PlanningRegister.ie
Planning report · Fingal County Council · 500 m around the house · the last 12 months · 1 Nov 2026, 06:09

Evora Park

53.38677, -6.07056

Homes here mostly date from the 1970s. Most home extensions nearby get approved (89%). A building site 422 m away stopped before it was finished.

See on the mapWatch this area

How planning works, with this area's numbers

steps can overlap · medians for home extensions within 1.5 km, 10 years
  1. 1ApplySite notice up, plans online
  2. 2Comments5 weeks, €20. Comment to keep your right to appeal
  3. 3Decision8 weeks by law. Here 51 days
  4. 4Appeal window4 weeks after the decision
  5. 5AppealHere about 5 months
  6. 6PermissionLasts 5 years
  7. 7StartStart notice to the council. Here about 7 months after
  8. 8Sign-offCompletion cert, or the owner opts out
Question 1

What's the planning story of this house?

Figure 1

When it was built, and the rules since

Most homes here were built 1971–80, after planning permission began and before building regulations (1992).

Timeline from 1955: planning permission needed from October 1964, building regulations from June 1992, building records online from March 2014, sign-off opt-out from September 2015. Most homes here were built 1971–1980.1960197019801990200020102020Oct 1964permission neededJun 1992building regulationsMar 2014building records onlineSep 2015owners may opt out of sign-offThis houseAll of Evora ParkBuilt: most homes in this small area date from 1971–1980 (census estimate)most built2021: 1 file on Evora Park2022: 2 files on Evora Park2024: 2 files on Evora Park5 files

Each line is a rule that applies to work done after it.

MeasuredEstimatecouncil register via NPAD · build years: CSO Census 2022, small area

  • 1 Feb 2023 · notice that building work was starting · no official sign-off needed for this kind of work
On this site
R2
Zoning · Existing residential
No
Protected or listed · on the council's list
No
Vacant land tax · lived-in homes don't pay it
1 in 20
Radon (EPA) · homes with high radon
Zoning, protection, tax and flood: the detail
Zoning
What it says

RS - Residential: Ensure that any new development in existing areas would have a minimal impact on and enhance existing residential amenity.

ZoningR2 · Existing residential
What it says

RS - Residential: Provide for residential development and protect and improve residential amenity

An established residential area. The objective is to protect existing residential amenity as well as to provide housing — which is the objective a neighbour's objection to an overbearing extension is usually argued under.

the fingal development plan 2023 2029 · 5 Apr 2023 – 5 Apr 2029

Conservation area1 within 100 m Howth Historic Core ACA
Radon1 in 20 homes have high radon (EPA)

Not on this site: protected building, heritage inventory, monument zone, EU nature site, EU bird site, natural heritage area, tree order, landslide risk, derelict list.

Licensed industrial sites within 1.0 km: licence W0312 (321 m)

Vacant land taxNo lived-in homes don't pay it
Flood riskNone mapped within 500 m
Within 500 mCountFor example
Conservation areas3Howth Castle Demesne ACA; Howth Historic Core ACA
Licensed industrial sites1W0312
Natural heritage areas2Baldoyle Bay; Howth Head
Heritage inventory buildings27Howth Railway Station; viaduct
Radon grid squares5
Protected buildings13Former Station Masters House; Howth Station
EU nature sites2Baldoyle Bay SAC; Howth Head SAC
Monuments15Cist; Church
EU bird sites1North-West Irish Sea cSPA
How we work this out
'On this site' means the record's own map outline touches the registered parcel (or a 12 m circle round the point where there is no parcel). Only the council's own list confirms a protected building; ask the council if in doubt. The council's map for the vacant land tax shows this spot inside an area of existing homes. Homes people live in, and their gardens, don't pay the tax. The OPW flood map's licence lets us show a yes/no only. Land on the vacant land tax map nearby: 6 on the draft 2027 map; 6 on the final 2026 map.
Sources: Development plan zoning (councils), Architectural Conservation Areas, EPA licensed sites, EPA radon map, Residential Zoned Land Tax maps, Constraint layers (bundle), Natural Heritage Areas (NPWS), National Inventory of Architectural Heritage, Records of Protected Structures, Special Areas of Conservation (NPWS), Sites and Monuments Record, Special Protection Areas (NPWS) · fetched 25 Oct 2026, 23:43
SourceLicenceFetchedLink
Development plan zoning (councils)CC BY 4.025 Oct 2026, 23:06open
Architectural Conservation AreasCC BY 4.027 Sept 2026, 19:36open
EPA licensed sitesCC BY 4.027 Sept 2026, 19:36open
EPA radon mapCC BY 4.027 Sept 2026, 19:36open
Residential Zoned Land Tax mapsCC BY 4.025 Oct 2026, 23:43open
Constraint layers (bundle)CC BY 4.0, CC BY-NC-ND 4.027 Sept 2026, 19:37open
Natural Heritage Areas (NPWS)CC BY 4.027 Sept 2026, 19:27open
National Inventory of Architectural HeritageCC BY 4.027 Sept 2026, 19:35open
Records of Protected StructuresCC BY 4.027 Sept 2026, 19:36open
Special Areas of Conservation (NPWS)CC BY 4.027 Sept 2026, 19:27open
Sites and Monuments RecordCC BY 4.027 Sept 2026, 19:29open
Special Protection Areas (NPWS)CC BY 4.027 Sept 2026, 19:27open
How we work this out
Applications whose site outline (or map point) falls on this property. 'No sign building has started' means we found no notice to the council's building control office; small jobs don't always file one, so ask. A missing completion certificate is not proof of a problem: an owner can opt out of official sign-off for a house or extension built for themselves.
Sources: Building Control Management System (commencement notices), National Planning Application Database · fetched 1 Nov 2026, 05:02
SourceLicenceFetchedLink
Building Control Management System (commencement notices)CC BY 4.01 Nov 2026, 03:07open
National Planning Application DatabaseCC BY 4.01 Nov 2026, 05:02open
Question 2

Could you extend?

Nothing on this site restricts it: not protected, not in a conservation area.

Figure 2

What happened to applications like yours

Extensions here: 75–100% by type. A new house in a garden is harder: 50% approved, and 1 in 5 is asked for more information.

Single-storey rear17 decided · more info asked 18%
100% · council 92%
Two-storey rear12 decided · more info asked 17%
75% · council 81%
Attic or dormer20 decided · more info asked 40%
95% · council 92%
New house in a garden or site10 decided · more info asked 20%
50% · council 53%
Approved nearbyFingal overall

Decided applications within 1.5 km, received in the last 10 years. The kind of work is read from each description.

CalculatedOur classificationcouncil register via NPAD · 59 nearby, 2,337 council-wide

Figure 3

Evora Park, file by file since 2021

2 of 2 decided extensions on the road were approved.

5 planning files on Evora Park since 2021, by kind and decision.202120222023202420252026Extensions, atticsNo. 45 · 2021 · attic conversion / dormer · approved · F21B/0173No. 7 · 2022 · attic conversion / dormer · approved · F22B/0040Porches, roofs, otherNo. 2 · 2022 · other work · approved · F22A/0707No. 41 · 2024 · other work · approved · F24A/0296No. 6 · 2024 · other work · approved · F24A/0400New house in a side garden
ApprovedRefusedWithdrawn or invalid

5 files with "Evora Park" in the address within 600 m, other roads of the same name left out. Hover a dot for the house number and reference.

MeasuredOur classificationcouncil register via NPAD · 2021–2026

Extensions and refusals right beside you 0 within 250 m · 0 refused within 100 m

Extensions and refusals near you 0 extensions within 250 m · the last 12 months

No home extensions within 250 m in the last 12 months.

Refused within 100 m 0 in the last 12 months

Nothing refused this close in the last 12 months.

    How we work this out
    Home extensions are read from the application's description (extension, attic or dormer, porch, garage conversion, garden room), so a few may be missed or mislabelled. The kind is the first that fits: a dormer with a rear extension counts as a dormer. Refusal reasons come from An Coimisiún Pleanála's inspector reports, so they exist only where the refusal was appealed (Dún Laoghaire-Rathdown so far). The council's own reasons are on its planning file.
    Sources: National Planning Application Database, An Coimisiún Pleanála cases (ArcGIS feed) · fetched 1 Nov 2026, 05:02
    SourceLicenceFetchedLink
    National Planning Application DatabaseCC BY 4.01 Nov 2026, 05:02open
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.030 Oct 2026, 23:01open
    Sources: An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices), National Planning Application Database · fetched 1 Nov 2026, 05:02
    SourceLicenceFetchedLink
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.030 Oct 2026, 23:01open
    Building Control Management System (commencement notices)CC BY 4.01 Nov 2026, 03:07open
    National Planning Application DatabaseCC BY 4.01 Nov 2026, 05:02open
    Question 3

    How long, and what if someone objects?

    Figure 4

    A home extension's journey here

    A decision takes 51 days. 1 in 5 is asked for more information, which adds about 94 days. Building starts about 7 months after permission.

    Comments open: 5 weeks · €20; Council decision: 51 days; If more info asked (1 in 5): 153 days; Appeal window: 4 weeks; If appealed: +163 days; Building starts: 222 days after permission0 mo3 mo6 mo9 mo12 mo15 mo18 moComments openComments close 5 weeks after the application is lodged5 weeks · €20Council decisionDecision: median 51 days, middle half 47–54 (n=89)51 daysIf more info asked (1 in 5)With further information: median 153 days (n=9)153 daysAppeal windowAnyone who commented can appeal within 4 weeks of the decision4 weeksIf appealedAt An Coimisiún Pleanála: median 163 days (n=35, all appeals within 1.5 km)+163 daysBuilding startsStart notice: median 222 days after permission (n=51)222 days after permissionSigned off55% of owners opt out of sign-off

    Bars are medians; whiskers show the middle half. Medians of separate steps don't add up exactly.

    Calculated110 decided home extensions, 53 start notices, 35 decided appeals · within 1.5 km, 10 years · NPAD, BCMS, An Coimisiún Pleanála

    Figure 5

    What appeals changed

    10 of 18 appealed refusals became permissions. 1 of 18 appealed approvals were reversed.

    Refusals appealed18 decided
    10 became permissions
    Approvals appealed18 decided
    1 reversed
    Ended approvedEnded refusedWithdrawn, invalid or other

    Every appeal decided within 1.5 km in 10 years, any kind of development.

    CalculatedAn Coimisiún Pleanála cases linked to the council file

    Appeals nearby 2 in the last 12 months

    None of 1 changed the council's decision

    • 502175 Pending · 3 Main Street, Howth, Co.Dublin (D13X064, D13WP57, and D13K6Y3) · 328 m
    • 500428 Refused · 30 Main Street, Howth, Co. Dublin, D13 P8K7 · 464 m report
    Sources: An Coimisiún Pleanála cases (ArcGIS feed), Courts Service legal diary (judicial reviews), National Planning Application Database · fetched 1 Nov 2026, 05:02
    SourceLicenceFetchedLink
    An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.030 Oct 2026, 23:01open
    Courts Service legal diary (judicial reviews)© the publisher31 Oct 2026, 23:12open
    National Planning Application DatabaseCC BY 4.01 Nov 2026, 05:02open
    Question 4

    What's changing around you?

    Street map around Evora Park with 15 numbered planning items
    ⌖ the houseBuilding site that stoppedApproved, not startedEmpty land zoned for homesNo decision yetApprovedRefused
    1. 16 Balscadden Road, Dublin SHD/009/21Building site that stopped · 422 m
    2. 260 Main Street F22A/0477Approved, no sign building has started · 439 m
    3. 31.3 ha zoned for homesEmpty land zoned for homes · 356 m
    4. 40.2 ha zoned for homesEmpty land zoned for homes · 367 m
    5. 571 Grace O'Malley Road, Howth F26A/0268No decision yet · 183 m
    6. 643 Church Street, Howth F26A/0304EApproved · 208 m
    7. 73A, Harbour Road F26A/0189ENo decision yet · 235 m
    8. 8Ground Floor, Unit 2 F26A/0009Refused · 252 m
    9. 9No. 6 St. Lawrence Terrace, Howth F26A/0851ENo decision yet · 286 m
    10. 102 St Lawrence Road, Howth F25A/1085EApproved · 300 m
    11. 113 Main Street, Howth F26A/0609ERefused · 328 m
    12. 1220 Abbey Street, Howth F25A/1133ERefused · 337 m
    13. 1314 Abbey Street, Howth F26A/0854ENo decision yet · 343 m
    14. 147 Main Street, Howth F26A/0165EApproved · 346 m
    15. 1548 Saint Peter’s Terrace, Howth F26A/0745ENo decision yet · 348 m
    Figure 6

    What happens to applications within 500 m

    Permission isn't building. Of 77 permissions since 2016, 32 show a start notice and 2 have a completion certificate.

    121 applications lodged within 500 m. Council: 77 approved, 20 refused. After appeals: 77 approved. Of those: 2 signed off, 11 built with the owner's opt-out, 19 started, 42 with no start notice found, 3 ran out.LODGEDCOUNCIL DECISIONAFTER APPEALSWHAT HAPPENED NEXT77: lodged → approved20: lodged → refused16: lodged → withdrawn or invalid8: lodged → undecided74: approved → approved17: refused → refused16: withdrawn or invalid → withdrawn8: undecided → undecided1 approved by the council, refused after an appeal2 approved by the council, withdrawn or invalid after an appeal3 refused by the council, approved after an appeal42: approved → no start notice found11: approved → built, owner opted out19: approved → started, not signed off2: approved → signed off3: approved → ran out121 lodged121 lodged77 approved77 approved20 refused20 refused16 withdrawn or invalid16 withdrawn or invalid8 undecided8 undecided77 approved77 approved18 refused18 refused18 withdrawn18 withdrawn8 undecided8 undecided42 no start notice found42 no start notice found11 built, owner opted out11 built, owner opted out19 started, not signed off19 started, not signed off2 signed off2 signed off3 ran out3 ran out

    Purple bands are refusals turned into permissions on appeal. "No start notice found" includes small jobs that never needed one and notices we couldn't match.

    Measured121 applications in 10 years · NPAD, An Coimisiún Pleanála, BCMS start notices and completion certificates

    Figure 7

    The next 30 days

    Nothing closes within 500 m in the next 30 days.

      Measuredcouncil registers and An Coimisiún Pleanála · deadlines worked out from the dates on file

      Figure 8

      Approved, stalled or planned, not built yet

      36 homes 439 m away were approved Aug 2024 with no start notice yet; the permission runs to Aug 2029. 1 building site nearby stopped before sign-off.

      6 Balscadden Road, Dublin · 180 homes: 180 homes, started Sep 2023, never signed off; 60 Main Street · 36 homes: 36 homes approved Aug 2024, not started202320242025202620272028202920306 Balscadden Road, Dublin · 180 homes422 m · SHD/009/21180 homes, started Sep 2023, never signed off180 homes, started Sep 2023, never signed off60 Main Street · 36 homes439 m · F22A/047736 homes approved Aug 2024, not started36 homes approved Aug 2024, not startedtoday

      Each row is a dated fact from a public register: no score and no forecast.

      Measuredcouncil registers, BCMS, derelict sites registers, development plan layers (CC BY 4.0)

      Sites that could change 4 within 500 m

      Building site that stopped 1

      Approved, not started 1

      Empty land zoned for homes 2

      • 31.3 ha zoned for homes · no homes built on it yet · 356 m
      • 40.2 ha zoned for homes · no homes built on it yet · 367 m
      Sources: An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices), Derelict sites registers, Council meetings (ModernGov), National Planning Application Database, Residential Zoned Land Tax maps · fetched 1 Nov 2026, 05:02
      SourceLicenceFetchedLink
      An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.030 Oct 2026, 23:01open
      Building Control Management System (commencement notices)CC BY 4.01 Nov 2026, 03:07open
      Derelict sites registersCC BY 4.026 Oct 2026, 23:09open
      Council meetings (ModernGov)Public1 Nov 2026, 02:24open
      National Planning Application DatabaseCC BY 4.01 Nov 2026, 05:02open
      Residential Zoned Land Tax mapsCC BY 4.025 Oct 2026, 23:43open
      Figure 9

      Applications within 500 m, by year

      Between 16 and 24 a year; busiest 2024. 79% of decisions were approvals.

      2021: 24, 2022: 21, 2023: 16, 2024: 24, 2025: 19, 2026: 1701020302021: 17 approved2021: 3 refused2021: 4 withdrawn or invalid24’21*2022: 18 approved2022: 3 refused21’222023: 13 approved2023: 2 refused2023: 1 withdrawn or invalid16’232024: 11 approved2024: 7 refused2024: 6 withdrawn or invalid24’242025: 14 approved2025: 2 refused2025: 3 withdrawn or invalid19’252026: 4 approved2026: 3 refused2026: 2 withdrawn or invalid2026: 8 undecided17’26*
      ApprovedRefusedWithdrawn or invalidUndecided

      2021 and 2026 are part years (*). Exemption requests and time extensions are left out.

      Measuredcouncil register via NPAD

      Every application within 500 m 20 in the last 12 months

      See every application on the map

      How we work this out
      Descriptions are shortened by the national planning database (to 80 characters in Dún Laoghaire-Rathdown, 70 in Fingal), and it does not publish applicants' names.
      Sources: National Planning Application Database, An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices) · fetched 1 Nov 2026, 05:02
      SourceLicenceFetchedLink
      National Planning Application DatabaseCC BY 4.01 Nov 2026, 05:02open
      An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.030 Oct 2026, 23:01open
      Building Control Management System (commencement notices)CC BY 4.01 Nov 2026, 03:07open
      Building work nearby 9 in the last 12 months
      3 not signed off6 no sign-off needed
      • Sushida - Block D, Claremont, Howth Road, Howth, Co. Dublin, Dublin · 4 Aug 2026 · 7-day notice not signed off · F26A/0312E · 438 m
      • 5 The Haggard, Dublin, D13 K658 · 17 Jul 2026 · 1 homes · short notice no sign-off needed · F24A/0192 · 466 m
      • 7 Main Street, Dublin, D13 X0P2 · 2 Jul 2026 · 1 homes · 7-day notice not signed off · 374 m
      • 16A West Pier, Howth Fishery Harbour,Howth, Dublin 13, Fingal, D13 V2K8 · 21 May 2026 · 7-day notice not signed off · F24A/0522 · 353 m
      • 46 Grace O'Malley Drive, Dublin, Fingal, D13 CX46 · 5 May 2026 · short notice no sign-off needed · F25A/0701E · 404 m
      • 47 Evora Crescent, Howth, Dublin, Fingal, D13 TY30 · 15 Apr 2026 · start notice, opted out no sign-off needed · F25A/0738E · 98 m
      • 15 Grace O'Malley Drive, Dublin, Fingal, D13 F292 · 2 Mar 2026 · start notice, opted out no sign-off needed · F25A/0246E · 230 m
      • 21 Grace O'Malley Road, Dublin, Fingal, D13 YT95 · 2 Feb 2026 · 1 homes · start notice, opted out no sign-off needed · F24A/1032E · 173 m
      • Dunbo Hill, Dublin, Fingal, D13DX54 · 6 Jan 2026 · 1 homes · start notice, opted out no sign-off needed · F25A/0030 · 117 m
      How we work this out
      Each row is a notice the builder sent to the council's building control office before work started. One notice can cover many homes. 'Signed off as finished' means a completion certificate is on file; work done under an opt-out or a short notice doesn't need one.
      Source: Building Control Management System (commencement notices) · fetched 1 Nov 2026, 03:07
      SourceLicenceFetchedLink
      Building Control Management System (commencement notices)CC BY 4.01 Nov 2026, 03:07open
      Homes coming 36 not started
      How we work this out
      Schemes of 10 or more homes approved since 2021, from the council and An Coimisiún Pleanála registers. 'Building started' means the builder told the council's building control office that work was starting (a commencement notice).
      Sources: An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices), National Planning Application Database, Social housing construction status report · fetched 1 Nov 2026, 05:02
      SourceLicenceFetchedLink
      An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.030 Oct 2026, 23:01open
      Building Control Management System (commencement notices)CC BY 4.01 Nov 2026, 03:07open
      National Planning Application DatabaseCC BY 4.01 Nov 2026, 05:02open
      Social housing construction status reportCC BY-SA 4.023 Oct 2026, 23:02open
      Named places nearby: estate, schemes, crèches, schools

      Named places estate, developments, inspections

      Developments within 1.0 km

      SchemeHomesProgressDistance
      Balscadden Road——362 m
      Howth Road512512 built (2025-Q4)391 m
      60 Main Street3636 not started (2026-Q2)412 m
      Deer Park162—659 m
      Lands Adjoining Howth Demesne Deer Park Howth——681 m
      Graymount3232 being built (2026-Q2)950 m

      Who applies most nearby

      • Honey & Hope Ltd — 2 applications, latest 18 Sept 2026
      • Cleveland Estates Limited — 2 applications, latest 10 Jul 2026
      • Kim & Di Limited t/a SUSHIDA — 2 applications, latest 20 Apr 2026
      • Little Team Creche Ltd — 2 applications, latest 12 Jan 2026
      How we work this out
      Organisations only: a person named on an application is never listed. Inspection dates and links are the publisher's; read their report for the findings.
      Sources: Dublin housing delivery pipeline, National Planning Application Database, Applicant organisations (from the CRO), Department of Education school list · fetched 1 Nov 2026, 05:02
      SourceLicenceFetchedLink
      Dublin housing delivery pipelineCC BY 4.026 Oct 2026, 23:00open
      National Planning Application DatabaseCC BY 4.01 Nov 2026, 05:02open
      Applicant organisations (from the CRO)Derived by Planning Register25 Oct 2026, 23:01—
      Department of Education school listCC BY 4.027 Oct 2026, 23:04open
      How busy is this area Busier than most of Fingal County Council.
      Homes approved
      Here36
      Council middle0
      Homes started
      Here206
      Council middle4
      How we work this out
      Homes approved counts schemes of 10 or more homes (one-off houses are not included). Homes started counts every home in a notice that building work was starting. The council figure is the middle value across the council's built-up squares of the same area (3.1 km², about a 1 km circle), so half of them saw more and half fewer.
      Sources: An Coimisiún Pleanála cases (ArcGIS feed), Building Control Management System (commencement notices), National Planning Application Database · fetched 1 Nov 2026, 05:02
      SourceLicenceFetchedLink
      An Coimisiún Pleanála cases (ArcGIS feed)CC BY 4.030 Oct 2026, 23:01open
      Building Control Management System (commencement notices)CC BY 4.01 Nov 2026, 03:07open
      National Planning Application DatabaseCC BY 4.01 Nov 2026, 05:02open
      Question 5

      What's the area like?

      Figure 10

      This street block against the council

      29% of homes built before 1971 (council 11%). 84% owner-occupied (council 67%).

      Homes built before 1971
      29% · council 11%
      Homes built since 2001
      10% · council 43%
      Owner-occupied
      84% · council 67%
      Rented
      13% · council 28%
      Children under 15
      21% · council 22%
      Aged 65 and over
      26% · council 11%
      Households with 2+ cars
      34% · council 42%
      Work mainly from home
      17% · council 12%
      This small area (311 people)Fingal

      MeasuredCSO Census 2022, Small Area Population Statistics (CC BY 4.0) · small area 267095015

      Bus
      157 m
      Howth Harbour · 6, H3 · busiest stop within 500 m: 4 an hour at peak
      Radon
      1 in 20
      homes here likely high (EPA). Test it
      Nearest school
      286 m
      Scoil Mhuire Mxd, 349 pupils
      Homes sold nearby
      24
      in 3 years (Property Price Register)
      Schools, stops and the council

      Schools

      • Scoil Mhuire Mxd · primary · 349 pupils · 286 m

      Stops 15

      • Howth Harbour · 6, H3 · 4/hour at peak · 157 m
      • Howth Harbour · 6, H3 · 3/hour at peak · 184 m
      • Howth Station · 6, H3 · 3/hour at peak · 290 m
      • Howth Abbey · 6, H3 · 3/hour at peak · 300 m
      • Howth Station · 6, H3 · 2/hour at peak · 325 m
      • Howth · DART · 3/hour at peak · 339 m
      • Main Street Howth · 6, H3 · 3/hour at peak · 353 m
      • Main Street Howth · 6, H3 · 3/hour at peak · 374 m

      Schools growing or shrinking planning in 3 years · pupils last year

      • Scoil Mhuire Mxd · 286 m-3.6% pupils (349)

      Council meetings 30 items

      Public land

      • Fingal County Council · 0.48 ha · 105 m
      • Fingal County Council · 0.21 ha · 111 m
      • Fingal County Council · 0.28 ha · 280 m
      • Fingal County Council · 0.23 ha · 311 m
      • Fingal County Council · 0.15 ha · 312 m
      • Fingal County Council · 0.2 ha · 312 m
      Sources: Public transport stops and routes (NTA GTFS), Department of Education school list, National Planning Application Database, Council consultation portals, Council meetings (ModernGov), Land Development Agency public land register, cso_saps_2022, National Transport Authority, Fingal County Council and Dún Laoghaire-Rathdown County Council development plan layers (CC BY 4.0), dartplus.ie project extents over NTA GTFS rail shapes (CC BY 4.0), EPA strategic noise maps, Fingal County Council · fetched 1 Nov 2026, 05:02
      SourceLicenceFetchedLink
      Public transport stops and routes (NTA GTFS)CC BY 4.025 Oct 2026, 23:02open
      Department of Education school listCC BY 4.027 Oct 2026, 23:04open
      National Planning Application DatabaseCC BY 4.01 Nov 2026, 05:02open
      Council consultation portalsPublic1 Nov 2026, 01:08open
      Council meetings (ModernGov)Public1 Nov 2026, 02:24open
      Land Development Agency public land registerCC BY 4.011 Sept 2026, 16:43open
      cso_saps_2022CC BY 4.0—open
      National Transport AuthorityCC BY 4.0——
      Fingal County Council and Dún Laoghaire-Rathdown County Council development plan layers (CC BY 4.0)CC BY 4.0——
      dartplus.ie project extents over NTA GTFS rail shapes (CC BY 4.0)CC BY 4.0——
      EPA strategic noise mapsCC BY 4.0——
      Fingal County CouncilCC BY 4.0——
      Question 6

      What to ask, and who

      1. Any work done without planning permission?
        Ask for: An opinion of compliance for the whole house.
        Seller · solicitor
      Reference

      Where this is, the terms, the sources

      Townland
      Howth
      Electoral division
      Howth
      Electoral area
      Howth-Malahide
      Council
      Fingal County Council
      Everything we found, as a list 8 lines
      • Zoned R2 (existing residential); not protected; no vacant land tax.
      • 4 sites nearby could change: 1 stalled build, 1 approved scheme, 2 empty zoned plots.
      • 36 homes approved nearby, not started; largest 36 at 60 Main Street.
      • Howth Harbour (bus 6, H3) 157 m away: 4 an hour at morning peak; 32 from all stops within 500 m.
      • Inside Dublin Airport Noise Zone D.
      • Here (2022 census): 84% owner-occupied (council 67%); 11% of homes empty (council 5%); most built 1971–1980; 41% drive to work (council 52%); population up 1% since 2016.
      • Around here the council decides in a median 55 days (about 8 weeks); 1 in 3 is asked for more information.
      • Homes started within 1 km: 9 in the last year, 1,728 three years before.
      What the terms mean 8 terms
      • Vacant land tax (Residential Zoned Land Tax (RZLT)): A yearly tax of 3% of the land's value on land that is zoned for homes and serviced but left unbuilt.
      • Building started (Commencement notice (BCMS)): The builder must tell the council's building control office 14 to 28 days before work starts.
      • Signed off as finished (Certificate of Compliance on Completion): A certificate filed when a building is finished, confirming it meets the building regulations.
      • Approved (Grant of permission): The council said yes, usually with conditions.
      • Conservation area (Architectural Conservation Area (ACA)): A street or area whose character is protected.
      • Appeal (Appeal to An Coimisiún Pleanála): The applicant, or anyone who commented in time, can appeal the council's decision within four weeks.
      • What the land is zoned for (Zoning objective): The council's development plan sets what each area is for: homes, shops, open space and so on.
      • Building site that stopped (Commenced, no completion certificate): A housing build that told the council it was starting at least three years ago, passed its own planned finish date, and has never been signed off as finished.
      Sources and licences 35
      SourcePublisherLicenceFetched
      EPA strategic noise maps—CC BY 4.0—
      Fingal County Council—CC BY 4.0—
      Fingal County Council and Dún Laoghaire-Rathdown County Council development plan layers (CC BY 4.0)—CC BY 4.0—
      National Transport Authority—CC BY 4.0—
      services-eu1.arcgis.comAn Coimisiún PleanálaCC BY 4.030 Oct 2026
      data.nbco.gov.ieNational Building Control Office (BCMS)CC BY 4.01 Nov 2026
      data.gov.ieVarious (see each layer)CC BY 4.0, CC BY-NC-ND 4.027 Sept 2026
      services.arcgis.comLocal authorities (ACAs)CC BY 4.027 Sept 2026
      gis.epa.ieEnvironmental Protection AgencyCC BY 4.027 Sept 2026
      services-eu1.arcgis.comNational Parks and Wildlife ServiceCC BY 4.027 Sept 2026
      services-eu1.arcgis.comNational Inventory of Architectural HeritageCC BY 4.027 Sept 2026
      gis.epa.ieEnvironmental Protection AgencyCC BY 4.027 Sept 2026
      services.arcgis.comLocal authorities (Record of Protected Structures)CC BY 4.027 Sept 2026
      services-eu1.arcgis.comNational Parks and Wildlife ServiceCC BY 4.027 Sept 2026
      services-eu1.arcgis.comNational Monuments Service (SMR)CC BY 4.027 Sept 2026
      services-eu1.arcgis.comNational Parks and Wildlife ServiceCC BY 4.027 Sept 2026
      dlrcoco.citizenspace.comLocal authorities (consultation portals)Public1 Nov 2026
      www2.courts.ie—© the publisher31 Oct 2026
      cso.ie—CC BY 4.0—
      dartplus.ie project extents over NTA GTFS rail shapes (CC BY 4.0)—CC BY 4.0—
      services-eu1.arcgis.comLocal authorities (derelict sites registers)CC BY 4.026 Oct 2026
      services.arcgis.comDublin local authorities (housing delivery pipeline)CC BY 4.026 Oct 2026
      esbnetworks.ie—© the publisher · flag only11 Sept 2026
      transportforireland.ieNational Transport AuthorityCC BY 4.025 Oct 2026
      lda.ieLand Development AgencyCC BY 4.011 Sept 2026
      meetings.fingal.ieLocal authorities (council meetings)Public1 Nov 2026
      services.arcgis.comDepartment of Housing (National Planning Application Database)CC BY 4.01 Nov 2026
      organisationsPlanning Register (derived from applications and the CRO register)Derived by Planning Register25 Oct 2026
      services-eu1.arcgis.comTailte ÉireannCC BY 4.011 Sept 2026
      services-eu1.arcgis.comCSO, Tailte Éireann, OpenStreetMap contributorsCC BY 4.04 Oct 2026
      propertypriceregister.ieProperty Services Regulatory Authority (PPR)© PSRA, PSI licence1 Nov 2026
      services.arcgis.comLocal authorities (RZLT maps)CC BY 4.025 Oct 2026
      gov.ieDepartment of EducationCC BY 4.027 Oct 2026
      gov.ieDepartment of HousingCC BY-SA 4.023 Oct 2026
      services.arcgis.comLocal authorities via the Department of Housing (GZT / MyPlan)CC BY 4.025 Oct 2026
      Measured
      counted from a public register
      Calculated
      a rate or median we worked out from those counts
      Our classification
      we sorted it by reading each description
      Estimate
      inferred from another source (census, map data)
      Rule summary
      the law, simplified: check before relying on it
      How we work this out
      Generated 1 Nov 2026, 06:09 from the Planning Register store; nothing was fetched live. Not a legal search: the council's planning file is the record. Deadlines come from published dates under the Planning and Development Act 2000: confirm with the council before relying on them. Street map © OpenStreetMap contributors; building outlines © Overture Maps Foundation. The text version carries every figure with its source, for an AI assistant.