control Management System (commencement notices) | CC BY 4.0 | 1 Nov 2026, 03:07 | open |
| National Planning Application Database | CC BY 4.0 | 1 Nov 2026, 05:02 | open |
| Social housing construction status report | CC BY-SA 4.0 | 23 Oct 2026, 23:02 | open |
Named places nearby: estate, schemes, crèches, schools
Named places estate, developments, inspections
Developments within 1.0 km
| Scheme | Homes | Progress | Distance |
|---|---|---|---|
| Balscadden Road | — | — | 362 m |
| Howth Road | 512 | 512 built (2025-Q4) | 391 m |
| 60 Main Street | 36 | 36 not started (2026-Q2) | 412 m |
| Deer Park | 162 | — | 659 m |
| Lands Adjoining Howth Demesne Deer Park Howth | — | — | 681 m |
| Graymount | 32 | 32 being built (2026-Q2) | 950 m |
Who applies most nearby
- Honey & Hope Ltd — 2 applications, latest 18 Sept 2026
- Cleveland Estates Limited — 2 applications, latest 10 Jul 2026
- Kim & Di Limited t/a SUSHIDA — 2 applications, latest 20 Apr 2026
- Little Team Creche Ltd — 2 applications, latest 12 Jan 2026
How we work this out
Sources: Dublin housing delivery pipeline, National Planning Application Database, Applicant organisations (from the CRO), Department of Education school list · fetched 1 Nov 2026, 05:02
| Source | Licence | Fetched | Link |
|---|---|---|---|
| Dublin housing delivery pipeline | CC BY 4.0 | 26 Oct 2026, 23:00 | open |
| National Planning Application Database | CC BY 4.0 | 1 Nov 2026, 05:02 | open |
| Applicant organisations (from the CRO) | Derived by Planning Register | 25 Oct 2026, 23:01 | — |
| Department of Education school list | CC BY 4.0 | 27 Oct 2026, 23:04 | open |
How busy is this area Busier than most of Fingal County Council.
How we work this out
Sources: An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices), National Planning Application Database · fetched 1 Nov 2026, 05:02
| Source | Licence | Fetched | Link |
|---|---|---|---|
| An Coimisiún Pleanála cases (ArcGIS feed) | CC BY 4.0 | 30 Oct 2026, 23:01 | open |
| Building Control Management System (commencement notices) | CC BY 4.0 | 1 Nov 2026, 03:07 | open |
| National Planning Application Database | CC BY 4.0 | 1 Nov 2026, 05:02 | open |
What's the area like?
This street block against the council
29% of homes built before 1971 (council 11%). 84% owner-occupied (council 67%).
MeasuredCSO Census 2022, Small Area Population Statistics (CC BY 4.0) · small area 267095015
Schools, stops and the council
Schools
- Scoil Mhuire Mxd · primary · 349 pupils · 286 m
Stops 15
- Howth Harbour · 6, H3 · 4/hour at peak · 157 m
- Howth Harbour · 6, H3 · 3/hour at peak · 184 m
- Howth Station · 6, H3 · 3/hour at peak · 290 m
- Howth Abbey · 6, H3 · 3/hour at peak · 300 m
- Howth Station · 6, H3 · 2/hour at peak · 325 m
- Howth · DART · 3/hour at peak · 339 m
- Main Street Howth · 6, H3 · 3/hour at peak · 353 m
- Main Street Howth · 6, H3 · 3/hour at peak · 374 m
Schools growing or shrinking planning in 3 years · pupils last year
- Scoil Mhuire Mxd · 286 m-3.6% pupils (349)
Council meetings 30 items
- 4 Nov 2026 · Confirmation and Re-affirmation of Minutes of the Howth/Malahide Area Committee (Services B -…
- 4 Nov 2026 · Councillor C. Haughey - Balscadden Beach Access Steps - AI110725
- 4 Nov 2026 · Councillor J. Hopkins - Portmarnock Running Track - AI110859
- 4 Nov 2026 · Councillor A. Tormey - Mural Project - Howth DART Line- AI110821
- 4 Nov 2026 · Councillor C. Haughey - Partnership with Causeway Coast and Glens Borough Council - AI110681
- 4 Nov 2026 · Councillor J. Hopkins - SAC Dogs on Leads Signs in this LEA - AI110175
- 4 Nov 2026 · Councillor J. Hopkins - River Walk Belcamp Taking in Charge - AI110861
- 4 Nov 2026 · Councillor J. Hopkins - ACA Shop Front Fines in this LEA - AI110865
Public land
- Fingal County Council · 0.48 ha · 105 m
- Fingal County Council · 0.21 ha · 111 m
- Fingal County Council · 0.28 ha · 280 m
- Fingal County Council · 0.23 ha · 311 m
- Fingal County Council · 0.15 ha · 312 m
- Fingal County Council · 0.2 ha · 312 m
Sources: Public transport stops and routes (NTA GTFS), Department of Education school list, National Planning Application Database, Council consultation portals, Council meetings (ModernGov), Land Development Agency public land register, cso_saps_2022, National Transport Authority, Fingal County Council and Dún Laoghaire-Rathdown County Council development plan layers (CC BY 4.0), dartplus.ie project extents over NTA GTFS rail shapes (CC BY 4.0), EPA strategic noise maps, Fingal County Council · fetched 1 Nov 2026, 05:02
| Source | Licence | Fetched | Link |
|---|---|---|---|
| Public transport stops and routes (NTA GTFS) | CC BY 4.0 | 25 Oct 2026, 23:02 | open |
| Department of Education school list | CC BY 4.0 | 27 Oct 2026, 23:04 | open |
| National Planning Application Database | CC BY 4.0 | 1 Nov 2026, 05:02 | open |
| Council consultation portals | Public | 1 Nov 2026, 01:08 | open |
| Council meetings (ModernGov) | Public | 1 Nov 2026, 02:24 | open |
| Land Development Agency public land register | CC BY 4.0 | 11 Sept 2026, 16:43 | open |
| cso_saps_2022 | CC BY 4.0 | — | open |
| National Transport Authority | CC BY 4.0 | — | — |
| Fingal County Council and Dún Laoghaire-Rathdown County Council development plan layers (CC BY 4.0) | CC BY 4.0 | — | — |
| dartplus.ie project extents over NTA GTFS rail shapes (CC BY 4.0) | CC BY 4.0 | — | — |
| EPA strategic noise maps | CC BY 4.0 | — | — |
| Fingal County Council | CC BY 4.0 | — | — |
What to ask, and who
- Any work done without planning permission?Seller · solicitorAsk for: An opinion of compliance for the whole house.
Where this is, the terms, the sources
- Townland
- Howth
- Electoral division
- Howth
- Electoral area
- Howth-Malahide
- Council
- Fingal County Council
Everything we found, as a list 8 lines
- Zoned R2 (existing residential); not protected; no vacant land tax.
- 4 sites nearby could change: 1 stalled build, 1 approved scheme, 2 empty zoned plots.
- 36 homes approved nearby, not started; largest 36 at 60 Main Street.
- Howth Harbour (bus 6, H3) 157 m away: 4 an hour at morning peak; 32 from all stops within 500 m.
- Inside Dublin Airport Noise Zone D.
- Here (2022 census): 84% owner-occupied (council 67%); 11% of homes empty (council 5%); most built 1971–1980; 41% drive to work (council 52%); population up 1% since 2016.
- Around here the council decides in a median 55 days (about 8 weeks); 1 in 3 is asked for more information.
- Homes started within 1 km: 9 in the last year, 1,728 three years before.
What the terms mean 8 terms
- Vacant land tax (Residential Zoned Land Tax (RZLT)): A yearly tax of 3% of the land's value on land that is zoned for homes and serviced but left unbuilt.
- Building started (Commencement notice (BCMS)): The builder must tell the council's building control office 14 to 28 days before work starts.
- Signed off as finished (Certificate of Compliance on Completion): A certificate filed when a building is finished, confirming it meets the building regulations.
- Approved (Grant of permission): The council said yes, usually with conditions.
- Conservation area (Architectural Conservation Area (ACA)): A street or area whose character is protected.
- Appeal (Appeal to An Coimisiún Pleanála): The applicant, or anyone who commented in time, can appeal the council's decision within four weeks.
- What the land is zoned for (Zoning objective): The council's development plan sets what each area is for: homes, shops, open space and so on.
- Building site that stopped (Commenced, no completion certificate): A housing build that told the council it was starting at least three years ago, passed its own planned finish date, and has never been signed off as finished.
Sources and licences 35
| Source | Publisher | Licence | Fetched |
|---|---|---|---|
| EPA strategic noise maps | — | CC BY 4.0 | — |
| Fingal County Council | — | CC BY 4.0 | — |
| Fingal County Council and Dún Laoghaire-Rathdown County Council development plan layers (CC BY 4.0) | — | CC BY 4.0 | — |
| National Transport Authority | — | CC BY 4.0 | — |
| services-eu1.arcgis.com | An Coimisiún Pleanála | CC BY 4.0 | 30 Oct 2026 |
| data.nbco.gov.ie | National Building Control Office (BCMS) | CC BY 4.0 | 1 Nov 2026 |
| data.gov.ie | Various (see each layer) | CC BY 4.0, CC BY-NC-ND 4.0 | 27 Sept 2026 |
| services.arcgis.com | Local authorities (ACAs) | CC BY 4.0 | 27 Sept 2026 |
| gis.epa.ie | Environmental Protection Agency | CC BY 4.0 | 27 Sept 2026 |
| services-eu1.arcgis.com | National Parks and Wildlife Service | CC BY 4.0 | 27 Sept 2026 |
| services-eu1.arcgis.com | National Inventory of Architectural Heritage | CC BY 4.0 | 27 Sept 2026 |
| gis.epa.ie | Environmental Protection Agency | CC BY 4.0 | 27 Sept 2026 |
| services.arcgis.com | Local authorities (Record of Protected Structures) | CC BY 4.0 | 27 Sept 2026 |
| services-eu1.arcgis.com | National Parks and Wildlife Service | CC BY 4.0 | 27 Sept 2026 |
| services-eu1.arcgis.com | National Monuments Service (SMR) | CC BY 4.0 | 27 Sept 2026 |
| services-eu1.arcgis.com | National Parks and Wildlife Service | CC BY 4.0 | 27 Sept 2026 |
| dlrcoco.citizenspace.com | Local authorities (consultation portals) | Public | 1 Nov 2026 |
| www2.courts.ie | — | © the publisher | 31 Oct 2026 |
| cso.ie | — | CC BY 4.0 | — |
| dartplus.ie project extents over NTA GTFS rail shapes (CC BY 4.0) | — | CC BY 4.0 | — |
| services-eu1.arcgis.com | Local authorities (derelict sites registers) | CC BY 4.0 | 26 Oct 2026 |
| services.arcgis.com | Dublin local authorities (housing delivery pipeline) | CC BY 4.0 | 26 Oct 2026 |
| esbnetworks.ie | — | © the publisher · flag only | 11 Sept 2026 |
| transportforireland.ie | National Transport Authority | CC BY 4.0 | 25 Oct 2026 |
| lda.ie | Land Development Agency | CC BY 4.0 | 11 Sept 2026 |
| meetings.fingal.ie | Local authorities (council meetings) | Public | 1 Nov 2026 |
| services.arcgis.com | Department of Housing (National Planning Application Database) | CC BY 4.0 | 1 Nov 2026 |
| organisations | Planning Register (derived from applications and the CRO register) | Derived by Planning Register | 25 Oct 2026 |
| services-eu1.arcgis.com | Tailte Éireann | CC BY 4.0 | 11 Sept 2026 |
| services-eu1.arcgis.com | CSO, Tailte Éireann, OpenStreetMap contributors | CC BY 4.0 | 4 Oct 2026 |
| propertypriceregister.ie | Property Services Regulatory Authority (PPR) | © PSRA, PSI licence | 1 Nov 2026 |
| services.arcgis.com | Local authorities (RZLT maps) | CC BY 4.0 | 25 Oct 2026 |
| gov.ie | Department of Education | CC BY 4.0 | 27 Oct 2026 |
| gov.ie | Department of Housing | CC BY-SA 4.0 | 23 Oct 2026 |
| services.arcgis.com | Local authorities via the Department of Housing (GZT / MyPlan) | CC BY 4.0 | 25 Oct 2026 |